HomeMy WebLinkAboutPRODUCT APPROVALFlorida Building Code Online https://www.floridabuil c)rg/pr/pr_app_Atl.aspx?param.=WGEVY,..
a RON*;
vm— MIN NO R
m ilM
ERA
RCIS Hom� Ug� US.Rnt"tb. H.tT.p� S.bmtSumMm. S��&Fa= ftbk�Wrs MCSUff BCISSt�MaP
Florid product Approval
d bp r SM: Nbk W�
�dud ADDMVal menu > ��d or Al�� Se�� >T�a SCANNED
Fl- # BY
Application Type St. Lucie County
Code Version
Application status
Comments
Archived
Product Manufacturer GAF
Address/Phone/Ennall I Campus Drive
Parlsppany, ND 07054
(800) 766-3411
mstleh@gaf.com
Authorized Signature Robert Nlemlnen
lindamith@trinityerd.com
Technical Representative William Broussard
Address/Phone/Emall I Campus Drive
Parsippany, N3 07054
(800) 766-3411
TechnicalQuestionsGAF@gaf.corn
Quality Assurance Representative
Address/Phone/Email
Category
Subcategory
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed
Florida Profwslonal Engineer
F Evaluation Report - Hardoopy Received
Florida Engineer or Architect Name who developed Robert I.M. Nlemlnen
the Evaluation Report
Florida License
Quality Assurance Entity
Quality Assurance Contract Expiration Date
Validated By
Certificate of Independence
Referenced Standard and Year (of Standard)
-PE-59166
UL LLC
04/22/2018
)ohn W. Knezevich, PE
m Validation Checklist - Harcloppy Received
Fl S68p g12 Col 2017 01 CQI glenineaMdf
Statridilrd
Year
ASTM D6162
2008
ASTM D6163
2008
ASTM D6164
2011
ASM D6222
2011
FM 4470
2012
ar
I
I of2 12120/2017,3:59PM
fTi,RINITY I ERD
Table
Deck
Application
5
1A
Wood
New, Heroof (Tear -Off)
A-1
Bonded insulation, Bonded Roof Cover
IB-1
wood
New, Reroof (Tear -Off)
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
5-9
113-2
Wood
New, Reroof (Tear -Off), Recover
A-2
Mach. Attached Anchil Bonded Insulation, Bonded Roof Cover
9-12
1C
ood
New, Reroof (Tear -Off), Recover
B
MeCh. Attached Base Insulation, Bon ded Top Insulation, Bonded Roof Cover
—
—
ID
Wood
New, Reroof (Tear-Offl, Recover
C
Mech. Attached Insulation, Bonded Roof Cover
13
1E
Wood
New, Reroof (Tear -Off), Recover
D
insulated, Mech. Attached Base Sheet, Bonded Roof Cover
14
IF-1
Wood
New, Reroof (Tear -Off)
E
Non -insulated, Mech. Attached Base Sheet, Bonded ROOT cover
14-15
IF-2
Wood
New, Reroof (Tear -Oft), Recover
E
Non -insulated, mech. Attached Base Sheet, Bonded Root Cover
16
ZA-1
Steel Structural concrete
New, Reroof (Tear -Off), Recover
B-1
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded K oofCover
17-22
2A-2
or
steel or Structuml concrete
New, Reroof (Tear -Off), Recover
B-2
Mech. Attached Thermal Barrier, Bonded Temp Roof, Bonded Insulation, Bonded Roof Cover
23
2B-1A
Steel or Structural concrete
New, Peroof (Tear -Off), Recover
C-1
Mech. Attached Insulation, Bonded Roof Cover
24-32
33
213-113
Steel or Structural concrete
New, Renchof (Tear -Off), Recover
C-1A
Thermal Barrier with Vapor Barrier, Mech. Attached insulation, bona ed Roof Covet
—
213-2
Steel or Structural concrete
New, Reroof (Tear -Off), Recover
C-2
Bonded and Mech. Attached Insulation, Bonded Root Cover
33
34-37
2C
Steel or Structural concrete
New, Reroof (Tear -Off), Recover
D
insulated, Mech. Attached Base Sheet, Bonded Roof Cover
