April 16, 2019 LuecOUnty
American Foundation, Inc.
10780 NW 138th St. #D6
Hialeah Gardens, FL 330
RE: Pile Installation Certification
Proposed Residence
Fort Pierce, FL
690�: a'f2�
_ 3931 sw 47 Ave.#104
Davie, Fl. 33314
Tel: 954-584-6115
E-mail: rcoletto(aisoilprobe net
Soilprobe-Engineering-& Testing, 4nc-.has-completed-field-observation-of-auger-cast piles
installation for the above referenced project. Piling operation was conducted by American
Foundation corresponding to the date of April 16, 17, 18, 19, and 23, 2019 and installation
witnessed by a representative of this office. The purpose of this site inspections was to observe
and document pile installation operation only.
A total number of sixty four (64) piles were placed at locations staked in the field by the owner's
representative and to depths as indicated in the attached field inspection logs. Pile installation
data for each pile are presented in the attached field installation logs.
Following our observation of pile installation operation at the . scheduled time, and our,
knowledge of project documents we certify that the referenced piles were adequately installed
for achieving an allowable bearing capacity of 40 tons compression and 12 tons tension
respectively.
Sincerely,
& Testing, Inc.
Enc. Pile installation logs
Location sketches
1
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE &
AC3- QL ILegged
Contractor: SION HOMES
Grout Spec's
Load Bearing (loos)
5000 psi
40 comp
12 tension
By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
ADDRESS: 4410, 4416, w22iLQYF w_S12 n
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with 93 ties @ 4" O.C. @ top of pine
and @10".O.C. @ balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
GroutAnn't
C.Y.
Pump
Strokes
Actual
Grout Amt
C.Y.
-
Grout
Factor
1G
comp
P s
tension
Date: April 16, 2019
Notes
1
1
2:20
30
1.50
50
2.05
1.36
80
24
Start 7:33 Arrived 7:30
2
2
2:00
30
1.50
50
2.05
1.36
so
24
ADONEL #4416 9 cy
3
3
1:59
1 30
1.50
51
2.09
1.39
80
24
4
4
2:32
30
1.50
50
2.05
1.36
80
24
Stop 8:20
5
5
1:48
30
1.50
48
1.96
1.31
80
24
Start 8:24 Arrived 8:18
6
6
2:12
30
1.50
50
2.05
1.36
80
24
ADONEL #4009 9 cy
7
7
2:23
30
1.50
49
2.00
1.34
80
24
'
8
8
2:00
30
1.50
48
1.96
1.31
80
24
9
9
2:01)
30
1.50
59
2.41
1.61
80
24
Stop 9:25 Start 9:25
10
10
2:40
j 30
1.50
64
2.62
1.75
80
24
ADONEL #7004 Arrived 9:15
11
11
2:16
30
1.50
50
2.05
1.36
80
24
9 cy
12
12
1:45
30-
1.50
53
2.17
1.45
80
24
Stop 10:15 Start 10:15
13
13
1:47
30
1.50
50
2.05
1.36
SO
24
ADONEL #7012 Arrived 10:00
14
14
2:33
30
1.50
50
2.05
1.36
80
24
9 cy
15
15
2:15
30
1.50
55
2.25
1.50
80
24
16
16
2:29
30
1.50
56
2.29
1.53
SO
24
Stop 11:00 Start 11:00
17
17
2:18
1 30
1.50
51
1 2.09
1.39
80 1
1 24
JADONEL #7016 Arrived 10:37
18
18
2:22
30
1.50
51
2.09
1.39
80
24
Test taken 9 cy
19
19
2:16
1 30
1.50
52
2.13
1.42
80
24
20
20
1:53
30
1.50
52
2.13
1.42
80
24
Pag.: 1/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE &
_ _ .O ' L
Contractor: SION HOMES
GroutSpec's Load Bearing (tons)
5000 psi
40 comp
12 tension
Logged By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
ADDRESS: 4410, 4416, 4_22Y w `
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @ 4" O.C. @ top of pile
and @10" O.C. @ balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
I
comp
' Ps
tension
Date: April 16, 2019
Notes
1 1
21
2:07
30
1.50
53
2.17
1.45
80
1 24
Stop 11:28 Start 11:29
2
22
2:17
30
1.50
54
2.21
1.47
80
24
ADONEL #4009 Arrived 11:00
3
23
3:00
30
1.50
50
2.05
1.36
80
24
9 cy
4
24 _
2:16
30
1.50
52
2.13
1.42
80
24
5
25
2:32
30
1.50
50
2.05
1.36
80
24
Stop 1:04 Start 1:04
6
26
2:42
30
1.50
52
2.13
1.42
80
24
ADONEL #8001 Arrived 12:29
7
27
2:26
30
1.50
50
2.05
1.36
80
1 24
9 cy
8
28
2:31
30
1.50
55
2.25
1.50
80
124
9
29
3:04
30
1.50
50
2.05
1.36
80
1 24
10
30
2:11
30
1.50
52
2.13
1.42
80
1 24
IStop 1:50 Start 1:50
11
31
1:59
30
1.50
50
2.05
1.36
80
24
JADONEL #7012 Arrived 1:00
12
32
1:56
30
1.50
50
2.05
1.36
80
24
Testtaken 9 cy
13
33
2:23
30
1.50
48
1.96
1.31
80
24
14
34
2:13
30
1.50
56
2.29
1.53
80
24
Stop 2:25
15
35
2:00
30
1.50
52
2.13
1.42
80
24
Start 2:31 Arrived 1:40
16
36
1:56
30
1.50
60
2.45
1.64
80
24
ADONEL #7016 9 cy
17
37
2:07
30
1.50
60
2.45
1.64
80
24
18
38
2:19
30
1.50
53
2.17
1.45
80
24
19
39
2:49
30
1.50
54
2.21
1.47
80
24
Stop 3:07 Start 3:07
20
40
2:13
30
1.50
52
2.13
1.42
1 80
24
JADONEL #7004 Arrived 2:38
Pag.: 2/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile
Log
PROPOSED TWO-STORY RESIDENCE &
PROJECT:
LPK(D ILogged
Contractor: SION HOMES
Grout Spec's
Load Bearing (tons)
5000 psi
40 comp
12 tension
By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
ADDRESS: 4410, 4416, 4XAMw,l`�.,d+1
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @ 4" O.C. @ top of pile
and @10" O.C. @ balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
com P
P s
tension
Date: April 16, 2019
Notes
1
41
2:14 1
30
1.50
52
2.13
1.42
80
24 1
9 cy
2
42
2:34 1
30
1.50
52
2.13
1.42
80
24
3
43
2:39 1
30
1.50
59
2.41
1.61
80
24
Stop 3:47 Start 3:47
4 1
44
2:39
30
1.50
50
2.05
1.36
80
24
ADONEL #4009 Arrived 3:15
5
45
2:05
30
1.50
58
2.37
1.58
80
24
9 cy
6
46
2:20
30
1.50
55
2.25
1.50
80
24
_
7
47
2:26
30
1.50
60
2.45
1.64
80
24
Stop 4:22 Start 4:22
8
48
2:13
30
1.50
53
2.17
1.45
80
24
ADONEL #8001 Arrived 4:04
9
49
2:15
30
1.50
50
2.05
1.36
80
24
9 cy
10
50
2:51
30
1.50
52
2.13
1.42
80
24
Stop 5:00,
11
12
13
14
15
16
17
18
19
20
Pag.: 3/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile
Log
PROPOSED TWO-STORY RESIDENCE &
PROJECT: c
?.
Contractor: SION HOMES
Grout Spec's
Load Bearing (tons)
5000 psi
40 comp
12 tension
Logged By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
_.„.,
ADDRESS: 4410, 4416,E Hw, 'Ai
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile
d @10" o.c. at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes.
Actual
Grout Amt.
C.Y.
Grout
Factor
compt
Ps
tension
Date: April 17, 2019
Notes
1
51
2:24
30
1.50
50
2.08
1.38
80
1 24
IStart 7:30 Arrived 7:20
2
52
2:39
30
1.50
51
2.12
1.41
80
11 24
JADONEL #7016 9 cy
3
53
2:36
30
1.50
50
2.08
1.38
80
1 24
4
54
2:43
30
1.50
1 50
2.08
1 1.38
80
1 24
IStop 8:19
5
55
2:56
30
1.50
1 52
2.16
1.44
80
1 24
IStart 8:24 Arrived 8:08
6
56
2:34
30
1.50
49
2.03
1.36
80
1 1 24
JADONEL #8001 Testtaken 9 cy
7
57
3:14
30
1.50
48
1.99
1.33
80
24
8
58
3:10
30
1.50
51
2.12
1.41
80
24
9
59
2:55
30
1.50
50
2.08
1.38
80
24
Stop 9:13 Start 9:13
10
60
2:15
30
1.50
55
2.28
1.52
g0
24
ADONEL #7010 Arrived 9:07
11
61
2:28
30
1.50
50
2.08
1.38
80
24
9 cy
12
62
2:52
30
1.50
55
2.28
1.52
80
24
13
63
2:05
30
1.50
53
2.20
1.47
80
24
Stop 10:04 Start 10:04
14
64
2:41
30
1.50
49
2.03
1.36
80
24
JADONEL #4001 Arrived 9:57
15
65
2:27
30
1.50
50
2.08
1.38
80
24
9 cy
16
66
1:58
30
1.50
48
1.99
1.33
80
24
17
67
2:38
30
1.50
55
2.28
1.52
80
24
18
68
2:21
30
1 1.50
49
2.03
1.36
80
24
Stop 10:55 Start - 10:55
19
69
2:34
30
1.50
51
2.12
1.41
80
24
ADONEL 47016 Arrived 10:35
20
70
2:12
30
1.50
52
2.16
1.44
80
24
9 cy
Pag.: 4/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile 1Log
PROPOSED TWO-STORY RESIDENCE &
PROJECT:
9.Q
Contractor: SION HOMES
Grout Spec's
Load Bearing (tons)
5000 psi
40 comp
12 tension
Logged By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
_
ADDRESS: 4410, 4416, �22 i wy A17a
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Specs: (6) #6 full length bars with #3 ties @4" o.c. at top of pile
and @10" o.c, at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Gr'C.Y. .
C.Y.
Grout
Factor
comp
rP s
tension
Date: April 17, 2019
Notes
1
71
3:05 1
30
1.50
50
2.08
1.38
80
24
2
72
2:42 1
30
1.50
47
1.95
1.30
8o
24 IStop
11:35
3
73
2:20
30
1.50
50
2.06
1.38
80
24 IStart
11:42 Arrived 11:22
4
74
3:35
30
1.50
50 -
2.08
1.38
g0
24 JADONEL
#8001 Test taken 9 cy
5
75
2:51
30
1.50
51 1
2.12
1.41
80
24
6
76
2:27
30
1.50
48 1
1.99
1.33
80
24
7
77
2:40
30
1.50
51
1 2.12
1.41
80
24
IStop 12:23 Start 12:23 '
8
78
2:45
30
1.50
52
1 2.16
1.44
80
1 24
JADONEL #7010 Arrived 12:00
9
79
2:42
30
1.50
53
2.20
1.47
80
24
9 cy
10
80
2:30
30
1.50
50
2.08
1.38
80
24
11
81
2:22
30
1.50
52
2.16
1.44
g0
24
Stop 1:37 Start 1:37
12
82
1:59
30
1.50
51
2.12
1.41
80
24
ADONEL #7003 Arrived 1:26
13
83
2:45
30
1.50
52
2.16
1.44
8o
24
9 cy
14
84
2:23
30
1.50
51
2.12
1.41
80
24
15
85
2:18
1 30
1.50
52
2.16
1.44
So
24
16
86
2:14
1 30
1.50
55
2.28
1.52
1 80
1 1 24
IStop 2:24 Start 2:24
17
87
2:37
30
1.50
53
2.20
1.47
80
1 1 24
JADONEL #4001 Arrived 1:41
18
88
3:02
30
1.50
50
2.08
1.38
g0
24
9 cy
19
89
2:30
30
1.50
50
2.08
1.38
80
24
20
90
2:25
30
1.50
50
2.08
1.38
80
24
Stop 2:55 Start 2:55
i
Pag.: 5/12
SOILPROBE ENGINEERING AND TESTING, INC.
