HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASEOct 171910:34a Hometec Contrppfgrs Inc 77-'- 8-2139 p.1
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
SGANNED
BY
St. Lucie County
Request for 30-Day Temporary Power Release
Date: 3a /.. Permit Number:
Project Address: D2
3 yY,2-2-
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE
REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
I. This temporary power release is requested for the above stated purpose only, and there will be no
occupancy of any type, other than that permitted by construction during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement,
including Building Division Policy, which is incorporated herein by reference.
3. All conditions and requirements listed in the attached document entitled "Requirements for 30 Day
Power for Testing" have been fulfilled and the premise is ready for compliance inspection.
4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating
the'reason for the request. Power may be removed from the site and/or a Stop Work Order issued if
the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to fift
the Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE
DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT.
OCT 17 2019
Permitting Department
St. Lucie County, FL
Planning & Development Services RECEIVED
- Building & Code Regulation Division JUN 06 2019
t� �` �1 ��
2300 Virginia Ave
v L co ui c C_ tz ' Fort Pierce, FL 34982 ST. Lucie County, Permitting
772-462-2165 Fax 772-462-6443
Request for 30-Day Temporary Power Release
Date: Jr Permit Number:
Project Address: _--,.Qo2\ lViGlCotel/ S)2
r elcce
SCANNED
BY
St. Lucie County
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. INCONSIDERATION OF APPROVAL OF THE
REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
1. This temporary power release is requested for the above stated purpose only, and there will be no
occupancy of any type, other than that permitted by construction during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement,
including Building Division Policy, which is Incorporated herein by reference.
3. All conditions and requirements listed in the attached document entitled "Requirements for 30 Day
Power for Testing" have been fulfilled and the premise is ready for compliance inspection.
4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating
the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if
the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift
the Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE
DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT.
OWNER SIGNATURE
GENERAL CONTRACTOR
St. Lucie County
Building and Zoning Department
Requirements for 30 Day Power for Testing
I. Form entitled "Request for 30-Day Temporary Power Release" must be fully executed and posted
in the Building Department record files prior to inspection.
II. Inspection Requirements:
1. Address numbers shall be posted per county Ord. No. 7.05.09.
2. All entrances, exits, windows and garage doors must be lockable.
3. All circuits on exterior shall be terminated in a box with weatherproof cover. The same
applies to a disconnect. If circuits are at or above 7'6" from grade they may be capped with
wire nuts and taped.
4. All breakers must be installed. Any blank space must be closed by a breaker or approved
filler plates.
5. Interior Wiring: All receptacles, light fixtures and fans must be trimmed. Any fixture below
T 0 from the floor or mezzanine that is not available at the time of inspection must have an
Inviso plate installed. Fixtures at or above that height may be capped with wire nuts and
taped.
6. All smoke detectors must be installed.
7. Kitchen cabinets must be installed; any exception for special conditions or circumstances
must have an approval prior to scheduled inspection.
8. Sewer and water connections must be complete. Only well pumps are excluded from this
requirement.
9. Exterior construction must be complete and weather tight, including stucco, siding, roof and
soffit.
10. Permit work shall be substantially completed except for back orders, paint on exterior, carpet
and/or floor covering, pumps, air conditioners and driveway.