HomeMy WebLinkAboutAPPROVAL AGREEMENTAPPLICANVARB APPROVAL AGREEMENT
I understand that in accordance with the requirements of the Harbour Ridge documents, the Architectural
Review Board (ARB) will act on this request and provide me with a written response of their decision. I
further understand and agree to the following provisions:
1. No work or commitment of work will be made by me until I have received written approval from
the Association.
2. All work will be done expeditiously once commenced and will be done in a good workman -like
manner by a contractor or myself.
3. Any work which disturbs irrigation lines and requires removal, repair, etc. notice must be given to
the Landscape Department prior to the start of work, minimum two -week notice. Homeowner
assumes all costs associated with the turn of� relocation, repairs, etc.
4. All work will be performed at a time and in a manner to minimize interference and inconvenience
to other unit owners.
5. I assume all liability and will be responsible for all damage and/or injury which may result from
performance of this work. ARB approval does not signify that the proposed plan specs or work
comply with local laws or regulations — It is applicant's responsibility to ensure compliance.
6. I will be responsible for the conduct of all persons, agents, contractors, and employees who are
connected with this work. Safety and Security will be notified as to the start up of construction.
They will contact me regarding the construction and I agree to cooperate in providing any
additional information required
I will be responsible for complying with, all ARB fee's if applicable, and will comply with, all
applicable federal, state and local laws, codes, regulations and requirements in connection with
this work, and I will obtain any necessary governmental permits and.approvals for. the work. I
understand and agree that the Harbour Ridge Property Owners Association, its Board of Directors,
its agent and the ARB have no responsibility with respect to such compliance and that the Board
of Directors' or its designated ARB's approval of this request shall not be understood as the
making of any representation or warranty that the plans, specifications or work comply with any
- law, code, regulation -or governmental requirement. I understand that Harbour Ridge policy may
be more stringent than St. Lucie County's codes, regulations and requirements.
yy� �iuDi�G o �
8. If approved, the work would start on or about /`1i a --j -j r,*i c j- r 14s _ and would be
completed by E^80 DiF �� �njq
9. Change Order Form (Attached) must be completed prior to changing (modifying) an approved
plan or request.
RECEIVED d
JUL 2 2 ?W9 SC NE® Applicant Signature
ST. Lucie county, Permitting BY
St. Lucie Courdy
Landscape Generator Plan
As requested, a hedge will be planted in a L-Shape design
around the generator blocking the neighbor and view from the
street. The hedge will be constructed of mature Clusia
I I ;M fl
=RECEIVED
Guttiferra. Picture attached