Field Density Tests of Compacted Soils Method D-6938
Client: JMC Contracting, Inc Date: June 5, 2013
Address: 41 E. Ocean Blvd., Stuart, FL 34994 Order #:
Project: Proposed Residence Permit #:
13-1542
Address: 1848 Wildcat Cove, Fod-Pierce,_FL- - - - - - Tech: SJ
Area Tested: Building Pad Compaction Req.:
95%
Material Type: Light Brown Sand w/Shell Fra s & Traces of Rock Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NW Corner of Pad
12"
FG
8.1
106.4
108.0
10.6
98.5%
Yes
2
NE Comer of Pad
12"
FG
7.3
105.9
108.0
10.6
98.1 %
Yes
3
Center of Pad
12"
FG
7.8
106.6
108.0
10.6
98.7%
Yes
4
BE Comer of Pad
12"
FG
7.5
107.1
108.0
10.6
99.2%
Yes
5
SW Comer of Pad
12"
FG
8.2
106.3
108.0
10.6
98.4p/o
Yes
6
7
8
9
10
11
J�'0�
12
EC
13
O
R,pti.
14�
15�
Remarks: See Reverse For Disclaimer y
Legend for Elevation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: /
SL = Springline FL = Final Lift KEITH LEBLANC '
SG = Subgrade BG = Below Grade Professional Engineer #59394
BC = Basecourse BOF = Bottom of Footing Cert. of'Autharizatiori #5471
TOP = Top of Pipe FG = Finished Grade State of Florida,
As a mutual protection to clients, the public and ourselfs, all reports are submitted as the confidential property of clients, and aL LNoriz96'o� fc�publicationG f statements,
conclusions or extracts from or regarding our reports is reserved pending our written aproval. A density test determines the degree cfcompactico-otttia tested layer of material
only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy raiNstorms: retesting must be performed on
this work.
Pursuant to your request, Federal Engineering & Testing, Inc has performed a
compaction test at the referenced project on the reverse side. The purpose of our test was
to determine the degree of compaction of the tested layer of material only. In no way
shall a compaction test replace a soil bearing capacity determination. A soil boring test
must be performed by client prior to construction to verify subsoil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If
environmental analysis of the soils is required, we can provide a proposal for performing
an environmental analysis of the soil materials. The scope of services is for determination
of the degree of compaction of the tested layer of material only. No other analysis is
implied or warranted.
Job project specifications were not available at the time the work was performed.
Determination of the pass/fail compaction results are based on current common industry
requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of
the AASHTO T-180 standard for paved areas. such as roadways and parking lots. If
different specifications are required, Federal Engineering & Testing, Inc shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied
upon to represent conditions on other areas or dates. Any subsequent site disturbances
due to water erosion, rain, construction activities, excavations, overgrown, vegetation,
traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
As,L�,t,mutual protection to clients, the public and ourselves, all reports are submitted are
the confidential property of clients and authorization for use, publication of statements,
conclusions or extrabts; from or regarding our reports is reserved pending written
approval.
%(W
It has been a pleasure working with you and look forward to do so in the near future.
.YI
- .. Phone 954-784-2941
800-848-1919
Lijede--l-1, �/t I 954-784-7875
Fax 954-784-7875
A TESTING INC. www.fed-eng.com
260 SW 13th Ave Pompano Beach, FL 33069
Field Density Tests of Compacted Soils Method D-6938
Client:
Address:
Project:
JMC Contracting, Inc
41 E. Ocean Blvd., Stuart, FL 34994 RV
St.
Date: June 5, 2013
Order #: 13-1542
Permit #:
Address: 1848 Wildcat-Cove,-FortPierce, FL - - Tech:
SJ
Area Tested: Building Pad Compaction Req.: 95%
Material Type: Light Brown Sand w/Shell Frags & Traces of Rock
Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NW Comer of Pad
12"
FG
8.1
106.4
108.0
10.6
98.5%
Yes
2
NE Comer of Pad
12"
FG
7.3
105.9
108.0
10.6
98.1 %
Yes
3
Center of Pad
12"
FG
7.8
106.6
108.0
10.6
98.7%
Yes
4
SE Comer of Pad
12"
FG
7.5
107.1
108.0
10.6
99.2%
Yes
5
SW Corner of Pad
12"
FG
8.2
106.3
108.0
10.6
98.4%
Yes
6
7
8
9
10
11
12
13
14
15
Remarks: See
Legend for Elevation:
PR = Proofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by:
SL = Springline FL = Final Lift KEITH LEBLANC �/'�3
SG = Subgrade BG = Below Grade Professional Engineer #59394
BC = Basecourse BOF = Bottom of Footing Cert. of Authorization #5471
TOP = Top of Pipe FG = Finished Grade State of Florida
As a mutual protection to clients, the public and oursefts, all reports are submitted as the confidential property of clients, and authorization for publ;cXtion of statements,
conclusions or extracts from or regarding our reports is reserved pending our written aproval. A density test determines the degree of'ccinpeclior of the tested layer of material
only. A density does not replace a soil bearing capacity, determination. After laying dormant for a period of 90 days or after heavy'reiNslorms, retesting must be performed on
this work.
Pursuant to your request, Federal Engineering & Testing, Inc has performed a
compaction test at the referenced project on the reverse side. The purpose of our test was
to determine the degree of compaction of the tested layer of material only. In no way
shall a compaction test replace a soil bearing capacity determination. A soil boring test
must be performed by client prior to construction to verify subsoil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If
environmental analysis of the soils is required, we can provide a proposal for performing
an environmental analysis of the soil materials. The scope of services is for determination
of the degree of compaction of the tested layer of material only. No other analysis is
implied or warranted.
Job project specifications were not available at the time the work was performed.
Determination of the pass/fail compaction results are based on current common industry
requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of
the AASHTO T-180 standard for paved areas such as roadways and parking lots. If
different specifications are required, Federal Engineering & Testing, Inc shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied
upon to represent conditions on other areas or dates. Any subsequent site disturbances
due to water erosion, rain, construction activities, excavations, overgrown, vegetation,
traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are
the confidential property of clients and authorization for use, publication of statements,
conclusions or extracts from or regarding our reports is reserved pending written
approval.
It has been a pleasure working with you and look forward to do so in the near future.