Loading...
HomeMy WebLinkAboutDUCT SEALING CERTIFICATEDate: 1 Cu p g Contractor: Construction: osl Construction Test Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Permit #: 1110 (i+s25' SCANNED St LucieYCounty Lot #: A S Address: rJ 250 Qa� (crd Lole C\r ❑ Rough -in Test Jest Conditions: Date: i120 Floor Area (ft2): ) 7 22 Time: icy 1 Primary Location of Supply Ductwork my%c Indoor Temperature (F): U S Primary Location of Return Ductwork _AA61 Outdoor Temperature(F): —15 Total Leakage Test (Outside) Duct Leakage: Default ❑ Prop. Leak Free ol1roposed On = r 0 3 Test Pressure: 2 (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ass ❑ Fail Installed Pa $ H Total Leakage (cfm): 43 Total Leakage per 100 sgft: , D 2 CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sgft. Testing Company Company Name: P>-ci Address: I hereby certify, that the above Duct Sealing Leakage results demonstrate compliance with 6t^ Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature: Printed Name:l I C E License/Certificate #: