HomeMy WebLinkAboutTRUSS PAPERWORKPermit Number.
Miscellaneous:
neerina Index Sheet
Lot Number #:
Address:
The Information in this box is for administrative purposes only and is not pan of the engineering review.
Ross
7606 Ft. Walton Rd
Ft. Pierce/St. Lucie, FL
Truss Fabricator: East Coast Truss Client : Emporium Job NameRoss
Page 1 of 1
Job Number: 24892 Date: 04/10/13 Specification Quantity: 24 1
Note: A Professional Engineers Seal affixed to this Index Sheet indicates the acceptance of professional
Engineering responsibilities for individual truss components fabricated in accordance with the listed
and attached Truss Specification Sheets. Determination as to the suitability of these individual truss
components for any structure is the responsibility of the Building Designer, as defined in '
ANSI/'IPI 1-95, Section 2.2. Permanent files of the original Truss Specification Sheet are maintained
by East Coast Truss. Questions regarding this Index Sheet and/or the attached Specification Sheets
may be directed to East Coast Truss Q 772466.2480.
Standard Roof Loading:
T.C. Live: 20.00 psf
T.C. Dead: 15.00 psf 170.000 MPH
B.C. Live: 0.00 psf Exp Cat: B
B.C. Dead: 10.00 psf Enclosed Bldg
Total Load: 45.00 psf
Notes: Refer to individual truss design drawings far special loading conditions.
Building Code
FBC2010/TP1200'
PAUL A BEATfY, P.E. / LICENSE # 47449
P.C. Box 812.f WU fit 33928
Qr'FtTIFIC•
No. 47449
STATE OF c
ORIOR•-* N���`•
With my seal affixed to this sheet, I hereby certify that I am the Truss Design Engineer and this
index sheet conforms to 61 G15-31.003, section 5 of the Florida Board of Professional Engineers Rules.
Page 1 of 1
e .- . 1
Job
Truss
Truss Type
Oty
Ply
24892
A1H
HIP TRUSS
1
1
::1
Job Reference (optional)
East Coast Truss, Fort Pieme, FL. 34946 Run: 7.35D s Jun 222012 YnnC f.35U s Jun zz 2012 MI I eK Inousmes, Inc. I ue Apr ua ua:uJ:zo bu is raga i
IDxDhnOn9Y2cMz2ntDgRHZaGzSMF-MNFyryvhBna2vBsNfJnCgEIKyPdgIWCJEk4PW7.SW 7 V
-1410 3.10.14 7-0-0 11d9 ifi9-7 2039 23-0-2 27So 2aJ'Q
F1-0-0! 3-10.14 I &1-2 I 4{r9 I 43.13 I 44ie 31-2 ~ 8-10.1-
Sole: IW=1'
Dead Load Defl. = 314 in
I> 28 29" 13 30 31 ..32 33
402= 5x5= 4x10 M1aSHS= We= Sx5- 4x12=.
4x4 =
2915#1--762#
7-04 11-59 15.0.7 W 27.3-0
r 7. I bd-9 I 43.13 {- 4S9 1 7-0-0
291518.762#
�N
Plate Offsets MY):
12:0-0-3 Edgel 14.0-5-12 0-2-121
17'0.5-12 0-2-121 f9.0-0J
Edcel
111:0-2-8 0-3-01
f15.0-2-8 0-3-01
LOADING (psf)
SPACING 2-0-0
CSI
DEFL
in (loc)
Udell
L/d
PLATES
GRIP
TCLL 20.0
Plates Increase 1.25
TC 0.84
Vert(LL)
0.49 12-14
>665
240
MT20
244 190
TCDL 15.0
Lumber Increase 1.25
BC 0.92
Vert(TL)
-1.2112-14
>271
180
M18SHS
244/190
BCLL 0.0 '
Rep Stress Incr NO
WB 0.72
Horz(TL)
0.28 9
n/a
n/a
BCDL 10.0
Code FBC201 OfrP12007
(Matrix-M)
Weight: 128 lb
FT=O%
LUMBER BRACING
TOP CHORD 2x4 SYP M 31 TOP CHORD
BOT CHORD 2x4 SYP M 31
WEBS 2x4 SP No.3 BOT CHORD
REACTIONS (lb/size) 2=256410-8-0 (min. 0.2-7), 9=2564/0.8-0 (min. 0-2-7)
Max Horz2=38(LC 7)
Max Uplifl2=762(LC 8), 9=762(LC 8)
Max Grav2=2915(LC 2), 9=2915(LC 2)
FORCES (lb) -Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=7324/1911, 3-4=7464/1959, 4-5=8634/2212, 5-6=8631/2210,
6-7=8631/2210, 7-8=7464/1959, 8-9=7324/1911
BOT CHORD 2-15=1728/6833, 14-15=1779f7139, 12-14=2094/8634, 11-12=1780f7139,
9-11=1728/6832
WEBS 3-15=2891449, 4-15=269/1030, 4-14=356/1769, 5-14=621/216,
6-12=587/216, 7-12=354/1765, 7-11=270/1031, 8-11=291/450
Structural wood sheathing directly applied or 2-0-13 oc
pudins.
Rigid ceiling directly applied or 5-53 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be Installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCOL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=241t;
eave=4ft; Cat. II; Exp B; Encl., GCpt=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) All plates are MT20 plates unless otherwise indicated.
5) Plates checked for a plus or minus 0 degree rotation about its center.
6) This truss has been designed for a 10.0 pelf bottom chord live load noncencurrent with any other live loads.
7)' This truss has been designed for a live load of 20.Opsf on the bottom chord In all areas where a rectangle 3-&0 tall
by 2-M wide will fit between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 762 lb uplift atjoint 2 and
762 lb uplift at joint 9.
9) "Semi -rigid pitchbreaks including heels" Member end fixity model was used in the analysis and design of this truss.
Continued on page 2
Job
Truss Type
City
Ply
24892
TM
HIP TRUSS
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 a Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:26 2013 Page 2
IDxDhnOn9V2cMz2ntOgRHZaGzSIaF-MNFyzywhena2vBSNfJnCgEIKyPdgr W CJEk4PWzSW I V
NOTES
10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 112 lb down and 100 lb up at 7-0-0. 112 lb down
and 100 lb up at 9-0-12, 112 lb down and 100 lb up at 11-0-12, 112 lb down and 100 lb up at 13-0-12. 112 lb down and 100 lb up at 14-2-4. 112 lb
down and 100 lb up at 16-2-4, and 112 lb down and 100 lb up at 18-2-4. and 112 lb down and 100 lb up at 20.3-0 on top chord, and 1040 lb down and
368 lb up at 7-0-0. 66 lb down and 2 lb up at 9-0-12. 66 lb down and 2lb up at 11-0-12, 66 lb down and 2 lb up at 13-0-12, 66 lb down and 2lb up at
14-2-4, 66 lb down and 2 lb up at 16-2-4, and 66 lb down and 2 lb up at 18-2-4, and 1040 lb down and 368lb up at 20.2-4 on bottom chord. The
design/selection of such connection device(s) is the responsibility of others.
11) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always required.
12) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (8).
LOAD CASE(S) Standard
1) Regular. Lumber Increase=11.25, Plate Increase=1.25 _
Uniform Loads (plf) - -
Vert: 1-4=-60, 4-7=-60, 7-10=-60, 16-19=20
Concentrated Loads (lb)
Vert: 4=96(F) 7=96(F) 15=902(F) 11=-902(F) 22=96(F) 23=96(F) 24=96(F) 25=96(F) 26=96(F) 27=96(F) 28=-41(F) 29=41(F) 30=-01(F)
31=-41(F) 32=-41(F) 33= 41(F)
Job
Truss
Truss Type
Qly
Ply
24892
A2
Hip Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34W Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:27 2013
4X4 =
3X4 =
4X4 =
Scale: 114"'
Dead load Defl. =7/16 in
3X8= 3X8— 4X4= W 3X8=
129W-278#
129W-Z78#
9-0-0
1830
I
_ 2730
9-0-0
93-0
9-0-0
LOADING (psl)
SPACING
2-0-0
CSI
DEFL
in (too)
Vdefl
Ud
PLATES GRIP
TCLL 20.0
Plates Increase
1.25
TC 0.47
Vert(LL)
0.19 10-12
>999
240
MT20 244/190
TCDL 15.0
Lumber Increase
125
BC 0.96
Vert(TL)
-0.64 10-12
>512
180
BCLL 0.0 '
Rep Stress Incr
YES
WB 0.27
Horz(TL)
0.14 8
n/a
n/a
BCDL 10.0
Code FBC2010/rP12007
(Matrix-M)
Weight: 123 lb FT=O%
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3 BOT CHORD
REACTIONS Qb/size) 2=1153/0-8-0 (min. 0-1-9). 8=1 16NO-8-0 (min. 0-1-9)
Max Hoa2=50(LC 6)
Max Uplift2=278(LC 8), 8=278(LC 8)
Max Grav2=1299(LC 2), 8=1299(LC 2)
FORCES (Ib) - Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=28931600, 3-0=2501/500, 4-5=2361/495, 5-6=2361/495,
6-7=2501I500, 7-8=2893/600
BOT CHORD 2-12=-49612694, 10-12=-434/2617, 8-10=-49612694
WEBS 3-12=-389/158, 4-12=-56/479, 5-12=420/102, 5-10=-420/102,
6-10=-56/479, 7-10=389/158
Structural wood sheathing directly applied or 3-1.4 oc
pudins.
