Loading...
HomeMy WebLinkAboutREVIEW COMMENTSSir�csdtf (�Osss�r Planning & Development Services Building & Code Regulation Division 2300 Virginia Avenue Fort Pierce, FL U982 Address: City / State / Zip: Parcel #: Zoning: 80B Osprey Ct Fort Pierce, FI 34949 1410-502-0343-000/9 HIRD APPLICATION INFORMATION Permit Number: Permit Type: Contractor Name: Business Name: Business Addr: City / State I Zip: 1907-0149 REVIEW COMMENTS SC All Nbu S$° udecolint, Page 1 Owner(s): Michael A Chesanek Jurisdiction: SAINT LUCIE COUNTY BUILDING RESIDENTIAL RENOVATION Lot#: Stories: Block: Automatic Sprinkler System? No Fax Number_- x Email: kP C.LI e'e �^e, i c /MP.ti l REVIEWS AND COMMENTS Review Type Status Reviewed By Date Started Date Completed, Date Released �s FRONT COUNTER REVIEW COMPLETE Audrey Humphrey 7/8/2019 71812019 71812019 Comment PERMIT ON HOLD COMPLETE Gary Stepalavich 9124/2619 912412019 Comment: -. PLANS EXAMINER REVIEW INCOMPLETE Jpi, Inc -Andrew 913012019 Comment: fiff WIND EXPOSURE CATEGORY IS INCORRECT. SITE IS WITHIN 600' OF OPEN WATER IN EXCESS OF 9/26/2019 5,000'. (R301.2.1.4.3) --- 9/26/2019 Comment: 2) KEYNOTES ARE MISSING FROM STAIR DETAIL. ([A] 107.2.1) 9Y26/2019 Comment: 3 REVISE DRAWINGS TO INCLUDE ONE PLAN TO SHOW EXISTING WORK TO BE REMOVED AND ONE N TO SHOW NEW WORK. ([A] 107.2.1) Comment: 4) COLUMNS FORTHE DECKARE ON THE SEAWALL. THE SEAWALL IS DIVIDED BY THE PROPERTY LINE. 9/26/2019 OWNERSHIP OF THE SEAWALL IS NOT CLEAR. THE COLUMN CANNOT BE INSTALLED OUT OF THE PROPERTY LINE OR ON ANOTHER OWNER'S STRUCTURE. PLEASE CLARIFY ([A] 107.2.1) Comment: 5) INFORMATION IS MISSING FROM PLANS. SHOW FOUNDATION REQUIREMENTS, COLUMN ATTACHMENT 9/2612019 TO FOUNDATION & BEAMS/JOISTS. SHOW ALL CONNECTIONS OF ALL MATERIALS & COMPONENTS. NO \ CONNECTION OF CEMENT AND HARDI BOARD PROVIDED./HARDI BOARD REQUIRES A PRODUCT t 1 PPROVA . ([A] 107.2.1) ���bbb���ddd 9/26/2019 Comment: ��''pp Comment: 7j STRUCTURAL SYSTEMS OF BUILDINGS AND STRUCTURES SHALL BE DESIGNED, CONNECTED AND 9/26/2019 ANCHORED TO RESIST FLOTATION, COLLAPSE OR PERMANENT LATERAL MOVEMENT DUE TO STRUCTURAL LOADS AND STRESSES FROM FLOODING EQUAL TO THE DESIGN FLOOD ELEVATION. (R322.1.2) 9/30/2019 Comment: 8) COMBUSTIBLE STRUCTURE REQUIRES 5' SETBACK FROM ADJOINING SITE. (FBC [A] 101.4.5) SEE FL FIRE PREVENTION CODE SECTION 27.1 REFERENCE TO NFPA 501A SECTION 6.4. C("6 "OL 4pr47 qo� - ?`,s4 �'467 -MI6 3 - gos9 11 :4. \i