Loading...
HomeMy WebLinkAboutGAS PIPING SCHEMATICBOARD OF COUNTY COMMISSIONERS PLANNING & DEVELOPMENT SERVICES DEPARTMENT Building and Code Regulation Division GAS PIPING SCHEMATIC TANK SIZE: S D D GALS. APPLICANCE — TYPE/SIZE q Al Cnf l �� r d 0 D I D BTU A2 BTU A3 A4 A5 A6 PIPING LENGTH & SIZE L1FT. g�_INCH DIA. L2 FT. 3j�-S__INCH DIA. L3 FT. INCH DIA. L4 FT. INCH DIA. L5 FT. L6 FT. L7 FT. L8 FT. L9 FT. L10 FT. L11 FT. L12 FT. Revised 7/22/14 INCH DIA. INCH DIA. INCH DIA. INCH DIA. INCH DIA. INCH DIA. INCH DIA. INCH DIA. BTU (PIPE SIZE WAS TAKEN FROM THE 2014 FBC FUEL GAS CODE - TABLE 402 (_�) Website: www.stludeco.aov 2300 Virginia Avenue - Fort Pierce, FL. 34982-5852 Phone (772) 462-1553 FAX (772) 462-1578 SCANNED BY St. Lucie Countv BOARD OF COUNTY COMMISSIONERS GAS PIPING SCHEMATIC TANK SIZE: SD l7 GALS. APPLICANCE - TYPE/SIZE D Al Cnf�v vti Fti�f i BTU A2 BTU A3 BTU A4 BTU A5 BTU A6 BTU PIPING LENGTH & SIZE L1FT. �INCH DIA. L2 FT. 3�_INCH DIA. L3 FT. INCH DIA. L4 FT. INCH DIA. L5 FT. INCH DIA. L6 FT. INCH DIA. L7 FT. INCH DIA. L8 FT. INCH DIA. L9 FT. INCH DIA. L10 FT. INCH DIA. L11 FT. INCH DIA. L12 FT. INCH DIA. Revised 7/22/14 PLANNING & DEVELOPMENT SERVICES DEPARTMENT Building and Code Regulation Division (PIPE SIZE WAS TAKEN FROM THE 2014 FBC FUEL GAS CODE - TABLE 402 (_ J) Website: www.stlucieco.gov 2300 Virginia Avenue - Fart Pierce, FL. 34982-5652 Phone (772) 462-1553 FAX (772) 462-1578 Application Materials Ideal for use as a first stage regulator on any domestic size ASME or DOT container in propane gas installations requiring up to 1,500,000 BTU's per hour. The regulator is factory set to reduce container pressure to an intermediate pressure of approximately 10 PSIG. Features Compact design can be connected to a service valve using either a POL adapter or a RegO product pigtail. Large threaded a/a F.NPT bonnet vent can easily be piped -away underground installations without the need of glue (tits or extra adapters. Non Adjustable Large flow orifice resists freeze ups due to water concentration In LPG vapor. Design provides for good flow regulation at both high and law container pressures. Built in relief valve and travel stop comply with NFPA 58 over pressure requirements. Incorporates +/a" RNPT downstream pressure tap for an easy inline check of the regulator's delivery pressure. Molded diaphragm provides an o-ring type seal between the body and bonnet. Body and bonnet are assembled in the USA using the unique, patented RegUlok seal system. Fully painted In brilliant red for complete corrosion protection Mounting bracket available as an accessory: part number 230231 Ordering Information 1W RNPT I Y: RNPT Body........................................................................................... _._ Zinc. Bonnet......................................................................................... Spring........................................................................................ Steel Seat Disc..................................................................Resilient Rubber Diaphragm ............................ Integrated Fabric and Synthetic Rubber a N mew %= naom +tmpoo fsso,mo Aea FLOW PROPANE y,," 1 10 PSIG 1,500.000 r.varve,n.� Madmum flow based on inlet pressure 20 PSIG higher Dvm Ne regWator segNg and tlabvery pressure 20%lower Nan the regul�setW,g end tlerrvery pressure 20% lower Nan the selling. A14 100 Rego Dr. P.D. Box 247 Mn- NC 27244 USA w.vwregopmtlucts.wm rhrre (336) 419-77D7 Fax (336) 9436594 J!w O Designed to reduce first stage pressure of 5 to 20 PSIG down to bumer pressure, normally 11" w.c. Ideal for medium commercial installations, multiple cylinder installations and normal domestic loads. Large vent helps prevent blockage and has %" F.NPT for vent piping. With 15 PSIG inlet pressure, regulator is designed to not pass more than 2 PSIG with the seat disc removed. • Incorporates Integral relief valves. Replaceable valve orifice and valve seat disc. ,Straight line valve closure reduces wear on seat disc. Unique bonnet vent profile minimizes vent freeze over when property installed. Large molded diaphragm is extra sensitive to pressure changes. Built in pressure tap has plugged 1/8" F.NPT outlet. Plug can be removed with a 3/16" hex allen wrench. Select brown finish. aax ma3uvsE�i�a Mounts directly to house line piping. Eliminates need for union Joints, elbows, and mounting brackets. Quick and easy to Install. • Backmouot design ^ Maximum OM based on 10 PSIG 'let and 9• w.c. delivery pressure. Die cast Zinc Body ........................................................................... ............. Die Cast Zinc t Bonnet....................................................................................... Brass NozzleOrifice ....................6.............................. ......:. Steel Resilient Rubber Valve Seat Disc ........................................................ Integrated Fabric and Synthetic Rubber. Diaphragm ........................... LISTED LV44O78fleclec Mj w'S 1oo Rego Oc P.O. Box 247 Eton. NC 27244 USA w.vx.regoproducts.00m PMna (336) 449-TT07 Fax (336) 449-6594 REGQ. W a � 1 N hNOln t•1 maw 00 O SIN q `; mf [+1NNl`1 NN�b^ V i c ':a h S rvf mN ..Qa .Gam r S bF FTb•--�Q OIN �O m'.O m In Y1 OI �bQl�rn b.r nQ m n �r1 OTa�--.� OobON�m car} W m V.�-� W [b�l�m�p oIpQNO aT O IObIG Yl Y]Q�r� e{ mm mT N N Q eN.eo.-. vaa.a r '� �a ly •��F � Fti�N".1`pe1�' _ amn �n�T C aG lh0 eI(l Vo' c f1 vrCmI mv�piQ.'Q+.n�y•�.m.^O bawn N N N C I N �� .L' H � ti � N r N a � blmifhmS vh1 n NFCC'1 � �N? ? V oT0 `�{�{��1 Nc�1N O V�i �tb�nel1 N�1 w�]] 4�pp'] O OQO q N1 0 ~•'I � CI 1'T'1 Gmt rn F Q� R.F tN+f NN�m+n-.ba ..ha���:-� .a 1Y 4y P i c 6 m b.O Q 1il G1 m Ir. F m �F� mar � b Nam vNi.b b hbF Nn Nm.OaOi Q. �bN F M a} a •pl Nan vmjl��� oQ0 n nbb vl V � Vtbmh oT0 b � mFOF N ti ti T b ap •--i .a � l 11 � F mvl�opa QOmoN N OI \O V' N m �ry� ehit orn0 b \O 4l VNt 7 V � N ayyt •E1 2 ••• o 3� Vlb� Y� wT0 C! V�1 "•� "" ^ ^ N� n �1 N N N OY�1C hp 0000 p O O d yN � u� R T T V a'1' h 1O F m OI O V 1 O El u %1 +im ■ Corrugated stainless steel tubing (CSST) gas piping systems will be bonded in accordance with Section G2411.1(310) of theFlorida Building Code and NFPA 54. ■ Underground gas piping will be installed at a minimum depth of 12 inches below grade in accordance with Section G2415.12 (404.12) of the Florida Building Code and NFPA 58. ■ Polyethylene pipe will