Rigid ceiling directly applied or 2-2-0 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.0psf; h=15ft; 13=451t; L=24ft;
eave=oft; Cat. II; Exp B; End., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) Plates checked for a plus or minus 0 degree rotation about its center.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 278 lb uplift atjoint 2 and
278 lb uplift at joint 8.
8) "Semi -rigid pitchbreaks Including heels' Member end fixity model was used in the analysis and design of this truss.
9) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Qty
Ply
24892
A3
Hip Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MiTek Industries, Inc. Tue Apr 09 09:03:27 2013 Page 1
lDmDhnOn9Y2cMr2ntOQRHZaGzSIBF-gZoKAl%Jt5i tWLRuxNg011myMINPKYWu2Tgdaxm.nSW 1U
_7-0-01 7-0-0 11fi0 W_ W 1 2730 I�
7-0-0 7-0-0 4-0-0 530 441-0 74/0
Scale: 1/4=1'
Dead Load De9.=7/161n
5X5= 5x5=
3%4= 4%4= 3%4= 4x4=
4%4 =
1299JN-278#
1299#1-ZTB#
LOADING (psf)
TCLL 20.0
TCDL 15.0
BCLL 0.0 '
BCDL 10.0
SPACING 2-M
Plates Increase 1.25
Lumber Increase 1.25
Rep Stress Incr YES
Code FBC2010rrP12007
CSI
TC 0.60
BC 0.95
WB 0.22
(Matrix-M)
DEFL in
Vert(LL) -0.35
Vert(TQ -0.64
Horz(TL) 0.13
(Joe) Udefi L/d
9-14 >934 240
9-11 >512 180
7 n/a n/a
PLATES GRIP
MT20 244/190
Weight 107 lb FT = 0%
LUMBER
BRACING
TOP CHORD 2x4 SP No.2
TOP CHORD
Structural wood sheathing directly applied or 2-11-1 oc
BOT CHORD 2x4 SP No.2
pur ins.
WEBS 2x4 SP No.3
BOT CHORD
Rigid ceiling directly applied or 2-2-0 oc bracing.
MiTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation nuide.
REACTIONS (Ib/size) 7=1153/0-8-0 (min. 0-1-9), 2=1153/D.8-0 (min. 0-1-9)
Max Horc2=62(LC 6)
Max Uplift7=278(LC 8), 2=278(LC 8)
Max Grav7=1299(LC 2), 2=1299(LC 2)
FORCES (Ib) -Max. CompJMax. Ten. - All forces 250 (Ib) or less except
when shown.
TOP CHORD 2-3=2752/544, 3-4=2468/507, 4-5=2048/465, 5-6=2468/507,
6-7=2752/544
BOT CHORD 2-11=-42412542, 9-11=-292/2048, 7-9=-424/2542
WEBS 3-11=-015/150, 4-11=-65/543, 5-9=-65/543, 6-9==115/150
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. II; Exp B; End., GCpl=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water pending.
4) Plates checked for a plus or minus 0 degree rotation about Its center.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-5-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 278 lb uplift at joint 7 and
278 lb uplift at joint 2.
8) "Semi -rigid pitchbreaks including heels' Member end fixity model was used in the analysis and design of this truss.
9) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job Truss
Truss Type
Qty
Ply
24892
Hip Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print 7.350 s Jun 22 2012 MiTek Industries, Inc. Tue Apr 09 09:o3:Za Zulu
Scale:114 =1'
Dead Load Defl. =7116 in
5z5= W=
3z4 = 3x4 = 3x4 = AIM =
414 =
1299#1-278#
1299IN-27M
LOADING (psf)
TCLL 20.0
TCDL 15.0
BCLL 0.0 •
BCDL 10.0
SPACING 2-0-0
Plates Increase 1.25
Lumber Increase 1.25
Rep Stress Incr YES
Code FBC2010rFP12007
CSI
TC 0.76
BC 0.95
WB 0.30
(Matrix-M)
DEFL In
Vert(LL) -0.19
Vert(rL) -0.65
Horz(TL) 0.12
(Ioc) Udefl L/d
9-11 >999 240
9-11 >505 180
7 n/a n/a
PLATES GRIP
MT20 2441190
Weight:112lb FT=O%
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
Structural wood sheathing directly applied or 2-2-0 oc
BOT CHORD 2x4 SP No.2
pudins.
