HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATESt. Lucie County InspG'Ctions
2300 Virginia Avenue SCANNED
Ft. Pierce, FL 34982 BY
(772) 462-2172 St Lucie County
CERTIFICATE OF TERMITE TREATMENT
- CONSTRUCTION SOIL TREATMENT
PERMIT # .S C- b 910- 0-30 E JOB ADDRESS 55o1 Z'rhen5o l Ave- E. P, n c' (/.
BUILDER oral Poati
PEST CONTROL CONTRACTOR _HANNAN PEST MANAGEMENT
PEST CONTROL LICENSE# JB99418
NOTE:
We, the undersigned, hereby certify that we have pretreated the above -described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
4(he gr I L
Square -feet of area treated: 5".5 Chemicals used: C v O e ✓ 1
Percentage of solution: 2 C% Total gallons used: 2 2
Date of treatment: l — 3 - os-- Time of treatment: ff 'l O Aly.
❑ Footing
❑ 1 st Treatment
❑ Re -treat
❑ Slab
❑ 1st Treatment
❑ Re -treat
❑ Driveway
❑ 1 st Treatment
❑ Re -treat
❑ Pools
i_' st Treatment
❑ Re -treat
❑ Other
❑ 1 st Treatment
❑ Re -treat
FBC 104.2.E Certfcate of Protective Treatment for prevention of termites.
A weather resistant jobsite posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
completed, providing a copyfor the person the permit is issued to and
another copyfor the building permit files. The Treatment Certificate shall
provide the product used, identity of the applicator, time and date of the
treatment, site location, area treated, chemical used, percent concentration
and number of gallons used, to establish a verifiable record ofprotective
treatment. If the soil chemical barrier method for termite protection is used,
final exterior treatment shall be completed prior to final building approval.
St. Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
❑ Perimeter for Final Inspection
Signature 1
erminator
There must be a completed form for each required treatment or re -treatment and this form must be on
the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will
fail and a te-inspection fee charged.