Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 tERI IFICATE ADF TER�Ii� I E TREATMENT CONSTRUCTION SOIL TREATMENT [ �Ib .-oZ51c� 0 SCANNED BY St. Lucie County PERMIT # :l g D 5- O a 9 D JOB ADDRESS: S I CISCt f� 1Z CONTRACTOR: _( r- LICENSE #: 7-9 BUILDER/CONTRACTOR: PEST CONTROL PEST CONTROL We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean.termites-.in-.accordance_with.thestandards of-the.National-Pest-Control.Association. Square feet if area treated: 3 O Percentage of solution: 0, LU Date- of Treatment: 2, ✓ Footing IS` Treatment Re -Treat Driveway 15` Treatment Re -Treat Other 1'` Treatment Re -Treat J Chemicals used: CroSS CA ecK Total gallons used: Time of Treatment: Z 2 Slab iu Treatment Re -Treat Pools 15` Treatment Re -Treat Perimeter for Final Inspection Signature of Exterminator Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be piovidedto receive duplicate Treatment Cerrtiiicates as -each required proiectMe treatinentis completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatmentshall be completed prior to final buildng approval. St. Lucie County requiresfor thefinat inspection for CCU a Permanent. Stickertobe placed on the electrical panel box cover, listing all the treatments and dates of applications.