WEBS 2x4 SP No.3 BOT CHORD
Rigid ceiling directly applied or 2-2-0 oc bracing.
MiTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation quide.
REACTIONS (lb/size) 7=115310-8-0 (min. 0.1-9), 2=1153/0-8-0 (min. 0-1-9)
Max Horz2=74(LC 7)
Max Uplift7=278(LC 8), 2=278(LC 8)
Max Grav7=1299(LC 2), 2=1299(LC 2)
FORCES (lb) -Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=2799/562, 3-4=2476/522, 4-5=1799/441, "b 2476/522,
6-7=2799/562
BOT CHORD 2-11=-04312592, 9-11=242/1799, 7-9=-04312592
WEBS 3.11=500/186,4-11=113U34, 5-9=11V734,6-9=500/186
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. II; Exp B; End., GCpt=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left
and right exposed; Lumber DOL=1.60 plate gdp DOL=1.60
3) Provide adequate drainage to prevent water pending.
4) Plate(s) at joint(s) 4, 7, 11, 3, 9, 5, 6 and 2 checked for a plus or minus 0 degree rotation about its center.
5) Plate(s) at joint(s) 10 checked for a plus or minus 5 degree rotation about its center.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurent with any other live loads.
7) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 278 lb uplift at joint 7 and
278 lb uplift at joint 2.
9) "Semi -rigid pilchbreaks Including heels" Member end fixity model was used in the analysis and design of this truss.
10) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Qty
Ply
24892
A5
Common Truss
7
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MiTek Industries, Inc. Tue Apr 09 09:03:23 2013 Page 1
IDaDhnOn9Y2cMQntOgRH7aGzSIBF-IIMNey ePgmBV74U4LFHFJ48m5b8mGVmYDATPZSW7T
-1-0-0 741-0 167-8 20-30 2730
14101 730 6741 I 673 7-"
Scala =1:47a
Dead Load Deft. =12 in
44 =
d]i Z
7
cc
10
9
e
d
3x4=
U4=
3x4=
4x4=
4xd =
129W-Z78p
1299k/-278p
9-0-0
1830
2730
r
9d111
I
930
9.0 0
LOADING (psf)
SPACING
2-0-0
CSI
DEFL
In
(loc)
Udell
L/d
PLATES
GRIP
TCLL 20.0
Plates Increase
1.25
TC 0.95
Vert(LL)
-0.19
8-10
>999
240
MT20
244/190
TCDL 15.0
Lumber Increase
1.25
BC 0.95
Vert(TL)
-0.66
8-10
>498
180
BCLL 0.0 '
Rep Stress Incr
YES
WB 0.32
Horz(TL)
0.12
6
n/a
n/a
BCDL 10.0
Code FBC2010/TP12007
(Matrix-M)
Weight: 114 lb
FT=0%
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
BOT CHORD 2x4 SP No.2 BOT CHORD
WEBS 2x4 SP No.3
REACTIONS (lb/size) 6=1153/0-8-0 (min. 0-1-9), 2=115310.8.0 (min. 0-1-9)
Max Horz2=78(LC 7)
Max Uplif:6=278(LC 8), 2=278(LC 8)
Max Grav6=1299(LC 2), 2=1299(LC 2)
FORCES (lb) -Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=2813/568, 3d=24821528, 4-5=24821528, 5-6=2813/568
BOT CHORD 2-10=44912607, 8-10=229/1737, 6-8=-049/2607
WEBS 4-8=1261785, 5-8=504/194, 4-10=126f785, 3-10=504f194
Structural wood sheathing directly applied.
Rigid ceiling directly applied or 2-2-0 oc bracing
MTek recommends that Stabilizers and required
cross bracing be Installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. II; Exp B; End., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Plate(s) at joint(s) 9 checked for a plus or minus 5 degree rotation about its center.
4) Plate(s) at joint(s) 6, 8, 4, 5, 10. 3 and 2 checked for a plus or minus 0 degree rotation about its center.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 278 lb uplift at joint 6 and
278 lb uplift at joint 2.
