A. M. ENGINEERING AND TESTING, INC. n'C��t�,
590 N.W. MERCANTILE PLACE SCANNGt�
PORT ST. LUCIE, FLORIDA 34986 N
OFFICE: (772) 924-3575 FAX: (772) 924-3580 BY
St. Lucie County
REPORT OF FOUNDATION PAD COMPACTION
Client: First 1 Construction, LLC
5206 SE Schooner Oaks Way
Stuart, Florida 34997
Site: 1472 Sweetbay Circle, Harbour Ridge
St. Lucie County, Florida
Foundation Pad, Attached Addition
Report Date:
November 18, 2008
Project No:
----
Lab No:
08-1507
Technician:
W. Hissong
Permit No.:
0806-0079
Density tests and Hand Cone Penetrometer (HCP) readings were made from slab grade through the depth of
fill at a minimum of three locations in the building pad. The density tests were performed in general
compliance with ASTM D 2922. The HCP test, in conjunction with information about the soil type, is
empirically correlated to the relative density of subsurface soils.
Density
Test Na
Date
Tested
Location
Elevation
(feet)
Dry Density (pct)
Percent
Compaction
In Placel
Proctor
1
11/18/08
Northeast Comer
0 - 1
111.6
113.3
98.5
2
1 Center Area
0-1
110.4
l 13.3
97.4
3
Southwest Comer
0-1
111.7
113.3
98.6
* Elevations are below slab grade.
The depth of the fill was approximately one foot. The fill should extend at. least five feet beyond the
building perimeter. At the time of our testing no information was available regarding the foundation pad
setbacks.
In the locations and depths that were tested, the soil has been compacted to a minimum of 95 percent of the
modified Proctor maximum dry density (ASTM D 1557). No soil borings were performed below the
recently placed fill.
,�
Distribution: Submitted by:
Client - 2 A. M. EN INE'�ERJNG—A�AND TESTlNG,1NC.
SLC Bldg. Dept. — 1 / *0,
Paul C. Martin, P.E. S� A/8 �40
PCM/ah Florida Registration No. 65051 <�"��bio ?OOB