Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 v w r wgCvcy I VED SEP 11 2019 Permitting Department St. Lucie County, FL CERTIFICATE OF TERMITE TREATMENT SGAN1 20 BY CONSTRUCTION SOIL TREATMENT St. LurieCnartfi PERMIT #: JOB BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 ADDRESS: r7?Oq C'i"S ARriGQ 51o) We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 9-104 Percentage of solution: -05% Date of Treatment: A' -2019 ,Footing 1st Treatment Re -Treat Driveway 1't Treatment Re -Treat Other 1't Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: Time of Treatment: 3•/0 go Slab 1st Treatment Re -Treat Pools 1't Treatment ' Re -Treat xxxxx Perimeter for Final Inspectio Signatur of Exterm' ator Da Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to estabiish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CID, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014