Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATESSt. Lucie County In-YectionR E C E I V E D 2300 Virginia Avenue JUL - 8 2008 Ft. Pierce, FL 34982 public Works (772) 462-2172 St. Luck county, FL CERTIFICATE OF TERMITE TREATMENT SCANNF® CONSTRUCTION SOIL TREATMENT BY St. Lucie Con* PERMIT # 002- 02 7;2, JOB ADDRESS Lfo7 jFa i4 51. )„, BUILDER PEST CONTROL CONTRACTOR PEST CONTROL LICENSE# JB99418 NOTE: L. i t. J h rdt e,7 -f9 ` --sf'r l C f . d(_ca ACA LT We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: SO 0 0 Percentage of solution: O 6 Date of treatment: 6 -13 ❑ Footing ❑ l st Treatment ❑ Re -treat Q'Slab L' l st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1 st Treatment ❑ Re -treat ❑ Other ❑ 1 st Treatment Re -treat Chemicals used: -7—a i JJc V Total gallons used: S-0a Time of treatment: %'0-0 A-M FBC104.2.6 Certificate of protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copyfor the person the permit is issued to and another copyfor the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment. If the soil chemical barriermethod for termite protection is used, final exterior treatment shall be completed prior to final building approval. St. Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. ❑ Perimeter for Final Inspection Signature ofXterminator There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged, St. Lucie County Inspections 2300 Virginia Avenue Ft. Pierce, FL 34982 (772)462-2172 CERTIFICATE OF TERMITE SCANNED BY TREATMENT• Lucie County CONSTRUCTION SOIL TREATMENT PERMIT # 05703 - Q 2 -J,), JOB ADDRESS 1103 7; H-V-1 Rd BUILDER H 8 PEST CONTROL CONTRACTOR PEST CONTROL LICENSE# JB99418 NOTE: nV tr^On Y" vicei We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 320 44eorr-R Percentage of solution: 2l-% Date of treatment: d 7-- O i� 'footing 16,- rst Treatment Re -treat ❑ Slab ❑ 1 st Treatment ❑ Re -treat ❑ Driveway ❑ 1 st Treatment ❑ Re -treat Pools ❑ 1 st Treatment ❑ Re -treat ❑ Other ❑ 1st Treatment ❑ Re -treat Chemicals used: t cI A-g P- Total gallons used: 12, R Time of treatment: I i� Y z) A /,W FBC104.2.6 Certificate of Protective Treatment for prevention of termites. Aweather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copyfor the person the permit is issued to and another copyfor the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment. If the soil chemical barrier method for termite protection is used, final exterior treatment shall be completed prior to final building approval. St. Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. ❑ Perimeter for Final Inspection 4 '73�i Signature of exterminator There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged.