Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPLANSI
f
Gulf Coast Supplg and MFG 5v Crimp Metal roding FL #11651.12
2L ga. 5v crr% metal roofing attached to plgwood deck using a9
wood screws wit self sealing washer at 12" o.c. max spacing over
(tgpe 2) 30 lb felt underlagment installed with min. 4 side laps
laps fastened with corrosion resistant tin caps and with I. " ring
spaced L o.c. at all laps and two staggered rows 12' o.c. Pre
deck to trusses using attachment detail on this sheet
R
5/8 thick light textured
itucco on typical concrete
block construction
12
SLOPE 14
RIGHT ELEVATION
12
4 SLOPE,
0'-0' = Finished Floor
LEFT ELEVATION
---------------------- ---------4
somw
5/8" thick x 8"w cut
coral finished stucco bands
ai,"ni.a: If"r- - r—v-
Gulf Coast Supplg and MFG 5v Crimp Metal rooting fit #11451.12
2G ga. 5v crimp metal roofing attached to plgwood deck using #41 x 1.5'
wood screws with self sealing washer at 12' o.c. max spacing over ASTM D
(tgpe 2) 30 lb felt underlagment installed with min. 4 side laps and L' end
laps fastened oth corrosion resistant tin caps and with 1.25' ring shank nails
spaced L o.c. at all laps and two staggered rooms 12" o.e. in field. Attach
?aced
to trusses using attachment detail on this sheet
---------------
5/8" thick light textured77
stucco on typical concrete
block construction
SCALE: 1/4' - 1'-0'
Finish Columns with /
5/8" thick cut coral
finished stucco bands
Gulf Coast Supplg and MFG 5v Crimp Metal roofing FL #11651.12
26 ga 5v crimp metal roofing attached to plgwood deck using a9 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(tgpe 2) 30 Ib felt underlagment installed with min. 4 side laps and G' and
laps fastened with corrosion resistant tin cap& and with 1.25" ring shank nails
spaced V o.c. at all laps and two stagggered rows 12' o.c. in field. Attach
deck to trusses using attachment detail on this sheet
5/8" thick x 8"w cut
coral finished stucco bands
2" x 4" top plate 1I 1/2' drgwall ceiling on truss bottom cord
I/2" drywall on
20x 4" studs at IL" O.G.
base —board 11 11 / 2" x 4" P.T. bottom plate
\ 4" concrete slab with fibermesh OR
VxV #10/10 WWM on L mil Visqueen over
clean compacted termite treated fill
nterlor Non—Bearinq Partition
12
4 1 SLOPE,
stucco on typical concrete 5/8" thick x 8% cut
block construction coral finished stucco bands
REAR ELEVATION
SCALE: 1/4' - r—O'
Gulf Coast Supplg and MFG 5v Crimp Metal roofing FL #II451.12
2L ga. 5v crimp metal roofing attached to plgwood -deck using #9 x 15"
wood screws with self sealing washer at 12' o.c. max spacing over ASTM D
(tgpe 2) 30 lb felt underlagment installed with min. 4 side laps and L" end
laps fastened with corrosion resistant tin caps and with 1.25' ring shank nails
spaced V o.c. at all laps and two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet
ov
l V
FOR
PLIANCE
%Q�IJ�VTY
C
1/8' Thick cut coral stucco over paper
backed wire lath nailed to substrate through
one layer of 15 lb felt using 8d nails. Substrate
to be 19/32' CDX Pggwood nailed at V o.c.
in field and edges with IOd ring shank galvanized
nails into truss webbing.
1I-MI
IMI
IMI
I_MI
M
I=I
ICI
ICI
I0I
ICI
ICI
Ini
ICOII
ICI
ICI
FRONT ELEVATION
SCALE: 1/4' - 1'-0'
ALL CONTRACTOR WARRANTIES BEGIN WHEN THE CLOSING
OCCURS BETWEEN THE BUYER AND WYNNE BUILDING CORP.
AND WILL CONTINUE FOR ONE YEAR FROM THAT DATE
PERMITTING INFORMATION (FORM 100)
Florida Building Code Residential: Lth Edition and ASCE 1-10 for Wind Loading
Suildin Deign is: Enclosed Risk Categorg. II Wind Velocity: IL5 mph ultimate
Mean Roof Height: IIII'—OO' Roof Pitch:
4.12
Internal Pressure Coefficient. tote
tpwr
Subjectabmhty to damage frog Weathering: Ne ible Termites:Veru Heavu
Width of Roof End Zone: 3'-4■ Wind Speed:i0mph ultimate
Wind Exposure Clawfication: C 1.21 x O.L = 0.126
Adjustment factor for Exposure Height: A§D esi n
wam
Load Combination: ASCE 1-10 Section 2.4 DL+LL: DL+O.LWL: 0.6 L 4WL
Components t Cladding Wind Pressure (NET) Root Zone: I. +20.L/-32.L psf
R Zone: 2. +20.L/-51.0 pal
R Zone: 3. +20.L/-84.0 psf
Components t Cladding WON End Zone Width: '_
Components t Cladding Wind Pressure (NET) Well bane: 4. +35.8/-38.1 pat
= Roof Zone I
Well Zone. 5. +35.8/-41.8 pat
Walls Zone 4
Components t Cladding Wind Pressure (NET) on Garage Door:+32.0/-40.3paf
Shear Walls Considered for Structure? yes
Continuous Load Path Provided? Yea
Ott = Roof Zone 2
Are Components an Cladding Detail— Provmded7 yies
Walls Zone 5
END ZONE
Minimum Sal Searing Pressure: si, Presumptive: X S Test: psi
Caner Zones
S E!OO UC APPROVAL- FOR IM A T P O E TION FOR O E IN S
Rod Zone 3
ROOF LIVE LOAD: 31 pal ROOF DEAD LOAD: 10 pat
FLOOR LIVE LOAD —_ list FLOOR DEAD LOAD:_10 pat
JOB ADDRESS:
D
FLOOR PLAN �l Reeat top plate L"w x 3/8"d Counter top - varvfy typo
^for steel support angle with contractor
CRASH POST D E T A I L see detail on this sheet 17
TYPICAL NOTES: SCALE 1/4" = 1'-O" N.T.S.
I. Contractor to verify ALL notes and dimensions prior to steel
high by 4" diameter
steel crash post. Floor Steel countertop wpport angle
proceeding with work.
Flange with 4 - 3/8" Install 6' from each and and
Base cobinat
2. Contractor to STRICTLY enforce ALL OSHA Requirements.
expansion bolts into M; �gleenter of counter.
3. ALL Lumber to be used as Beam, Rafters, etc... to have
slab (3/8"t 50 ksi steel plate)
2' x 8" weed studs
a minimum 1,400 P.S.I. fiber stress.
1/2' drywall
at I6" D.C.
4. No dissimilar metals to touch.
S. ALL Concrete used for slabs shall be min. 2,500 PSI concrete.
2 �"q
2" x 8' PT woad plate
b t t
�„
ALL Concrete used for vertical filled cells, cont. tie eams a c.. o 0
shall be 3,000 P.S.I. concrete and/or 4,000 P.S.I. grout mix
6. Drywall at ceilings shall be leveled and attached to bottom chord
of trusses with screws per FBC R102.3.5. O
1. ALL wood in contact with concrete shall be pressure treated.
8. ALL wall dimensions are nominal and not finished wall or stud dimensions. O
9. ALL plumbing fixtures to be low flow.
10. Contractor to Provide Drain at water heater in accordance
with the current edition of the Florida Plumbing Code.
11. Contractor to Provide a 2'-8" wide door at one bathroom for
handicap accessibrhtg requirements.
12. Lowest finished floor to be set bg Governing Building Department 2„ E2�2'surveyor to set in field. h° ,213. Separation between residence and garage shall be per FBC R302.LL
14. Door between garage and residence shall be 1-3/4"t 20 min. rated door
w"H. = Water Heater
S. Wall and Ceiling shall have a flame -spread classification of not greater than 200 per FBC R302.9.1
�. Wall and ceiling finishes shall have a smoke -developed index of not greater than 450 per FBC R302.9.2
1. All exposed attic insulation materials installed on attic floors shall have a critical radiant
flux not less than 0.12 watt per square centimeter. Exposed foam plastic insulation
materials exposed on the underside of the roof deck or on the attic walls shall complg
with F.B.C. R316 - see permit info box of code edition
8. Gygppsum board material shall conform to ASTM C36, C19, C415, C514, C630, C931
C�fb0, C1002, C1041,0111, C1118, C1218 C1395, or C1396 and shall be installed
according to the following: (FBC R102.3.5)
ppryuall
Thickness
Location
Orientation
Pre"Mrg
M�nimini
I'faxiM
Max. spacing
of fasteners
ON
Nail sizing options for
installation of drywall into
wood framing members
2" x min. thickness
-ails
Scraws
y2
Ceding
Perpendicular
24"
7"
12"
13ga 1 3/8' long with 19/64" head
OR
0.098' diameter x 1 1/4" long
annular -ringed or 5d coder nil
OR
0.080' dia. xx 1 5/8" long with
15/64 headR
Walls
Either
Direction
I6'
g•
IL'
Gppsum board nil 0.080 dia.
x 1 5/8' with 9/32' head.
Ceiling
Perpendicular
24"
7'
12'
13ga 1 5/8' long with 19/1.4' head
OR
0.098' diameter x 1 3/8' long
annular -ringed or 6d cooler nil
0.092• dia. xR 1 1/8' long with
1/4' head
OR
Walls
Either
mection
16'
8•
I6'
Gypww board nail 0.011S' dia.
x 1 1/8• with 14/(4' head.
19. ALL ceramic the surfaces installed shall conform to ASTM A108.1 thru A108.6,
A108.1, A118.1, A118.3, A136.1 and A131.1
20. Cement, fiber -cement or glass mat g psum backers in accordance with ASTM
C1288, C1325, OR CI118 and installed I.A.W. manufacturers recommendations shall
be used as backer for the wall the in tub areas and wall panels In shower areas.
21. Insulation including facings such as retarders or vapor permeable members installed
within floor -ceiling assemblies, roof -ceiling assemblies, wall, crawl spaces and attics
shall have a flame spread index not to exceed 25 with an accompanying smoke
developed index not to exceed 450 when tested in accordance with ASTM E 84.
Insulation shall complg with F.B.G. R316.
Gulf Coast Supply and MPG 5v Crimp Metal roofing FL #1165I.12
26 ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c, max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min. 4 side laps and V end
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
?aced 6" o.c. at all laps and two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet \
Simpaon HETA 20 or equal
mth flu) iOd�x at
1/2' nei*
( 24" ac.) suppporting Max
18101bs. upld't
EdgeAluminum Drip .-
Edge /-
2' x 6" Sub -Fascia
Kagcan full o vent vmgl sent i
amng1/8' de shank x 1.5' hmg
roong "a" with 3/8' the. Madci
product approval - we chart al
5/8' thick light textured
stucco on typical concrete
block construction
#5 bar vert. w/
30' overlap
at each filled cell
Grade
al
KITCHEN ISLAND FRAMING, DETAIL
Ir`
12 1 ``a BATH MASTER
LAY-4(2 T`. '� ly
1 LA
I H
uv-i
1 +• I 1 3. 1 2' LAUNDRY
I I
1 1 2"1
1 I I 1�Yi "
3" aiwim-i
2" 2R
sou
Window Schedule
Mark
Size
Rou h Open.
Window Description
PRESSURE ZONE
I.
4'-6Ye"x 4'-6 %a"
54%"x 54Y4"
Single Hung
ZONE 4
2.
V-2 Yu"x 5'-3 re'
15' x 63 /;'
Single Hung
ZONE 4
s.
2'-2' x 3'-2%
21k2"x 31111
Single Hwig
ZONE 4
4.
3'-I" x 5'-3V
38' x 63'/4"
Single Hwig
ZONE 4
ALL Windows to be aluminum windows w/ tint
and mullions per elevations.
ALL windows to withstand pressures in permit info box
ALL windows in bathrooms to be tempered
All rough opening dimensions to be verified by contractor
with manufacturer a specs prior to construction
on sheet I
Door Schedule
Mark
Size
Rough Opening
Door Description
PRESSURE ZONE
A
4'-0' X 1'-0'
lose x 84'
Overhead Garage Door
ZONE 4
B
31-0' X 6'-80
41'i/4" x 8VV
larbeirdau Panel - Irimmung
ZONE 4
C
61-0' X 6'-so
14' x 81 %2" ra'°' 6'"e
Skang Glass Door
ZONE 4
D
X-O' X V-8'
Solid Core - Wood
- 6-Panel -Bi-fold
lemahed 24' x 81'2"
E
2'-6' X c-8'
Solid Care - Wood
- 6-Penal
F
5'-0' X 6'-8'
Solid Core - Wood
- 6-Panel - Br+oW
G
'-8' x 6'-8' x 1 N"
Solid Core Wood, Steel, or Masorete Door
H
2'-8e X 6'-So
Solid Core - Wood
- 6-Panel
J
2'-6' X 6'-8'
Solid Cont - Wood
- 6-Panel - Bi-PoW
ALL Exterior doors to withstand pressures stated
box on sheet #1
GARAGE DOOR SPECIFIED IN PRODUCT APPROVAL FORM
WITHSTAND THE PRESSURES STATED IN PERMIT INFO BOX
All rough openiri� dimensions to be verified by contractor
with manufacturers specs prior to construction
in permit info
AND SHALL
ON SHEET #1
12
PRE-ENGINEERED TRUSSES I" x 6' P.T. 8
4 at 24'o.c. TYPICAL block with case
( d w 1, a ufact ref) prior to door a
I_I IIII IIII- :�"*
-�lilllllllllllll IIII III
IIII-IIII I
TYPICAL SEC
shop ro logo y m n u
XXXXXXXZ
R-30 blown fiberglass
in bottom chord of trusses
I/2' drywall with smooth finish
Two rows of beam block filled with concrete
and (I) #5 bar Cont. in each row. Substitute
precast lintel Pilled with concrete and (1) #5
bar cunt. for bottom row over openings
1/2" drywall over 1" x furrin
Pi-foil
strippa at 14" o.c. with R4.1
insulation on tgpical 8" Block walls
All drywall to be installed per FBC R102.3.1
T
and shall meet all pertaining ASTM codes,
in
Mortar to be Tgp"M' onlgg proportioned per FBC R601.I
FBC R601.2.1.
and Mortar Jonts shall comprg with
Provide Dur-O-Rock at all wet areas (ex. showers, tuba etc...)
Fill cell with concrete and
(U #5 bar vert. (typical).
ax. spacing shall not exceed
Wood
48' unless otherwise noted
see foundation plan notes for
Base
spacing at openings
4" concrete slab with Fibermesh OR
Vx6" #10/10 WWM on 6 and Visqueen over
to
clean compacted termite treated fill
'�+''IIII-IIII
IIII�I�IIIII-
III II I III
II
�I "
14" x 14' Concrete footingg
with (2) #5 bars cunt, #5
T I O N
"and
transverse bars at 48 c.c.
Scale : 1/2" = 1'-0'
to
Masonry Beam
/
Hells
Install SGD thru buck into
block with 3/16" tap -con with
1 1/2" penetration at 6" o.c. max.
from each corner and 20." o.c. max
thereafter at head per product approval
Use 3/16' tap -con with
O 0
1 1/2" penetration at 6' o.c. max.
from each corner and 20" o.c, max
thereafter at sill per product approval
KITCHEN
r AAv
Or
12'
r
I
`14
2µ
r
I_ ."
2R
i'' BATH #2 N-
SANITARY RISER
n"
Attach buck to block mall with
1/4" dia. Etc* cone scree with inn.
1 1/4' panetratxm at 12" ac" am
and 4' max from each corner thru
xi� two
2' x 6" PT Buck
fin
se Weed saran claw iamb into buck
Detail
rt esah hwige and 16• as max and
at Door w+Q � dear .tt.ekpiit
NT5
INSTALL VULKEM BLOCK SEALANT
_T
ON ALL JAMB, HEADER, AND
SILL
BLOCK PRIOR TO BUCK
INSTALLATION
Instal window thru buck into
block with SAP tap -can with
1 1/2' penetration at 6" as max
free comer and 20.• oc. sax
Exterior face
there:br at dand 20' amax.
at head and sit . s per product approval
cr mall
stuck to be r x 4' PT
7ED
Vans.
-
I'x4' P.T. Buck oiled to
'M
Detail
k with case hardened role
at Windows prior to window attachment
NTS
IT
Verify attachment
hole location with GC
prior to fabrication
3/8"
steel
6"
COUNTER TOP BRACKET DETAIL
I' x 6" P.T. Buck nailed to
block with case hardened mils
Head prior to door attachment
fixed door
sliding door ;
N Masonry Wall
CIA
Bottom Trac Tgpical Flooring
Sill Install SGD thru buck into
block with 3/IV tap -con with
S l 1 d f n g Door Detail I from
each
c penetration at 6" ." max
from each corner and 20." o.c. max
At Masonry Wall NTS thereafter at Jambs per product approval)amb
Braden t Braden AIAe PA
Architects - Planners
411 S.E. Coconut Avenue
Tel : (112) 281-8258
Fax : (112) 281-8283
E-marl: bradenaia®comcast.net
wiUa U
m
v M
M
D
W
Of
Ill
IL
S
al
I-
ST,
"Ld,NTV
15'-3"
8'-10Y2,: I
8'-10%'2" I
l'-7 Y2" i'-7 Y2"
°° °° °°
EGRESS °
12" x 12" Concrete column
block filled with concrete and
13'-II"
p
(2) #7 bars vert. tied into
°
p
r -
lintels above
Filled cell under P O R ^ H
girder above (�,
WIRE LATH
IyGTUCCOCEILI
p
19'-9"
it
°
MASTER
T�p
°
BEDROOM
°
0 IF -
8'-O" A.F.F.
In
° °
° °
°
Flat Ceiling
I
°
I
°
Vanity to be O
I
O
4 Y2„high
Rod 4 Shelf
1
(48'-0" toll-8"
'Ceiling
A.F.F.
T
qV Vaulted
19
m
GREAT'ROOM
�LOS T 1"90
I
Rod I Shelf
n
�U
m in
-
a
°
I
Qv
to m
lit
T 32" DRYER ABHER
:.
9' S. ° LAUNDRY
I
O
r
I
<+
W-O" to 9'-8"
A.F.F.
O
°
Vaulted C
dingHD(NiNC.�Vanity
M42"
to be 34 Y2"high
ROOM
(1,(
T
counter tops to
overhang wa
3/8' thick steel11
9'5' 5'-3"
90„I
eq-
counter 14 1 op wpp
eq• coon
or tope to
t
over
ono wall 1.5'
in
c+l
SECOND
q BEDROOM
8'-0" A.F.F. O
Flat Ceding r
r
12'-8"
° O
THIRD
BEDROOM
° o
8`0" A.F.F. in
A/C Flat Ceding
#I
o V
12'-8" in
O
I (rl
in
° R-II Matta Inada4an Provide auto
150 Amp closer
Panel
° r-----------------
3
i I I
p I I
° I GOLF CART'
GARAGE
I 1
1
1
1
1
+41" high wall
Upper eabineta to
extend over Ref.
---
I I
" o I OW I
I I
KITC 1HEN m
/lh8'-O" to19'-8" A.F-F._ i
Vr) Vaulted Ceiling M O
I -
1
NON- NT
REF• NON-
OPENING
_ L_
if
/•_ Ia-1 start. Inrdawon
1
1
1
1
(
Provide auto
O
C
closer
4"40 Steel Bayard
©
Sae detail on this
sheet
F\# ul
O O
r
xc�At
ti As
w e
I
�
t____8'
-,OI
" A.F.F.
Flat Ceiling
G ARAG
1 4
OOf
Block wall in O
°
MT °
/garage be !
2'-8"
ck r+
°track block
°
EMERGENCY
EGRESS
r - - - - - - - - - - - - -
I
---�
I
r
I
I
r p
i
I
I
I
1
a
1
I
I
I
I
I
'1 J
H.B.
O
a -
in
W W
o
0
0
�p ❑°
°
,I,
r
W-
o
❑° ❑°
❑° °
W
W
®
®
T-8" 9'-0"
2'-8"
6'-4" 2'-8"
9'-0" T-8"
��35' -0��-O ,
F
Square Footage Breakdown
Total A/C S ace =
1,153
sq. ft.
Covered Porch Total =
212
sq. ft.
Garage =
459
sq. ft.
Total
Cubic Ft = 1'4,024
Under Roof Total =
2,484 sq. ft.
Wynn
Building Corp.
Date Drawn
Revisions :
Sheet
REAR
5-23-I0
Garage floor slope and
smoke detector revision
TH E
W i N D S O R
PORCH
Drawn log:
2,
RIGHT
C.C.U.
Checked bg:
Sppanish Lakes
Si. Lucie
County Florida
D.R.B.
OF 5
Comm #
15-159B
impact
r
0
1 lqlzlUL.,
I
Ul�ttL IXk/ i C.7:
I.
ALL FOOTING ARE DESIGNED FOR A MINIMUM OF 2,500 PSF SOIL
S.
SLOPE ALL PORCH SLABS, COVERED WALK, ETC. AWAY
BEARING CAPACITY. IF ANY SUB -SOIL, MUCK OR NON -UNIFORM
FROM HOUSE TO DRAINS (IF PROVIDED) PER PLANS
CONDITIONS EXIST, REPORT TO ARCHITECT AND OBTAIN
PROPER ENGINEERING DATA FOR DESIGN.
2.
ALL SLABS AND FOOTINGS TO BE A MINIMUM 2,500 PSI AT 28 DAYS
9.
DESIGN LOADS ARE AS FOLLOWS:
ROOF (DL+LL) = 41 PSF
ALL COLUMNS, FILLED CELLS, AND BEAMS SHALL BE MIN. 3000 PSI
WIND VELOCITY = PER PERMIT INFO BOX ON SHEET #1
BE 3000 PSI OR 4,000 PSI GROUT MIX AT 28 DAYS
EXPOSURE ="C"
3.
POISON SOIL AND COVER W/ L MIL. VISQUEEN WITHIN 24 HOURS. NO
SOIL POISONING TO BE ACCOMPLISHED OUTSIDE OF FOUNDATION.
10,
ALL REINFORCING STEEL SHALL BE GRADE 40, MEETING ASTM A -IL, t
4
GROUND FLOOR SLAB TO BE A MINIMUM 4" THiCK W/ IGX6 10/10
A-35 SPECIFICATIONS. ALL ANCHOR TO BE A - 30-1 STEEL.
WELDED WIRE MESH REINFORCING ON L MIL. POLYETHYLENE VAPOR
BARRIER ON TERMITE TREATED, CLEAN MACHINE COMPACTED FILL
11.
ALL DOWELS, SLEEVES, CONDUITS, INSERTS, BLOCKOUTS, ANCHOR
(MINIMUM DENSITY). LAP POLYETHYLENE 12" MINIMUM. FIBERMESH
BOLTS AND FRAMES SHALL BE IN PLACE PRIOR TO POURING CONCRETE.
MIX MAY BE SUBSTITUTED FOR WELDED WIRE MESH.
BE
FOR OPENINGS AND SPECIAL FEATURES OMITTED ON THESE PLANS,
SEE ARCHITECTURAL OR MECHANICAL PLANS WHERE APPLICABLE.
5.
LOT TO BE CLEARED OF ALL SMALL PLANT GROWTH AND DEBRIS
BEFORE FILL 15 BROUGHT IN. FILL MATERIAL SHALL CONSIST OF
CLEAN GRANULAR SAND CONTAINING LESS THAN 10% MATERIAL
12•
MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS:
PASSING THE US STANDARD NO. 200 MESH SIEVE. PLACE
FOOTING: 3"
BEAMS: 1-1/2"
STRUCTURAL FILL IN LOOSE LAYERS OF 12" IN THICKNESS AND
COMPACT EACH LIFT TO AT LEAST 95% OF ITS MODIFIED DRY
PROCTOR VALUE.
