Loading...
HomeMy WebLinkAboutBUILDING PERMIT CHECKLISTBOARD OF PLANNING & DEVELOPMENT COUNTY SERVICES DEPARTMENT COMMISSIONERS . Building & Code Regulation CHECKLIST FOR RESIDENTIAL/COMMERCIAL BUILDING PERMIT //RR��,, � --pp / �,, / / RECEIVED Project Location:s'a� l.t% 0a n4L L c� �CP�URIY 1�, Date: Permit Number: 40 �� Techni ' �• Lucie County, Permitting SCANNED SY Required Documents: Lucie CountyApplication completely filled out with Notarized Signatures ............................ Yes_)No _ N/A_ Sub Agreements with Notarized Signatures (prior to issuance) .......................... Yes �No N/A Owner / Builder Affidavit (signed in office) ................................................. Yes_No _ N/AX Filled Land Affidavit (prior to issuance)......................................................Yes V//No _ N/A_ Recorded Warrany Deed, if applicable....................................................... Yes V No _N/A_ Recorded Notice of Commencemement (prior to issuance or inspection) ............... Yes_/No ✓/ N/A_ Utility Agreement or Payment Receipt (prior to issuance) ................................. Yes 1// N�A /A Vegetation Removal Application with copy of survey ..................................... Yes V No N/A Plans, Calculations & Attachments ( 3 copies commercial, 2. copies residential) Complete set of plans with Engineer / Architect Raised Seal ........................... Yes V No _ N/A Truss Plans reviewed and approved by Engineer / Architect ............................ Yes N No _/ N/A Landscaping and Parking plan (under 6,000 sgft)......................................... Yes % No ,/ N/A Approved Site Plans........................................................................... Yesl No N/A Sealed Survey with Dimensions, Finished floor ........................................... Yes V No _ N/A_ Elevations and Setbacks.............................................................. Yes v No N/A Plot plan with Setbacks............................................................... Yesv No — N/A Health Department approval stamped on survey and floor plan ........................ Yes_ No _ N/A Ci Health Department Food Establishment Permit stamped on floor plan ................ Yes_ /No N/A2� Manual "J" or Manual "N" Calculations................................................... Yes ✓ No N/A Signed Energy Calculations (1 original signature) ....................................... Yes No N/A Sealed Wind Load Compliance Certification ............................................... Yes No _ N/A_ Product Review Affidavit..................................................................... Yes J No N/A Other: Health Department Permit Paperwork....................................................... Yes_ No _ N/�K— CD for Fire Department if commercial or multi -family ................................... Yes_ No N/6 DEP, SFWMD or Army Corp of Engineers (dock, seawall, SF on beach)............ Yes No N/A4 Pool Barrier Affidavit.......................................................................... Yes_ No _ NIX Ground Sign Landscape Affidavit (signs) ................................................... Yes_ No N/A C� Burn Rate for Sign Cabinets.................................................................. Yes No Nl, x- RV and Mobile Home Tie -Down Only (2 copies) Permit Worksheet (Tie -Down Diagram) ................................................... Yes No N/A Manufacture Set -Up and Installation Manual .............................................. Yes_ No N/A Manufacture Blocking Documents.......................................................... Yes_ No _ N/A Signed Penetrometer Test (1 copy)......................................................... Yes_ No _ N/A StairDetails.................................................................................... Yes No N/A Mobile Home Inspection Report for Relocation (used only) ........................... Yes No N/A Copy of Title for Relocation (used only) ................................................... Yes_ No N/A Private Property not in a mobile home park Class "A" Approval from Planning or file4 ................................................ Yes_ No N/A COMMENTS Revised 7/27/18