38-40
3A-1
Structural concrete
New, Refoof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover [Base insulation Layer unlyl
3A-2
Structural concrete
New, Refoof (Tear -Off)
A-1
Bonded Insulation, Bonded Root Cover (Base and Top Insulation Layers)
41-49
3B
Structural concrete
New, Reroof (Tear -Off)
F
Non -Insulated, Bonded Roof Cover
49
50-51
4A
LWIC
New, Renal (Tear -Off)
A-1
insulation. Bonded Roof Cover
52
4B
LWIC
New or Reroof (Tear -Off)
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
4C
LWIC
New, Reroof (Tear -Off)
E
Non -Insulated, Mech-Attached Base Sheet, Bonded Roof Cover
53-56
56
4D
LWIC
New, Reroof (Tear -Off)
F
Non -insulated, Bonded Root cover
57
SA
CWT
New, Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
58
CWT
New, Reroof (Tear -Off)
A-2
Mach. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
SB
5C
CWF
New, Reroof (Tear -Off)
E
Non -insulated, Mech. Attached Base Sheet, Bonded Roof Cover
59
60
6A
Gypsum
Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Root cover
60-61
Reroof (Tear -Oft)
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
68
6C
Gypsum
Gypsum
Renoof (Tear -Oft)
C
Mech. Attached insulation, Bonded Roof Cover
61
62
GD
Gypsum
Reroof (Tear -Off)
E
NDn-Insulated, Mach. Attached Base S heet, Bonded Roof Cover
63-71
A-1
Bonded �Insultlon, Bonded Roof Cover (Base Insulation Layer Only)
7A-1
Various
Recover
A-1
Bonded Insulation, Bonded Root Lover (Base and TOP Insulation Layers)
72-86
7A.2
Various
Recover
The following notes aol2lyto the sntems outlined herein
shall be In accorclancewlth FBC requirements to the satisfaction of the Authority Having Jur'isdiction.
1.
The roof system evaluation herein
pertains to above -deck roof components.
Roof decks
and structural members
Load resistance of the roof deck shall
be documented through proper codified and/or FBC Approval documentation.
2.
Unless otherwise noted, fasteners
and stress plates for Insulation or base Sheet attachment shall be as follows. Fasteners shall be of sufficient length for the following engagements:
3" Steel Plate or Drill-Tec AccuTrac Flat Plate or Drill-Tec AccuTrac Recessed Plate (Insulation
> Wood: Drill-Tec H12 Fastener or Drill-Tec #14 Fastener with
Drll[-Tec 3" Standard Steel Plate, Drill-Tec
Assembled with a 3" Metal Plate. Minimum 0.75-inch plywood penetration or minimum 1-Inch wood plank
only), Drill-Tec
ASAP 3S or Dril Heavy Duty ASAP
Roofing
Fastener
embedment.
Evziluatlon Report 01506.11.04-1119
for FLS680.R19
Exterior
Research and Design, U.C. d/b/a Trinity I ERD
e"
EDITION (2017) FBC 14ON-HVHZ EVALUATION
Revision 19:09/22/2017
Certificate
of Authorization #9503
GAF Modified Bitumen Roof Systems; (900) 766�3411
Appendix 1, Page I of 86
Prepared by: Robert Nieminen, PE-59166
ERD
TW, NITY I.
• Steel: Drill-Tec#12 Fastener, Drill-Tec 014 Fastener or Drill-TecXHD Fastener with Drill-Tec 3" Standard Steel Plate, Drill-TeC3' Steel Plate or Drill-TeCACCUTrac Flat Plate or Drill-Tec AccuTrac
Recessed Plate jInsulatlon only); Drill-TeCASAP3S; Drill-Tec Heavy Duty ASAP Roofing Fastener Assembled with 33" Metal Plate; Drill-Tec Extra Heavy Duty ASAP Roofing Fastener- Insulation.