13.
LAP ALL REINFORCING STEEL A MINIMUM OF 48 BAR DIAMETERS.
4-
GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND
14.
USE STRUCTURAL GRADE WOOD WITH A MINIMUM Fb OF 1400 PSI
DIMENSIONS. BRING ANY DISCREPANCIES OR OMISSIONS TO THE
ATTENTION OF THE ARCHITECT.
15
ALL STANDARD LUMBER SHALL BE SYP WITH A MINIMUM Fb OF 1000
PSI OF NO.2 SOUTHERN PINE, UNLESS NOTED OTHERWISE.
11-
GARAGE FLOORS TO BE SMOOTH TROWEL FINISH (SLOPPED PER
FOUNDATION PLAN). PROVIDE 1-1/2" RECESS FOR OVERHEAD DOOR
14.
ALL LUMBER IN CONTACT WITH ANY CONCRETE OR MASONRY SHALL BE
PRESSURE TREATED. FASTENERS TO HAVE MIN. G185 RATING.
FOUNDATiON
FLAN
I An chan es
to
plans must
be submitted to the architect SCALE: 1/4" = 1'-0"
for rapproval before proceeding with construction.
2. Contractor shall be responsible for verification of all
notation and dimensions before starting construction.
3. Soil conditions assumed to be 2500 psf. Should any other conditions be
encountered, the architect shall be notified in writing for revision
4. Verify all recess thickness at showers, tile, etc....
5. Contractor to provide filled cell with concrete and 1 45 bar vert. at 48"
o.c. max. Provide (1) filled cell on each side of openings upp to 5'-II" wide.
Provide (2) filled cells on each side of openings from 6'-O" to 9'-II"
and Provide (3) filled cells on each side of openings from 10'-0" and up
Contractor to see plans forany other condition used_ Foundation walls
shall have filled cells at 24fs o.c. unless otherwise noted (see section)
6. Contractor to provide for Form Board Survey - Form Board Survey
to be provided to Truss Company prior to truss construction
1. Contractor to provide for soil test prior to construction and provide
a copy of soil test to architect for review prior to construction
8. ALL Reinforcing steel shall be grade 60, meeting ASTM A-14 and
A-35 specifications. ALL Anchors to be A-301 steel.
9. Provide a minimum of 3" concrete protection at footings and
1-1/2" concrete protection at beams for ALL reinforcing bars.
#5 bar Vert. w/ Thicken edge to 8"4"
30" overlap 11�.SEE TYPICAL with concrete and 4" concrete slab with fibermesh OR
at each filled cell r,SECTIONS one #5 bar continuous VxV #10/10 WWM on 10 mil Visqueen over
clean compacted termite treated fill
4" concrete slab with fibermesh OR GRADE
L'xL" #10/10 WWM on 10 and Visqueen over
clean compacted termite treated fill
FOOTING
SCHEDULE
Mark
saw
Desai
tion
I
14"W
x 14'D
MONOLITHIC FOOTING
WITH
2 #5 BARS CONTINUOUS
12"W
X 14'D
MONOLITHIC FOOTING
- V
STEP DETAIL ON THIS SHEET
30"
x 30" x IL"D
COLUMN FOOTING WITH (4)
#5 BARS EACH WAY
8'W
x 8"D
THICKEN SLAB EDGE
WITH
1 #5 BAR CONTINUOUS
®x
With
With
14°D
Curb at Garage
MONOLITHIC FOOTING
WITH
2 #5 BARS CONTINUOUS - CURB s 0' 0'
12nW
X 180D
MONOLITHIC FOOTING
- 4"
STEP DETAIL ON THiS SHEET
�.. c —� -.
QD 6E I • ..' � ..... _ (III I I I
III= 144w x 14"d concrete monolithic
Porting with (2) #5 bars colt.
14"
j TYPICAL FOOTING DETAIL
Orel C I/1" = P-n"
4" "concrete slab with fibermesh OR
L x6 #10/10 WWM on 10 mil Visqueen over
clean compacted termite treated fill
#5 bar cont.
r
10" (2) #5 bars cost. bottom steel
/ DET A II A T / if r A O PDOWN
12" x 12' concrete column
block filled with concrete
and (2) #1 bars Vert. tied
into lintels above
Top of footer
IL" below finished fioo-
4GE %?
SCALE 1/2" = 1'-0
"
Verify house slab
height in field
ME311111fiffol
PORCH SLAB EDG
#5 bar Vert. w/
30' overlap
at each filled cell
Adjust curb height
based on gar. floor
slope.
#5 bar in curb \
E 1/2" = 1'-0"
4' concrete slab with fibermesh OR
0XV #10/10 WWM on 10 fail Visqueen over
clean compacted termite treated fill
,)" a F F A-\
Tl
_ i1 III
I I I —III 14°w x 14"d concrete monolithic
footI g with (2) #5 bars Cont.
14"
GARAGE CURB DETAIL
SCALE 1/2" = I'•
4" concrete slab with fibermesh OR
Oxb" #10/10 WWM on 10 mil Visqueen over
clean compacted termite treated fill
#5 bar cont.
Ln
10^ (1) 05 bara Cont. bottom steel
12.
DETAIL AT 9" GARAGE STEPDOWN
A rALP 1/2" = 1'-0"
Termite Protection for New
Construction.
Soil treatment used for subterranean termite prevention
inside the foundation perimeter shall be done after all
excavation, backfilling and compaction is complete.
If soil area is disturbed after initial chemical soil treatment
area shall be re -treated with a chemical soil treatment
including spaces boxed or framed.
Treatment must be in accordance with the rules and laws
established bg the Florida Department of Agriculture and
consumer services.
Protective sleeves around metallic piprn penetrating
concrete slab on grade floors shall not be of cellulose
containing materials and shall receive application of
termicide in annular space between sleeve and pipe.
2" x 4' PT wood secured with \
3/8"dia. x V anchor bolt at 18" o.c.
overhead door track secured to wood
jamb per manufacturer's product approval
Garage Door Jamb Detail
GARAGE DOOR TO WITHSTAND PRESSURES STATED NTS
IN PERMIT INFO BOX ON SHEET #1. SEE PRODUCT
APPROVAL FORM FOR MANUFACTURER MAKE AND MODEL.
Filled Cell Masonry Column With One
#5 From Footing To Beam Each. Filled Cell Masonry Column With One
Conc. Fill To Be 3000 PSI
See Floor Plan For Location #5 From Footing To Tie Beam
Conc. Fill To Be 3000 PSI
See Floor Plan For Location
r:?• r
NO de •..ad?ty O y ^ r
Double Filled Cell Column Single Filled Cell Column
NTS NTS
0
I
r
H.B.
A/C
#I
15'-3"
r---- I ---- i
I
I FI I
24" "
I® I
II r�
I N� °
Thicken footing to W l•
under ffilled
r dcell
I "
I under girder bearing. I "
I 1— —
I s
I
I
I
L. 1— /-1 I I v / a L f-ft
12'
with
Into
x 12" concrete
concrete and
lintels above
column blocs
(2) #1 bars
"
8'-I0 Y2^
(
8'-10 Y2°
Il
Io'-off
— 7B7
F
Filled cell under
girder above
Rear
be
Porch Slab to
O
1
I
poured
separatelg
W
from
House Slab.
o
O
p
�
I
Rear Patio/Slab to
be Plush with bottom of
sliding door recess.
Slope I"
i
I
I
a
I
i
I
\ 4" concrete slab with fibermesh OR
4HxC' #10/10 WWM on 6 mil Visqueen over '
clean compacted termite treated fill I
o I
DRYER ASHER
I
i
I
o
I
FI I
I I
I I
I o o I DW I
i I
I pl 4" concrete slab with fibermesh OR I
4"x6" #10/10 WWM on L mil Visqueen over
clean compacted termite treated fill
MICROWAVE
RE' NON -VENT
se• cI.EAR
OPENING • O O
-- v ---- W.H.
i 4"# Steel Ballard
See detail on this sheet
Fist W
I � � O 1
I Q`� I
`--�
I
I
I Q Fi
W
I p 14 Step W
I to
I© I o
ri
I I
------®--L �'1
Braden 4 Braden AiAe PA Wunine Building Corp.
