HomeMy WebLinkAboutA.M. ENGINEERING - FOUNDATION PAD COMPACTION1� J A. M. ENGINEERING AND TESTING, INC. n'C��t�, 590 N.W. MERCANTILE PLACE SCANNGt� PORT ST. LUCIE, FLORIDA 34986 N OFFICE: (772) 924-3575 FAX: (772) 924-3580 BY St. Lucie County REPORT OF FOUNDATION PAD COMPACTION Client: First 1 Construction, LLC 5206 SE Schooner Oaks Way Stuart, Florida 34997 Site: 1472 Sweetbay Circle, Harbour Ridge St. Lucie County, Florida Foundation Pad, Attached Addition Report Date: November 18, 2008 Project No: ---- Lab No: 08-1507 Technician: W. Hissong Permit No.: 0806-0079 Density tests and Hand Cone Penetrometer (HCP) readings were made from slab grade through the depth of fill at a minimum of three locations in the building pad. The density tests were performed in general compliance with ASTM D 2922. The HCP test, in conjunction with information about the soil type, is empirically correlated to the relative density of subsurface soils. Density Test Na Date Tested Location Elevation (feet) Dry Density (pct) Percent Compaction In Placel Proctor 1 11/18/08 Northeast Comer 0 - 1 111.6 113.3 98.5 2 1 Center Area 0-1 110.4 l 13.3 97.4 3 Southwest Comer 0-1 111.7 113.3 98.6 * Elevations are below slab grade. The depth of the fill was approximately one foot. The fill should extend at. least five feet beyond the building perimeter. At the time of our testing no information was available regarding the foundation pad setbacks. In the locations and depths that were tested, the soil has been compacted to a minimum of 95 percent of the modified Proctor maximum dry density (ASTM D 1557). No soil borings were performed below the recently placed fill. ,� Distribution: Submitted by: Client - 2 A. M. EN INE'�ERJNG—A�AND TESTlNG,1NC. SLC Bldg. Dept. — 1 / *0, Paul C. Martin, P.E. S� A/8 �40 PCM/ah Florida Registration No. 65051 <�"��bio ?OOB eel2o' ,04,+s Werver-ame"company\CO.D. Jobs\First I Construction, LLCV472 Sweetbay Circle. Harbour Ridge\08-1507 - Pad w. Fill - Attached Addition.doc