August 29, 2019
SCANNEL,
BY
LLS Development Co. Inc.
St. Lucie Comm
4804 Paleo Pines Circle
RECEIVED
Ft. Pierce, Floirda 34951
AUG 3 0 2019
LS]
Re: 18905 Orange Avenue
F i
7 Pierce, Florida
ST. Lucie county, Permitting
Permit#: MJvL-o%1C-
KSM Project M 183105-1 d
Dear Sir:
Enclosed, please find the nuclear density test results performed on the building slab at
the above referenced project.
Should you have any questions, please feel free to contact the office.
No. JF439
III
BED/ct
E-mail tor dcs.dial@gmail.com
RonaIdLG. Keller, RE.:37293/Sl Lic. No.: 860 / Julie E. Keller, RE.: 68366
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 PO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (661) 845-7445
1 www.ksmengineering.net MELBOURNE (321) 768-M8
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET
C.A.: 5693 ST. LUCIE (772y 229-9093
FAX (772) 689-6469
SOIL COMPACTION REPORT
ASTM D 1557 and ASTM D 2922
DATE TESTED: August 28th, 2019 KSM JOB* 183105-1 d/SH/ct
PERMIT#:
CONTRACTOR: LLS Development Co. Inc.
JOB LOCATION: 18905 Orange Avenue
Ft. Pierce, Florida
MATERIAL: Brown Sand with Shell Fragments
ITEM TESTED: Building Slab
_fff-f C6,6ATR514
--- ij6F�§_- -
- Tifli ----
15FW ----
----
FiEf�15E&i_ - -
OF SAMPLE
TURE
READ
DENSITY
PROCTOR
COMPACTION
------------------------------------------------
VALUE
1. N. E.
0" — 12" 11.2
50
108.3
112.8
96.0
2. Center
50
109.7
97.3
3. S.W.
50
110.3
97.8
Ronald G. Keller, P.E.:37293/Si Lic. No.; 860 / Julie E. Keller, RE.: 68366
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772)589-0712
PALM BEACH (561) 845-7445 wvvw.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NEr ST. LUCIE (772) 229-9093
G.A.: 5693 scMMW89-6469
September 10, 2018 BY
St. Lucie Countv
J. L. Dial
4804 Paleo Pines Circle
Ft. Pierce, Florida 34951 L:RECEIV:E,D
D:
C I
Re: 18905 Orange Avenue. DEC 10 2018
Ft. Pierce, Florida Lucie county, perm
KSIVI Project#: 1831 05-b
Dear Mr. Dial:
As reque ' sted, KSM Engineering & Testing has performed a subsurface investigation at
the referenced site. Presentation of the data gathered during the investigation, together
with our geotechnical related opinions, are included in this report.
A. Site Description:
At the time of drilling, the site was fairly flat with light surface vegetation (grass).
B. Project. Description:
A 1250 SF storage building is planned to be constructed on the site. Loads from the
structure will -be transferred to the ground by conventional shallow footings. We
estimate thernaximum loads will be less than 2,500 pounds per linear foot along the
wall foundation and less than 15 kips for any individual column pads.
Some site fill will be required to reach the desired grades.
Q��.W r-' V�11� Or - q7SQq I Q1 I i- ki- - oan / I..[;- = V-11— 0C. aaqaa
11VOlks
A% lll�p AW
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN V72) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772)589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NEr ST. LUCIE (772) 229-9093
G.A.; 5693 FAX (772) 589-6469
18905 Orange Avenue
Ft. Pierce, Florida
IPA
C. The scope of our study consisted of the following:
September 10, 2018
1 . Performed Standard Penetration Test Borings in the proposed construction area
to estimate the subsoil relative density.
2. Measured the groundwater level at each boring.
3. Evaluated the existing soil conditions with respect to the proposed construction
and provided recommendations for site preparation and foundation design.
4. Prepared this report to document our findings.
D. Site Investigation:
The site investigation program consisted of performing two (2) Standard Penetration
Test b6rings (SPT), in the proposed storage building area. The SPT borings Were
terminated at depths of 10 feet below grade. The locations of the borings are indicated
on the attached boring logs. '
The, SPT borings were completed in accordance with procedures described in ASTM D-
1586. A standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by
successive blows of a 140 pound hammer freely falling 30 inches. The number of
blows required to drive the sampler I foot, after seating 6, in., is designated the
Penetration Resistance, or "N" value. At regular intervals the sampler is extracted from
the ground and opened to allow visual examination and classification of the retained
soil sample. Also,the groundwater table was allowed to stabilize and the depth of the
grou ndwater elevation recorded from existing grade.
The records of the soils encountered, the penetration resistances and groundwater
level are shown on the attached logs.
r-, V.11.� Dg: - q70Gq I Q1 I i, rd� - nnn I hdi- P D P - RQQAA
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN V72) 337-77.55 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561.) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 22979093
C.A.: 5693 FAX (772) 589-6469
18905 Orange Avenue
Ft. Pierce, Florida
-3-
E. Engineering Evaluation and Conclusions:
September 10, 2018
Based on the information obtained from this site investigation, we are pleased to offer
the following evaluation: I
The boring logs indicate the subsurface soils consist mostly of fine-grained Sand and
fine-grained clayed sand. "N" values recorded during the boring operation indicate the
soil density is generally medium dense. Please refer to the soil boring logs for specific
information. relative to the soil description.
Based on the existing soil conditions, the proposed structure can be supported on a
shallow foundation system provided that the site is properly prepared.
The following sections provide recommendations for the site preparation and foundation
design.
F. Site Preparation:
The proposed storage building area and areas to be paved, plus a minimum margin of
five feet beyond the proposed construction shall be stripped and grubbed of surface
debris, including vegetation, roots and organic matter. Stumps shall be removed
entirely. The building area should be graded level and proofrolled. Any soft yielding
areas shall be excavated and replaced vifith clean compacted fill. Sufficient passes
should be ' made during- compaction operations to produce a density no less than 95
percent of its modified dry Proctor value (ASTIVI D 1557) to a depth of two feet.
After the- exposed surface ' ha ' s been proofrolled, the storage building and pavement
areas ma�__be filled to the -desired grades. The fill material shall consist of clean
granular sand containing less than 10% material passing the U.S. Standard No. 200
mesh sieve. Place structural fill in loose layers of 12 inches in thickness and compact
each lift to at least 95 percent of its modified dry Proctor value.
After excavating for the footings, the disturbed footing subgrade should be recompacted
to 95 percent (minimum) of its modified dry Proctor value. This can be best achieved
by making several passes with a relatively light -weight walk -behind vibratory sled or
roller.
r K.U., PF -'.179A'A /Al I in Nn - AACI / Aidip F_ Kp.11p.r P_E_- SH366
F��
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN V72) 337-7755 . P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 - E-Mail: KSM@KSMENGINEERING.NEr ST. LUCIE (772) 229-9093
C.A.: 5693 1 FAX (772) 589-6469
18905 Orange Avenue -4- September 10, 2018
Ft. Pierce, Florida
G. Foundation:
Provided that our recommendations for site preparation are followed, the proposed
structure may be supported on conventional concrete, steel reinforced footings
designed for an allowable soil bearing pressure of 2,500 pounds per squarefoot, or
less.
With the foundation properly designed and the site properly prepared, we anticipate
total settlements less than % of an inch and differential settlement of less than % of an
inch. The majority of the settlement should occur during construction.
H. Floor Slabs:
A conv6ntional.slab-on-grade can be used in the "at grade" portion of the storage
building. We recommend the disturbed subgrade below the floor slab be re -compacted
to 95 percent of the modified Proctor maximum dry density (ASTIVI D 1557) prior to
placementof the concrete. An estimated modulus of subgrade reaction of 150 pounds
per cubic inch (pci) can be used for design of the slab -on -grade. , We recommend that
control joints -be incorporated in the slab at frequent intervals to control shrinkage
cracks and expansion.
A moisture barrier is recommended beneath the floor slab to prevent moisture migration
from the underlying soil resulting in dampness of the slab.
Pn..I,i r Kallor PF -RiOQq /.ql I i,� m� - Agn / Adi. r K.11.r t3l= - CMARR
UP a lk 9
L%L'JAVJL
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772)589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) B45-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
G.A.: 5693 FAX (772) 589-6469
18905brange Avenue -5- September 10, 2018
Ft. Pierce, Florida
1. Closure:
This report has been prepared in accordance with generally accepted soil and
foundation engineering practices based on the results of the test borings and the
assumed loading conditions. No warranties, either expressed or implied, are intended
or made. - This report does not reflect any variations which may occur between the
borings. - If variations appear evident during the course of construction, it would be
necessary to re-evaluate the recommendations of this project.
