Loading...
HomeMy WebLinkAboutPLANS, — F� , , XIST GROUTED CELL W/ #5 w ON Do ❑ ❑■ ❑ IN ❑ w ❑ ■ ❑ ❑ 8" CMU WALL 0 5'10" HIGH ❑ w ■ ❑ ❑ 8" CMU WALL 5'10" HIGH ■ w ❑ 90X70 GARAgF_ DOOR— DP-125/-27 ❑ i ■❑ ❑■_ _—� ■ _ ❑ Elm ND ❑w [,IL4' MAXI, TYP. ADD DOWEL PER DETAIL FLOOR PLAN FRONT ELEVATION REAR ELEVATION SIDE ELEVATION DOD ATTACHED TO TRUSS W/ 8d @ 6" O.C. 3' T,YR. ROOF ZON DESIGN CRITERIA WIND 150 MPH ASCE 7-10 EXPOSURE "B" GCpi +/- 0.18 ENCLOSED ALL OPENINGS PROTECTED RISK CATEGORY I ROOF LIVE LOAD 20 PSF DEAD LOAD 17 PSF GABLE B' FLOOR LIVE LOAD 125 PSF ROOF ZONE 1 /2" CD' 8d @ 6" E ROOF ZOI 1' OVERHAN GABLE I FILE COPY 2X6 BUCK TO JAMB W/ 1/2" "J" BOLT W/ 2" WASHER, 2" HOOK, 5" EMBED @ 1',3',5',7' ABOVE SLAB 15# FELT BARRIER (2) #5 T&B ROOF FRAMING PLAN I� i ml win L REINFORCING PER PLAN TYP 3"=1'—O" GARAGE BUCK 2X8 BLOCK (RIPPED) (10) 16D 2X6 TOP CHORD AT BRACE (5) 16D BACK — NAIL EACH END 2X6 "T" BRACE @ 48" OC 8" EXIST FOOTING 30,_8„ FOUNDATION PLAN ' ALL SUPP RTSd @6" O.C. �\ HETA16 (10) 10D TO BLOCK NAIL ROOF @ 4" O.C. AT ALL TRUSSES W/ G BRACE ST. LUCIE COUNfi BUILDING DIVISION ,J NAIL @ 4" O.C. REVIEWED FOR COMPLIAN REVIEWED BY 1 L_ MAX 1 TYP CAS_ G- AB LE DATE LANS ANPFPERVIT MUST BE KEPT ON JOB OR 12" MAX. NO INSPECTION WILL BE MADE 1/2" CDX PLYWOOD SIDING NAILED W/ 10D @ 6" EDGES AND 12" O.C. FIELD GABLE TRUSS PER PLAN TRUSS TO BEAM 4 HGAM EQUAL SPACE (2) SIMPSON HGAM EACH BRACE THESE PLANS AND ALL PROPOSED WORK ARE SUBJECTTO ANY CORRECTIONS REOUIR10 BY FIELD INSPECTORS THAT MIAY BE NECESSARY IN ORDER TO COMPEY WITH ALL APPLICABLE CODES. D ETA L U J DOF ZONE 3 z a Z Z w 0 N BRACE )ETAIL o U O U OOF ZONE 3 HGAM EQUAL SCE GABLE SS TO TIE BEAM DOF ZONE 3 TRUSS I HETA12 1SS CONGEALED FASTENERS ORATtACHYENTS ARE THE REANSIMUTY oFTHE t NTiiACfOROFREW ALUMINUM SOFFIT INSTALL PER MANUFACTURER NOA OR FLORIDA APPROVAL # TO MEET DESIGN PRESSURE OF —33 / +24.3 PSF #5 PER PLAN GROUT CELL TO TOP OF DOWEL ADD #5 DOWEL @ 48" O.C. THROUGH EXIST INTO NEW EXIST 8"X8" FOOTING — 8"X8" FOOTING ADD FTG. W/ (1)#5 F--0 OT N G D ETA L ' ECEIVE SG"ED By St. LUCi i`AOf1@� 00 \./ N ` DD N 00 °O '0 r N O N Q r v � U r1 (n CD I I M" N N v s= w w In cn m N fV O 0) m e, r v . z Ln Ln o 0 00 "O ti C (� 0 '-a ti > L ro o m L l tU t wn by. chk d scale: job no. 12.05.2013 JUL 1 2 ILI Q.�1 Z U�zO Q u� u� O zuLJ WEbO OOp� 0 z O Q o Q I` -I uJ z uu✓ U—) I=-000 PAGE OF 1 3/4"= V-0" 3/4"=1'-0"