be installed in accordance with 6.11.4 of NFPA 58 and the Florida Building Code. ■ Carbon monoxide monitors will be installed prior to inspection and will meet all code and safety requirements of NFPA 54 and the Florida Building Code. Quality Steel Corporation AG/UG Propane , anks -+I LE, WICT4 r 14Z-n 19. A:JD LIP APPROXIMATE ABOVEGROUND/UNDEGROUND(AG/UG) VESSEL DIMENSIONS AND SPECIFICATIONS WATER CAPACITY DIAMETER (OD) HEAD TYPE OVERALL LENGTH OVERALL HEIGHT , LEG* WIDTH LEG** SPACING WEIGHT (Ibs.) **QUANTITY FULLLoaD PERSTACK * 120 wg. 24 � Ellip. 1_ 1 5 8 3 V- , 1 11/2 2'-101/2" or 3'•11" 260 108 196 16 (12 *250 wg. 30" Hemi. 7'-10" 3'-8" V-5" 4'41" 480 54 9 *320 wg. 30" Hemi. 9'-7" 3'4" 1'-5" 5' 620 45 9 =p �4371/2" Hemi. 10' 4'-2" V-8" 1 5' 1 950 1 37130 81 6 1000wg. 41" Hemi. 16' 4'-5" 1'-8" 10'2" 1 1,800 17115 1 615 1450 wg. 46 1/2" Ellip. 17'-4" 4'-11" V-9" 1 11'17" 1 2,650 12 1 4 1990 wg. 46 1/2" Ellip. 23'-11" 4'-11" 1'-9" 1 16' 1 3,520 8 1 4 Dimensions and specifications shown are approximate. Individual vessels may vary. -Leg spacing t/-2". Leg widths and spacing may vary based on mfg.location. Check with your salesperson for details. 120,250, 320 wg. standard tanks -no holes in legs (one renter hole an request). Soo and 1000 wg. standard tanks-2 holes 16°'on center. 1450 wg. and up as shown above. '-Full load and stack quantities vary by shipping location. Check with your salesperson for details. General Specifications - Conforms to the latest edition of ASME Rules for Construction of Pressure Vessels, Section VIII, Division 1. Complies with NFPA 58. Rated at 250 psig from -20° F to 125' F. All vessels registered with National Board. Two serviceoptionsavailable: Option 1: Ready -to -bury underground option, coated with either powder coated phenolic epoxy finish or liquid applied epoxy primer coat followed by urethane top coat, supplied with composite AG/UG dome. Option 2: Aboveground option, coated with either powder coated TGIC polyester finish or liquid applied epoxy primer coat followed by urethane topcoat, supplied with steel AG/UG dome. All vessels are shipped vacuum pre -purged to enable simplified first fill of the vessel. Updated June 30,2015 VLV. CABLE W/ CLAMPS TO (PULLED ANCHOR STRAP CLAMPS TO (PULLED - UNDERGROUND .TANK HOLD DOWN DETAIL I GENERAL NOTES: 1. HELICAL ANCHORS SHALL HAVE AN ALLOWABLE PULL—DUT CAPACITY AS SHOWN NElQ,F. ANCHORS SHALL RE INSTALLED PER ANCHOR jSl7FAb�URERJO ACHIEVE STATED LOAD CAPACITY CAPACITY VARIES WITH SDII TYPE. VERIFY ANCHOR CAPACITY WITH SOILy�P.f'�f'b>,CUR�f�fTERm:;.F,, 50�`.GAl1'LNIC :•:.. ...:::: 1350 _. 350', 2.� HEC If IJ 61 GROt1NR `.UHUTIES PRIOR TO ANCHOR INSTALLATION LOCATION OF TANK RELATI4 qT0 ADJACENT STRUCTURES AND FEATURES ARE DEPENUOT UPON LOCAL CODES AND IS THE RESPONSIBILITY 6F OTHERS 4::�'[THE,TANK .AS SHOWN HAS. BEEN DESIGNED TO PREVENT FLOTATION, OOLLAPSE, OR LATERAL MOVEMENT DURING 1NE BASE FLODO„ p COPYRIGHT 2016 — FARLEY ENGINEERING, LLC ATRT I AMERIGAS CunsutUng Engineer P0111 — CA28108 ^^Ce Y � v t a � rx < ki x *rNt�' '` ` + it p{ � �'+,�i ,� i• CD a. x t ; 1207 Kingswood Lane• + �' i sa47 y �, {t «, r��4 r 3 S*4� ;,Vol 5 F rx'�`� {� x { yt± A° v a 'D Y# w. +daa ,�,+ WA W��