Minimum 0.75-inch steel penetration and engage the top flute of the steel deck.
• Structural concrete: Drill-Tec U14 Fastener or Drlil-Tec CD-10 with Dril-Tec 3" Standard Steel Plate, Drill-Tec 3" Steel Plate or Drill-Tec AccuTrac Flat Plate or Drill-TeC AccuTraC Recessed Plate (insulation only) or
Drill-Tec Heavy Duty ASAP Roofing Fastener Assembled with a 3" Metal Plate. Minimum I -Inch embedment Into pilot hole In accordance with the fastener manufacturer's published
Installation Instructions.
3. Unless otherwise noted, Insulation may be any one layer or Combination of polylsocyanurate, polystyrene, wood fiberboard, partite, gypsum -based roof board or mineral wool roof board that meets the QA
requirements of F.A.C. Rule 6IG20-3 and is documented as meeting FEC 1505.1 and, for foam plastic, Chapter 26, when Installed with the roof cover. VersaShleldO Solo� Fire -Resistant Slip Sheet may be used as a
non -load -bearing, fire -barrier slip -sheet component within any system outlined herein.
4. Minimum 200 psi, minimum 2-Inch thick lightweight Insulating concrete may be substituted for, or installed beneath rigid Insulation board for SysterriType D (mechanically attached base sheet, bonded roof cover),
whereby the base sheet fastener$ are installed through the LWIC to engige the structural steel or concrete deck. The structural deck shall be of equal or greater configuration to the steel and concrete deck listings.
Roof decks and structural members shall be In accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified
and/or FBC Approval documentation.
5. Preliminary Insulation attachment for System Type D: Refer to Section 2.2.10.2.3 of FM Loss Prevention Data Sheet 1-29 (January 2016).
6. Unless otherwise noted, insulation adhesive application rates are as follows. Ribbon or bead width is at the time of application; the ribbons/beads shall expand as noted In the manufacturer's published Instructions.
> Hot asphalt: Full coverage at 25-30 lbs/square , Spo Shot or Canister dispensers. Note; Oly0ond Classic or OlyBond 500
)> OMG Olygond 500 (OBSOO): Continuous 0.75-inch wide ribbons, 12-inch O.c. using PaceCart t
Green may be used where Olygond 500 Is referenced.
> GAF URF Adhesive M (URF-M): Continuous 1-inch wide ribbons, 12-inch o.c
> Millennium One -Step Foarnable Adhesive flvl�OSFA): Continuous I -Inch wide ribbons, 12-Inch o.c.
> GAF 2-Part Roofing Adhesive (GAF 2-Part): Continuous 2.5 to 3-Inch wide ribbons, 12-inch o.c.
> Note: When multiple layers(s) of insulOtbil andlor coverboard are Installed In ribbon-appiled adhesive, boundjoints shall be staggered.
> Note: The maximum edge distancefirom the adhesive ribbon to the edge of the Insulation bound shall be not less than one-half the specified ribbons spacing.
7. Unless otherwise noted, all Insulations are flat stock or taper board of the minimum thickness noted. Tapered polylsocyanurate at the following thickness limitations may be substituted with the following Maximum
Design Pressure (MDP) limitations. In no case shall these values be used to 'increase' the MDP listings In the tables; rather if MDP listing below meets or exceeds that listed for a particular system in the tables, then
the thinner board listed below may be used as a drop -in for the equivalent thicker material listed in the table.
