Loading...
HomeMy WebLinkAboutREQUIREMENT COMPLIANCE - POOL - SPA - HOT TUBt� PLANNING &IEVELOPMENT SERVICES DEPAOMENT Building and Code Regulations Division 2300 VIRGINIA AVE SCANNED FORT PIERCE, FL 34982 Y V!at' (772) 462-1553 St. Lucie County AFFIDAVIT OF REQUIREMENT COMPLIANCE Residential Swimming Pools, Spa, and Hot Tub Safety Act RECEIVED PERMIT H MAY 0 9 pig [ (We) acknowledge t t a ne}� s rmming po , spa, or hottqb will be constructed or installed IatST• Lucie County, Permitting tL0 tr "\ ''X—i�. ��9and hereby affirm that one of the following methods (Please print street address) will be used to meet the requirements of Chapter 515, Florida Statutes: (Please initial the method used for pool.) f/ The pool will be isolated from access to the home by an enclosure that meets the pool barrier requirements of Florida Statute 515.29. ' The pop I -will be equipped with an approved safety pool cover that complies with ASTM FI 246-91 (Standard Performance Specifications for $af€ty Covers for Swimming Pools, Spas, and Hot Tubs). All doors and windows providing direct access from the home to the pool will be equipped with an exit alarm that has a minimum sound pressure rating of 85decibels at 10 feet. ✓_ All doors providing direct access from the home to the pool will be equipped with self closing, self latching devices with release mechanisms placed no lower than 54 inches above the floor or deck. Swimming pool alarm placed in pool meeting ASTM F2208 I understand that not having one of the above installed at the time of final inspection, or when the pool is completed for contract purposes, will constitute a violation of Chapter 515, F.S., and will be considered as committing a misdemeanor of the second degree, punishable by fines up to $50D.00 and/or up to 60 days in jail as established in chapter 775, F.S. 1 understand that the St. Lucie County Building Inspections Department assumes no liability for the final inspection of one of the above protective devices, or the lack of maintenance, or the removal of such after the swimming pool has been finalized. I, the contractor, agree to truct the owner of the proper use and maintenance of such safety device. q�� C N OR SIGN UR OWNER SIGNATURE STATE OF FLORIDA, COUNTY OFSN. NOTARY PUBLIC The foregoing instrument was acknowledged before me this `�'\ day ofW�6.1 20�1 STATE OF FLORIDA, COUNTY OF NOTARY PUBLIC The foregoing instrument was acknowledged before me this day of , 20 by ha64All d ''at 5by Personally Known or Produced Identification II%LA t_ Type of Identification Produced: NVS ^',%"-'" My COMIASSION 11 GG 022023 `` •; '�`- EXPIRES: December 16, 2020 SLCPDS 2vi5 N2019Z nnn Notarl Public Onderiaitars Personally Known or Produced Identification Type of Identification produced: Planning & Development Services Department Residential Pool Permit Checklist When applying for a residential pool permit use the following checklist. Building Permit 1 A completely filled out building permit application'shall be Application submitted, including all required information. The application shall be signed by the applicant(s) and the signatures shall be notarized. If the applicant is the contractor/qualifier, the application requires 2 signatures. - Notice of Commencement 1 A recorded Notice of Commencement for all construction with a value exceeding $2,500 shall be submitted prior to first inspection. Construction Plans 2 sets All proposed construction must be accurately shown on the plans including but not limited to electrical wiring, plumbing, and pool equipment detail. Both sets of plans shall be signed and sealed by a Florida registered engineer. Plot Plans/Surveys 2 2 Scaled Plots Plans with all dimensions of pool and deck area. Include location of pool equipment. Show setbacks of the pool/deck to all property lines and location of all existing structures. Form -board survey shall be required for poured concrete decks. Final survey shall be required for paver decks. Vegetation Removal Permit 1 A completely filled out vegetation removal application must be submitted with the building permit application. Please include one (1) survey or site plan, for review by the Environmental Resource Department. A specific plan for tree removal and preservation is required if applicable. ' Subcontractor Agreement 1 each One subcontractor agreement with original signature is required for each subcontractor on the job. The building permit cannot be issued until it has been determined that all subcontractors are properly licensed and registered. The use of unlicensed contractors is strictly prohibited. Filled Land Affidavit 1 This form is required for all construction, except for interior renovation. It shall bear the original notarized signature of the property owner. This affidavit serves to notify the property owner of their responsibility not to adversely impact their neighbor's properties with stornwater drainage and runoff. Pool Alarm Affidavit 1 Indicate the type of barrier/alarm. Shall be signed by property owner and notarized. ****An Application for a Pool Permit shall not be accepted without a Pool Enclosure permit application and plans or a fence permit, (or proof of existing fence enclosing proposed pool area). Revised 3/1&7011