8) "Semi -rigid pitchbreaks including heels' Member end fixity model was used in the analysis and design of this truss.
9) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Oty
Ply
24892
A6
COMMON TRUSS
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 U9:03:29 2u13 Page 1
ID:xDhnOn9Y2cYa2ntOgRH7nGzS18F-mtw4b r7PrydmeaH2nsUgSsFt4RItCT??CyKtrzSW1S
7-0-0 13.7.8 2030 2730 283Q
6-7-81 6-7-8 7-0-0
Scale =1.45.6
Dead lead Deft. =7116 in
4x4 =
4x4= 3x4= 3x4= 3x4= 44=
12251#-231#
1300#/-2780
9-0-0
1830
27-3.0
90-0
I
930
I
90-0 1
LOADING (psi)
SPACING
24)-0
CSI
DEFL
In
(loc)
Well
L/d
PLATES GRIP
TCLL 20.0
Plates Increase
1.25
TC 0.95
Vert(LL)
-0.19
7-9
>999
240
MT20 244/190
TCDL 15.0
Lumber Increase
1.25
BC 0.96
Vert(TL)
-0.65
7-9
>499
180
BCLL 0.0 '
Rep Stress Incr
YES
WB 0.32
Horz(TL)
0.12
5
n/a
n/a
BCDL 10.0
Code FBC2010rrP12007
(Matrix-M)
Weight:113lb FT=O%
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD 2x4 SP No.2 BOT CHORD
Rigid ceiling directly applied or 2-2-0 oc bracing.
WEBS 2x4 SP No.3
MiTek recommends that Stabilizers and required
cross bracing be installed during buss erection, in
accordance with Stabilizer Installation guide.
REACTIONS (lb/size) 1=1089/0-8-0 (min. 0-1-8), 5=1153/0-8-0 (min. 0-1-9)
Max Herz 1=89(LC 6)
Max Uplift1=231(LC 8), 5=278(LC 8)
Max Gravl=1225(LC 2), 5=1300(LC 2)
FORCES (lb) -Max. CompJMax. Ten. -All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=2820/571, 23=2488/530, 3-4=2484/529, 4-5=2815/569
BOT CHORD 1-9=-452/2615, 7-9=-230/1740, 5-7=450/2609
WEBS 3-7=126/784, 4-7=504/194, 3-9=129/790, 2-9=507/195
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Plate(s) at joint(s) 1, 5, 7, 3, 4, 9 and 2 checked for a plus or minus 0 degree rotation about its center.
4) Plate(s) at joint(s) 8 checked for a plus or minus 5 degree rotation about its center.
5) This truss has been designed for a 10.0 psf bottom chord live load noncencurrent with any other live loads.
6) " This truss has been designed for a live load of 20.Opsf on the bottom chord In all areas where a rectangle 3-" tall
by 2-0-0 wide will fit between the bottom chord and any other members.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 231 lb uplift at joint 1 and
2781b uplift at joint 5.
8) "Semi -rigid pitchbreaks Including heels" Member end fixity model was used in the analysis and design of this truss.
9) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Qty
Ply
24892
77
HIP TRUSS
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 222012 Print: 7.350 s Jun 22 Zu12 Ml I ex In0u6me6, Inc. I ue Apr u9 u9:uJ:z9 zu'i s rage 1
Scale=1:46A
Dead load DeS.=7116In
SX5 = 5X5 =
3x4 = 3X4 = 3n4 = 414 =
4z4 =
122SN-211#
1300/N-276#
LOADING (psf)
TCLL 20.0
TCDL 15.0
BCLL 0.0 '
BCDL 10.0
SPACING 2-0-0
Plates Increase 1.25
Lumber Increase 1.25
Rep Stress Incr YES
Code FBC2010lrP12007
CS'
TC 0.76
Be 0.96
WB 0.30
(Matrix-M)
DEFL in
Vert(LL) -0.18
Vert(TL) -0.65
Horz(TL) 0.12
(loc) 9defi L/d
B-10 >999 240
B-10 >506 180
6 nla n/a
PLATES GRIP
MT20 244/190
Weight:111lb FT=0%
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
Structural wood sheathing directly applied or 2-2-0 oc
BOT CHORD 2x4 SP No.2
purlins.
WEBS 2x4 SP No.3 BOT CHORD
Rigid ceiling directly applied or 2-2-0 oc bracing.
MiTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation aulde.