> Hot asphalt: MDP -240.0 psf (Min. 0.5-inch thick)
-> OlyBond 500 (OB500): MDP -292.5 psf (Min. 0.5-inch EnergyGuard Polyiso insulation, EnergyGuard NH Polylso insulation, EnergyGuard Ultra Polylso Insulation,
EnergyGuard NH ultra Polylso insulation)
• DING OlyBond 500 (OB500): MDP -315.0 psf (Min. 05-finch thick EnergyGuard RH or RN)
• ONIG OlyBond 500 (08500): MDP -485.0 psf (Min. 0.5-inch thick EnergyGuard RA)
• GAF 2-Part Roofing Adhesive (GAF 2-Part): MDP -117.5 psi (Min. 1.0-Inch thick)
B. Bonded poly[socyanumte insulation boards shall be maximum 4 x 4 ft. sure for the selected assembly shall meet or exceed the Zone I design pressure determined in accordance with FBC
9. For mechanically attached components or partially bonded insulation, the maximum design pres
Chapter 16, and Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure Criteria. Commonly used methods are ANSI/SPRI WD1, FM LOSS
Prevention Data Sheet 1-29, Roofing Application Standard RAS 117 and Roofing Application Standard RAS 137. Assemblies marked with an asterisk- carry the limitations set forth in Section 2.2-10.1 of FM Loss
Prevention Data Sheet 1-29 (January 2016) for Zone 213 enhancements. e determined In accordance with FBC Chapter 16, and no rational analysis Is permitted.
10. Forfully bonded assemblies, the maximum design pressure for the selected assembly shall meet or exceed critical design pressur
11. For mechanically attached components over existing decks, fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison to the
minimum requirementsfor the system. Testing and analysis shall be in accordance with ANSI/SPRI FX-I orTestingApplic,tion Stanand TAS 105.
Evaluation Report 01506.11.04-RI9 for FIL5680-R16
Exterior Research and Design, U.C. d/b/a Trinity[ERD. 15"'EDITION (2017) FBC NON-HV"Z EVALUATION Revision 19: 09422/2017
Certificate of Authorization 99503 Appendix 1, Page 2 of 86
Prepared by; Robert Nieminen, PE-59166 GAP Modified Bitumen Roof Systems; (000) 766-3411
22.
13.
14.
15.
'\JTRINITYIERD
For existing substrates In a bonded recover or re-rooflnstallatton, the existing roof surface or existing roof deck shall be examined for compatibility and bond performance with the selectedadhesive, and the existing
roof system (for recover) shall be capable of resisting project design pressures on Its own merit to the satisfaction of the Authority Having Jurisdiction, as documented through field uplift . testing in accordance with
ANSI/SPRI IA-1, ASTM E907, FM Loss Prevention Data Sheet 1-52 or Testing Application Standard TAS 124.
For Recover Applications using System Type D, the insulation Is optional. Alternatively, min. 0.5-Inch EnergyGuand Polylso Insulation, EnergyGuard NH Polylso Insulation, EnergyGuard ultra Polylso Insulation,
EnergyGuard NH Ultra Polylso Insulation, EnergyGuard RA, EnergyGuard RH, EnergyGuard RN or EnergyGuard Ultra, Structodek High Density Fiberboard Roofinsulation, EnergyGuard RH HD Polylso Insulation,
EnergyGUaTd HD Pohylso Insulation, EnergyGuard NH HD Polylso Insulation, EnergyGuard HD plus polylso Insulation or EnergyGuand NH HD Plus Polylso insulation or min. 0.25-inch Dens Deck, Dens Deck Prime or
SECUROCK Gypsum -Fiber Roof Board or SECUROCK Glass -Mat Roof Board may be used as a separator board prior to base sheet Installation. The existing roof System Shall be suitable for a recover application. The
separator componentshall be documented as meeting FBC 1505.1 and, forfoam plastic, FBC 2603.4.1 or2603.6, when Installed with the roof cover in Recover applications.
Lightweight Insulating concrete jLWICJ shall be cast in accordance with FEC Section 1917 to the satisfaction of the Authority Having Jurisdiction. For systems where specific LWIC Is referenced, refer to mffent LWIC
Product Approval for specific deck construction and [imitations. Unless otherwise noted, for systems where specific LWIC Is not referenced, the minimum design mix shall be 300 PA. In all cases, the minimum top-
coat thickness Is 2-Inches. For LWIC over structural concrete, reference is made to FBC Section 1917.4.1, Point 1.
Cted refer to th. fnilnwhn� r�f�r�n,�, finr bonded base. Ply or cap sheet applications.
