HomeMy WebLinkAboutPERMIT RENEWAL3
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
t o `- " „ BUILDING AND CODE REGULATIONS DIVISION
..%rw 2300 VIRGIMA AVE
- FORT PIERCE, FL 34982 /
(772) 462-1553 Fa: (772) 462-1578 — _S e.h � r
SCANNED
BY ERMIT RENEWAL REQUEST DEC 2 3 2019
St. Lucie Count
ST. Lucie County, Permitting
PERM[ITNUMBER: 1905-0713 ADDRESS: 7875 Saddlebrook Dr, PSL, FL 34986
I Cheyenne Ellison , am requesting that the above permit be renewed. I
understand that 1 must schedule and pass all required inspections for the permit to be fmaled. Further, I
understand that this is a ONE TIME RENEWAL and the permit shall expire should I not receive a
passing inspection during any six month period during the renewal period.
Justification Permit has not expired yet, will need an extension. The builder will not be ready
for the next step for a while. Only the interior has been done.
Cheyenne Ellison
STATE OF FLORIDA
COUNTY OF ueen
BEFORE ME 1T11S 23
BY Cheyenne Ellison
HAS PROVIDED
FLORIDA,l
FOR OFFICE USE ONLY:
12l23t19
DAY OF December
2019
WIIO IS PERSONALLY KNOWN TO ME x OR
Number of Open Inspections:
Total Inspections:
(Divide open by total to get % of open inspections)
Percentage:
Original permit fee: x % open = $ jtcncwal fee
AS IDENTIFICATION.
.,V Notary Pubbc State W Flande
Desiree N McIntosh
SEAL +Ac MY Couurssswn GG 2a3399
Excites tvttrzou
Example: [15 divided by 23=A5(%)] S175(permit fee) x .65=S113.75 (renewal fee)
Revised 7212014
PiwmtngSDevelopment Services ADVANCED NOTICE OF EXPIRATION -CONTRACTOR
Building & Coda Regulation Division
2300 Virginia Avenue
Fort Pierce, FL 34982
Phone:(7721462.2172 Faz_(772)4625443
December 13, 2019
22680
PROPANE SERVICES INC
CHEYENNE ELLISON .
2130 SW POMA DR
PALM CITY, FL 34990
RE -Building Permit Number, 1905-0713
Permit Type GAS/GAS PIPING -1 &2 FAMILY RESIDENTIAL
Job Location . 7875 SADDLEBROOK DR
Expiration Date 11112020 R Gl CA:% �
(-A VY-1 �
DEAR CHEYENNE ELLISON:
PLEASE BE ADVISED THAT YOUR PERMIT REFERENCED ABOVE IS GOING TO EXPIRE ON 1111202012:00:00
PM.
IN ACCORDANCE WITH ST. LUCIE COUNTY LAND DEVELOPMENT CODE
SECTION 11105.01 (A) (2): A BUILDING PERMIT SHALL EXPIRE AND
BECOME NULL AND VOID IF WORK AUTHORIZED BY SUCH BUILDING
PERMIT IS NOT COMMENCED, HAVING CALLED FOR AND RECEIVED A
SATISFACTORY INSPECTION, WITHIN SIX (6) MONTHS FROM THE DATE OF
ISSUANCE OF THE PERMIT, AND IF THE WORK IS NOT COMPLETED
WITHIN (18) EIGHTEEN MONTHS FROM THE DATE OF ISSUANCE OF THE
BUILDING PERMIT.
THIS COURTESY NOTICE IS SENT TO YOU PRIOR TO THE EXPIRATION DATE OF YOUR PERMIT. IN DOING
SO, THIS GIVES
TOR U THE OPPORTUNITY
HEDULE INSPECTION FINAL
YOUR
PERMIT
28 BEFORE
THE REQUIREMENT TO RENEW
PLEASE DO NOT DELAY. IF ORIGINAL PERMIT FEE WILL -1280.
Y BEREQUIREDAR PERMIT EXPIRES. A RENEWAL FEE UP TO THE FULL AMOUNT OF THE
LONG WITH ALL REQUIRED INSPECTIONS.
IF THE PERMIT EXPIRES YOU WILL BE CONSIDERED IN VIOLATION. FINES COULD BE LEVIED FOR UP TO
$250.00 PER DAY UNTIL THE VIOLATION IS CORRECTED.
SHOULD YOU HAVE ANY QUESTIONS, PLEASE CALL (772) 462-2172 AND ASK FOR HEATHER.
THANK YOU,
PERMITTING OFFICE