HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATE7729058511 Adams Homes 18:53:01 11-15-2019
St Lucie County Inspections
2300 Virginia Avenue
Ft Pierce, FL 34982
(722) 462-2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
A(0V
Permitt.
Ing
St. Qlcie epa"t
coun In...
SCAUNED
-- BY —
St. Lucie County
PERMIT# _I 5b, OB ADDRESS 8508 Waterston Blvd, Fort Pierce, FL 34951
t ' —
BUILDER Adams Homes
PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc.
PEST CONTROL LICENSE# JF0001886
We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean
termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated:
Percentage of solution: .50%
Date of treatment: 11/07/19
* Footing
N I st Treatment
El Re -treat
* Slab
111 st Treatment
11 Re -treat
* Driveway
El I st Treatment
El Re -treat
* Pools
111 st Treatment
I--] Re -treat
El Other
El Ist Treatment
El Re -treat
Chemicals used: Bora-Care
Total gallons used:
Time of treatment: AM
FBC104-2.6 Certificate of Protective Treatinentfor prevention of termites.
A weather resistanijobsite posting board shall be provided to receive
duplicate Treatment Certificates as each requiredprotective treatment is
completed, providing a copyfor the person the poermit is fisued to and
another cofffor the buildhigpermitfiles. The Treatment Cervicate shall
provide the product used, identity of the applicatol., time and date of the
treatment, site location, area treated, chentical used. percent concentration
and number ofgallons used, to establish a verifiable record ofprolective
treatinent. If the soil chemical barrier methadjar termile prevention is used,
final exterior treatment shall be completedprior tofinal building approval.
St Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
9 Perimeter for Final Inspection
Signature of exterminator
MOTE. There must be a conipletedformfor each required treatment or re -treatment and thisjorm must he on the
job site to bepicked tip by the inspector at time of each inspection or the scheduled inspection willfail and a
re -inspection fee charged.