.nderence i :
Vr
Material
Application
RP -AA
Base:
(5AFuLAS#75 Base Sheet, Trl-Ply #75 BaSeSheet, GAMILASMOUltima BaseSheet
Hot asphalt at 25 lbs/square.
Ply:
one or more plies GAFGLAS Ply 4, Trii-Ply Ply 4, GAFGLAS FlexPlY 6
(Base/ Ply sheets, Asphalt -Applied)
Matrix- 102 SBS Membrane Adhesive
BP -CA
Base:
GAFGLAS #75 Base Sheet, Tri-Ply #75 Base Sheet
(form erly known as TOPCOAT MATRIX 102
SOS Membrane Adhesive) at 1.5 gal/sq.
(Base/ Ply sheets, Cold -Applied)
B-LL
Base:
GAFGLAS Stratavent Perforated Venting Base Sheet
Loose laid
(Base sheet� Loose-l-ald)
Base or Ply:
0 ne or two plies Ruberold 20 S mooth, Ruberold Mop Smooth, Ruberold Mop Smooth 1.5, Ruberold Mop Plus Smooth
585-AA
Ru herald 30 Granule, Ruberold 30 Gra rule FIR, Ruberold EnergVCap 30 Granu le FR, Ruberold Mop Smooth, Ruberold Mop
Hot asphalt at 75 Tbs/square.
(SBS, Asphalt -Applied)
Cap:
Smooth 1.5, Ruberald Mop Plus Smooth, Ruberold Mop Granule FIR, Ruberold Mop Granule, Tri-Ply SBS Granule, Intec
Flex PRF, Rulbenohl Mop Plus Granule FR, Ruberold Mop Plus Granule, Ruberosd EnergyCap Mop Plus Granule FR
voth, luz saS Membrane AchesWe
SBS-CA
(SBS, Cold -Applied, Matrix- 102 SBS
Base or Ply:
Ruberold 20 Smooth hold Mop Granule FR, Ruberold �7p plus 'GI, FR,
R berold 30 Granule Fft Rubenold EnergyCap 30 Granule FIR, Rube
(formerly known as TOPCOATMATRIX102
SBS Membrane Adhesive) at 1.5 gal/sq.
Membrane Adhesive)
Cap�
Ruuberold EnergyCap Mop Plus Granule FR
matrix,- 101 PrRmlum SBS Membrane
Base:
Ruberold 20 Smooth or Ruberoid Mop Smooth 1.5
Adhesive (formerly known as TOPCOAT
SBS-CA-1
MATRIXMojorbond Modified Bitumen
(SBS, Cold-Appiled, Matrix- 101
Ruberoid 30 Gra nule FR, Ruberold Ene,gyCap 30 Granule FR, Ru behold Mop Plus Granule FR, Rubanald EhergyCap Mop
Membnori. Adhesive) at 1.5 — 2.0
Premium SBS Membrane Adhesive)
Cap--
Plus Granule FR
gal/square
Base or PIT.
0 ne or two plies Ruberold HW 25 Smooth, Rubenold HW Smooth
SBS-TA
R herald HIM Granule, Ruberoid HW ranule FR, Ruberold HW Plus Granule, RuberoTd HW Plus Granule FIR, Ruberold
(SBS,Tomh-Applied)
Cap:
EuergyCap 14W Plus Granule FR
Torch spored
Base or Ply:
One ortwo piles Ruberoid Torch Smooth, Tri-Ply APP Smooth
APP-TA
Ruberold Torch Granule, Tri-Ply APP Granule, Ruberold Torch Plus Granule FR, Ruberold EnergyCapTorch Granule FR,
(APP,Tonh-Applied)
Cap:
Ruberold EnergyCap Torch Plus Granule FR
Base or Ply:
Liberty SB5 Self -Adhering Base/Ply Sheet
Self-adhened
SBS.SA (self -adhering)
Cap
Ulberty SBS Self -Adhering Cap Sheet
Evaluation Report 01506.11.04-RI9 for FLS680-R19
Exterior Research and Design, LLr_ allbla Trinity I ERD ftevlso� 19: 09/22/2027
Certificate of Aurthorizallon M9503 Era EDITION (2017) FBC NON-HVHZ EVALUATION Appendix 1, Page 3 of 86
Prepared by: Robert Nieminen, PE-59166 GAF Modified Bitumen Roof Systems; (800) 766-3411
\,4TRINITY1 ERD
.-777-7
TABILEIF4! wooDbECKS-NEWCONSTRUC.1`10N ORREROQF(TEAR-0FFj77.
ON I' LATE[), MECHANICALYFASTEDED BASESHEET� BONDED RO&Cov9ft
:sys.r,EMtYPE:E:.N -NSU
System
Base sheet
Roof Cover (Note 151
MDP
No.
Deck (Note 1)
Type
Faster
Attachment
Ply
Cap
(psn
Min. 19/32-inch
GAFGLAS #90 Ultima Base Sheet, GAFGLAS Stratavent
32 St., 1-5/8-inch dia. tin
9-Inch o.c. at min. 4-inch laps and 9-inch
(Optional)
APP-TA
-60.0
W-51.
Plywood at max.
Eliminator Nallable Venting Base Sheet, Ruberold 20 Smooth,
caps with 11 ga. annular
o.c. In two, equally spaced, staggered
APP-TA
24-Inch span
Ruberold Mop Smooth, Ruberold Mop Smooth 1.5
ring shank nails
center rows
rAA
-
-
Min. 19/32-Inch
GAFGLAS 080 Wilma Base Sheet, GAFGLAS Stratavent
32 ga., 1-5/8-Inch dia. tin
8-Inch O.C. at min. 4-inch laps and 8-Inch
1)
(Optional)
W-52.
plywood at max.
Eliminator Nallable Venting Base Sheet, Ruberold 20 Smooth,
caps with 12 ga. annular
o.c. at three, equally spaced, staggered
BP -AA, SBS-
I
SBS-AA
-75.0
24-Inch span
Ruberold Mop Smooth, Ruberoid Mop Smooth 1.5
ring shank nails
center rows
Min. 19/32-inch
GAFGLAS #80 Ultinna Base Sheet, GAFGLAS Stratavent
32 ga, 1-5/8-Tnch dia. tin
7-inch o.c. at min. 4-Inch laps and 7-Inch
BP -AA SBs-
SBS-AA,
SBS-TA,
-82-5
W-53.
plywood at max.
Eliminator Nall.ble Venting Base Sheet, Puberold 20 Smooth,
caps with 11 ga. annular
o.c. In three, equally spaced, staggered
AA
SBS-CA,
24-Inch span
Ruberold Mop Smooth, Ruberold Mop Smooth 1.5
ring shank nails
center rows
APP-TA
-
-0
Min. 19/32-Inch
32 ga, 1-5/8-Inch dia. tin
9-Inch o.c. at min. 44nch laps and 9-Inch
(Optional)
SBS-SA,
W-54.
plywood at max.
Liberty S13S Mechanically Attached Base Sheet
caps With 11 ga. annular
o.c. in two, equally spaced, staggered
SBS-SA
SBS-TA or
APP-TA
-373
24-Inch span
ring shank nails
dIatin
center rows
-TA
Min. 15/32-inch
32 ga., I-S/8-Fnch
8-inch o.c. at min. 3-Inch laps and 8-Inch
ptional)
-(0
SBS-SA,
�45 0]
plywood at max.
Liberty SBS Mechanically Attached Base Sheet
caps with 11 ga. annular
o.c. In three, equally spaced, staggered
SBS-SA
SBS or
APP-TA
24-Inch span
ring shank nails
center rows
Evaluation Report 01506.11.04-RI9 for FI5680-1119
Warier Research and Design, LLC. d1bla TrinitylERD Revision 19: 09/22/2017
Certificate of Authorization 99503 e- EDITION (2017) FBC NON-HVHZ EVALUATION Appendix 1, Page 15 of 86
Prepared by: Robert Nleminen, PE-59166 GAF Modified Bitumen Roof Systems; (800) 766-3411