HomeMy WebLinkAboutBLOWER DOOR TEST CERTIFICATEti � l� lQoO� or y3
Envelope Leakage Test Report (Blower Door
Test)
Residential Prescriptive, Performance or ERI Method Compliance
7f117 rinrir"la Ri• ilrlina rndo Enerav r'nncnruatinn F_.th Errllitinn
Permit # SCANNED
Jurisdiction.
t Lucie County
BY
Job Information St. Lucie County
Builder: Black
Street Enterprise
Lot:
AdAr S: 150 CCICSti_ C ^it:
City: Port St Lucie State: Florida Zip: 34983
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method
PRESCRIPFI VE METHOD" The building or dwelling units hal I be tested and verified as having an air tea kage rate of not exceeding 7 air changes
per hour -at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2.
PERFORMANCE or ERI METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or R406-2017 (ERI), section labeled as Infiltration, sub -section ACH.
ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI):
Method for calculating buildinavolume:
CFM(50) Building Volume ACH(50) �1 Retrieved from architectural plans
®PASS ❑FAIL Code software calculated
a When CH(50) is less than 3, Mechanical Ventilation installation Field measured and calculated
must be verified by building department.
Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure or 0.2 inche w.g. (50 Pascals). Testing
shall be conducted by either individuals as defined In Section 553.993(5) or (7), Florida Statues or individuals licensed as set
4o9:iui�sj(fb forth in Section
(g); or (i) or an approved third party. A written report of the results of the test shall be signed bythe party conducting the test and provided to
the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
I.Exterlor windows and doors, fireplace and stave doors shall be closed, but not sealed, beyond the intended weatherstripping or other
infiltration control measures.'
2.Dampers including exhaust; intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond Intended infiltration control
measures.
3.1nteriar doors, if installed at the time of the test, shall be open.
4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
S.Heating and cooling systems, if installed at the time of the test, shall be turned off,
6.Supply and return registers, if installed at the time of the test, shall be fully open. '
Testing Company
Company Names Kuebler Mechanical LLC. phone: 772-878-2281
1 hereby verify that the above Air Leakage results are accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements according to the com ' nce method selected above.
Signature of Tester: Date of Test: R 2-y 2C z O
Printed Name of Tester: Daniel Lipp
License/Certification #: CAC058105 Issuing Authority: Retrotec