:RECEIVE:D
February 13, 2020
7 2Century Complete Homes SCANNED ST. Lucnty, ng
3300 Battleground Avenue Suite 101 BY
Greensboro, NC 27410 St. Lucie County
Attention: Mr. Dan Murray
Reference: Final Foundation Certification for HUD Guidelines
Lakewood Park - Lot 0006- 7501 Brookline Ave. 70G Fill Soil Lot Conforma
tion 7501 Brookline Avenue, Ft. Pierce, St. Lucie County, FL
UES Project No.:0310.1900516.0005
Dear Mr. Murray:
Universal Engineering Sciences, Inc, was retained by Wade Jurney Homes to provide inspection and testing services
during the construction of the Lakewood Park - Lot 0006- 7501 Brookline Ave. in 7501 Brookline Avenue , Ft. Pierce,
Indian River County, FL. We provided materials testing services in an effort to ascertain whether the earthwork and
placement of structural fill material for the foundation were performed in general conformance to the approved specificati
ons and HUD guidelines.
To the best of our knowledge, the foundation soil bearing capacity was satisfied within the depth tested according to
the compaction testing dated 0112412020 and 01/28/2020, and meets HUD's guidelines. We do not undertake the
guarantee of the work, nor do we relieve the contractor of their responsibility to produce a completed project
conforming to the project plans and specifications, including any deeper site improvement measures.
We appreciate to have had the opportunity to provide material testing services for this project. Please do not hesitate to
contact us if you should have any questions, or if we can be of further assistance.
Richard E. Hoaglin, P.E.
FLORIDA
Professional Engineer No. 48796
Visit us on the web at www.UniversalEngineering.com
•YI 1
I
UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
UES Project No: 0310,1900516.0005
UES DOCS No:
UES ReportNo: 120611-1 DT 012420
In -Place Density Test Report
Client: Century Complete Homes FKA Wade Jurney
3300 Battleground Avenue Suite 101
Greensboro, NC 27410
Project: Lakewood Park - Lot - 7501 Brookline Ave.
7501 Brookline Avenue, Ft. Pierce, St. Lucie County, FL
Area Tested: House pad
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 01 /24/2020
Lab: ASTM D1557 Modified Proctor
Technician: Cliff Cherrnay
Requirements: 98% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not arlrirpee Oho r.,..r7ai......a a6_ ....a_-i..:__ __:._ . . . -
_ _.._
__..,.......
...,,,.. 11u
.,yu:y au110
uoiuw
ule tesrea aepms.
Test
Field Dry
Field
No.
Location of Test
Range
Depth
(inch)
Proctor
(2)
Density
Moisture
%
Comments
(PCF)
%
Compaction
(3)
1
N/W Test
0-1 ft
12.00
25062
112.0
12.3
100
A
2
N/E Test
0-1 ft
12.00
25062
111.8
13.3
100
A
3
S/E Test
0-1 ft
12.00
25062
110.8
11.9
99
A
4
S/W Test
0-1 ft
12.00
25062
110.5
12.3
99
A
H1
DeP n.-an _ I__ _
(2)
vULuII'. W I UN Ul r-11 ial uraae
Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
25062
112.0
11.0
(3) comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
Universal performed two 5 feet deep hand auger borings at the northwest and southeast comers.
No organics, deleterious materials or expansive, highly plastic clays were encountered.
The proposed residence can be supported upon conventional shallow footing foundation designed for a maximum allowable soil
bearing pressure of 2,000 pounds per square foot (psf).
Notes:
In Place Density Testing must be scheduled for stem wall backfill and footings prior to concrete placement.
These tests are in addition to the tests performed.
Any additional fill placed will require additional testing at standard unit fees.
This testing covers the house pad only.
Pool and deck areas were not included in this study; these items can only be tested as they are constructed.
Please notify us in the event you wish to test pool subgrade and badtfill.
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences.
UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
LIES Project No: 0310.1900516.0005
LIES DOCS No:
LIES Report No: 120759-1 DT 012620
In -Place Density Test Report
Client: Century Complete Homes FKA Wade Jurney
3300 Battleground Avenue Suite 101
Greensboro, NC 27410
Project: Lakewood Park - Lot - 7501 Brookline Ave.
7501 Brookline Avenue, Ft. Pierce, St. Lucie County, FL
Area Tested: House pad
Type of Test: Field: ASTM D-2937 Drive Cylinder Method Date of Test: 01/28/2020
Lab: ASTM D1557 Modified Proctor
Technician: Cliff Cherrnay
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not address the condition of the underlying soils below the tested depths
Test
No.
Location of Test
Range
Depth
(inch)
Proctor
(2)
Field Dry
Density
(PCF)
Field
Moisture
%
%
Compaction
Comments
(3)
1
Drive sleeve method south side
1+2 ft
12.00
25062
110.5
9.1
99
A
of pad
2
Drive sleeve method south side
2+3 ft
12.00
25062
110.2
10.3
98
A
of pad
3
Drive sleeve method north side
1+2 ft
12.00
25062
109.5
10.3
98
A
of pad
4
Drive sleeve method north side
2+3 ft
12.00
25062
110.1
10.6
98
A
of pad
5
Drive sleeve method west side of
1+2 ft
12.00
25062
109.6
9.6
98
A
pad
6
Drive sleeve method west side of
2+3 ft
12.00
25062
108.5
9.3
97
A
pad
t v Met. Datum: u = bottom of Fill
(2)
Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
25062
112.0
11.0
Universal performed two 5 feet deep hand auger bodngs at the northwest and southeast comers.
No organics, deleterious materials or expansive, highly plastic days were encountered.
(3) Comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
The prepased residence can be supported upon conventional shallow footing foundation designed for a maximum allowable soil bearing pressure of 2,000 pounds per
square foot (psq.
Notes:
In Place Density Testing must be scheduled for stem wall backfill and footings prior to concrete placomenL
These tests are in addition to the tests performed.
Any additional fill placed will require additional testing at standard unit fees.
This testing covers the house pad only.
Pool and deck areas were not included in this study; these items can only be tested as they are constructed.
Please notify us in the event you wish to test pool subgmde and backfill.
This test was performed without deviation from ASTMprocedures.
This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences.
UNWERSAL 0 o�t5
ENGINEERING SCIENCES ql l qQJ�
Consultants In: Geotechnical Engineering• Environmental Sciences
Geophysical Services Materials Testing •Threshold Inspection
Building Code Administration; Compliance Inspection & Plan Review
820 Brevard Avenue • Rockledge FL 32956- 321.638.0808 • Fax 321.638.0978
February 13, 2020
Century Complete Homes SCANNED
Battleground Avenue Suite 101
Greensboro, NC 27410 St. Lucie County
Attention: Mr. Dan Murray
Reference: Final Foundation Certification for HUD Guidelines
Lakewood Park - Lot -7501 Brookline Ave. 70G Fill Soil Lot Conformation
7501 Brookline Avenue, Ft. Pierce, St. Lucie County, FL
LIES Project No.:0310.1900516.0005
Dear Mr. Murray:
Universal Engineering Sciences, Inc. was retained by Wade Jurney Homes to provide inspection and testing services
during the construction of the Lakewood Park - Lot - 7501 Brookline Ave. in 7501 Brookline Avenue, Ft. Pierce, Indian
River County, FL. We provided materials testing services in an effort to ascertain whether the earthwork and placement
of structural fill material for the foundation were performed in general conformance to the approved specifications and
HUD guidelines.
To the best of our knowledge, the foundation soil bearing capacity was satisfied within the depth tested according to
the compaction testing dated 01/24/2020 and 01282020, and meets HUD's guidelines. We do not undertake the
guarantee of the work, nor do we relieve the contractor of their responsibility to produce a completed project
conforming to the project plans and specifications, including any deeper site improvement measures.
We appreciate to have had the opportunity to provide material testing services for this project. Please do not hesitate to
contact us if you should have any questions, or if we can be of further assistance.
, Respectfully submitted
,����\ J,. yy Universal Engineering Sciences
l VOI. /I..� COA No.: 00000549
��\ �7�• 1061V •�C1i �f Digitally signed by Richard E
`•�' SF Hoaglin
f. DN: c=US, o=UNIVERSAL
�40i 4.8%9i7 / � ENGINEERING SCIENCES INC,
,7' r�t�-inRhtiL Pose A01410D0000016B56966
• . f�+� ' A990,0003A80, cn=Richard E
zz
STATE OP • ��1j` ,-- Hoagliin+
Date: 2020.02.1708:33:53
This item has been electronically signed and Richard E. Hoaglin, P.E.
sealed by Richard E. Hoaglin, P.E.asing a
Digital Signature. Printed copies of this FLORIDA
document are not considered signed and
sealed and the signature must be verified on Professional Engineer No. 48796
any electronic copies.