Architects - Planners
411 S.E. Coconut Avenue H T D .7
Tel : ('112) 281-8258 I I I
IC
Fax : (112) 281-8283 S anish Lakes
E-marl: bradenaiaecomcast.net S Lucie Count Florida
1=1 'IAQQL itAernnnn21
I I
I I
I I
UJ
I iL I
I a F51
1 � I
I I
I � I
I I
I I
I II
i
I it
I® 13'-0" II
I I
L— — — — — — — J
" O 1.5" Recess for
Garage Door
2'-8" _ _ 9'-01, 2'-8"
Vert.` tied REVIEWED
CODE CO PLIAQNi
ST. LDCIE COUNT
BOCC
0
Date Drawn Revisions :
REAR 3-28-18 5-23-18 Garage floor slope and
Drawn bg: smoke detector revision
PORCH c.c_u.
RIGHT Checked bg:
D.R.B.
H.B.
O
I
d-
Sheet Comm #
1�-15gB
impact
OF 5
ROOF SHEETING
ATTACHMENT DETAIL
I. Minimum Nall Size = 8d ring shank (min. 2.5" long)
2. Minimum Screw Size = #8 x 2"
3. Minimum Sheathing Thickness 19/32" CDX Fill wood
4. Use nails or screws bas d on press re for rooT stated
in permit Info box on these plans i�'or zone 3
Ke
Area
Ede
Field
Fastener
Pr Max.
Zone 1
6"
"
8d ring shank
45 psf
Zone 2
L"
8d ring shank
16 par
Zone 3
4
8d rIng shank
84 psf
** Zone 3a
L"
L"
#8 wood screw
112.5 psf
** Use nails or a yews based on pres re for roof stated
in permit info box on these plans ror zone 3
Concrete
/ Lintel
Column
Verify with Plan
V1
Reber
to Lintel
48 Bar Dia.
Min. Overlap
Provide #5 bars with min. 48 bar
diameters overlap into beam. Tie
filled cell steel into continuous
beam block steel.
Provide Cast -Crete = T _ -
Bu8-OB/OT procast - ---- -?-
lintel set in mortar _
Min. 8' Bearing--
Provide #5 bar set in pre -cast
R0CF FLAN
Scale : 1/2" = 1'-0"
lintel into beam where length of
the opening calls for it. - O h t 1' — O" 1 t h t d t h h t
e PT Buck
Pal per jamb
into Pilled ci
4' Pre -cast
ll
.. Si
ver sings a un ass o erwise no a on 1s s ee
— Roof pitch at 4:12 unless otherwise noted on this sheet
— Truss shop drawings to be provided by manufacturer
— An changes to this plan shall be submitted to the
architect for approval in writing prior to starting construction.
— ALL TRUSS TO TRUSS CONNECTIONS BY
TRUSS MANUFACTURER
— Architect to review Truss Shop Drawings Prior
to construction for layout and uplift verification
' Poured Filled Cell — Contractor to provide for Form Board Survey and to provide
Form Board Survey to Truss Company prior to truss construction
i #5 bars with min. 48 bar
re overlap in filled cell. Tie
all steel into continuous
steel.
Concrete Footing
(we footer schedule
for exact sizes)
DETAIL AT WINDOW OPENiNG iN
CBS WALL scale: I/2" = I'-o"
12"x 12" \
dumn Bloc
k
Rebar
Attachment
SINGLE PLY REAR GIRDER TRUSS
Nod 2' x 4' bloclurd to vart. leg of
tnm with 10d it Ll risk at 4' o a.
Install! Sasp on MGT me wall ml
5/8' clue. threaded rod T min. 12'
mto wet boar and III lOd nah arts treas
TRUSS BLOCKING DETAIL
AT GIRDER STRAPPING
NTS '
1/8' thick light textured stucco installed per
ASTM C 926 over ASTM D type 2 paper backed
wire lath nailed to substrate through one layer of
ASTM D Type 2 felt paper using 8d nails. Substrate
to be 19/32" CDX Plywood nailed at V o.c. in field \`
and edges with IOd ring shank nails into studs.
ulf Coast Supply and MFG 5v Crimp Metal roofing FL #11651.12
6 gga. 5v crimp metal roofing attached to plywood neck using #9 x 1.5"
pooif screws oath self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min. 4 side laps and 6' end
laps fastened with corrosion resistant tin caps and with 1.25' ring shank nails
spaced As o.c. at all laps and two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet \
Additional reeeat Lintel " u " n
sib bay Lintel Bar Clear A 8
Length Length Span Bars Bars
� :,; � � '• .• � � i 2 -10" 2'-8" I -6 2 u3 none
3'-6" 3'-4" 2'-2" 2,#3 none
8F8-OBAT eFe-m/IT BPB-0/27
Additional 41-0" 3'-10" 2'-8" 2,43 none
-nrm #5 bars
cLeA ,,a 2,93 no
no Row of 'H' " . w%
' f t Block Above ` �' v;,;• ',R� . • 5'-4" 5'-2" 4'-10" 2.#3 none
s. g'.• ;,� 5'-101, 5'-8" 4'-6" 2,44 none
recast Lintel
6'-6" 6'-4" 5'-4" 2,#4 none
t `0 Addition i
7'-6" 7'-0" 6'-2" 2.#5 none
BFIL-�/IT SFIi-IB/1T 8'-4" T-10" l'-O" 2,#5 none
NOTES:
I. min. coverage of steel=1.5"
2. min, bearing required a ea. end=S" ALL reinforcing steel Is grade 60.
3. standard for reinf. steel=ASTM A615
TYPICAL LINTEL SECTION
PRECAST CONCRETE )
LINTEL SCHEDULE
Mark
Window
Unit
I
Lmtc
Bins
cast -Crete
8 euheation
" ow
pySvk•
Battles
at"
8�
Tap
stool
Sin
Max,
1
(PLF)
Mariam
LUI'A
(fK
Max.
LLsste
1 LM)
L22
2'-7
V-C
8118-08/IT
I
#6
300
154*1
1024
L31
3'—
4'-0'
ar'S-OB/IT
—
I
$i
26i1
r3i3
1i3
L45
4'-5"
5'-10'
SFS-OB/rr
—
I
as
sos
"10*1
339
LIO
W-o'
i'-6'
SPS-OB/IT
—
I
s6
1234
836
121
LLO
C-8'
T-As
SPS-015/1T
1
85
log
1"
534
LSO
S'-O'
Y-4'
BPS-IB/2T
1
1B
2
8B
192
591
112
L90
T-O'
101
OPS-I5/2T
1
15
2
#I
L43
530
401
L905
9'-O"
10'-6'
AIL-ID/1T
ONE
1
a5
2
as
us
1183
401
LI00
MY-0-
11'-4'
81198-I15/1T
1
e5
2
as
S82
494
452
WOOD
10'-0'
11'-4'
8F16-ID/1T
ONE
1
115
2
#5
131111,
1028
452
L120
IyW-�0/�'
19'-4'
ePe-�/2T
1
x5
2
#5
411
428
324
LMOB
12'-0"
13'-4'
SP16-ID/2T
ONE
I
ID
2
#I
1015
110
324
L140
W-O'
IV-4'
SPIL-I5/2T
ONE
1
86
2
35
1250
tOif
259
LI60
w-0'
n'-4'
�8-ID/1T
1
85
2
05
300
M2
N4
LILOD
IL'-O'
11'-4'
SFli-IB/2T
ONE
I
Of
2
#5
950
500
194
- ALL LINTELS SHALL BE MADE BY CAST-CRETE.
- LINTELS SHALL BE FILLED SOLID WITH 3000 PSI CONCRETE
- REFER TO CAST-CRETE CATALOG FOR ALL INFORMATION REGARDING
LINTEL EMENTSRUCTION, HANDLING INFORMATION, AND SAFE LOAD REQ.
REQUIR- LINTELS OVER 14'-O" LONG ARE TO BE PRESTRESSED.
Simpson HETA 20 or lacri
hu mean one at etch tru
with tl0) IOd x I V2 nails -
( 24' sic.) sip orl Max.
18101bs. uplift
Alwmrw Drip
Edge t Fascia
12"
2' x 6'
Kaacan hi o vent vinyl soffit installed
marl1/a' die shank x 1.5'
roiling nail with 3/a' da. char
approval pair
product apprevd - «a chart sheet sl
12' x 12' concrete column
block filled with concrete
and (2) 87 bars vert. tie
into lintel@ above
thicken edge to 8"xe,
with concrete and
one #5 bar continuous
BEYOND
Top of rooter
ILbelow finished floor
12
4
1/2'
T
Aluminum Drip
Edge t Fascia
Flash and Counter
flash
Nail ledger to
gable and truss
with (2) IOd Is
at each web
hi -rib lath
vertical ad
to gravid
merben
3/Y panetratwn
5/8" thick light textured
stucco on typical concrete
block construction
Varies - see plan
#5 bar vert. w/
30' overlap
at each filled cell
Rear Patio/Slab to
be flush with bottom or
eliding door recess.
Step
per
foundation
plan -
Slope
per
foundation
plan
IIIIIIIIIIIIIIII1111=
—1111 T
i�l
Ical Section
Q
W
In
=0
41
)II!4 A
rZ
r
Q�
ID
'J 4J
a'
W
_$
a,�
N
�U„—
Q
p so
o0
H
III
tnC
u
C4
Brace Gable and
with 2' x 4" SYP #2
8ft back nailed to bottom
of top chords using (2) IOw
nails at each truss
PRE-ENGINEERED WOOD TRUSSES
�N. w 24"o.c. TYPICAL
( shop drawings bg manufacturer )
\R-30 blown fiberglass
in bottom chord of trusses
I/2' drywall with smooth finish
Two rows of beam block filled with concrete
and (1) #5 bar cunt. in each row. Substitute
precast lintel filled with concrete and (U #5
bar cant. for bottom row over openings
1/2" drywall over I" x furringg
atrlpps a! 16" O.C. with R4.1 f -toil
insulatlon on typical 8" Block walls
All drywall to be installed per FBC R102.3.1
and shall meet all pertaining ASTM codes.
u Mortar to be Type "M" onlgg proportioned er FBC R601.1
and Mortar joints shall comply with FBC �LOi.2.l.
Provide Dur-O-Rock at all wet areas (ex. showers, tubs etc...)
Fill cell with concrete and
lD #5 bar vert. (typical).
ax. spacing shall not exceed
48' unless otherwise noted
see foundation plan notes for
spacing at openings
4' concrete slab with fibermesh OR
L"x6" #10/10 WWM on L mil Visqueen over
/ clean compacted termite treated fill
FI
at Front
For c
Scale 1/2" = 1'-0"
Simpson HETA 20
Strap truss to wall
using Simpson MGT wit
hurricane anchor at each
truss
5/8 da.
threaded
rod with min 12 embec
( 24" o.c.) supporting
1810 lbs. uplift
Max.
HETA 2O
into beam
(22) 10d
truss leg
either wet set or in epoxy with
nails into truss. Add blocking to
per detail on this sheet
�
dMA
I�l
HETA 20
Simpson HETA 20 Provide for ter
Provide downspout hurricane anchor at each truss
( 24" o.c.) supporting Max.
1810 lbs. uplift
F'�EVIEWED FOR
CODE COMPLIANCE
Sew LUCIE COUNTY
w
w
� X
.r X:
s3 c
q leg
Wt'w
2s a
ti
�1O o0
tnq�OD
u n
s
N
W
O
i
r
Provide downspout
Opt. PATIO/SLAB
PANEL
"All
Palms
BR
Load
Were
Description
eras
arcs
Deacriptmn
Wee
Load
BR
Palms
2
40
1.0 ks
se
A/C camp
1
2
AHU
sl0
3.5 ke
30
2
3
4
2
30
4.6 kw
sl0
40 pal. eater HTR
5
L
Range
sL
12.0 km
50
2
9
8
I
120
1 1.8 Its
1 $12
Pie,p
11
10
Drop
si0
5.0 ka
1 30
2
11
12
1
20
1.5 km
s12
13
14
Diahseaher
s12
1.2 km
20
1
1
20
1.5 ke
s12
I'fierosave
15
16
Refrigerator
s12
1.2 km
20
1
1
20
1.5 ke
$12
Kitchen S.A.C.
n
18
Recepts
$12
20
1
1
20
L5 kid
812
Kitchen S.A.C.
19
20
Recepts
$12
20
1
1
20
1.2 km
$12
Clothes Washer
21
22
Recepta
812
20
1
1
20
0.81 its
$12
Garage Door Opener
23
24
Rocepts
$12
20
1
1
20
1.4 ke
$12
25
2L
Rocepta
s12
20
1
1
20
1.92 km
s12
21
2s
Rocepts
812
20
1
1
15
214
General Lighting
29
30
Recepte
s12
20
1
-
1
i5
s14
General Lighting
31
32
Recepte
s12
20
1
I
15
814
General Lighting
33
34
Exterior GPCI
s12
20
1
I
15
s14
General Lighting
35
3L
Bathroom GPt
s12
20
1
-
1
20
s12
smoke Datectors
31
38
General Lighting
s14
15
1
-
1
20
s12
Bathroom GPI
39
40
General Lighting
s14
15
1
-
soar 1
41
1 42
1 spare
PANEL "A" LOAD CALCULATION SHEET
Load Description
Qt .
Watts
Totai(Watts)
General Lighting l3 watts ag. Pt.>
.......... ...............
,Range,,,,,,,,,,,,,,
Refrigerator .... .........................................
Microwave .............................................
Dish Washer . .........
Clothes..Washer...............................................
Clothes,.Dryer................................................
Water Heater
Water Pump ...................................................
GaragDorOpn ........................................
,
1136
3
5,205
3,000
12,000
2
1.500
1
12,000
1
1.200
1,200
1,500
1
1.500
1
1,200
1,200
1
1.200
1.20
1
5.000
5.000
1
4.500
4 00
1 80
810
I
1800
I
810
Total Watts
31,415
First 10000 Watts 9100%
1
10,000
10.000
Remainder 21,415 040%
1
O
10,961,
Electric Heat or A/C 10,000 01.5%
1
10,000
10,000
Calculated Load
Watts
30,9LL
Voltage
240
Calculated Wattage Divided by Voltage = Total Amps 129.03
Panel Size Required = 150 Awps
Electrical S mbol Legend
S
Seigle Pole Switch
®
Recessed Can Light
Za
Dable Pow Switch
Eyebel Recoa d
PB
Push Button Snitch
Cr
Exhaust Pan
Duplex Outlet
¢
Calling Mounted Light
Spacial Receptacle
0-
Wag Mounted Light
Watarprod, ground fault interrupter
Light with Pull Chain faittte)
Floor Duplex Outlet
Computer Connection Jack
®
Carbon Monoxides Detector
4&
Flood Light
T
Thermostat
cso
Electrical Penal
0
Central Vac
[Ea
Electrical Meter
®
Smoke Detector
Call" fan
®
Talavaeon Jack
=
Telephone Jack
AC O BC
A/C Disconnect
I x 4 Fwroseent Light
®
12 x 4 Florescent Light
®
®
Speaker Hook -Up
❑=
Intercow
= JUNCTION BOX TO SUPPORT A FAN
T� me THERMOSTAT LOCATION
B/A = Balanced Air
Electric Notes:
sISO
I'.� S�C Adiiit'""" feed B
�� PANEL
AiC
124 CPM
IOrdOxL
MASTER'
BEDROOM
124 CPM
IOxIOxL
B/A
50 CFM
O
IL Claim
8x4x4
PORCH
1122xI22x10
R-7
7X
141 CPM
lOxlOx1
9 CFM
I :REAT
R1
LOSETI
7rRYFn
ASHER
LAUNDRY I
111 CFM
12140
SECOND
BEDROOM
B%A
THIRD
BEDROOM
100 Clam
Oxf4d
I. Use copper wire onlyg, no aluminum. 150 Amp
2. Provide and wire all required smoke detectors. Panel
3. Contractor to verify location of electrical
service and provider. i GOLF C A F
4. ALL paddle fans shall be on a rheostat. I
5. ALL bath and kitchen receptacles to be GFI protected. 22 PVA
GARAGE
4. ALL exterior outlets to be WP/GFI protected. 1. Recessed cans to be installed per NFPA requirements.8. AFCI receptacles are required in all rooms exceptKitchen, Bathrooms, and Garage. 2" Bar. sc eR. 1
io s5 cline ar m slab
9. A/C Return Air Balance Must comply w/ FBC RMIL02
10. A/C Refri erant lines that are run thru slabs must be
sleeved in i�VC 1
11.
ALL A/C Equipment shall comply with energy calculation
= C T R I C,4 L R I S r.- R
12.
All work shall be performed bg a licensed electrical
- Contractor .hall use AL-CU Landing lugs. NTS
contractor, the completed system shall be full operative.
- Contractor shall torque lugs I.A.W.
13.
Contractor shall pay for Miss. permits, ten in ,and
manufacturers recomisendationa which
inspections including blower testing where required.
shalt be verdied prior to construction
14,
All work shall be coordinated with other trades to avoid
interference with the progress of construction.
d
Iq, The electrical stem shall be coin letel and effectively
15.
All required insurance shall be provided for protection
rounded as requiredsb the latest edition the N.E.C.
9y
against the public liability and property damage for the
20. All material shall be new and shall bear underwriters'
duration of the work.
labels where applicable.
IL.
Contractor shall guarantee all materials and workmanship
free of defects for a period of not less than two years from
21. All equipment and panel sizes shall be verified before
the date of acceptance or certificate of occupancy, or one
ordering. The contractor shall provide circuit routings to
year from closing sale of house.
suit the ,lob conditions.
Correction of defects shall be completed without additional
charge and shall include replacements or repair of any
22. Furnish and install all fixtures as called for on the plans
other phase of installation that may have been damaged.
or as selected bg others.
11.
It is not the intent of these plans to show every minor detail
of construction. The contractor shall furnish and install
23. All raceways and pipes placed in or through any concrete
all items for a complete electrical system and provide all
slab shall be spaced a minimum of three diameters of the
the requirements necessary for the equipment to be placed in
largest conduit or pipe from any other service.
proper working order.
18.
All work shall be done in accordance with the N.E.C. and
24. All exposed wire below 9'-1" shall be installed in metal EMT
shall comply with all local codes and ordinances, and shall
conduit.
meet all standard requirements of the local electric utility
25. Dryer Vents to be installed per FBC RMI502
and telephone company.
141 CPM
IOxlOx1
I I 141 CPM
IOadOx1
12•
DINING
ROOM
I
I
1 OW
I ' I
I 124 CPM
IOxIOxL
IL• KITCHEN I
I 20adt0 xrn OW NTE I
Raul T F CLPEAR OPENING L - - - -
C' Jli iTCT
r-�
14• I
1 4416 Steel Ballard
I See detail an this sheet
i
Atmetar th Whit
L
L-- --
- -
GARAGE
r----------------- i
I I
I I
I I
I I
I I
1 I
1 I
I I
I I
I I
MECHANICAL LAYOUT
O - THERMOSTAT LOCATION SCALE: 1/4" = I ' - O 11
Braden t
Braden AIIA.
Architects - Planners
411
S.E. Coconut Avenue
Tel
: (112) 281-8258
Fax
: (112) 281-8283
E-mail:
bradenaiaecomcast.net
3 TON
SEE MANUAL
We and Energy
Cakkvtm
for uin?*
Install oulet
under disc. -
not shown for
clarltg
MASTER
BEDROOM
1
DRYER 1 ASHER I
LAUNDRY
,' 100, PORCH
WP GFCI
� l
I �P W,
I
I
I
I
I
1
I
GREAT ROOM
®I
/I
/ ir
/ I
/ I
DINING
ROOM
I
I �
IL
SECOND
BEDROOM,/ i
/
/ I
- I C.M. De
onlyy per
/ ( R314.3
/ I
/ I
-4--
S.
THIRD ,
BEDROOM----F:A-
uJ
® 147 I
loop
i -S
alb
1�I 1=1
C
11 Ili 1!
a;
�FCI
W.H.
4"m Steel Ballard
See detail on this sheet
22• x 540,
r T -Af`ao Acme I
m.Fa��
L-- -�-
1\
rV�OPTIONAL PANEL
LOCATION
Ll 116 ILI
/
' GARAGE
U FCI 1
<( / / �/ GFCI \
150 Amp I
Panel ' \
GFCI \ � \ \GFCI
r--------� _ g / r------ S--------i
Garage `., / Garage j
Door I va / i Door 1
Opener I ° i Opener I
GOLF CART:GARAGE
/
GFCIII 01GFC1
to gagelights
ELECTRiCAL FLAN
Past Light with O
SCALE: 1/4" = 1'-0" Photo cell
Center Post Light
Attic Ventina Calculations
Total Attic Space = 2101 sq. ft. C 3 9.
Venting Ratio 1/150 = 18.00 sq. ft. required
Provide A Continuous Vented Soffit
Wynne Building Corp.
THE WINDSC
S anish Lakes
S . Lucie County Florida
betwen driveways
REVIEWED F0' ''F1
CODE COMPLU-)kNCE
Wire For
Front Post
Light
Date Drawn Revisions : Sheet Comm 4
REAR 3-28-18 5-23-18 Garage floor slope and
Drawn by: smoke detector revision
PORCH C.C.U. F -I 15-159B
RIGHT Checked bg: Impact
D.R.B. OP 5
A=LIFE SAFETY WARNING
This symbol identifies Life Safety Warnings that should be read
given special attention by all persons installing trusses.
5PAGING NOTE
ALL TRUSSES ARE TO BE SET
AT 2'-0ON GENTER
EXCEPT AS NOTED
MULTIPLE PLY TRUSSES MUST BE
ASTENED TOGETHER PER ENGINEERING
BEFORE SETTING. REFER TO
ENGINEERING DRAWING TO DETERMINE
IF MULTIPLE PLY. A
DON'T LIFT TRUSSES
WITH SPANS LONGER THAN
30' BY THE PEAK.
r.11NSl 11 T FirSl
30' Span!or less
60 degrees
or less
30' to 60'
Spreader
Span Aj
Bar
12
Tag Lint span Approx
ag 4— Approx 2/3 to
Ls 1/2 of Span
REFER TO BCSI
Truss must be set this way if crone used.
This is an example, truss may not match.
Insist crane operator sets truss this way.
REFER TO BCS
Truss must be set this way if crane used.
Truss on example, your truss may not match
Insist crane operator sets truss this way.
All load bearing walls, headers,
beams & lintels must be in place
at indicated height before trusses
Q are installed.
AIFR HAIVIllt—Ill lt NOTE
UNLESS NOTED ELSEWHERE ON THIS LAYOUT, THESE TRUSSES
ARE NOT DESIGNED FOR AIR HANDLERS IN THE ROOF OR FOR
ANY OTHER A/C REQUIREMENTS. THIS MAY BE IN CONFLICT
WITH BUILDING CODE AND A/C DESIGN REQUIREMENTS.
CONSULT WITH BUILDING DEPARTMENT AND A/C CONTRACTOR.
Carrying Girder
For Truss to Truss
Connections see
hanger/connector ails must be as
shown. Guide tabs o
schedule in engineering Dome angle nails.
package.
Carried Truss
SEAT PLATES BY CHAMBERS
`r
IIIIIIIIIIIII
upset=l/4" heel=315/16"
PLUMB CUT END
2 x 4 Top Chord
WALL HEIGHT 8'
END DETAIL: TYPICAL VAULT
upset=l/4" heel=315/16"
PLUMB CUT END
2 x 4 Top Chord
WALL HEIGHT 8'
TYPICAL END DETAIL
TRUSSES FOR THE FIRST MODEL SHOULD BE SHIPPED AND SUCCESSFULLY SET BEFORE ANY MORE TRUSSES ARE BUNT FOR TEAT MODEL. _
ARRANSE WITH CRANE OPERATOR IN ADVANCE FOR A SPREADER BAR OF 18' - 24' IN LENGTH A
Do not Etand on trusses until they are braced per BCSI & properly nailed to straps & hangers
I
15,_3„ C L
19'-9" 191 15'4" I
INDICATES LOAD BEARING
REQUIRED BY TRUSSES
SUPPLIED BY BUILDER
AT A HEIGHT OF ll
ABOVE FINISHED FLOOR
.-
o
to
s-
1-
I
Jl
x
Jt
i.
