Loading...
HomeMy WebLinkAboutENVIORNMENTAL PROTECTION�ECEtVEp enaFLORIDA DEPARTMENT OF `Environmental Protection Southeast District Office 3301 Gun Club Road, MSC 7210-1 West Palm Beach, Fl. 33406 561-681-6600 July 15, 2019 George Gemer 253 Marina Dr. Hutchinson Island, FL 34949 Sent via e-mail: ggemer2@gmail.com Re: File No.: 56-377633-001-002-003-EE File Name: Gerner Dear George Gemer: Ron Mantis Governor Jeanette, Ruiwz Lt Governor SCAM ED Roahvalensteln BY Secretary St. Lucie Countv On June 25, 2019, we received your request for verification of exemption to perform the following activities: (1) Replacement of an 80 linear foot seawall within 18 inches waterward of the original (wetface to wetface), (2) replacement of a 282ft2 dock with a new 300ft2 dock with installation of a boatlift adjacent to dock, and (3) installation of a 12in by 20in concrete cap on proposed seawall in a residential canal, Class III Waters, adjacent to 253 Marina Dr. Hutchinson Island (Section 25, Township 34 South, Range 40 East), in Saint Lucie County (Latitude N 27' 29' 17.00", Longitude W 800 18' 11.94"). Your request has been reviewed to determine whether it qualifies for (1) regulatory exemption, (2) proprietary authorization (related to state-owned submerged lands), and (3) federal approval that may be necessary for work in wetlands or waters of the United States. Your project qualifies for all three. However, this letter does not relieve you from the responsibility of obtaining other federal, state, or local authorizations that may be required for the activity. If you change the project from what you submitted, the authorization(s) granted may no longer be valid at the time of commencement of the project. Please contact us prior to beginning your project if you wish to make any changes. If you have any questions regarding this matter, please contact Donald Fontenot at the letterhead address or at 561-681-6629, Donald.Fontenot@FloridaDEP.gov. Project No.: 56-377633-001-002-003-EE Project Name: Gemer Page 2 of 20 1. Regulatory Review — VERIFIED Based on the information submitted, the Department has verified that the activities as proposed are exempt, under Chapter 62-330.051, (5)(b), (12)(a)(d) Florida Administrative Code, from the need to obtain -a regulatory-perrnitunderPart IV of Chapter 373 of the Florida Statutes. This exemption verification is based on the information you provided the Department and the statutes and rules in effect when the information was submitted. This verification may not be valid if site conditions materially change, the project design is modified, or the statutes or rules governing the exempt activity are amended. In the event you need to re -verify the exempt status for the activity, a new request and verification fee will be required. Any substantial modifications to the project design should be submitted to the Department for review, as changes may result in a permit being required. 2. Proprietary Review- NOT REQUIRED The activity does not appear to be located on sovereign submerged lands, and does not require further authorization under chapter 253 of the Florida Statutes, or chapters 18-20 or 18-21 of the Florida Administrative Code. 3. Federal Review - APPROVED Your proposed activity as outlined in your application and attached drawings qualifies for Federal authorization pursuant to the State Programmatic General Permit V-RI, and a SEPARATE permit or authorization will not be required from the Corps. Please note that the Federal authorization expires on July 26, 2021. However, your authorization may remain in effect for up to 1 additional year, if provisions of Special Condition 19 of the SPGP V-Rl permit instrument are met. You, as permittee, are required to adhere to all General Conditions and Special Conditions that may apply to your project. Special conditions required for your project are attached. A copy of the SPGP V-Rl with all terms and conditions and the General Conditions may be found at https://www.sa*.usace.anny.mil/Missions/Regulatory/Source-Book. Authority for review - an agreement with the USACOE entitled "Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection (or Duly Authorized Designee), State Programmatic General Permit", Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water Act. Additional Information Please retain this letter. The activities may be inspected by authorized state personnel in the future to ensure compliance with appropriate statutes and administrative codes. If the activities are not in compliance, you may be subject to penalties under Chapter 373, F.S., and Chapter 18-14, F.A.C. NOTICE OF RIGHTS This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until a subsequent order of the Department. Because the administrative hearing process is designed to formulate final agency action, the hearing process may result in a modification of the agency action or even denial of the application. Petition for Administrative Hearing A person whose substantial interests are affected by the Department's action may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rules 28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must contain the following information: Project No.: 56-377633-001-002-003-EE Project Name: Gerner Page 3 of 20 (a) The name and address of each agency affected and each agency's file or identification number, if known; (b) The name, address, any e-mail address, any facsimile number, and telephone number of the petitioner, if the petitioner is not represented by an attorney or a qualified representative; the name, address, and telephone number of the petitioner's representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner's substantial interests will be affected by the agency determination; (c) A statement of when and how the petitioner received notice of the agency decision; (d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate; (e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency's proposed action; (f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency's proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and (g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency.to take with respect to the agency's proposed action. The petition must be filed (received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing. Time Period for Filing a Petition In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of publication of the notice or within 21 days of receipt of the written notice, whichever occurs first. You cannot justifiably rely on the finality of this decision unless notice of this decision and the right of substantially affected persons to challenge this decision has been duly published or otherwise provided to all persons substantially affected by the decision. While you are not required to publish notice of this action, you may elect to do so pursuant Rule 62-110.106(10)(a). The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another party) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C. If you do not publish notice of this action, this waiver will not apply to persons who have not received written notice of this action. Extension of Time Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by the Department's action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time. Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us, before the deadline for filing a petition for an Project No.: 56-377633-001-002-003-EE Project Name: Gerner Page 4 of 20 administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon. Mediation Mediation is not available in this proceeding. — — — FLAWAC Review The applicant, or any party within the meaning of Section 373.114(1)(a) or 373.4275, F.S., may also seek appellate review of this order before the Land and Water Adjudicatory Commission under Section 373.114(1) or 373.4275, F.S. Requests for review before the Land and Water Adjudicatory Commission must be filed with the Secretary of the Commission and served on the Department within 20 days from the date when this order is filed with the Clerk of the Department. Judicial Review Once this decision becomes final, any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S., by filing a Notice of Appeal pursuant to Florida Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee, Florida- 323 99-3 000) and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department. EXECUTION AND CLERKING Executed in West Palm Beach, Florida. STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION 1�4jto'l 4 W �a Christopher Weller Environmental Manager Southeast District Enclosures: 62-330.051(5)(b), (12)(a)(d), F.A.C. Special Conditions for Federal Authorization for SPGP V-RI General Conditions for Federal Authorization for SPGP V-RI Project drawings, 8 pages Project No.: 56-377633-001-002-003-EE Project Name: Gemer Page 5 of 20 CERTIFICATE OF SERVICE The undersigned duly designated deputy clerk hereby certifies that this document and all attachments were sent on the filing date below to the following listed persons: FDEP — Chris Weller, Donald Fontenot Kimberly Colstad, kim@ardeaenvironmental.com Alisa Zarbo — Alisa.A.Zarbo@usaee.army.mil FILING AND ACKNOWLEDGMENT FILED, on this date, pursuant to Section 120.52, F. S., with the designated Department Clerk, receipt of which is hereby acknowledged. July 15, 2019 Clerk Date 62-330.051 Exempt Activities. The activities meeting the limitations and restrictions below are exempt from permitting. However, if located in, on, or over state-owned submerged lands, they are subject to a separate authorization under chapters 253 and 258, F.S., as applicable. (5) Dock, Pier, Boat Ramp and Other Boating -related Work - (b) Installation of private docks, piers, and recreational -ding facilities,, and-installation-of-local.governmental piers and recreational docking facilities, in accordance with section 403.813(1)(b), F.S. This includes associated structures such as boat shelters, boat lifts, and roofs, provided: 1. The cumulative square footage of the dock or pier and all associated structures located over wetlands and other surface waters does not exceed the limitations in section 403.813(1)(b), F.S.; 2. No structure is enclosed on more than three sides with walls and doors; 3. Structures are not used for residential habitation or commercial purposes, or storage of materials other than those associated with water dependent recreational use; and 4. Any dock and associated structure shall be the sole dock as measured along the shoreline for a minimum distance of 65 feet, unless the parcel of land or individual lot as platted is less than 65 feet in length along the shoreline, in which case there may be one exempt dock allowed per parcel or lot. (12) Construction, Replacement, Restoration, Enhancement, and Repair of Seawall, Riprap, and Other Shoreline Stabilization- (b) The restoration of a seawall or riprap under section 403.813(1)(e), F.S., where: 1. The seawall or riprap has been damaged or destroyed within the last year by a discrete event, such as a storm, flood, accident, or fire or where the seawall or riprap restoration or repair involves only minimal backfilling to level the land directly associated with the restoration or repair and does not involve land reclamation as the primary project purpose. See section 3.2.4 of Volume I for factors used to determine qualification under this provision; 2. Restoration shall be no more than 18 inches waterward of its previous location, as measured from the waterward face of the existing seawall to the face of the restored seawall, or from the waterward slope of the existing riprap to the waterward slope of the restored riprap; and 3. Applicable permits under chapter 161, F.S., are obtained. (12) Construction, Replacement, Restoration, Enhancement, and Repair of Seawall, Riprap, and Other Shoreline Stabilization- (d) Installation of batter piles, king piles, or a seawall cap, used exclusively to stabilize and repair seawalls, provided they do not impede navigation. Project No.: 56-377633-001-002-003-EE Project Name: Gerner Page 7 of 20 Special Conditions for Federal Authorization for SPGP V-R1 Note: JAXBO (Jacksonville District's Programmatic Biological Opinion), referenced throughout, may be found online in the Jacksonville District Regulatory Division Sourcebook, or at http://cdm 16021.contentdm.ocic.ore/utils/getfile/collection/i)16021 coII3/id/577. The SPGP V-Rl instrument and all attachments may be found online through the Sourcebook, or at https://www.sai.usace.army.mil/SPGP/ In addition to the conditions specified above, the following Special Conditions apply to all projects reviewed and/or authorized under the SPGP V-Rl. Special Conditions for All Projects 1. Authorization, design and construction must adhere to the terms of the SPGP V-RI instrument including the Procedure and Work Authorized sections. 