Visit us on the web at www.UniversalEngineering.com
UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing •Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
In -Place Density Test Report
00 Project No:
UES DOCS No:
UES Report No:
Client: Century Complete Homes FKA Wade Jurney
3300 Battleground Avenue Suite 101
Greensboro, NC 27410
Project: Lakewood Park - Lot - 7501 Brookline Ave.
7501 Brookline Avenue , Ft. Pierce, St. Lucie County, FL
Area Tested: House pad
0310.1900516.0005
120611-1 DT 012420
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 01/24/2020
Lab: ASTM D1557 Modified Proctor
Technician: Cliff Cherrnay
Requirements: 98% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not address the condition of the underlying soils below the tested depths.
Test
No.
Location of Test
Range
Depth
(Inch)
Proctor
(2)
Field Dry
Density
(PCF)
Field
Moisture
%
%
Compaction
Comments
(3)
1
N/W Test
0-1 ft
12.00
25062
112.0
12.3
100
A
2
N/E Test
0-1 ft
12.00
25062
111.8
13.3
100
A
3
S/E Test
0-1 ft
12.00
25062
110.6
11.9
99
A
4
S/W Test
0-1 ft
12.00
25062
110.5
12.3
99
A
(1) Ref. Datum: 0 = Top of Final Grade
(2)
Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
25062
112.0
11.0
(3) Comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
Universal performed two 5 feet deep hand auger borings at the northwest and southeast corners.
No organics, deleterious materials or expansive, highly plastic clays were encountered.
The proposed residence can be supported upon conventional shallow footing foundation designed for a maximum allowable soil
bearing pressure of 2,000 pounds per square foot (psf).
Notes:
In Place Density Testing must be scheduled for stem wall backfill and footings prior to concrete placement.
These tests are in addition to the tests performed.
Any additional fill placed will require additional testing at standard unit fees.
This testing covers the house pad only.
Pool and deck areas were not included in this study; these items can only be tested as they are constructed.
Please notify us in the event you wish to test pool subgrade and backfill.
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences.
U N I #E R S A L
Project o: 0310.1900516.0005
SES
DOCS No:
ENGINEERING SCIENCES
UESReport No: 120759-1 DT012820
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
In -Place Density Test Report
Client:
Century Complete Homes FKA Wade Jurney
3300 Battleground Avenue Suite 101
Greensboro, NC 27410
Project:
Lakewood Park - Lot - 7501 Brookline Ave.
7501 Brookline Avenue , Ft. Pierce, St. Lucie County,
FL
Area Tested:
House pad
Type of Test: Field: ASTM D-2937 Drive Cylinder Method Date of Test: 01/28/2020
Lab: ASTM D1557 Modified Proctor
Technician: Cliff Cherrnay
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not address the condition of the underlying soils below the tested depths.
Test
No.
Location of Test
Range
Depth
(inch)
Proctor
(2)
Field Dry
Density
(PCF)
Field
Moisture
%
%
Compaction
Comments
. (3)
1
Drive sleeve method south side
1+2 it
12.00
25062
110.5
9.1
99
A
of pad
2
Drive sleeve method south side
2+3 ft
12.00
25062
110.2
10.3
98
A
of pad
3
Drive sleeve method north side
1+2 ft
12.00
25062
109.5
10.3
98
A
of pad
4
Drive sleeve method north side
2+3 ft
12.00
25062
110.1
10.6
98
A
of pad
5
Drive sleeve method west side of
1+2 ft
12.00
25062
109.6
9.6
98
A
pad
6
Drive sleeve method west side of
2+3 it
12.00
25062
108.5
9.3
97
A
pad
(1) Ref. Datum: 0 = Bottom of Fill
(2)
Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
25062
112.0
11.0
Universal performed two 5 feet deep hand auger borings at the northwest and southeast comers.
No organics, deleterious materials or expansive, highly plastic Gays were encountered.
(3) Comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
The proposed residence can be supported upon conventional shallow footing foundation designed for a maximum allowable sell bearing pressure of 2,000 pounds per
square foot (pat).
Notes:
In Place Density Testing must be scheduled for stem wall backfill and footings prior to concrete placement
These tests am in addition to the tests performed.
Any additional fill placed will require additional testing at standard unit fees.
This testing covers the house pad only.
Pool and deck areas were not Included In this study; these hems can only be tested as they are constructed.
Please notify us in the event you wish to test pool subgrade and backfll.
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences.