Project: Proposed Pool
Date:
August 1, 2019
Address: 5436 Palmetto Avenue, Fort Pierce, FL
Kt(er
19CMT2036
Area Tested: Pool Deck
Permit
ESFrmittlng
1906-0576
Material Type: Dark Brown Sand
ech:
Client: Pools By Vital!
Address: 1544 SE Crowberry Drive
Compaction Req.:
95%
Port St. Lucie, FL 34983
Proctor Method:
ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
p
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
West Side of Pool
12"
FL
9.6
98.1
102.0
12.0
96.2%
Yes
2
North Side of Pool
12"
FL
11.6
97.4
102.0
12.0
95.5%
Yes
3
East Side of Pool
12"
FL
12.8
100.1
102.0
12.0
98.1 %
Yes
4
South Side of Pool
12"
FL
10.4
99.0
102.0
12.0
97.1%
Yes
5
6
BY
7
t9tiLucieC
.
ountv
8
9
10
11
12
13
14
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pool deck and is not a verification of Soil Bearing Capacity.
Legend for Elevation: G2'!/(�
PR = Proofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by:
SL = Springline FL = Final Lift Keith LeBlanc; P.E.
SG = Subgrade BG = Below Grade Federal Engineering R Testing; Inca
BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394
TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #54T1
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication rifst-mements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the ,lagiee of compacticq 0f the ;astod layer of
material only. A density does not replace a soil beading capacity determination. These density tests do not certify the underlyinu sob ,patonids -bulow the,prouosea structure.
The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify 0t the undedyin,� soils, Wlll support the
proposed structure without settlement If no soil borings have been performed to verify the underlying soils, we recommend that sa.l,hoflhg's tiv'lisrfi mbd to evaluate the
suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy min/stonns, iet6sdag'iT6it be performed on this
work.
PAGE 1 of 2
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction to verify underlying subsoil conditions. Our scope of services only included
testing the top 12" of the pool bottom pad material. FET was not contracted to perform supervision of the pool pad
preparation or excavation to verify if undermining of the building foundation has occurred. This testing of the fill material
does not include an analysis of the underlying soil conditions and materials to determine if they are capable of supporting
the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or
conditions below the tested top 12" of material. If no soil borings have been performed in the location of the proposed
structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the
underlying soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building and pool
foundations. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on
other areas of the site or other, dates. Any subsequent site disturbances due to water erosion, rain, construction activities,
excavations, overgrown vegetation;'traffic and other disturbances will void this test and the site must be re -compacted and
re -tested prior to construction.'."
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved our
reports is reserved pending our written approval.
It has been a pleasure working with you and look forward to do so in the near future
,
Page 2 of 2