2. Design and construction must adhere to the PDCs for In -Water Activities (Attachment 6, from PDCs AP.7 through AP11, inclusive, of JAXBO) (Reference: JAXBO PDC AP.1.). 3. All activities performed during daylight hours (Reference: JAXBO PDC AP.6.). 4. For all projects involving the installation of piles or sheet piles, the maximum number of piles, sheet piles or concrete slab walls or boatlift I -beams installed by impact hammer per day is limited to no more than 5 per day. Any installation of metal pipe or metal sheet pile by impact hammer is not authorized (Reference: Categories D and E of JAXBO PDCs for In -Water Noise from Pile and Sheet Pile Installation, page 86.). 5. Projects within the boundary of the NOAA Florida Keys National Marine Sanctuary require prior approval from the Sanctuary (Reference: JAXBO PDCs AP.14 and A1.6). 6. Notifications to the Corps. For all authorizations under this SPGP V-Rl, including Self - Certifications, the Permittee shall provide the following notifications to the Corps: a. Commencement Notification. Within 10 days before the date of initiating the work authorized by this permit or for each phase of the authorized project, the Permittee shall provide a written notification of the date of commencement of authorized work to the Corps. b. Corps Self -Certification Statement of Compliance form. Within 60 days of completion of the work authorized by this permit, the Permittee shall complete the "Self -Certification Statement of Compliance" form (Attachment 32) and submit it to the Corps. In the event that the completed work deviates in any manner from the authorized work, the Permittee shall describe the deviations between the work authorized by this permit and the work as constructed on the "Self -Certification Statement of Compliance" form. The description of any deviations on the "Self -Certification Statement of Compliance" form does not constitute approval of any deviations by the Corps. c. Permit Transfer. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer Project No.: 56-377633-001-002-003-EE Project Name: Gerner Page 8 of 20 of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date the enclosed form (Attachment 2). d. Reporting Address. The Permittee shall submit all reports, notifications, documentation, and correspondence required by -the -general and special conditions of this permit to the following address. (1) For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section, P.O. Box 4970, Jacksonville, FL, 32232-0019. (2) For electronic mail: SAJ-RD-Enforcement(a�.usace.armv.mil (not to exceed 10 MB). The Permittee shall reference this permit number, SAJ- 2015-02575 on all submittals. 7. The District Engineer reserves the right to require that any request for authorization under this SPGP V-R1 be evaluated as an Individual Permit. Conformance with the terms and conditions of the SPGP V-Rl does not automatically guarantee Federal authorization. 8. On a case -by -case basis, the Corps may impose additional Special Conditions which are deemed necessary to minimize adverse environmental impacts. 9. Failure to comply with all conditions of the SPGP V-RI constitutes a violation of the Federal authorization. 10. No structure or work shall adversely affect or disturb properties listed in the National Register of Historic Places or those eligible for inclusion in the National Register. Prior to the start of work, the Applicant/Permittee or other party on the Applicant's/Permittee's behalf, shall conduct a search of known historical properties by contracting a professional archaeologist, and contacting the Florida Master Site File at 850-245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites in the National Register Information System (NRIS). Information can be found at http://www.er.ni)s.gov/nr/research. a. If, during the initial ground disturbing activities and construction work, there are archaeological/cultural materials unearthed (which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the Permittee shall immediately stop all work in the vicinity and notify the Compliance and Review staff of the State Historic Preservation Office at 850-245-6333 and the Corps Regulatory Project Manager to assess the significance of the discovery and devise appropriate actions, including salvage operations. Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 C.F.R. § 325.7. b. In the unlikely event that human remains are identified, the remains will be treated in accordance with Section 872.05, Florida Statutes; all work in the vicinity shall immediately cease and the local law authority, and the State Archaeologist (850-245-6444) and the Corps Regulatory Project Manager shall immediately be notified. Such activity shall not resume unless specifically authorized by the State Archaeologist and the Corps. 11. The Permittee is responsible for obtaining any "take" permits required under the U.S. Fish and Wildlife Service's regulations governing compliance with these laws. The Permittee should contact Project No.: 56-377633-001-002-003-EE Project Name: Gemer Page 9 of 20 the appropriate local office of the U.S. Fish and Wildlife Service to determine if such "take" permits are required for a particular activity. 12. For Projects authorized under this SPGP V-RI in navigable waters of the U.S., the Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. 13. The SPGP V-RI will be valid through July 26, 2021 unless suspended or revoked by issuance of a public notice by the District Engineer. The Corps, in conjunction with the Federal resource agencies, will conduct periodic reviews to ensure that continuation of the permit during the period ending July 26, 2021, is not contrary to the public interest. The SPGP V-Rl will not be extended beyond July 26, 2021, but may be replaced by a new SPGP. If revocation occurs, all future applications for activities covered by the SPGP V-RI will be evaluated by the Corps. 14. If the SPGP V-Rl expires, is revoked, or is terminated prior to completion of the authorized work, authorization of activities which have commenced or are under contract to commence in reliance upon the SPGP V-RI will remain in effect provided the activity is completed within 12 months of the date the SPGP V-Rl expired or was revoked. Special Conditions for Shoreline Stabilization Activities 1. Shoreline stabilization materials must be placed by hand around red mangrove prop roots (Reference: JAXBO PDC A1.3.). 2. Living shorelines can only be constructed in unvegetated, nearshore water along shorelines to create tidal marshes or mangrove habitat for the purpose of shoreline erosion control or aquatic habitat enhancement. Native plants can be placed along the shoreline or between the shoreline and the living shoreline structure (Reference: JAXBO PDC A7.4.). 3. Living shoreline structures and permanent wave attenuation structures can only be constructed out of the following materials: oyster breakwaters, clean limestone boulders or stone (sometimes contained in metal baskets or cages to contain the material), small mangrove islands, biologs, coir, rock sills, and pre -fabricated structures made of concrete and rebar that are designed in a manner so that they do not trap sea turtles, smalltooth sawfish, or sturgeon (Reference: JAXBO PDC A7.5.). a. Reef balls or similar structures are authorized if are not open on the bottom, open -bottom structures with a top opening of at least 4 ft, and reef discs stacked on a pile are pre -fabricated structures are designed in a manner so that they do not trap sea turtles. b. Oyster reef materials shall be placed and constructed in a manner that ensures that materials will remain stable and that prevents movement of materials to surrounding areas (e.g., oysters will be contained in bags or attached to mats and loose cultch must be surrounded by contained bagged oysters or another stabilizing feature) (Reference: JAXBO PDC A7.2.). Project No.: 56-377633-001-002-003-EE Project Name: Gerner Page 10 of 20 c. Oyster reef materials shall be placed in designated locations only (i.e., the materials shall not be indiscriminately dumped or allowed to spread outside of the reef structure) (Reference: JAXBO PDC A7.3.). d. Wave attenuation-structures-must-have_5-t gaps at least every 75 ft in length as measured parallel to the shoreline and at the sea floor, to allow for tidal flushing and species movement (Reference: JAXBO PDC A7.6.). e. Wave attenuation structures must have 5 ft gaps at least every 75 ft in length as measured parallel to the shoreline and at the sea floor, to allow for tidal flushing and species movement (Reference: JAXBO PDC A7.6.). f. Other materials are not authorized by this SPGP V-RI (Reference: JAXBO PDC A7.5.). 4. For living shorelines, only native plant species can be planted (Reference: JAXBO PDC A7.1.). Special Conditions for Docks. Piers, Associated Facilities, and other Minor Piling -Supported Structures 1. For temporary structures associated with marine events. Upon completion of the event, these structures must be removed and, to the maximum extent practical, the site must be restored to pre - construction elevations. Water depths in the area of marine events must be deep enough to support at least 5 ft of water depth under the keel of a vessel and between the keel of a vessel and Endangered Species Act listed coral colonies, if present, when transiting to the mooring areas (Reference: JAXBO PDC A2.1.4.). 2. Educational Signs. For commercial, multi -family, or public facilities, and marine events, signs must be posted as described below (Reference: These replicate JAXBO PDCs A.2.2 and A22.1 to A.2.2.3., inclusive, within the table PDCs Specific to Activity 2 - Pile Supported Structures and Anchored Buoys, starting on page 112.): a. (A2.2.) For commercial, multi -family, or public facilities, and marine events, signs must be posted in a visible location(s), alerting users of listed species in the area susceptible to vessel strikes and hook -and -line captures. The most current version of the signs that must be downloaded and sign installation guidance are available at: (http://sero.nmfs.noaa.gov/protected resources/section 7/protected species educational sighs/ index.html). The signs required to be posted by area are stated below: (1) (A2.2.1.) All projects in Florida shall use the Save Sea Turtle, Sawfish, and Dolphin sign. These signs shall include contact information to the sea turtle and marine mammal stranding networks and smalltooth sawfish encounter database. (2) (A2.2.2.) Projects within the North Atlantic right whale educational sign zone shall post the Help Protect North Atlantic Right Whales sign. (3) (A2.2.3.) On the east coast of Florida, projects located within the St. Johns River and those occurring north of the St. Johns River to the Florida -Georgia line shall post the Report Sturgeon sign. On the west coast of Florida, projects occurring from the Cedar Key, Florida north to the Florida -Alabama line. 3. Monofilament Recycling Bins. For commercial, multi -family, or public facilities, monofilament recycling bins must be provided as described below (Reference: The below replicates PDC A.2.3 within the table PDCs Specific to Activity 2 - Pile Supported Structures and Anchored Buoys, the PDC itself on page 113 of the JAXBO.): Project No.: 56-377633-001-002-003-EE Project Name: Gerner Page 11 of20 a. (A2.3.) For commercial, multi -family, or public facilities, monofilament recycling bins must be provided at the docking facility to reduce the risk of turtle or sawfish entanglement in, or ingestion of, marine debris. Monofilament recycling bins must: (1) (A2.3.1.) Be constructed and labeled according to the instructions provided at http://mrro.mvfwc.com. (2) (A2.3.2.) Be maintained in working order and emptied frequently (according to http://mn-p.invfvvc.coin standards) so that they do not overflow. 4. North Atlantic Right Whale. The attached North Atlantic Right Whale Information Form (Attachment 271 describes the presence of North Atlantic right whales in the area and the Federal regulations governing the approach to North Atlantic right whales. (The FDEP or Designee will attach this document to their authorizations for a dock project (new construction, repair, or replacement) at a private residence located within 11 nautical miles of North Atlantic right whale critical habitat as measured in a radius from the center of the nearest inlet to open ocean described by Attachment 29, the North Atlantic Right Whale Educational Sign Zones (from Section 2.1.1.4 of JAXBO, pages 31 and 32, inclusive) (Reference: JAXBO PDC A2.4.). 5. Aids to Navigation. Aids to navigation must be approved by and installed in accordance with the requirements of the U.S. Coast Guard (i.e., 33 C.F.R., chapter I, subchapter C, part 66, Section 10 of the Rivers and Harbors Act, and any other pertinent requirements) (Reference: JAXBO PDC A2.5.). 6. Lighting for docks installed within visible distance of ocean beaches. If lighting is necessary, then turtle -friendly lighting shall be installed. Turtle -friendly lighting is explained and examples are provided on the Florida Fish and Wildlife Conservation Commission website: http://myfwc.com/wildlifehabitats/managed/sea-turtles/lighting/ (Reference: JAXBO PDC A2.8.). 7. Construction Location. Project construction shall take place from uplands or from floating equipment (e.g., barge); prop or wheel -washing is prohibited (Reference: JAXBO PDC A2.9.). 8. Regarding submerged and emergent aquatic vegetation, the design and construction of a Project must comply with the following: a. A pile supported structure (i) that is located on a natural waterbody (i.e., outside an artificial waterway that was excavated for boating access and is bordered by residential properties) and (ii) that is within the range of seagrass (estuarine waters within all coastal counties except for Nassau, Duval, St Johns, Flagler and Volusia north of Ponce Inlet), will be constructed to the following standards: (1) Must comply with or provide a higher level of protection than, the protective criteria in the joint U.S. Army Corps of Engineers'/National Marine Fisheries Service's "Construction Guidelines in Florida for Minor Piling -Supported Structures Constructed in or over Submerged Aquatic Vegetation (SAV), Marsh or Mangrove Habitat" updated November 2017 (Attachment 5). (2) In addition to (1), above, IF the project is within range of Johnson's seagrass (the range of Johnson's seagrass is defined as Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida), THEN the design and construction shall comply with, in some cases, the more restrictive requirements within paragraph 8.c., below (Reference: JAXBO PDC A2.17). Project No.: 56-377633-001-002-003-EE Project Name: Gemer Page 12 of20 b. For all other Projects, (1) Within the range of Johnson's seagrass (the range of Johnson's seagrass is defined as Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida); -the -presence -of submerged aquatic vegetation will be determined utilizing the "Submerged Aquatic Vegetation Survey Guidelines" (Attachment-7). If no survey performed, aquatic vegetation, including Johnson's seagrass, will be presumed to be present for purposes of this Special Condition. (2) Outside the range of Johnson's seagrass but within the range of seagrass (estuarine waters within all coastal counties except for Nassau, Duval, St Johns, Flagler and Volusia County north of Ponce Inlet) and within tidal waters, the presence of seagrass and tidal freshwater submerged aquatic vegetation will be determined using the "Submerged Aquatic Vegetation Survey Guidelines" (Attachment 71 unless a site visit or aerial photography observes absence during the growing season (if water depth and clarity allows) or aquatic vegetation has not been found in the vicinity in the past. (3) Pile -supported structures, IF aquatic vegetation is present (including seagrass, tidal freshwater submerged aquatic vegetation and emergent vegetation), THEN must comply with or provide a higher level of protection than, the protective criteria in the joint U.S. Army Corps of Engineers'/National Marine Fisheries Service's "Construction Guidelines in Florida for Minor Piling -Supported Structures Constructed in or over Submerged Aquatic Vegetation (SAV), Marsh or Mangrove Habitat" updated November 2017 (Attachment 5). (4) In addition to (1) to (3) above, IF the proposed dock or proposed structure is within range of Johnson's seagrass (the range of Johnson's seagrass is defined as Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida), and IF the proposed dock or proposed structure falls within the following scenarios, THEN the design and construction shall comply with, in some cases, the more restrictive requirements within paragraph 8.c.,below. (Reference: The following replicates "Scenario B" as defined within A2.17., PDCs for Docks or Other Minor Structures of JAXBO.): (i) Dock replacement in the exact footprint (i.e., same location/configuration/size) as the previous dock and: (a) within Johnson's seagrass critical habitat with No current seagrass survey (completed no earlier than 1 year before submitting the application); or, Johnson's seagrass under the dock; or, Native seagrass, other than Johnson's seagrass, under the dock; or, (b) within the Range of Johnson's seagrass (outside of critical habitat) with No current seagrass survey or,Johnson's seagrass under the dock, (ii) New docks or dock expansions and: (a) within Johnson's seagrass critical habitat; or, (b) within the Range of Johnson's seagrass (outside of critical habitat) with: No current seagrass survey (completed no earlier than 1 year before submitting the application) or, Johnson's seagrass within property limit. c. The following additional restrictions apply when required by paragraphs 8.a.(2) or 8.b.(4), above (Reference: The following replicates the "Dock PDCs for Scenario B" within A2.17. PDCs for Docks or Other Minor Structures of JAXBO.): (1) To avoid and minimize impacts to Johnson's seagrass and native, non -listed seagrasses to the maximum extent practicable: (i) The dock must be positioned to avoid and minimize effects to Johnson's seagrass. 1 Project No.: 56-377633-001-002-003-EE Project Name: Gemer Page 13 of20 (ii) Over any area that contains Johnson's seagrass or native, non- listed seagrasses, the dock shall be oriented in a north -south orientation to the maximum extent that is practicable to allow maximum sunlight under the structure. (iii)If practicable, terminal platforms shall be placed in deep water, waterward of Johnson's seagrass beds or native, non -listed seagrasses beds or in an area devoid of Johnson's seagrass or native, non -listed seagrasses. (iv)Piles must be spaced a minimum of 10 ft apart in any area that contains Johnson's seagrass to minimize direct impacts. (v) Piles shall be installed in a manner that will not result in the formation of sedimentary deposits (e.g., donuts or halos) around the newly installed pilings. (vi)No covered boat lifts are allowed over any Johnson's seagrass. (2) Decking options: Deck surfaces (parallel with the water) that are located waterward of the MHWL must be constructed of grated materials or plank construction or a combination of the both methods (e.g. plank decking on the walkway and grated decking on the terminal platform). These decking options are described below: (i) For grated decking: (a) Height requirement: The surface of the structure, including the dock walkway (the over- water narrow portion connecting the terminal platform to the shore and any over -water ramp required for access) and the dock, must be a minimum of 3 ft above MHW when constructed with grated decking. (b) Size limitations: The dock walkway is limited to a width of 4 ft. The terminal platform is limited to a total area of 160 ft2. Marginal docks are limited to a width of 5 ft. The 5 ft width restriction is measured from wet side of the seawall. For example, if a seawall cap is 3 feet overwater then the dock would be limited to 2 feet. (c) Material description: Decking materials shaped in the form of grids, grates, lattices, etc., to allow the passage of light through the open spaces. These materials must provide a minimum of 43% open space. (ii) For plank decking: (a) Height requirement: The surface of the structure, including the dock walkway (the over- water narrow portion connecting the terminal platform to the shore and any over -water ramp required for access) and the dock, must be a minimum of 5 ft above MHW when constructed of plank decking. (b) Size limitations: The dock walkway is limited to a width of 4 ft. The terminal platform is limited to a total area of 120 ft2. Marginal docks are limited to a width of 5 ft. (c) Material description: Deck boards may be constructed of any material. Deck Boards must be installed to provide a minimum of a 0.5-in gap between individual deck boards. d. Aids to Navigation in Acropora critical habitat. The distance from Aids to Navigation (ATONs) to ESA -listed corals and Acropora critical habitat shall ensure there are no impacts to the corals or the essential feature of Acropora critical habitat from the movement of buoys and tackle. The appropriate distance shall be based on the size of the anchor chain or other tackle to be installed to secure the buoy to its anchor, particularly when the design of the ATON does not prohibit the contact of tackle with the marine bottom. In all cases, buoy tackle will include flotation to ensure there is no contact between the anchor chain or line and the marine bottom (Reference: JAXBO PDC A2.10.). low Project No.: 56-377633-001-002-003-EE Project Name: Gerner Page 14 of 20 General Conditions for Federal Authorization for SPGP V-R1 1. The time limit for completing the work authorized ends on July 26, 2021. 2. You must maintaia n the ctivity authorized -by this -permit -in -good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature of the new owner on the enclosed form and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Further Information: 1. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, orlocal authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing orproposed Federal projects. 2. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the publicinterest. Project No.:56-377633-001-00_ ='3-EE Project Name: Gemer Page 15 of 20 c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or Construction deficiencies associated with the permitted work. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 3 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. 5. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CER 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date the enclosed form. 7. The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation or alteration. Project No.:56-377633-001-L wJ03-EE Project Name: Gerner Page 16 of 20 Department of the Army Permit Transfer for SPGP V-Rl PERMITEE: PERMIT NUMBER: ADDRESS/LOCATION OF PROJECT: (Subdivision) DATE: (Lot) (Block) When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. Although the construction period for works authorized by Department of the Army permits is finite, the permit itself, with its limitations, does not expire. To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions, have the transferee sign and date below and mail to the U.S. Army Corps of Engineers, Enforcement Branch, Post Office Box 4970, Jacksonville, FL 32232-0019. (Transferee Signature) (Name Printed) (Street address) (Mailing address) (City, State, Zip Code) (Date) Project No.:56-377633-001-00.,_ ��'-EE Project Name: Gerner Page 17 of 20 STANDARD MANATEE CONDITIONS FOR IN -WATER WORK 2011 The permittee shall comply with the following conditions intended to protect manatees from direct project effects: a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act. b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake" at all times while in the immediate area and while in water where the draft of the vessel provides less than a four -foot clearance from the bottom. All vessels will follow routes of deep water whenever possible. c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement. d. All on -site project personnel are responsible for observing water -related activities for the presence of manatee(s). All in -water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving. e. Any collision with or injury to a manatee shall be reported immediately to the FWC Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772- 562-3909) for south Florida, and to FWC at ImperiledSpecies(a myFWC.com f. Temporary signs concerning manatees shall be posted prior to and during all in -water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission (FWC) must be used (see MyFWC.com/manatee). One sign which reads Caution: Boaters must be posted. A second sign measuring at least 81/2" by I I" explaining the requirements for "Idle Speed/No Wake" and the shut down of in -water operations must be posted in a location prominently visible to all personnel engaged in water -related activities. Questions concerning these signs can be sent to the email address listed above. Project No.: 56-377633-001-9W303-EE Project Name: Gemer Page 18 of20 CAUTION: MANATEE HABITAT - - - -- -------— All project vessels --- IDLE SPEED / NO WAKE When a manatee is within 50 feet of work all in -water activities must SHUT DOWN Report any collision with or injury to a manatee: Wildlife Alert: 490 1-888-404-FWCC (3922) cell *FWC or #FWC Project No.: 56-377633-001-0C_, _3-EE Project Name: Gemer Page 19 of 20 UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE Southeast Regional Office 263 13th Avenue South St. Petersburg, FL 33701 SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS The permittee shall comply with the following protected species construction conditions: a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water -related activities for the presence of these species. b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973. c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service's Protected Resources Division, St. Petersburg, Florida. d. All vessels associated with the construction project shall operate at "no wake/idle" speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four -foot clearance from the bottom. All vessels will preferentially follow deep -water routes (e.g., marked channels) whenever possible. e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition. f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service's Protected Resources Division (727-824-5312) and the local authorized sea turtle stranding/rescue organization. g. Any special construction conditions, required of your specific project, outside these general conditions, if applicable, will be addressed in the primary consultation. h. Any collision(s) with and/or injuries to any whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS's Protected Resources Division (PRD) at (727-824-5312). Project No.:56-377633-001-6W03-EE \ ' Project Name: Gemer Page 20 of 20 i. Reports to NMFS's Protected Resources Division (PRD) may be made by email to takereoort.nmfsser@noaa.gov. j. Sea turtle-and-marine-stranding/rescue organizations' contact information is available by region at htto://www.nmfs.noaa.gov/pr/health/n ttworks.ht .. — - k. Smalltooth sawfish encounters shall be reported to http://www.flmnh.ufl.edu/fi sh/sharks/sawfish/sawfishencounters.html. 1. All work must occur during daylight hours. 41 C � P..3tls NQ + •r s � F _ L a➢Gw f ?. e _ { �• f 1�� Pau; i Cox Y 1 t i 1 Yyex ' L�fv:tl . f . «• .7. .. � ' Project Site ,�, N � W.{Ikl4.{41 pb l_ 91Iv�teaM1U t - S 4';SSr 1 II V EN101, • . A A Al $. }AGM 1�'. ml �I•»v 4. Permit Number y. yqe o 56-377633-001-002-003-EE Southeast District y O'a 2,224 4*S' !i0 p 3ve v i ;kM 13o S. Indian River Drive Gerner Residence A R D EA Suite zoz Sheet 1 of 8 253 Marina Drive �V�Fort Pierce, FL34950 June 20, 2019 Environmental Consultantj (772) 577-4141 Fort Pierce, FL 34949 Existing 282SF Dock v Existing 80LF seawall to to be replaced be replaced within 18" 44W A in ki 0] MA I n Residential Canal Existing Conditions I I ,4 r I 9 I N I O I j m I < I i � I n — Existing 80LF Seawall Total Shoreline Length = 80 feet ....,,,, „Illn 6' j Existing 282SF dock IIIIIIIIIIIIIIIIIII 4 O F E IV 1 47 � i $ w Permit Number i y a i r 56-377633-001-002-003-�E a p Southeast District' y° oResidential Can n, Not to scale for permitting purposes on ` 4p'- R ®�� 130 S. Indian River Drive Gerner Residence T-A 1 J suite zoz Sheet 3 of 8 'Environmental Consultants Fort Pierce, FL34950 253 Marina Drive June 20, 2019 (772) 577-4141 Fort Pierce, FL 34949 d so, Proposed Work 'I I � — Existing 80LF Seawall to be — replaced within 181, Total Shoreline Length = 80 feet 0 V Proposed , Proposed 3005E cep �° soatlift Wood Dock wi Ifte oatlift �$ � �------- � 4' i No seograsses observed 6/29/29 'a, A r+ PermitN#7ber i q ' r 56-377633-001--IID02-003-EE tie i � b Residential Canal i e i ential Wast,b➢strict y° Not to scale for permitting purposes onl R D EA 130 S. Indian River Drive Gerner Residence y v y s Suite zoz Sheet 4 of 8 Fort Pierce, FL34950 253 Marina Drive .tune 20, 2019 ,i Environmental Consultant (772) 577-4141 Fort Pierce, FL 34949 Dock Access Section Thru Dock Access Plan View 6 feet+/- SGL Bolts, Nut, Washers 5/8"5.5. (304)w Nut Fully D __________ _____________________ Fr Threaded @ Bents r_'I _ ` Z 6 feet 2" x 6" Tropical #1 Decking j' M'v 6"lags w/ minimal plankspacing, ror st4ngers 2"x 2" P.T. trim on cut edges. Fasten w #103" SS (304) Screws, 2 per Stringer N 2"x8" P.T. SYP, 0.40 ACQ treated a stringers. '^ 2" x 8" P.T. SYP, 0.60 ACQ treated 0 MHWL DBL bents _ _._._.-._._._._._._._._ MLWL ___________ Barren River Bottom of to seal R D EAFort PieSuite 0r?e, FLrive 34g D ;. Environmental Consultants (772) 577-4141 r'minimumFnbed'ym p A Treted Pilesermt i�Tumber 1 d 56-377633-001-002-003-EE Southeast District mittini; ouroos ,�. Center Stringers tied down with 2"x4"x 12" 0.40 treated pine \� 2PC 3" SS Screws@ ea member a j-,O*V Design Windload Information Cade: FBC 2017 0 ADD/FRC 2017/ASCE 7-10 Wind Speed: 170 MPH, 3 Second Gust Exposure "D" Importance Factor: 1.0 Internal Pressure Coeff.: 0.00 Height: <10 Ft. Mean °?s y+ ° esi�i 1�ce Drive Fort Pierce, FL 34949 Sheet 5 of 8 June 20, 2019 12" x 20" Concrete Cap w (5) #5, 60 KSI Rebar continuous w 18" Overlap CL 9900 Vinyl Sheet Piling u � #3 Ties, 24" O.C., 3" from outside edge of concrete Tie notW3'OG'. plat, ......., ea�h eqd and Seawall Details Blow Cap 2.5'x2.5'x 6"Pre- Cast Concrete Deadman m a -4-- 24" —► Y L J .I. N X III .N+ 3 '. 03 Stirrup Not to scale, for permitting purposes only 130 S. Indian River Drive -j R D Atants suite 202 Fort Pierce, FL 34950 Environmental Consu (772) 577-4141 i i� Concrete Cap & Deadman Poured onsite w 5000 PSI Concrete Y." chamfer all exposed edges 20" Design Windload Information Code: FBC 20176' ADD/FRC 2017/ASCE 7-10 Wind Speed: 170 MPH, 3 Second Gust Exposure "D" Importance Factor: 1.0 ,4, lc Internal Pressure Coeff.: 0.00 �. Height:<10 Ft. Mean q All Construction Must Meet Appl cable Portions of the 2010 FBC and/fort c 2o0 NEC, Whichever is More Strin ent Gerner Residence 253 Marina Drive Fort Pierce, FL 34949 12" °� � 4 ber t p Southeast 1s ric r o Sheet 7 of ?� June IV ---_June 190 ° aavIS LNGMYf &r1B N= BOAT TIFF FOP RO MOUNTING ORACNFIBECOUALY IUS CJra WIND LOAD REDUfRENENT$Of rur OW FDJTJON (?OJT) FLORIDA OUJLWNO CODE, PER ASCE ➢-TR AND PER 0£9GN LOAD' REQUIREMENT& OF THE 30 f S EDITION ALOMJNUN ASSOCIAPA'c ALOUJNOU DESION LIAN OEAUS AND MOUNTING ORAL 7bTALLED PER Nl-RX AMMUCOO4 EXCEED UWATE DESIGN IWND .Pt 100 unN (EXPOSURE CATEGORY C DDATS ARE TO DE RORD" MOLT LIFTS PRIOR TO A MAAAR 6W & fin:MVAC W%Z J A'JAP £1WIRC LOW 1 8 AMPS 0 If5V CAW SA AUPS 0 aeOV LAW OUM)BrM TOTAL WAIT£ V-04 12,000 LD, CUDA.GEAR BOAT L)fr om7 rec) N� R NICE SCALE. N%S "To sw^/O REY I - I[bntlM A R D EA 130 S. Indian River Drive Gerner Residence Suite 202 Fort Pierce, FL34950 253 Marina Drive Environmental Consultants (772) 577-4141 Fort Pierce, FL 34949 (( F TO FYM%M 015'C RhTg8:'rumi LRED ORAWD Nd5 COW PREPARED SPELRTCAtLY ECLR DIE WA.Y 8T! -.n�N it-• Fooiu 9b6'�N 2 5 'N BLr+REe>F a GOAL. RcaR RAWER P.S. No 4340 LR PROTIVi IZAL bASN4F/a1'II 014 ITT PMTIONE DF MARE At JAR'N ' " pF EILr�r It I SIN I" - Olk SS LAOWOOD PILTNC ORE ANCHORS FOR.Was PER PHTNO NIAIUU (2) J/�8'RIAGE DOLT FOROUNTING TTABToALOUINUNrLAT OAR377633-001-002trmDtrcTs .y 0 r � —V1-et8of8 June 20, 2019 FLORIDA DEPARTMENT OF RanMantis Gavemormor Environmental Protection Jeanette Nuilez SCANNED' LtGovemor Southeast District Office SCANNED' Noahvalensteln 3301 Gun Club Road, MSC 7210-1 BY Secretary West Palm Beach, FL33406 SQ. LucieCoun'ty 561-681-6600 ED George Gemer 253 Marina Dr. Hutchinson Island, FL 34949 Sent via e-mail: ggerner2@gmail.com Re: File No.: 56-377633-004-005-006-EE File Name: Gemer Dear George Gemer: On December 10, 2019, we received your request for verification of exemption to perform the following activities: (1) Replacement of an 80 linear foot seawall within 18 inches waterward, wetface to wetface, of the original; (2) replacement of a dock with a new 300ft2 dock; (3) installation of a boatlift, and; (4) installation of a concrete seawall cap in a residential canal, Class III Waters, adjacent to 253 Marina Dr., Hutchinson Island (Section 25, Township 34 South, Range 40 East), in Saint Lucie County (Latitude N 27129' 17.00", Longitude W 800 19' 11.94"). Your request has been reviewed to determine whether it qualifies for (1) regulatory exemption, (2) proprietary authorization (related to state-owned submerged lands), and (3) federal approval that may be necessary for work in wetlands or waters of the United States. Your project qualifies for all three. However, this letter does not relieve you from the responsibility of obtaining other federal, state, or local authorizations that may be required for the activity. If you change the project from what you submitted, the authorization(s) granted may no longer be valid at the time of commencement of the project. Please contact us prior to beginning your project if you wish to make any changes. If you have any questions regarding this matter, please contact Donald Fontenot at the letterhead address or at 561-681-6629, Donald.Fontenot@FloridaDEP.gov. 1. Regulatory Review — VERIFIED Based on the information submitted, the Department has verified that the activities as proposed are exempt, under Chapter 62-330.051(5)(b), (12)(b), and (12)(d) Florida Administrative Code, from the need to obtain a regulatory permit under Part IV of Chapter 373 of the Florida Statutes. Project No.: 56-377633-004-005-006-EE Project Name: Gerner Page 2 of 5 This exemption verification is based on the information you provided the Department and the statutes and rules in effect when the information was submitted. This verification may not be valid if site conditions -materially -change, -the -project design is modified, or the statutes or rules governing the exempt activity are amended. In the event you'need to re -verify the ex6npt-status for the activity, -a— new request and verification fee will be required. Any substantial modifications to the project design should be submitted to the Department for review, as changes may result in a permit being required. 2. Proprietary Review- NOT REQUIRED The activity does not appear to be located on sovereign submerged lands, and does not require further authorization under chapter 253 of the Florida Statutes, or chapters 18-20 or 18-21 of the Florida Administrative Code. 3. Federal Review - APPROVED Your proposed activity as outlined in your application and attached drawings qualifies for Federal authorization pursuant to the State Programmatic General Permit V-Rl, and a SEPARATE permit or authorization will not be required from the Corps. Please note that the Federal authorization expires on July26, 2021. However, your authorization may remain in effect for up to 1 additional year, if provisions of Special Condition 19 of the SPGP V-Rl permit instrument are met. You, as permittee, are required to adhere to all General Conditions and Special Conditions that may apply to your project. Special conditions required for your project are attached. A copy of the SPGP V-Rl with all terms and conditions and the General Conditions may be found at https://www.sai.usace.armv.mil/Missions/Regulatorv/Source-Book. Authority for review - an agreement with the USACOE entitled "Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection (or Duly Authorized Designee), State Programmatic General Permit", Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water Act. Additional Information Please retain this letter. The activities may be inspected by authorized state personnel in the future to ensure compliance with, appropriate statutes and administrative. codes. If the activities are not in compliance, you may be subject to penalties under Chapter 373, F.S., and Chapter 18-14, F.A.C. NOTICE OF RIGHTS This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until a subsequent order of the Department. Because the administrative hearing process is designed to formulate final agency action, the hearing process may result in a modification of the agency action or even denial of the application. Petition for Administrative Hearing A person whose substantial interests are affected by the Department's action may petition for an. administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rules 28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must contain the following information: (a) The name and address of each agency affected and each agency's file or identification number, if known; (b) The name, address, any e-mail address, any facsimile number, and telephone number of the petitioner, if the petitioner is not represented by an attorney or a qualified representative; the Project No.: 56-377633-004-005-006-EE Project Name: Gerner Page 3 of 5 name, address, and telephone number of the petitioner's representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner's substantial interests will be affected by the agency determination; (c) A statement of when and how the petitioner received notice of the agency decision; (d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate; (e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency's proposed action; (f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency's proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and (g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency's proposed action. The petition must be filed (received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing. Time Period for Filing a Petition In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of publication of the notice or within 21 days of receipt of the written notice, whichever occurs first. You cannot justifiably rely on the finality of this decision unless notice of this decision and the right of substantially affected persons to challenge this decision has been duly published or otherwise provided to all persons substantially affected by the decision. While you are not required to publish notice of this action, you may elect to do so pursuant Rule 62-110.106(10)(a). The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another party) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C. If you do not publish notice of this action, this waiver will not apply to persons who have not received written notice of this action. Extension of Time Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by the Department's action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time. Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us, before the deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon. Mediation Mediation is not available in this proceeding. Project No.: 56-377633-004-005-006-EE Project Name: Gemer Page 4 of 5 FLAWAC Review The applicant, or any party within the meaning of Section 373.114(1)(a) or 373.4275, F.S., may also seek appellate review of this order before the Land and Water Adjudicatory Commission under —Section-373.1-1.4(L�or 373_4275, F.S. Requests for review before the Land and Water Adjudicatory Commission must be filed with the Secretary of the Commission and. served on the Department within 20 days from the date when this order is filed with the Clerk of the Department. Judicial Review Once this decision becomes final, any party to this action has the right to seekjudicial review pursuant to Section 120.68, F.S., by filing a Notice of Appeal pursuant to Florida Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000) and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department. EXECUTION AND CLERKING Executed in West Palm Beach, Florida. STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION FM Jeffrey Meyer Environmental Manager Southeast District Enclosures: 62-330.051 (5)(b)(12)(b)(d),F.A.C. Special Conditions for Federal Authorization for SPGP V-RI General Conditions for Federal Authorization for SPGP V-RI Project drawings, 8 pages CERTIFICATE OF SERVICE The undersigned duly designated deputy clerk hereby certifies that this document and all attachments were sent on the filing date below to the following listed persons: FDEP — Jeffrey Meyer, Donald Fontenot Kimberly Colstad, kim@ardeaenvironmental.com Project No.: 56-377633-004-005-006-EE Project Name: Gemer Page 5 of 5 FILING AND ACKNOWLEDGMENT FILED, on this date, pursuant to Section 120.52, F of which is hereby acknowledged. December 26.2019 Clerk Date S., with the designated Department Clerk, receipt 62-330.051 Exempt Activities. The activities meeting the limitations and restrictions below are exempt from permitting. However, if located in, on, or over state-owned submerged lands, they are subject to a separate authorization under chapters 253 and 258, F.S., as applicable. ---(5)-Dock,.Pier,Boat_Ramp and Other Boating -related Work— (b) Installation of private docks, piers, and recreational dockmg facilities, -and -installation of local governmental piers and recreational docking facilities, in accordance with section 403.813(1)(b), F.S. This includes associated structures such as boat shelters, boat lifts, and roofs, provided: 1. The cumulative square footage of the dock or pier and all associated structures located over wetlands and other surface waters does not exceed the limitations in section 403.813(1)(b), F.S.; 2. No structure is enclosed on more than three sides with walls and doors; 3. Structures are not used for residential habitation or commercial purposes, or storage of materials other than those associated with water dependent recreational use; and 4. Any dock and associated structure shall be the sole dock as measured along the shoreline for a minimum distance of 65 feet, unless the parcel of land or individual lot as platted is less than 65 feet in length along the shoreline, in which case there may be one exempt dock allowed per parcel or lot. (12) Construction, Replacement, Restoration, Enhancement, and Repair of Seawall, Riprap, and Other Shoreline Stabilization — (b) The restoration of a seawall or riprap under section 403.813(1)(e), F.S., where: 1. The seawall or riprap has been damaged or destroyed within the last year by a discrete event, such as a storm, flood, accident, or fire or where the seawall or riprap restoration or repair involves only minimal backfilling to level the land directly associated with the restoration or repair and does not involve land reclamation as the primary project purpose. See section 3.2.4 of Volume I for factors used to determine qualification under this provision; 2. Restoration shall be no more than 18 inches waterward of its previous location, as measured from the waterward face of the existing seawall to the face of the restored seawall, or from the waterward slope of the existing riprap to the waterward slope of the restored riprap; and 3. Applicable permits under chapter 161, F.S., are obtained. (12) Construction, Replacement, Restoration, Enhancement, and Repair of Seawall, Riprap, and Other Shoreline Stabilization — (d) Installation of batter piles, king piles, or a seawall cap, used exclusively to stabilize and repair seawalls, provided they do not impede navigation. Project No.: 56-377633-004-005-006-EE Project Name: Gemer Page 7 of 5 Special Conditions for Federal Authorization for SPGP V-R1 Note: JAXBO (Jacksonville District's Programmatic Biological Opinion), referenced throughout, may be found online in the Jacksonville District Regulatory Division Sourcebook, or at http•//cdm16021 contentdm ocic ory/utils/getfile/collection/i)16021coII3/id/577. The SPGP V-RI instrument and all attachments may be found online through the Sourcebook, or at https://www.sao.usace.armV.mil/SPGP/ In addition to the conditions specified above, the following Special Conditions apply to all projects reviewed and/or authorized under the SPGP V-Rl. Special Conditions for All Projects 1. Authorization, design and construction must adhere to the terms of the SPGP V-Rl instrument including the Procedure and Work Authorized sections. 2. Design and construction must adhere to the PDCs for In -Water Activities (Attachment 6, from PDCs AP.7 through AP11, inclusive, of JAXBO) (Reference: JAXBO PDC AP.1.). 3. All activities performed during daylight hours (Reference: JAXBO PDC AP.6.). 4. For all projects involving the installation of piles or sheet piles, the maximum number of piles, sheet piles or concrete slab walls or boatlift I -beams installed by impact hammer per day is limited to no more than 5 per day. Any installation of metal pipe or metal sheet pile by impact hammer is not authorized (Reference: Categories D and E of JAXBO PDCs for In -Water Noise from Pile and Sheet Pile Installation, page 86.). 5. Projects within the boundary of the NOAA Florida Keys National Marine Sanctuary.require prior approval from the Sanctuary (Reference: JAXBO PDCs AP.14 and A1.6). 6. Notifications to the Corps. For all authorizations under this SPGP V-Rl, including Self - Certifications, the Permittee shall provide the following notifications to the Corps: a. Commencement Notification. Within 10 days before the date of initiating the work authorized by this permit or for each phase of the authorized project, the Permittee shall provide a written notification of the date of commencement of authorized work to the Corps. b. Corps Self -Certification Statement of Compliance form. Within 60 days of completion of the work authorized by this permit, the Permittee shall complete the "Self -Certification Statement of Compliance" form (Attachment 32) and submit it to the Corps. In the event that the completed work deviates in any manner from the authorized work, the Permittee shall describe the deviations between the work authorized by this permit and the work as constructed on the "Self -Certification Statement of Compliance" form. The description of any deviations on the "Self -Certification Statement of Compliance" form does not constitute approval of any deviations by the Corps. c. Permit Transfer. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer Project No.: 56-377633-004-005-006-EE Project Name: Gemer Page 8 of 5 of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date the enclosed form (Attachment 2). d. Reporting Address. The Permittee shall submit all reports, notifications, documentation, --and-correspondence_mquired by the general and special conditions of this permit to the following address. - (1) For standard mail: U.S. Army Corps of Engineers, Regulatory Division, -Enforcement Section, P.O. Box 4970, Jacksonville, FL, 32232-0019. (2) For electronic mail: SAJ-RD-Enforcement(¢?usace.army.mil (not to exceed 10 MB). The Permittee shall reference this permit number, SAJ- 2015-02575 on all submittals. 7. The District Engineer reserves the right to require that any request for authorization under this SPGP V-RI be evaluated as an Individual Permit. Conformance with the terms and conditions of the SPGP V-Rl does not automatically guarantee Federal authorization. 8. On a case -by -case basis, the Corps may impose additional Special Conditions which are deemed necessary to minimize adverse environmental impacts. 9. Failure to comply with all conditions of the SPGP V-RI constitutes,a violation of the Federal authorization. 10. No structure or work shall adversely affect or disturb properties listed in the National Register of Historic Places or those eligible for inclusion in the National Register. Prior to the start of work, the Applicam/Permittee or other parry on the Applicant's/Permittee's behalf, shall conduct a search of known historical properties by contracting a professional archaeologist, and contacting the Florida Master Site File at 850-245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites in the National Register Information System (NRIS). Information can be found at http://www.er.nps.gov/nr/research. a. If, during the initial ground disturbing activities and construction work, there are archaeological/cultural materials unearthed (which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the Permittee shall immediately stop all work in the vicinity and notify the Compliance and Review staff of the State Historic Preservation Office at 850-245-6333 and the Corps Regulatory Project Manager to assess the significance of the discovery and devise appropriate actions, including salvage operations. Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 C.F.R. § 325.7. b. In the unlikely event that human remains are identified, the remains will be treated in accordance with Section 872.05, Florida Statutes; all work in the vicinity shall immediately cease and the local law authority, and the State Archaeologist (850-245-6444) and the Corps Regulatory Project Manager shall immediately be notified. Such activity shall not resume unless specifically authorized by the State Archaeologist and the Corps. 11. The Permittee is responsible for obtaining any "take" permits required under the U.S. Fish and Wildlife Service's regulations governing compliance with these laws. The Permittee should contact Project No.: 56-377633-004-005-006-EE Project Name: Gerner Page 9 of 5 the appropriate local office of the U.S. Fish and Wildlife Service to determine if such "take" permits are required for a particular activity. 12. For Projects authorized under this SPGP V-RI in navigable waters of the U.S., the Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. 13. The SPGP V-Rl will be valid through July 26, 2021 unless suspended or revoked by issuance of a public notice by the District Engineer. The Corps, in conjunction with the Federal resource agencies, will conduct periodic reviews to ensure that continuation of the permit during the period ending July 26, 2021, is not contrary to the public interest. The SPGP V-RI will not be extended beyond July 26, 2021, but may be replaced by a new SPGP. If revocation occurs, all future applications for activities covered by the SPGP V-Rl will be evaluated by the Corps. 14. If the SPGP V-Rl expires, is revoked, or is terminated prior to completion of the authorized work, authorization of activities which have commenced or are under contract to commence in reliance upon the SPGP V-RI will remain in effect provided the activity is completed within 12 months of the date the SPGP V-Rl expired or was revoked. Special Conditions for Shoreline Stabilization Activities 1. Shoreline stabilization materials must be placed by hand around red mangrove prop roots (Reference: JAXBO PDC A1.3.). 2. Living shorelines can only be constructed in unvegetated, nearshore water along shorelines to create tidal marshes or mangrove habitat for the purpose of shoreline erosion control or aquatic habitat enhancement. Native plants can be placed along the shoreline or between the shoreline and the living shoreline structure (Reference: JAXBO PDC A7.4.). 3. Living shoreline structures and permanent wave attenuation structures can only be constructed out of the following materials: oyster breakwaters, clean limestone boulders or stone (sometimes contained in metal baskets or cages to contain the material), small mangrove islands, biologs, coir, rock sills, and pre -fabricated structures made of concrete and rebar that are designed in a manner so that they do not trap sea turtles, smalltooth sawfish, or sturgeon (Reference: JAXBO PDC A7.5.). a. Reef balls or similar structures are authorized if are not open on the bottom, open -bottom structures with a top opening of at least 4 ft, and reef discs stacked on a pile are pre -fabricated structures are designed in a manner so that they do not trap sea turtles. b. Oyster reef materials shall be placed and constructed in a manner that ensures that materials will remain stable and that prevents movement of materials to surrounding areas (e.g., oysters will be contained in bags or attached to mats and loose cultch must be surrounded by contained bagged oysters or another stabilizing feature) (Reference: JAXBO PDC A7.2.). Project No.: 56-377633-004-005-006-EE Project Name: Gemer Page 10 of 5 c. Oyster reef materials shall be placed in designated locations only (i.e., the materials shall not be indiscriminately dumped or allowed to spread outside of the reef structure) (Reference: JAXBO PDC A7.3.). d. Wave attenuatiorrstructures-must haves-ft.gaps_at least every75 ft in length as measured parallel to the shoreline and at the sea floor, to allow for tidal flushing and species movement — (Reference: JAXBO PDC A7.6.). e. Wave attenuation structures must have 5 ft gaps at least every 75 ft in length as measured. parallel to the shoreline and at the sea floor, to allow for tidal flushing and species movement (Reference: JAXBO PDC A7.6.). f. Other materials are not authorized by this SPGP V-RI (Reference: JAXBO PDC A7.5.). 4. For living shorelines, only native plant species can be planted (Reference: JAXBO PDC A7.1.). Special Conditions for Docks Piers Associated Facilities, and other Minor Piling -Supported Structures 1. For temporary structures associated with marine events. Upon completion of the event, these structures must be removed and, to the maximum extent practical, the site must be restored to pre - construction elevations. Water depths in the area of marine events must be deep enough to support at least 5 ft of water depth under the keel of a vessel and between the keel of a vessel and Endangered Species Act listed coral colonies, if present, when transiting to the mooring areas (Reference: JAXBO PDC A2.1.4.). 2. Educational Signs. For commercial, multi -family, or public facilities, and marine events, signs must be posted as described below (Reference: These replicate JAXBO PDCs A.2.2 and A.2.2.1 to A.2.2.3., inclusive, within the table PDCs Specific to Activity 2 - Pile Supported Structures and Anchored Buoys, starting on page 112.): a. (A2.2.) For commercial, multi -family, or public facilities, and marine events, signs must be posted in a visible location(s), alerting users of listed species in the area susceptible to vessel strikes and hook -and -line captures. The most current version of the signs that must be downloaded and sign installation guidance are available at: (http•//sero nmfs noaa oov/protected resources/section 7/protected species educational signs/ index.html). The signs required to be posted by area are stated below: (1) (A2.2.1.) All projects in Florida shall use the Save Sea Turtle, Sawfish, and Dolphin sign. These signs shall include contact information to the sea turtle and marine mammal stranding networks and smalltooth sawfish encounter database. (2) (A2.2.2.) Projects within the North Atlantic right whale educational sign zone shall post the Help Protect North Atlantic Right Whales sign. (3) (A2.2.3.) On the east coast of Florida, projects located within the St. Johns River and those occurring north of the St. Johns River to the Florida -Georgia line shall post the Report Sturgeon sign. On the west coast of Florida, projects occurring from the Cedar Key, Florida north to the Florida -Alabama line. 3. Monofilament Recycling Bins. For commercial, multi -family, or public facilities, monofilament recycling bins must be provided as described below (Reference: The below replicates PDC A.2.3 within the table PDCs Specific to Activity 2 - Pile Supported Structures and Anchored Buoys, the PDC itself on page 113 of the JAXBO.): Project No.: 56-377633-004-005-006-EE Project Name: Gemer Page 11 of a. (A2.3.) For commercial, multi -family, or public facilities, monofilament recycling bins must be provided at the docking facility to reduce the risk of turtle or sawfish entanglement in, or ingestion of, marine debris. Monofilament recycling bins must: (1) (A2.3.1.) Be constructed and labeled according to the instructions provided at http://mrrp.myfwc.com. (2) (A2.3.2.) Be maintained in working order and emptied frequently (according to http://mrrp.myfwc.com standards) so that they do not overflow. 4. North Atlantic Right Whale. The attached North Atlantic Right Whale Information Form (Attachment 271 describes the presence of North Atlantic right whales in the area and the Federal regulations governing the approach to North Atlantic right whales. (The FDEP or Designee will attach this document to their authorizations for a dock project (new construction, repair, or replacement) at a private residence located within 11 nautical miles of North Atlantic right whale critical habitat. as measured in a radius from the center of the nearest inlet to open ocean described by Attachment 29, the North Atlantic Right Whale Educational Sign Zones (from Section 2.1.1.4 of JAXBO, pages 31 and 32, inclusive) (Reference: JAXBO PDC A2.4.). 5. Aids to Navigation. Aids to navigation must be approved by and installed in accordance with the requirements of the U.S. Coast Guard (i.e., 33 C.F.R., chapter I, subchapter C, part 66, Section 10 of the Rivers and Harbors Act, and any other pertinent requirements) (Reference: JAXBO PDC A2.5.). 6. Lighting for docks installed within visible distance of ocean beaches. If lighting is necessary, then turtle -friendly lighting shall be installed. Turtle -friendly lighting is explained and examples are provided on the Florida Fish and Wildlife Conservation Commission website: http://myfwc.com/wildlifehabitats/managed/sea-turtles/ii2htine/ (Reference: JAXBO PDC A2.8.). 7. Construction Location. Project construction shall take place from uplands or from floating equipment (e.g., barge); prop or wheel -washing is prohibited (Reference: JAXBO PDC A2.9.). 8. Regarding submerged and emergent aquatic vegetation, the design and construction of a Project must comply with the following: a. A pile supported -structure (i) that is located on a natural waterbody (i.e., outside an artificial waterway that was excavated for boating access and is bordered by residential properties) and (ii) that is within the range of seagrass (estuarine waters within all coastal counties except for Nassau, Duval, St Johns, Flagler and Volusia north of Ponce Inlet), will be constructed to the following standards: (1) Must comply with or provide a higher level of protection than, the protective criteria in the joint U.S. Army Corps of Engineers'/National Marine Fisheries Service's "Construction Guidelines in Florida for Minor Piling -Supported Structures Constructed in or over Submerged Aquatic Vegetation (SAV), Marsh or Mangrove Habitat" updated November 2017 (Attachment 5). (2) In addition to (1), above, IF the project is within range of Johnson's seagrass (the range of Johnson's seagrass is defined as Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida), THEN the design and construction shall comply with, in some cases, the more restrictive requirements within paragraph 8.c., below (Reference: JAXBO PDC A2.17). Project No.: 56-377633-004-005-006-EE Project Name: Gerner Page 12 of 5 b. For all other Projects, (1) Within the range of Johnson's seagrass (the range of Johnson's seagrass is defined as Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east (2) (3) (4) coast -of Florida),-the-presence_of submerged aquatic vegetation will be determined utilizing the "Submerged Aquatic Vegetation Survey Guidelines" (Attachment 7). If no survey — performed, aquatic vegetation, including Johnson's seagrass, will be presumed to be present for purposes of this Special Condition. Outside the range of Johnson's seagrass but within the range of seagrass (estuarine waters within all coastal counties except for Nassau, Duval, St Johns, Flagler and Volusia County north of Ponce Inlet) and within tidal waters, the presence of seagrass and tidal freshwater submerged aquatic vegetation will be determined using the "Submerged Aquatic Vegetation Survey Guidelines" (Attachment 7) unless a site visit or aerial photography observes absence during the growing season (if water depth and clarity allows) or aquatic vegetation has not been found in the vicinity in the past. Pile -supported structures, IF aquatic vegetation is present (including seagrass, tidal freshwater submerged aquatic vegetation and emergent vegetation), THEN must comply with or provide a higher level of protection than, the protective criteria in the joint U.S. Army Corps of Engineers'/National Marine Fisheries, Service's "Construction Guidelines in Florida for Minor Piling -Supported Structures Constructed in or over Submerged Aquatic Vegetation (SAV), Marsh or Mangrove Habitat" updated November 2017 (Attachment 5). In addition to (1) to (3) above, IF the proposed dock or proposed structure is within range of Johnson's seagrass (the range of Johnson's seagrass is defined as Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida), and IF the proposed dock or proposed structure,falls within the following scenarios, THEN the design and construction • shall comply with, in some cases, the more restrictive requirements within paragraph 8.c.,below. (Reference: The following replicates "Scenario B" as defined within A2.17., PDCs for Docks or Other Minor Structures of JAXBO.): (i) Dock replacement in the exact footprint (i.e., same location/configuration/size) as the previous dock and:. (a) within Johnson's seagrass critical habitat with No current seagrass survey (completed no earlier than 1 year before submitting the application); or, Johnson's seagrass under the dock; or, Native seagrass, other than Johnson's seagrass, under the dock; or, (b) within the Range of Johnson's seagrass (outside of critical habitat) with No current seagrass survey or,Johnson'sseagrass under the dock, (ii) New docks or dock expansions and: (a) within Johnson's seagrass critical habitat; or, (b) within the Range of Johnson's seagrass (outside of critical habitat) with: No current seagrass survey (completed no earlier than 1 year before submitting the application) or, Johnson's seagrass within property limit. c. The following additional restrictions apply when required by paragraphs 8.a.(2) or 8.b.(4), above (Reference: The following replicates the "Dock PDCs for Scenario B" within A2.17: PDCs for Docks or Other Minor Structures of JAXBO.): (1) To avoid and minimize impacts to Johnson's seagrass and native, non -listed seagrasses to the maximum extent practicable: (i) The dock must be positioned to avoid and minimize effects to Johnson's seagrass. Project No.: 56-377633-004-005-006-EE Project Name: Gemer Page 13 of 5 (ii) Over any area that contains Johnson's seagrass or native, non- listed seagrasses, the dock shall be oriented in a north -south orientation to the maximum extent that is practicable to allow maximum sunlight under the structure. (iii)If practicable, terminal platforms shall be placed in deep water, waterward of Johnson's seagrass beds or native, non -listed seagrasses beds or in an area devoid of Johnson's seagrass or native, non -listed seagrasses. (iv)Piles must be spaced a minimum of 10 ft apart in any area that contains Johnson's seagrass to minimize direct impacts. (v) Piles shall be installed in a manner that will not result in the formation of sedimentary deposits (e.g., donuts or halos) around the newly installed,pilings. (vi)No covered boat lifts are allowed over any Johnson's seagrass. (2) Decking options: Deck surfaces (parallel with the water) that are located waterward of the MHWL must be constructed of grated materials or plank construction or a combination of the both methods (e.g. plank decking on the walkway and grated decking on the terminal platform). These decking options are described below: (i) For grated decking: (a) Height requirement: The surface of the structure, including the dock walkway (the over- water narrow portion connecting the terminal platform to the shore and any over -water ramp required for access) and the dock,_must be a minimum of 3 ft above MHW when constructed with grated decking. .(b) Size limitations: The dock walkway is limited to a width of 4 ft. The terminal platform is limited to a total area of 160 ft?. Marginal docks are limited to a width of 5 ft. The 5 ft width restriction is measured from wet side of the seawall: For example, if a seawall cap is 3 feet overwater then the dock would be limited to 2 feet. (c) Material description: Decking materials shaped in the form of grids, grates, lattices, etc., to allow the passage of light through the open spaces. These materials must provide a minimum of 43% open space. (ii) For plank decking: (a) Height requirement: The surface of the structure, including the dock walkway (the over- water narrow portion connecting the terminal platform to the shore and any over -water ramp required for access) and the dock, must be a minimum of 5 ft above MHW when constructed of plank decking. (b) Size limitations: The dock walkway is limited to a width of 4 ft. The terminal platform is limited to a total area of 120 ftz. Marginal docks are limited to a width of 5 ft. (c) Material description: Deck boards may be constructed of any material. Deck Boards must be installed to provide a minimum of a 0.5-in gap between individual deck boards. d. Aids to Navigation in Acropora critical habitat. The distance from Aids to Navigation (ATONs) to ESA -listed corals and Acropora critical habitat shall ensure there are no impacts to the corals or the essential feature of Acropora critical habitat from the movement of buoys and tackle. The appropriate distance shall be based on the size of the anchor chain or other tackle to be installed to secure the buoy to its anchor, particularly when the design of the ATON does not prohibit the contact of tackle with the marine bottom. In all cases, buoy tackle will include Rotation to ensure there is no contact between the anchor chain or line and the marine bottom (Reference: JAXBO PDC A2.10.). Project No.: 56-377633-004-005-006-EE Project Name: Gerrter Page 14 of 5 General Conditions for Federal Authorization for SPGP V-R1 1. The time limit for completing the work authorized ends on July 26, 2021. 2. You must maintain the activity authorized byy is permit ri good -condition -and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third parry in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic. or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this"office of what you have found.,We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. ' 4. If you sell the property associated with this permit, you must obtain the signature of the new owner on the enclosed form and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit, 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Further Information: 1. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, orlocal authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing orproposed Federal ,projects. 2. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted projector uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. Project No.: 56-377633-001-002-0(' Project Name: Gerner Page 15 of 20 c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or Construction deficiencies associated with the permitted work. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 3 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. 5.. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CER 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date the enclosed form. 7. The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation or alteration. Project No.: 56-377633-(, - )2-003-EE Project Name: Gemer Page 16 of 20 Department of the Army Permit Transfer for SPGP V-Rl PERMIT NUMBER: DATE: (Subdivision) (Lot) (Block) When the structures or workauthorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. Although the construction period for works authorized by To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions, have the transferee sign and date below and mail to the U.S. Army Corps of Engineers, Enforcement Branch, Post Office Box 4970, Jacksonville, FL 32232-0019. (Transferee Signature) (Date) (Name Printed) (Street address) (Mailing address) (City, State, Zip Project No.: 56-377633-001-002-6 .F E Project Name: Gemer Page 17 of20 STANDARD MANATEE CONDITIONS FOR IN -WATER WORK 2011 The permittee shall'comply with the following conditions intended to protect manatees from direct project effects: a. All personnel associated with the project shall be instructed about the presence of manatees and.manatee speed zones, and the need to avoid collisions with and injury, to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act. b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake" at all times while in the immediate area and while in water where the draft of the vessel provides less than a four -foot clearance from the bottom. All vessels will follow routes of deep water whenever possible. c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement. . d. All on -site project personnel are responsible for observing water -related activities for the presence of manatee(s). All in -water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving. e. Any collision with or injury to a manatee shall be reported immediately to the FWC Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and. Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772- 562-3909) for south Florida, and to FWC at ImperiledSpecies@mvFWC.com f. Temporary signs concerning manatees shall be posted prior to and during all in -water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission (FWC) must be used (see MyFWC.com/manatee). One sign which reads Caution: Boaters must be posted. A second sign measuring at least 81/2" by 1.1" explaining the requirements for "Idle Speed/No Wake" and the shut down of in -water operations must be posted in a location prominently visible to all personnel engaged in water -related activities. Questions concerning these signs can be sent to the email address listed above. Project No.: 56-377633-0G __2-003-EE N Project Name: Gemer ` Page 18 of 20 CAUTION: MANATEE HABITAT All project vessels — -- IDLE SPEED/NO WAKE When a manatee is within 50 feet of work all in -water activities must SHUT DOWN Report any collision with or injury to a manatee: Wildlife Alert: jJ0 1-888-404-FWCC (3922) cell * FWC or #FWC .Project No.: 56-377633-001-002-L_ 3E Project Name: Gerner Page 19 of 20 gQp"OAT Y CCph4P9n .7 Y7, UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE Southeast Regional Office 263 13th Avenue South St. Petersburg, FL 33701 SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS The permittee shall comply with the following protected species construction conditions: a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water -related activities for the presence of these species. b. The permittee shall advise all construction personnel that there are civil and criminal. penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973. c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service's Protected Resources Division, St. Petersburg, Florida. d. All vessels associated with the construction project shall operate at "no wake/idle" speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four -foot clearance from the bottom. All vessels will preferentially follow deep -water routes (e.g., marked channels) whenever possible. e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition. f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service's Protected Resources Division (727-824-5312) and the local authorized sea turtle stranding/rescue organization. g. Any special construction conditions, required of your specific project, outside these general conditions, if applicable, will be addressed in the primary,consultation. It. Any collision(s) with and/or injuries to any whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS's Protected Resources Division (PRD) at (727-824-5312). ProjectNo.: 56-377633-06r 2-003-EE Project Name: Gerner Page 20 of 20 i. Reports to NMFS's Protected Resources Division (PRD) may be made by email to takereport.mnfssernanoaa.gov. contact information is available by region at k. Smalltooth sawfish encounters shall be reported to httu://www.Rmnh.ufl.edu/fish/shdrks/sawfish/sawfiishencounters.html. 1. All work must occur during daylight hours. ee... 5 m <wa 3 r Y 130 S. Indian River Drive Suite 02 A R D EA Fort Pierce, Fl. 34950 Environmental Consultants (772)577-4141 Gerner Residence 253 Marina Drive Fort Pierce, FL 34949 1!P 0 mn AA iM F— 6 —= 0 a zs sc Sheet 1 of 8 June 20, 2019 Existing Conditions AR D EA 1ulte20dianRverDrive Gerner Residence Suite zoz Sheet 2 of 8 Fort Pierce, FL 34950 253 Marina Drive dune 20, 2019 Environmental Consultants I7721577-4141 Fort Pierce, FL 34949 j I Existing Conditions I i C i a j i i Existing 80LF Seawall Total shoreline Length = 8o feet I i i 11111111 , 5 ' Existing 28 13It oc I i 4- i i m Permit Number y a r I 56-377633-004-005-006-EE j b I 1 S ' p Southeast District y° b O Residential Canal? �o y Residential Canal °o I a4r1.s- i Not to scale formitting purposes only 1305. Indian River Drive Gerner Residence >--.'AR Q EA suite Sheet 3 of 8 Fort Pierce, FL 253 Marina Drive 3a9s0 June 20, 2019 i Environmental Consultants (772) 5774141 Fort Pierce, FL 34949 Proposed Work Existing 80LF Seawall to be 4 t 'IF a replaced within 18" �4� Total Shoreline Length = 80 feet C i °+• Permit Number z• - 6' a r sa 56-377633-0©4-005-0O6-EE a No seogrosses , p Southesist District Y observed 6/19/19 Proposed B ailrftd '* Proposed 300SF Replacement i °? V Wood Dock with New Boatlift -"'"---= S- Residential Canal Residential Canal A R D EA130 S. Indian River Suite Fort Pier ce, FL 34950rive Environmental Consultants (772) 577-4141 Gerner Residence 253 Marina Drive Fort Pierce, FL 34949 rN Sheet 4 of 8 June 20, 2019 rev. 12110119 Dock Access Section Thru Dock Access Plan View 6ise q- SGL BoIts,0 Washers 5/gThrasdp6) w Net Fully ........ ..... _ Threaded is Bents 6 reer./- �� w/mini mpiplank pacing, e•a•un-/minimalnnnkutedg, _I - rarsmnnn 2'v 3'P.T. true an cut edges It V H stringers. +� O f• 4 2' x B' P.T. SYP, 0.fi0 ACQ ere d'f n N ........................ ..i.... OBL bents 4 _ . ...................... :. .�...!"n.., Permit Number y O 56-377633-004=005-006-EE ,e ----------------- .--- - p Southeast District fllverB oO`i��^m•a CenterSMngerstled dawn with 2-x4° x12'0.40tmated pine ola. reated Piles 2PC 3-S5 Sennas@ea member O � y _wR 9.fnl embedment YY ..LL Design Wind ad Information Code: FOC 2017 6- AD D/FRC 2017/ASCE 7-10 Wind Speed: 170 MPH, 3 Second Gust Exposure'D' Importance Factor 1.0 Internal Pressure Coeff.: 0.00 Not to scale for permitting pur oses oniv Height:<10 Ft. Mean ■w) 130 S. Indian River Drive Gerner Residence i )AR. V EA suite zoz Sheet 5 of 8 % Fort Pierce, FL 34950 253 Marina Drive June 20, 2019 t T En+fnnm<ninl Gnsuha p72) 577-4141 Fort Pierce, FL 34949 1V x 20- Concrete Cap w (5) 115, 60 KSI Rebar continuous w 1r Overlap CL 9900 Vinyl Sheet Piling #3 Ties, 24' O.C., 3° from outside edge of concrete 4 ai i b Seawall Details Concrete Cap & Deadman Poured smite w5ooa PSI Concrete 2.5'x2.5'x6.Pre- CastConcrete Deadman Permit u \! .� #3Stirrup Not to scale, for permitting purposes only 4' 130 S. Indian River Drive /ARQEA Fort P202 ier Fart Pierce, FL 34950 .0 LI Emirenmental Consultants (772)577-4141 Concrete Cap TFTflT CL 9900 Series Shoreguard Sheet Piling ti^l�r •�itv �S•T:ii :C3 1%1.. ;.Y'/'1 .'.. <'Pl, `i''y.{;{ A W eir.mferall• exposed edges 'Id d Speed: 170 MPH, 35econd GustW�VRMe D'partanm Faacr. Lc ternal Pressure Caeff.: 0.00 Height:<10 Ft Mean All Caiutruction Must Meet Applicable I Pardons of the 2010 MCand/crthe 2008 NE4 Michever 4 More Stringent Gerner Residence Sheet 7 of 8 253 Marina Drive June 20, 2019 Fort Pierce, FL 34949 e MOST Oft IOi CAAMCH DCAV3 AND %INS O D f[OminY"5➢a➢F' THE nN-6iYKN'((SYSJ li440A@veiM C WA fTE ASCC " Ab TR L8915 CD.Ia RCDV(R lfflW S A 5 CMBON UM DEYf ASSOOMnOAL, At VtliNVY DCL/LN YiNJAt. MAPS AND YWNUNL aRA"rTS C UIV,Rff RAW MUDDORft6.OIL FYLCff; LLiWAR 0C9LU RROS'[ID.M d0 W$(IXPDAtj'C 4}CC64Y C:BP 0)', RSiAAi2. 106" KYDI[D MJ1 ft4T Yre➢rnR ro A NAA'RYWtOC�/,C �TCM•TAAn� TOBC IC cWM DCR 04 B! faX/ 0@` 91P A'RlACL C8W119tl.CA➢ raW.OxAnr, ns:bn:RAriw SRAtt YCRifY: AY4l0.f cA➢A CSTKj'r0 COYPt r• ntti 8' M/N1MflMOtAMETER .0 ec.e RRr,suec:,DurtD aaa4: qR:-SRN55'(h:Cat'/£!L W'tDYPwRAq[S cOStrACCN! Qr c 4 !� Permit Number S. Indian River Drive ARDE130 Suite Emir@nmental Consultants Fart Pierce, FL34950 (772) 577-4141 r L WA' 11 {$G" vBGJ N S Sort cI w .m. , SQIALW NO RCY IY![lAQA. S P laa�- n tU895 s aaoEv a' NasxDYstwn-@vucavc �icluaMYt 2r�De. ; i PHAG MOUNTURG TABS NRLYW (L !%D. Ci SS u0 so! IS I" WOOD PIUNC OR IS CPRRC2 ANT"VAS 10, ,,.CSSir P4IXS4 PCR PR. MONITO.YININW (2) l/H' OM. IS CARRLtOC 00LT 0.P A JCACNMG MMRNC LAS TS .CC RCWKCO-ASR PAIRS. RMHYNXO-YAO CCNSTRYCTW F.O. ,/R•X. a' Al VV1uON Wn61-Ta-fi AT WAR-. WARM AND iM1I umE PRC0VC15 i wx, mom Raw Gerner Residence 253 Marina Drive Fort Pierce, FL 34949 Sheet 8 of 8 June 20, 2019