Environmental conditions, wetland delineation, water quality, and municipal
requirements are not a part of this report.
We are pleased to be of assistance to you on this phase of your project. When we may
be of further service to you or should you have any questions, please feel free to
E-mail to: dcs.di.al@gmail.com; Rodolfov@mbveng.com
Pnn.lri r, K.H., P r - A79Q_1 I _CZ1 I i, M� - AM I _hdi. P K.11.� P P - RRIRF;
Keller Schleicher & MacWilliam Engineering & Testing
BORING NUMBER B-1
KSMP. 0. Box 78-1377
PAGE 1 OF 1
Sebastian, FL. 32958
Telephone: 772-589-0712
Fm 772-58M469
CLIENT J.L. Dial
PROJECT NAME 18905 Orange Avenue
PROJECTNUMBER 183105-b
PROJECTILOCATION
Ft. Pierce,
Florida
DATE STARTED 918/18 COMPLETED 9/8/18
GROUND ELEVATION
HOLE
SIZE inches
DRILLING CONTRACTOR
GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample
�.ZATTiMEOFDRILIJNG
4.00ft
LOGGED BY JR/JV CHECKED BY JEK
ATENDOFDRILLING
NOTES -See Attached Location Plan
AFTER DRILLING
A SPT N VALUE A
C)
of
>_
(n a
Lu
20 40 60 80
0-3
W
ul m
its
W
�- =
Z
(L
PL MC LL
o_
Lu
MATERIAL DESCRIPTION
M
iLm
> a
0 W
0
" '
z
=)
i 0
20 40 60 80
2 z
0
no 0
0 z
<
W
0
X
0 FINES CONTENT (%) 0
Co
it
0.
0
20 40 60 80
Light Brown Sand, Slightly Clayed with Roots
Light Brown Sand, Slightly Clayed
5-5-6
...... . ...... ..............
2
SS......
........ ...... ......
:...Y Dark Gray Clayed Sand
e
10-1 14
3-
........ ...... ............... ......
v
SS
(27)
......... ... ...... . ...... ......
........ ...... ...... . ...... ......
SS
SS
a-8 10
(18)
..... .......
Ss
X_SS1
10-10-8
...... .... ................. ......
(18)
..... ...... ............... ......
R Light Gray Clayed Sand
SS
8-12-12
(24)
...... ...... . ...... ......
10
Bottom of borehole at 10.0 feet.
I?
m
0
9
0
I
Keller Schleicher & MacWjlliam Engineering & Testing
BORING NUMBER B-2
KSMP. 0. Box 78-1377
PAGE 1 OF 1
Sebastian, FL. 32958
Telephone: 772-589-0712
Fax 772-589-6469
CLIENT J.L. Dial
PROJECTNAME 18905 Orange Avenue
PROJECTNUMBER 183105-b
PROJECT LOCATION Ft. Pierce, Florida
DATE STARTED 9/8118 COMPLETED 9/8118
GROUND ELEVATION
HOLE
SIZE inches
DRILLING CONTRACTOR
GROUNDWATER LEVELS:
DRILLING METHOD Split Spoon Sample
VAT TIME OF DRILLING 3.83ft
LOGGED BY JR/JV CHECKED BY JEK
AT END OF DRILLING —
NOTES See Attached Location Plan
AFTERDR11-LING —
W
A SPT N VALUE
C)
EL
�
lwl-
W
20 40 60 80
PIL MC LL
0.9
= a
MATERIAL DESCRIPTION
W
W Co
WE
Oz�
a.
W
�n
cy
>w
0—
�:)*
Z
0
20 40 60 80
=)
z
()
Mo
0 z
0 FINES CONTENT (%) 0
U)
W
w
0
w
n
Bottom of borehole
SS
5-5-6
SS
6-8-12
(20)
SS
12-15-15
(30)
SS
13-12-12
(24)
SS
14-10-12
7�x
CE)
cla
I
7U-UU* WIDE
EAS�i
<
FZ
Q�
pz La
� (fj
�;613-2
U- C�
Lu
oc
6 . 004
FPL
r MU(j 40-E 2406.710
�arcel 4421-0001-00011
O.R.B. 0487 PG. 2189
LOCATION OF TESTS
SHEETI OF I IW 11162=
PERMIT #: -a
PROJECTM 183105-b I " &
9
t-74
DRAWN BY: J.L
DESIGNED BY: J.K.
DATE: 20180911
ONE
SCALE: Nj