HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATE09/06/2019 08:40 UN
-"0772 56910M P.0011001
Sr
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Port Pierce, FL 34982
772-482-2272 Fax 772-462-6443
SCANNED
BY
St. Lucie County
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: 1105 140D ADDK
S: 0g,3I YeAdale xj
13UUILDER/CONTRACTOR: ,�,��,„ Ic SYSA
PEST CONTROL CONTRACTOR: EVICT-ABUQ TERMRE& PEST CONTROL. INC.
PEST CONTROL LICENSE #•:-.e17a77e.
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: .2001'
Percentage of solution:.00%
Date of Treatment: 12D79
_Footing
1e Treatment
--Re-Treat
Driveway
io Treatment
:her
Re- Lt G�
Treatment
__Jte-Treat
Chemicals used: DOMINION 2L
Total gallons used: ' 20
Time of Treatment: if 10 0
Slab
1# Treatment
_._,_.Re Treat
Pools
A 111 Treatment
Re -Treat
r0000c rimeter far Final Inspection
nature of Dcterminator
Note. Them mustbe a completed form for each required &w mentorm-heatmentand this form mustbe on the jab
site to be pk:ted up by the lnspedorat time of each Inspecdan or the sdtec'u/ed Inspector, wl//fall and a ffl41Wwff0n
fee ahaiged.
FOC104.2.6 CerM ate ofprptectNe 77eabnent for prevention of temm/les. A weather res/stantjobs/ta pasting board
shall be provided to receive dupkate neabnent Cartif/catea as eadm mequ/red prot&&e beabnWt 15 C0410ted,
providing a copy for bye person the pennitIs Issued to and another Dopy for the bulld/rrg pemm/tiiles The 77eahnent
Cerb'Bcate shall provide the produd used, Identity of the appllcatar, time and date of Me breatme.7t site location, area
heated, chetniml used, percentCOnosnbatfon and number ofgalbons used, to establish a vem0b/e record of
pmteWW heahrrent. rthe soil chemical barrier nletlrod for termite pfeventlon is used, Anal exterior he OPL-nts/rall
be completed prior to Anal building approval.
St Lucie County requires for the final Inspection for CO, a Permanent Sticker to be placed an
the electrical panel box cover, listing all the treatments and dates of applications.
7/24/2014