16'1 Auger Cast Pile Log
PROPOSED TWO-STORY RESIDENCE &
PROJECT:
2
Contractor: SION HOMES
GroutSpec's
Load Bearing (tons)
5000 psi
40 comp
12 tension
Logged By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
���.�,���
ADDRESS: 4410, 4416, qUE LR ffiW1'd
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Specs: (6) 46 full length bars with #3 ties @4" o.c. at top of pileand
@10" o.c. at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
GroutAnn't
C.Y.
Pump
Strokes
Actual
GroutAmt.
C.Y.
Grout
Factor
comp
p s
tension
Date: - April 17, 2019
Notes
1
91
2:53
30
1.50
56
2.32
1.55
80
1 24 JADONEL
#8001 Arrived 2:20
2
92
2:27
30
1.50
52
2.16
1.44
80
24
9 cy
3
93
2:27
30
1.50
51
2.12
1.41
80
24
4
94
2:39
30
1.50
48
1.99
1.33
80
1 24 IStop
4:03 Start 4:03
5
95
2:21
30
1.50
50
2.08
1.38
80
1 24
ADONEL #7010 Arrived 3:10
6
96
2:38
30
1.50
50
2.08
1.38
80
24
9 cy
7
97
2:56
30
1.50
50
2.08
1.38
80
24
Stop 5:20
8
98
2:40
30
1.50
52
2.16
1.44
80
24
Start Arrived 5:18
9
99
1:52
30
1.50
47
1.95
1.30
80
24
ADONEL #4010 9.cy
10
100
2:11
30
1.50
53
2.20
1.47
80
24
11
1 101
2:37
30
1.50
50
2.08
1.38
SO
1 24
IStop 6:00
12
13
14
15
16
17
18
19
20
Pag.: 6/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile
Log
PROJECT: PROPOSED TWO-STORY RESIDENCE &
Contractor: SION HOMES
_
Grout Spec's (tons)
Load Bearingtons
5000 psi
40 comp
- 12 tension
.
Logged By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
ADDRESS: 4410, 4416, �321N11'iHw-y1%�
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
-
Steel Specs: (6) #6 full length bars with #3 ties @4" ox. at top of pile'
and @10" o.c.at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theories[
Grout Am't
C.Y.
Pm
mes
Actual
Grout Amt.
C.Y.
Grout
Factor
I
comp
p s
tension
Date: - April 18, 2019
Notes
1
102
3:00
30
1.50
50
2.01
1.34
80
1 24
Start 8:12 Arrived 7:43
2
103
2:34
30
1.50
50
2.01
1.34
80
24
ADONEL #7010 9 cy
3
104
2:55
30
1.50
55
2.21
1.47
80
24
4
105
3:19
30
1.50
50
1 2.01
1.34
80
24
Stop 8:50
5
106
3:50
30
1.50
50
2.01
1.34
80
24
Start 8:57 Arrived 8:42
6
107
2:14
30-
1.50
50
2.01
1.34
80
24
ADONEL #7009 Test taken 9 cy
7
108
2:57
30
1.50
48
1.93
1.29
80
24
8
109
2:31
1 30
1.50
51
2.05
1.37
80
24
9
110
2:35
30
1.50
48
1.93
1.29
80
24
Stop 10:07 Start 10:07
10
1101 -
3:00
30
1 1.50
52
2.09
1.39
80
24
ADONEL #7014 Arrived 9:56
11
112
3:00
30
1.50
48
1.93
1 1.29
80
24
9 cy
12 I
13
2:40
30
1.50
51
2.05
1.37
80
24
13
"Ill
3:15
30
1.50
52
2.09
1.39
80
24
14
115
2:55
30
1.50
53
2.13
1.42
80
24
IStop 10:55 Start 10:55
15
116
2:25
30
1.50
52
2.09
1.39
ADONEL #7016 Arrived 10:27
16
117
2:11
30
1.50
50
2.01
1.34
9 cy
17
118
2:40
30
1.50
51
2.05
1.37
18
119
2:05
30
1.50
52
2.09
1.39
1180ADONEL
Stop 11:49 Start 11:49
19
120
2:53
30
1.50
53
2.13
1.42
#7009 Arrived 11:45
20
121
2:23
30
1.50
54
2.17
1.45
9 cy
Pag.: 7/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile
dog
PROPOSED TWO-STORY RESIDENCE &
PROJECT:���
g `4.:
Contractor: SIGN HOMES
Grout Spec's
Load Bearing (tans)
5000 psi
40 comp
12 tension
Logged By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
ADDRESS: 4410, 4416,N F1YJ..A3.
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Specs: (6) #6 full length bars with #3 ties @4" o.c. at top of pile
d @10" o.c.at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theories[
Grout Am't
C.Y.
Pump
Strobes
Actual
Grout Amt
C.Y.
Grout
Factor
Kips
comp
tension
Date: April 18, 2019
Notes
1
122
2:33
30
1.50
53
2.13
1.42
80
1 24
2
123
2:41
30
1.50
49
1.97
1.31
80
1 24
Stop 1:17 Start 1:17
3
124
2:26
30
1.50
52
2.09
1.39
80
24
ADONEL #7014 Arrived 12:50
4
125
2:57
30
1.50
51
2.05
1.37
80
24
9 cy
5
126
3:09
30
1.50
50
2.01
1.34
80
24
6
127
3:28
30
1.50
50
2.01
1.34
80
24
7
1201 M
3:00
30
1.50
53
2.13
1.42
80
24
Stop 2:15 Start 2:15
8
129
2:37
30
1.50
51
2.05
1.37
80
24
ADONEL #7010 Arrived 1:35
9
13t? a
2:49
30
1.50
52
2.09
1.39
So
24
9 cy
10
131
2:48
30-
1.50
52
2.09
1.39
80
24
11
3
2:49
30
1.50
53
2.13
1.42
80
24
Stop 3:14 Start 314
12
133
2:32
30
1.50
51
2.05
1.37
80
24
ADONEL #4005 Arrived 2:24
13
134
2:04
30
1.50
51
2.05
1.37
80
24
Testtaken 9 cy
14
135
2:00
30
1.50
54
2.17
1.45
80
24
15
136
2:14
30
1.50
55
2.21
1.47
80
1 24
16
137
2:07
30
1.50
53
2.13
1.42
SO
24
Stop 4:20 Start 4:20
17
138
2:23
30
1.50
50
2.01
1.34
80
24
ADONEL #7009 Arrived 2:52
18
139
2:00
30
1.50
52
2.09
1.39
80
1 24
9 cy
19
140
2:33
30
1.50
54
2.17
1.45
1 80
24
Stop 5:30
20
Pag.: 8/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile 1,og
PROPOSED TWO-STORY RESIDENCE &
PROJECT:
%& ILogged
Contractor: SION HOMES
Grout Spec's
Load Bearing (tons)
5000 psi
40 comp
12 tension
By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
ADDRESS: 4410, 4416,94221�lrFiLvyA
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Spee's: (6) #6 full length bars with #3 ties @4" at top of pile and
610" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
camp
is
p
tension
Date: April 19, 2019
Notes
1
141
2:57
30
1.50
48
2.16
1.44
80
1 24 IStart
7:53 Arrived 7:34
2
142
2:16
30
1.50
50
2.25
1.50
80
24
ADONEL #7016 Test taken 9 cy
3
143
2:21
30
1.50
50
2.25
1.50
80
24
4
144
2:21
30
1.50
49
2.21
1.47
80
24
5
145
2:38
30
1.50
50
2.25
1.50
80
24
Stop 8:39 Start 8:39
6
146
3:00
30
1.50
50
2.25
1.50
80
24
ADONEL #8001 Arrived 8:02
7
147
2:17
30
1.50
51
2.30
1.53
80
24
9 cy _
8
148
2:27
30
1.50
48
2.16
1.44
g0
24
9
149
2:22
30
1.50
55
2.48
1.65
80
24
Stop 9:35 Start 9:35
10
150
2:24
30
1.50
50
2.25
1.50
80
24
ADONEL #7014 Arrived 8:54
11
151
3:22
30
1.50
50
2.25
1.50
80
24
9 cy
12
152
2:30
30
1.50
53
2.39
1.59
80
24
13
153
2:36 -
30
1.50
48
2.16
1.44
80
24
Stop 10:39 Start 10:39
14
154
2:51
30
1.50
50
2.25
1.50
80
24
JADONEL #7004 Arrived 9:39
15
155
2:44
30
1.50
52
2.34
1.56
80
24
1 9 cy
16
156
2:14
30
1.50
51
2.30
1.53
80
24
17
157
2:32
30
1.50
53
2.39
1.59
80
24
Stop 11:32 Start 11:32
18
158
1 2:35
30
1.50
55
2.48
1.65
80
24
JADONEL #4009 Arrived 10:23
19
159
1 2727
30
1.50
55
2.48
1.65
80
24
1 9 cy
20
160
1 1:59
30
1.50
50
2.25
t.50
80
1 24
Pag.: 9/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROPOSED TWO-STORY RESIDENCE &
PROJECT:
fMal
_�„�
Contractor: SION HOMES
Grout Spec's
Load Bearing (tans)
5000 psi
40 comp
12 tension
Logged By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
ADDRESS: 4410, 4416, ;N WTA'fA
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 fall length bars with #3 ties @4" at top of pile an
10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
GroutAm't
C.Y.
Pump
Strokes
Stroke
Actual
GroutAmt.
C.Y.
Groulips
Factor
Facto
comp
P
tension
Date: April 19, 2019
Notes
1
161
2:50
30
1.50
52
2.34
1.56
80
24
Stop 12:22 Start 12:22
2
162
2:15
30
1.50
55
2.48
1.65
80
24
ADONEL #7016 Arrived 11:42
3
9 cy
4
Stop 1:30
5
6
7
a
9
10
11
12
13
14
15
16
17
18
19
20
Pag.: 10/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROJECTPROPOSED TWO-STORY RESIDENCE &
• P
Q
Contractor: SION HOMES
Grout Spec's
Load Bearing (tons)
5000 psi
40 camp
12 tension
Logged By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
ADDRESS: 4410, 4416E4422._Jylliii�AfiA
Misc. Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: Auger Cast Pile with (6) #6 full length bars with #3 ties �4"
at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strolces
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
comp
I
tension
Date: April 23, 2019
Notes
1
163
2:34
30
1.50
50
2.13
1.42
80
24
Start 9:50 Arrived 9:34
2
164
3:01
30
1.50
49
2.0B
1.39
80
24
ADONEL #7007 Test taken 9 cy
3
1165
2:35
30
1.50
55
2.34
1.56
80
24
4
166
2:22
30
1 1.50
50
2.13
1 1.42
80
24
IStop 10:39
5
167
2:14
30
1.50
52
2.21
1.47
80
24
Start 10:40 Arrived 10:15
6
rl 6�8
]W
2:41
30
1.50
54
2.30
1.53
80
24
ADONEL #7016 9 cy
7
169
2:09
30
1.50
54
2.30
1.53
80
24
6
170
1 2:19
30
1.50
52
2.21
1.47
80
24
9
171
2:40
30
1.50
51
2.17
1.45
80
24
Stop 11:20 Start 11:20
10
172
2:44
1 30
1.50
50
2.13
1.42
80
24
ADONEL #4009 Arrived 10:49
11
173
2:58
30
1.50
52
2.21
1 1.47
80
24
9 cy
12
174
2:27
30
1.50
50
2.13
1.42
80
24
13
175
2:16
30
1.50
50
2.13
1.42
80
24
Stop 12:18 Start 12:18
14
176
2:25
30
1.50
54
2.30
1.53
80
24
ADONEL #7015 Arrived 11:51
15
177
2:00
30
1.50
52
2.21
1.47
80
24
9 cy
16
178
3:33
30
1.50
54
2.30
1.53
80 1
24
17
179
2:22
1 30
1.50
52
2.21
1.47
80
24
Stop 1:12
18
180
2:17
30
1 1.50
50
2.13
1.42
80
24
Start 1:25 Arrived 12:40
19
181
2:29
30
1 1.50
53
2.25
1.50
80
24
ADONEL #8001 9 cy
20
182
2:26
30
1 1.50
55
1 2.34
1.56
80
24
Pag.: 11/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROJECT • PRO POSED TWO-STORY RESIDENCE &
OO
Contractor: SION HOMES
Grout Spec's _
Load Bearing (tons)
5000 psi
40 comp
12 tension
Logged By: AO
SOILPROBE ENGINEERING &
TESTING, INC.
Engineers Sign and Seal:
r:�r
ADDRESS: 4410, 4416,�12MMEWy`Tr
Misc.Info:
CITY: Fort Pierce, FL
Field Notes:
Steel Specs: Auger Cast Pile with (6) #6 full length bars with #3 ties
4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes.
Actual
GroutAmt.
C.Y.
Grout
Factor
comp
i ps
tension
Date: April 23, 2019
Notes
1
183
2:10
30
1.50
55
2.34
1.56
80
1 24 IStop
1:57
2
184
2:34 1
30
1.50
56
2.38
1.59
80
1 24 IStart
2:06 Arrived 1:00
3
185
2:28
1 30
1.50
55
2.34
1.56
80
1 24 JADONEL
#7000 Testtaken 9 Cy
4
186
2:50
30
1.50
56
2.38
1.59
80
24
5
187
2:44
30
1.50
55
2.34
1 1.56
80
24
Stop 2:41
6
188
2:25
30
1.50
48
2.04
1.36
80
24
Start 2:58 Arrived 2:36
7
189
2:05
30
1.50
54
2.30
1.53
80
24
ADONEL #7016 9 cy
8
190
2:22
30
1.50
55
2.34
1.56
8o
24
Stop 3:30
9
10
11
12
13
14
15
16
17
18
19
20
Pag.: 12/12
94
95 96 51 52 53
- ----- -----
54 55
971
9.1
56 A 1
99 /01\
163
53
102 108
�-1 06 -"]k L 1171
Ell, 04 -----
1241
118
103
105 =,W,ello 125
170
171
120 -1 Z
119 121 122 123 127 172
AUGER CAST FILE LAYOLrr
�.Tx•. I A,
615
64
131
RE
Ell
115
173
174
SOMPROBE ENGINEERING AND I Pile Location Sketch
TESTING American Foundation Lot #3
3931 SW 4r Ave. #104��-
Davie, FL 33314 Fort Pierce, FL
Tel. (954) 584-6115 1
TESTING
3931 SW 4T" Ave. 9104
Davie, FL 33314
Tel. (954) 584-6115
r-AM,
129
13�C I I I 111-
1 165
1 12
I �:51N
1
! PROPOSED
I POOL
166
114
169
%, Iv
132 _
American Foundation
Pile Location Sketch
Lot #3
Fo '.Tierce, FL