HomeMy WebLinkAboutGAS SCHEMATICC q07-og5i
BOARD OF
COUNTY
COMMISSIONERS
GAS PIPING SCHEMATIC
PLANNING & DEVELOPMENT
SERVICES DEPARTMENT
Building and Code Regulation
Division
SCANNED
BY
St Lucie Comb
RF�F�
Pe�hl/ -('91�
rrr�9p 19
s n
.�°QP span
ca°n�Y enr
ST. LUCIE COUNTY BUILDING DIVISION
REVIEWED FOR COMPLIANCE
TANK SIZE: 9)) GALS. REVIEWED BY DATE rr9
9
PLANS AND PERMIT MUST BE KEPT ON JOB
APPLICANCE — TYPE/SIZE / �L Il OR NO INSPECTION WILL BE MADE.
BTU
Al �P/ZP�a aC,r J P�
A2 BTU
A3 BTU
A4 BTU
A5 BTU FILE
A6 BTU O /1\ '
PIPING LENGTH & SIZE (PIPE SIZE WAS TAKEN FROM �+ �/
L1 qO FT. 3 1-)" INCH DIA. THE 2014 FBC FUEL GAS CODE —
L2 FT. INCH DIA. TABLE 402 (_—J)
L3 FT. INCH DIA.
L4 FT. INCH DIA.
L5 FT. INCH DIA.
L6 FT. INCH DIA.
L7 FT. INCH DIA.
L8 FT. INCH DIA.
L9 FT. INCH DIA.
L10 FT. INCH DIA.
1-11 FT. INCH DIA.
L12 FT. INCH DIA.
Website: w stlucieco.aov
2300 Virginia Avenue - Fort Pierce, FL 34982-5652
Phone (772)462-1553 FAX (772)462-1578
Revised 7122114
r
•tx.
a
A
A
1
^�
'l i
may— W
� 4
V �w�y`�pm� � } f ! •
� ir' Ey
F'� "•
�
o 0
E p
n
Ua u-1
d
90�tt
m W
�0000 OlIIO4.nO V UN V va j OHO W V p�VII'1[ w Vp �yy o p,o 0 o po 0 0 o vloy.�u, o�lpoo o po o aili` R
...� F. ......+IILI-•11 Nam C7 .� V
���N O.wO A mvim V+l a b �
� w
A
W Ipp V
b,T
H
V SON l+OV+O
pip �ij�
�OdaN
N Otr IO
W W
�l Y.a V 01 tft'
AUwU
?W'+a
W W
OhoW
m �l W l�'i%1
A OT-
IJ
O r'I,tT
O
iuNwi+in
rn��O1[u
�J
J+>•N
01
b
}{N
WWW AA
I J 41 0 N U
i+tn Vlrn �l
NON
N O4+bu
Otp V O i ra
T'.0 W
O o
�!
A V W V! A
N OO V AlA
m W m O l V
I p N J N�
O�NA �
I r
���••�..
N i-+F+ W
m p Au O
C.00
J
T�OAAr
w OO�I.+ O�
`O[1•i
O
y
W N m O
ya
N W m QI w
.,a
1 O
m pl T pp rr
� n,
4,ry H
A pl
Oi I
O �+ N�.�
��aa
rNN
In m
W W Jew.. W
pI
~ NI
AV rTu
a m D• N.IO
ID AlO 01?
A. -a W+1
pWw
O
tAJ N'b
�t er
O
O
i
f�
Designed to reduce first stage pressure of 5 to 20 PSIG down to
burner pressure, normally 11" w.c. Ideal for medium commercial
installations, multiple cylinder installations and normal domestic
loads.
�
Large vent helps prevent blockage and has %" F.NPT for vent
piping.
With 15 PSIG inlet pressure, regulator is designed_ to not pass
more than 2 PSIG with the seat disc removed.
Incorporates integral relief valves.
• Replaceable valve orifice and valve seat disc.
• Straight line valve closure reduces wear on seat disc.
Unique bonnet vent profile minimizes vent freeze over when
properly installed.
Large molded diaphragm is extra sensitive to pressure changes.
Built In pressure tap has plugged 1/8" F.NP.T outlet. Plug can be
removed with a 3/16" hex alien wrench.
Select brown finish.
teLR3a�9Ta"Z�
Mounts directly to house line piping. Eliminates need for union joints,
elbows, and mounting brackets. Quick and easy to install.
• Backmaunl design
"Maximum Flow Cased on 10 PSIG Wet and 9- w.a delivery pressum.
Body.................... :...................................................
.... .. Die Cast Zinc
Bonnet......................................................
................. I... Die Cast Zinc
NozzleOrifice............................................................................
Brass
Steel
Spring
Valve Seat Disc .......................................................
Resilient Rubber
Diaphragm ...........................
Integrated Fabric and Synthetic Rubber.
SQL
LISTED
E
?U13
a 12
Z;11
_`010
Gocg
5
CFr 1Y.
BIllM:
i•V440389ertes
IS 1o0 Rego Or. P.O. Box 247 Mon. NC 27244 USA H .rsgoproduds.mm PMne (336) 449-Tr07 Fart (336) M9-6594 NEW
•. W
Application Materials
Ideal for use as a first stage regulator on any domestic size ASME or
DOT container in propane gas Installations requiring up to 1,500,000
BTU's per hour. The regulator is factory set to reduce container
pressure to an intermediate pressure of approximately 10 PSIG.
Features
Compact design can be connected to a service valve using e'dher
a POL adapter or a RegO product pigtail.
Large threaded % FNPT bonnet vent can easily be piped -away
underground installations without the need of glue kits or extra
adapters.
Non Adjustable
Large flow orifice resists freeze ups due to water concentration in
LPG vapor.
Design provides for good flaw regulation at both high and low
container pressures.
Built in relief valve and travel stop comply with NFPA 58 over
pressure requirements.
Incorporates''/e" F,NPT downstream pressure tap for an easy
inline check of the regulator's delivery pressure.
Molded diaphragm provides an o-ring type seal between the body
and bonnet.
Body and bonnet are assembled In the USA using the unique,
patented RegUlok seal system. '
Fully painted In brilliant red for complete corrosion protection.
Mounfing bracket available as an accessory: part number 2302-31.
Ordering Information
Body....................... ............. ......... ........ 6",.... ........ ............ ........... Zinc
Bonnet.. ........ 4 ......... — ......... 0 .... * ..................................6............6 Zinc
Spring.......... ........... ,........... .................. ......... ............................. Steel
Seat Disc..................................................................Resilient Rubber
Diaphragm....... ....... — - Integrated Fabric and Synthetic Rubber
MAIN
`�
—IN
erumr. zv.mo cone r5o➢oo.-•....
nori PROPANE
eff7LV3 3TR-1 I '/°FNPT 9'00 W F.NPT I %." I 10 PSIG r= —� 1,500,000
LV3403TRVO
Maxlnusa now based on Inlet pressure 20 PSIG higher lean the agulatorsering and delivery pressure 20%lower Nan the 09 lslnse[lmg end tleMaryp 20%I th N Omg
.DW
A14
100 RegG O, P.O. S. 241 Don, NC 27244 GSA www.regopmducts.wm rhea (336) 449-77W Fax (336) M"594 iQmO
V. CABLE w/
CLAMPS TO
(PULLED
ANCHOR STRAP
(2)HDG CLAMPS TO
ANCHOR (PULLED -
UNDERGROUND .TANK HOLD DOWN DETAIL
GENERAL NOTES:
1. HELICAL ANCHORS SHALL HAVE AN ALLOWABLE PULL- OUT CAPACITY AS SHOWN BFol[ ANCHORS SHALL BE INSTALLED PER
ANCHOR (+?dl'1F9milRER;TO ACHIEVE STATED LOAD CAPACITY. CAPACITY VARIES WITH SOQ TYPE. VERIFY ANCHOR CAPACITY WITH
SOIL P�-y-.fD1.CCfL��JTEftED:.:.:e,. .
50sY,.AtK • t - . "1350 - _
•`20 GAL T 350 .,
2. HEC 6R'UWRGRO[1NP`.bTIU'RES PRIOR TO ANCHOR INSTALLATION
f2 LOCATION 0� TANK RELATIVE%$0 ADJACENT STRUCTURES AND FEATURES ARE DEPENETT UPON LOCAL CODES AND IS THE
,SPONSIBILTTY OF OTHERS.
THE;TANK .AS SHOWN WAS. BEEN DESIGNED TO PREVENT FLOTATION, COLLAPSE, OR LATERAL MOVEMENT DURING THE BASE
:FLOOD., EVENT..... .
O COPYRIGHT 2016 — FARLEY ENGINEERING, LLC
PAX 1,11DATW
.- AMERIGAS Consulting Engineer $40111 — CA281013 nnce
Quality Steel Corporation AG/UG Propane Tanks
:LEI WimH
1450 Y g. AND U=
APPROXIMATE ABOVEGROUND/UNDEGROUND (AG/UG) VESSEL DIMENSIONS AND SPECIFICATIONS
WATER
CAPACITY
DIAMETER
(OD)
HEAD
TYPE
OVERALL
LENGTH
OVERALL
HEIGHT
. LEG*
WIDTH
LEG**
SPACING
WEIGHT
(Ibs.)
**QUANTITY
FLILLLOAD
PERSTACK
120 wg.
2411
Ellip.
5 S
3
1 1 1/2
or 3'•11"
260
108 196
16 1 12
*250 wg.
30"
Hemi.
7-10"
3'-8"
1'-5"
4'-11"
480
54
9
*320 wg.
30"
Hemi.
9'-7"
3'-8"
V-5"
5
620
45
9
(5001wg.
371/2"
1 Hemi.
I 10'
4'-2".
V-8"
5'
950
37 130
8 ( 6
1000wg.
1 41"
1 Hemi.
1 16'
4'-5"
V-8"
10'1"
1,800
17 115
6 (5
1450 wg.1
46 1/2"
1 Ellip.
1 17'-4"
1 4'-11"
1 1'-9"
111.7"
2,650
12
4
1990 wg. 1
461/2" 1
Ellip. 1
23'-11" 1
4'-11" 1
V-9" 1
16'
3,520
8
4
Dimensions and specifications shown are approximate. Individual vessels may vary.
'Leg spacing +/- 2". Leg widths and spacing may vary based on mfg.location. Check with your salesperson for details. 120,250, 320wg. standard tanks
-no holes In legs (one center hole on request). 500 and 10D0 wg, standard tanks- 2 holes 16" on center. 1450 wg. and up as shown above.
'• Full load and stack quantities vary by shipping location. Check with your salesperson for details.
General Specifications
- Conforms to the latest edition of ASME Rules for Construction of Pressure Vessels, Section VIII, Division 1.
Complies with NFPA 58.
- Rated at 250 psig from -20' F to 125' F. All vessels registered with National Board.
-Two service options available:
Option 1: Ready -to -bury underground option, coated with either powder coated phenolic epoxy finish
or liquid applied epoxy primer coat followed by urethane top coat, supplied with composite
AG/UG dome.
Option 2: Aboveground option, coated with either powder coated TGIC polyester finish or liquid
applied epoxy primer coat followed by urethane topcoat, supplied with steel AG/UG dome.
- All vessels are shipped vacuum pre -purged to enable simplified first fill of the vessel.
updated June 30,2015