Loading...
HomeMy WebLinkAboutD O H PAPERWORKON SCANNED STATE OF FLORIDA BY DEPARTMENT OF HEALTH �} 1 ONSITE SEWAGE TREATMENT AND DISPALLP94LGOUn4y CONSTRUCTION INSPECTION AND FINAL APPROVAL APPLICATION #:AP1425721 PERMIT #:56-SF-1977956 DOCUMENT #:FI1361879 DATE PAID:07/26/2019 FEE PAID:545.00 56-PID-4023487 RECEIPT #. APPLICANT: Sharina Saka AGENT: Atlantic Land Designs of the TC PROPERTY ADDRESS: 3901 Millisa Ter Fort Pierce, FL 34947 LOT: 4 BLOCK: DEC 3 12019 SUBDIVISION: Hartman Heights ID#: 2417-602-0004.000-2 CHECKED [X3 ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR ROLE AND MOST BE CORAEC TANK INSTALLATION SETBACKS [ I [O13 TANK SIZE Ill 1090.00 [23 [ ] [273 SURFACE WATER FT [ 3 [023 TANK MATERIAL Polypropylene [ 1 [281 DITCHES 76 FT [ 3 [031 OUTLET DEVICE [ 3 [291 PRIVATE WELLS 100 FT [ 3 [041 MULTI -CHAMBERED ELIJ N I [ ] [301 PUBLIC WELLS FT [ 3 1051 OUTLET FILTER Polylok PL-68 [ 3. [3l] IRRIGATION WELLS FT [ 1 [061 .LEGEND 1.. 70-143-11DC4 2. [ 3 [323 POTABLE WATER 6 FT [ 3 1073 WATERTIGHT [ 3 [333 BUILDING FOUNDATIONS 6 FT [ 3 1081 LEVEL [ 3 [341 PROPERTY LINES 12 FT [ ] [09] DEPTH TO LID [ 3 [353 OTHER FT DRAINFIELD INSTALLATION FILLED / MOUND SYSTEM [ 3 [103 AREA Ill 684 121 SQFT [ 3 [361 DRAINFIELD COVER ' [ 3 [111 DISTRIBUTION BOX x HEADER [ 3 [37I SHOULDERS [ ] [123 NUMBER OF DRAINLINES 1. 6.00 2. [ 3 [383 SLOPES [ I [133 DRAINLINE SEPARATION [ ] [391 STABILIZATION 12/3012019 [ 1 [143 DRAINLINE SLOPE [ ] [15] DEPTH OF COVER ADDITIONAL INFORMATION [ 3 1163 ELEVATION [ ABOVE]/ BELOW IBM 1.00 [ 1 [401 UNOBSTRUCTED AREA [ 3 1171 SYSTEM LOCATION [ 3 [411 STORMWATER RUNOFF [ 3 1183 DOSING PUMPS [ 3 [421 ALARMS [ 3 [193 AGGREGATE SIZE [ I [431 MAINTENANCE AGREEMENT ' [ 3 [201 AGGREGATE EXCESSIVE FINES [ 3 [441 BUILDING AREA [ 3 [211 AGGREGATE DEPTH [ 3 [451 LOCATION CONFORMS WITH SITE PLAN [ 3 [461 FINAL SITE GRADING FILL / EXCAVATION MATERIAL [ 1 [473 CONTRACTOR (OWNER) [ I [223 FILL AMOUNT [ ] [483 OTHER INFILTRATOR Ouick4 EO36 (single c [ 3 [231 FILL TEXTURE [ 3 [24I EXCAVATION DEPTH ABANDONMENT [ I [25I AREA REPLACED [ ] 1493 TANK PUMPED [ I [261 REPLACEMENT MATERIAL [ 3 r5O] TANK CRUSHED S FILLED Coaanents: Comments are on page 2. c St. Lucie CHD DATE: 09130/2019 CONSTRUCTION [ APPROVED / OISAPpAOVED l: Eavlron tal Specialist II Br :gram (ENVIRONMENTAL HEALTH) FINAL SYSTEM [ ppPAOVED / DISAPPROVED 3: St. Lucie CHD DATE: 12/30/2019 _% Env nmentaISpeclallat 11Bria Ingram(ENVIRONMENTALHEALTH) (Explanation of Violations on following page) DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003r FAC Page 2 of 3 EH Database v 1.0.1 AP1426721 EID1977956 STATE OF FLORIDA DEPARTMENT OF HEALTH ONSITE SEWAM TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL Violation. Number Comment comments APPnlc=oN u:AP1425721 PzFMT (t:56-SF-1977956 DOCUMENT ti:FI1361879 DATE PAID:07/26/2019 FEE 2AID:545.00 ]RECEIPT u:56-PID-4023487 The system is sized for 3 bedrooms with a maximum occupancy of 6 persons (2 per bedroom), for a total estimated flow of 400 gpd. New ST, filter, and 3x9+3x10 long DF installed. No violations, system ok to cover. Owneribuilder notified onsite. Needs final inspection for mound system and final site grading. Final system approved. Building Department emailed final approval. DR 4016, 06/09 (Obsoletes all previous editions which may not he used) Incorporated: 64E-6.003, FAC Page 2 of 3 EH Database v1.0.1 AP1425721 EID1977956