Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutLETTER - GODWIN ENGINEERING AND DESIGNGODWIN ENGINEERING AND DESIGN, LLC
8378 Foxtail Loop, Pensacola, FL 32526 1 (850)712-4219 1 chad@godwineng.com BY
St. LUae COU11tg!
June 12, 2019
To: St. Lucie County Building Division
2300 Virginia Avenue
Ft. Pierce, FL 34982 I c
��+•; a 3 i.lil
Re: O'Donnell — Residential PV Roof Mount Installation + ucln Ccunty, Permitting
5541 Teal Terrace
Fort Pierce, FL 34982
REVIEWED FOR Gmfi9 AP
CODE COMPLIANCE ST(6c7�nA�
Plan Reviewer, ST. LUCI��E��CrrOUNTY
This letter is regarding the installation of a new ground-mpp¢&�5�far PV system at the address
above. I have analyzed/reviewed the attached plans and have determined that the Ground Mounted
PV Structure is in compliance with the applicable sections of the following Codes and Reference
documents:
Codes:
2017 Florida Building Code 6th Ed., FBCq�
ASCE/SEI 7-10 Min. Design Loads for Buildings & Other Structure
References: ��• IVI
Aluminum Design Manual 2015.
IronRidge Exhibit EX-0001
Per FBC 2017, the Ground Mounted PV structure is considered risk category I structure and will be
subject to the following design criteria: Design Wind Speed(V +t) - 150mph 3sec gust, Exposure
Category — B
The structure is a simple column(pier) and beam (cross pipe) system. The tops of the piers are
connected in the E-W direction by the cross pipes which cantilever over and extend past the end
piers. The cross pipes are connected by proprietary IronRidge XR1000 Rails spanning up and down
the slope which cantilever over and extend past the top and bottom cross pipes. There are typically
two rails per column of modules. The modules are clamped to the rails by the IronRidge module
mounting clamps.
If the structure is constructed according to the attached drawings and in accordance with the
IronRidge Ground Mount installation manual, it will be more than adequate to support the design
wind loads.
Please see attached documents and contact me should you have any questions.
Sincerely,
D. Chad Godwin, PE 81360
Exp.02/28/2021
1�\
Udonnell
GROUND BASED
283571NDUSIRIAL BLVD., HAYWARD, CA 94545
Project Details
NAME
Odonnell
LOCATION
Fort Pierce, FL, 34982
MODULE
LG:LG320NlK-A5(40mm)
DIMENSIONS
66.38" x 40.00" x 1.57"(1,686 x 1,016 x 40mm)
Load Assumptions
DATE
2019-06-12
TOTAL MODULES
55
TOTAL WATTS
17,600
TILT
25 deg
CONFIGURATION
5-Up
Foundation Requirements
WIND EXPOSURE
B
TYPE
Concrete
WINDSPEED
150mph
HOLE DIAMETER
12 in.
GROUND SNOW LOAD
0 psf
MIN HOLE DEPTH
72 in.
Substructure Requirements
Foundation Loads
PIPE SIZE
3"
SHEAR
1,8541bs.
DIAGONAL BRACING
Yes
MOMENT
Oft-Ibs.
UPLIFT
-2,874 Ibs.
3rd Party Substructure Materials vllli
TOTAL PIPE 244' 4.9" j�j" '� •� ��•, i h 'I-�+ '>
TOTAL CONCRETE 2.44 yd 3
_ •" j P V I,
C.
*. .8 60 *�
j©n�'•FtORIOP:
11il ONIA V 601ll
Last updated by Chad Godwin on 2019-06-12 11:24:47 -0700
Udonnen
r
GROUND -BASED
29357 INDUSTRIAL BLVD., HAYWARD, CA 94545
Plan View
Side View
CANTILEVER
N-S PIER 90"
SPACING
SOUTH EDGE 1
CLEARANCE
MINIMUM
HOLE DEPTH I
°•aE°��
aEO 16\
�.�I'1�'I
t ; 4 $
f(t.. I.71
REVIEWED FOR
COMPLIANCE
tSTo IJCIE/VCOUNTY
®®CC
8'2.2" NORTH EDGE
618.4"ABOVE CLEARANCE
5'8" BELOW 1 $'8' BELOW
1— _1 9'0.. a
1 n NS PIER SPACING
12" HOLEDIAMEfER
Note: The Images displayed in this report are meant to represent one portion of the array. The use of a break line indicates that the array may continue on beyond that point.
Last updated by Chad Godwin on 2019-06-12 11:24:47 -0700
///IIJ
OnInnen
GROUND -BASED
28357 INDUSTRIAL BLVD., NAYWARD, CA 94545
Pipe Fittings Detail
Front View
Clamp Detail
"MODULE
FRAME
UNIVERSAL
FASTENING
OBJECT
Mid Clamp, Plan
INECTOR
ING
Mid Clamp, Front
UNIVERSAL
FASTENING
OBJECT
PV MODULE
FRAME
RAIL
UNIVERSAL FASTENING OBJEC
PV MODULE
XR1000 RAIL
3' RAILCONNECTOR
3'TOPCAP
3'PIPE LBING
Side View
II ,j
RAIL
PV MODULE
FRAME
UNIVERSAL
FASTENING
OBJECT
STOPPER
SLEEVE
End Clamp, Plan
End Clamp, Front
REVIEWED FOR
CODE COMPLIANCE
ST. LUCIE COUNTY
E®CC
STOPPER
SLEEVE
UNIVERSAL
FASTENING
OBJECT
RAIL
PVMODULE
FRAME
\\\\\�Xe C. c---- � X GO �i
4) :Z
V360
.� ;Z_
r ®. S EOF '14
Last updated by Chad Godwin on 2019-06-12 11:24:47 -0700
r Udonnell
GROUND -BASED
28357 INDUSTRIAL BLVD., HAYWARD, CA 94545
Grounding Diagram
('Al (Mr)) (nl (Mr))
w
w
w w
Tw
Plan Vieo* one Greundirg Lug mgdmd per oaminuaus subanay.
OUFOor Grounding Lug*
CAMO
Fault Current Min 10 AWG
Ground Path — Copper Wire
0 Bonding Points F Fault Current Ground Path
Section View
'Groundlip Wgs areaim are am required W aymeas using
cerlaln Enphase rnom.enere orcarmi Sunpamer modules.
Equlpmant gmunding Is aWlaced wh Ne EngagecaWa for
Erphase or Iho AC module cable rystemfor Sunpawar We their
ino,rmed MC.
\ 1
;� � 11 •�j F� �; �t �_:;� r1
V �
?• n amp i ,j
L'L ( ` t •4 1 N
l
00
' 81 �
htir :it
EOF
%il��0JVAL 6 a\('yll
Last updated by Chad Godwin on 2019-06-12 11:24:47 -0700