J3
J3
J5
J5
GRA
A
Al
1
1 /1
I
A2
/1
A3
A4
a)
io
A5
AS
1
A5
I
1
A5
A5
I
I I
A5
14'-9"
3"
2"
I
A5
I
A5
2. 21 J /12
A5
A5
-- ^
1
117/1
ih
N
A5
1
s
I
A5
A5
Z
Is
A5
A5
1
A5Is
--
-- --—�����-- -- -- — --
AT
'
AT
"'
INVERTED "V" WEBS AT CENTER
o
WI B.C. PANNEL. LOAD W/ (2)
50# POINT LOADS PER TRUSS FOR A/H/U
AT
AT
a
ATAA
B
fN
e
T SETBACK BOSTON HIP
BHA
I�
J5
J5
J
J3
J3
J1
J1
PORCH RIGHT
I�I�I�I�I�I�111�1�1�1I
Iffi®�®���
losilk";�.�I.
Igo
QWX
!aa�!l�l
���
��
o��I
rl\
L��1: f�����_� L
INVERTED"" WEBS AT CENTER
Vie B.C. PANNEL. LOAD W/ (2)
Ill
�ilt,l
i' CLOU�CSED AREAS ARE OF
/ SPECIAL CONCERN & MUST BE I
CHECKED CAREFULLY & MAY
t INDICATE DEVIATION FROM
PLANS.
1
1
I
1
1
1
4�
GRA
IOSION HIP
i> BHA
�ht"I, - —
�TRUSSESCANOTaEBT �AON AL THIS AGREEGREEMENT
The legal description of the AroRED MENT IS SIGNED; R
p "are the busses will be installed Is: RETURNED
,The undemlgnetl acknowledges and egress: l: T1r,17e will be mad; In stria accordatrce alth tills W98 placement dlag layout,
which la the axle authority for determining su I.
All dimensions In this teyout have been env rill
fabrication of Ne trusses.
.3. Unless
wdttan notice b preNded b rifled by the undersigned.
Oilor delivery me undersigned agreeaen v no°d mall to Chambers T
each written notice la hrmished Chambers True° �0oh8 °° NB8 within tan (1g)
'to begin repelre roqulred, or to aobsV c4 oth shell have th II be lowed. In the event
4. The underelgnsd acknowledges receipt o/ C°SI �.a03Caummary heal b .N,I & In'Ich
6. Dedvery 4 to Job she, It la the buyar'e'roa n Y v'/TCA.
daMery. Chambers Truss has the sole autho p0^alblllty to make the job she euhable for
portion oflhe Joh aft° for dalHa rl�'to determina the suitable of The buyer I° reaponelble for ad donee dellveTNss will be responsible fo! dump tlejwe de oh a
baeause Job she la riot prepared for tlelW °�B^8BS d Chembere True° hoe ry only.
9uysr k responelble to Chambare Trues fa or buyer Is nol prepared for delhre to redeliver
d. Pike ae shown In paragraph 7 yelpµ, towing costa due to etta oontlltione. ry of trusses.
1hle.leydul A S60 per hour fee (or reNalona maybe cha change H any char
7: 7hls� le a PURCHASE ORDER to Chambers• Truss of the sum a Bee ere, made In reed by Chambers Tryea. Agreement a reaeonabla price. Invoice wig be made on dalWe and old
on delArery. Invoice greed to. or h nA
dell of fabrkated muY be made at scheduled date bf delvery Palo
aoxep'
ahomey'a fee for collet ej� �eM otlBe lg^ed agrees to pay Chambers. TNsa reasonable
chaise wltl be added for ell sums not peldwldreln^tem,glmey made, L92 r/,
e. Slgnatum or Inldgive Par month aenlce
nYa'hea on this sheet ppng(inrtas agroement to all terra haro11 ln.
g. In conalderetlon of he am
base a#ending or it }o, them material the underelgned
mtcontlttlonagy pusrontaes payment when duo of any end all Indebtedness
dab
Trusss11by any anOty receiving motorise and We untlarelgned agrees to a
aciple dnesa Including aq1, fees, d default In °w'� to
b10 Inl- Payment for matedal e Y the
70. In the event of any Irylgat(on concemin made by the
r payment referred to herein, g this agreement, Me demo famished hereunder
e Saint 60d° ooun parties egms that the eofe venue for any such hereon dill
7 f. Design responslbllltl edam
aeponslbllttlee For Cone- on U Using Metal plot nConnnedard ctetl W0000d Trussea0ufdellnes On
NSI/rPiblild ,4.2002
%TED
.3NED
FOR
TITLE
niml��P�' Bcsf1-0s"rop,egen<W,+A,$der„age,
P Ply trusses must be /aatoned together per engineering
before they are $et; }allure to do so can msult.ln roof calliopes.
Temporary and permanent bracing are required and can save life
and Property and Is the responsiblllty of the truss erector.
Study the contents of the In}ortnatlon packet Included on delivery
before setting trusses.
TtUlm mtstbe$OaW braced p —
Trusses must be set plumb and qu�g
Do not set bunks or stack of plywood roots other concentrated loads on trusses g material or any
this can cause calliopes, _
DO T SET TRUSSES USING THIS L4 YOUT
USE LAYOUT DEUVERED WITH TRUgSE3 TO SET TRUSSES
CHAMBERS TRUSS INC
3105 Oleander Avenue
Fort Plercei Florida 34982-8423
80
Fort Pierce 72 20-551-5932
Vero Beach 772-569.2012 Fax 772'�"g711
"! m•-. Ile., aeec 'Stuart '772-286-3302 '
Telres�AM It
presentafive's
shop drawing approval is NOT a
..double check" of the contractor. The contractor shall remain responsible
for checking field measurements and
other construction criteria. Architect's
approvaf covers general roof shape,
review of'. truss strapping, and loading on
structure from gra -
their res cty and uplift loads and
ve locati ns..
Approved By:
Date:
Brad &ne Qradon A.I.A. A
92.0/93.2 MITEK 4.2
DESIGN CRITERIA
County SAINT LUCIE
Building Department ST LUCIE COUNTY
Wind Design Criteria ASCE 7-2010
Wind Design Method MWFRS/C-C hybrid Wind ASCE 7-10
Roofing Material Shingle or Shake
Loading in PSF Roof R.D.L.
o Top Chord Live 20
Top Chord Dead 7 4.2
N ' o Bottom Chord Live 10 Non -Concurrent
Bottom Chord Dead 10 3
c TOTAL Load 37 7.2
w I H Duration Factor 1.25
rq Z Wind Speed 165mph
m T Top Chord C.B. Sheeting by builder.
0 R Bottom Chord C.B. Sheeting by builder.
y 0 Highest Mean Height 16-0"
Building Type ENCLOSED
Building Category II:Non Restrictive
Exposure Category C
Barrier Island No
Conforms to FBC 2017
K.U.L..=Kestraininq Dead Load C.B =Continuous Bracin
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the
Buildina Designer and/or Engineer of Record.
LlChambers Truss Inc. Drawing Name: M11392
Scale: 1 /4 = 1'
W
82 total trusses, 15 different trusses.
MI 4: RLC ACAD: RLC Reviewed By:
Date:10/07/15 Revised:03/21/18
v, FOR
14-4"l< WYNNE BUILDING CORP.
DESCRIPTION:
PORCH LEFT 71' CARLTON 3BED REAR PORCH
PAGE 1 of 1 CUSTOMER INITIALS EACH PAGE
15 TRUSS DRAWINGS ARE ATTACHED TO LAYOUT M11392 /
it as