REACTIONS (Ib/size) 1=10891043.0 (min. 0-1-8), 6=115310-8-0 (min. 0-1-9)
Max Harz 1=86(LC 6)
Max Upliftl=231(LC 8), 6=278(LC 8)
Max Grav1=1225(LC 2), 6=1300(LC 2)
FORCES (Ib) -Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=2807/565, 2-3=24821525, 3-4=18011443, 4-5=24781523,
5-0=2801/563
BOT CHORD 1-10=-046/2600, 8-10=243/1801, 6-8=-44412594
WEBS 2-10=502/187, 3.10=-115/739, 4-8=113f733, 5-8=-499I186
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASIDE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) Plate(s) at joint(s) 1, 3, 6, 10, 2, 8, 4 and 5 checked for a plus or minus 0 degree rotation about its center.
5) Plate(s) at joint(s) 9 checked for a plus or minus 5 degree rotation about its center.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 240-0 wide will fit between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 231 lb uplift at joint 1 and
278 lb uplift at joint 6.
9)'Semi-rigid pitchbreaks including heels" Member end fixity model was used in the analysis and design of this truss.
10) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASES) Standard
Job
Truss
Truss Type
Qty
Ply
24892
A8
HIP TRUSS
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:zu 2u13 rage i
IDxDhnOn9Y2cMz2ntDgRH7aGzSI6F-myw4b_zZPiydm H2nsUgSsKHARntEOf?Cypk�7.¢aSW1S
7-0O 11-0-0 163-0 203O 2730
' 7Z 440 53-0 4-0-0 T_ 1.00
N1
b
4x4 =
1225M.231#
Scale =1:46A
Dead Load Dell. = 7/16 in
5x5 = 5x5 =
3x4 = 4x4 = 3x4 = 4x4 =
13DD#/.278#
LOADING (psf)
TCLL 20.0
TCDL 15.0
BCLL 0.0 '
BCDL 10.0
SPACING 2-M
Plates Increase 1.25
Lumber Increase 1.25
Rep Stress [nor YES
Code FBC2010/TPI2007
CSI
TC 0.61
BC 0.95
WB 0.22
(Matdx-M)
DEFL in (loc) Vdefl L/d
Vert(LL) -0.35 10-13 >926 240
Vert(TL) -0.64 8-10 >511 180
Horz(TL) 0.13 6 n/a n/a
PLATES GRIP
MT20 244/190
Weight: 105 lb FT = 0%
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
Structural wood sheathing directly applied or 2-10-11 oc
BOT CHORD 2x4 SP No.2
puriins.
WEBS 2x4 SP No.3 BOT CHORD
Rigid ceiling directly applied or 2-2-0 oc bracing.
MiTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation quide.
REACTIONS (lb/size) 1=1089/0-8-0 (min. 0-1-8), 6=1153/0-8-0 (min. 0-1-9)
Max Herz 1=74(LC 6)
Max Uplift1=231(LC 8), 6=278(LC 8)
Max Grav1=1226(LC 2), 6=1300(LC 2)
FORCES (lb) -Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=2760/547, 2-3=2474/510, 3-0=2051/466, 4-5=2471/509,
5-6=2755/545
BOT CHORD 1-10=427/2550, 8-10=294/2051, 6-8=-425/2545
WEBS 2-10=-419/151, 3-10=-67/546, 4-8=-65/542, 5-8=-415/149
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.OpsP,, BCDL=3.OpsF, h=15ft; B=45ft; L=24ft;
eave=4111; Cat 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water pending.
4) Plates checked for a plus or minus 0 degree rotation about its center.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) " This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 231 lb uplift at joint 1 and
278 lb uplift at joint 6.
8) "Semi -rigid pitchbreaks including heels" Member end fixity model was used in the analysis and design of this truss.
9) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASES) Standard
Job
Truss
Truss Type
Oty
Ply
24892
A9
HIP TRUSS
1
1
Job Reference o tional
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:30 2013 Page 1
IDxDhnOn9Y2cMz2MOgRHZaGzSl8F-E8UToK BA04UNo9TcVNjMgOX97JscgWOEsiHYHZSW7R
9W-8 242 2730.4.14 7.8 347-2 0.-0 I 263g
4x4 =
d 00F1_2
3z4 = 4x4 =
Scale =1.46.4
Dead Lead Deg. =7116 in
10
3x6 = 318 = 4x4 = 3x8- 3u6 =
122SN-237#
1300#1279#
-0
i
y
9 00
LOADING (psf)
SPACING
2-0-0
CSI
DEFL
in
(loc)
Udall
L/d
PLATES GRIP
TCLL
20.0
Plates Increase
1.25
TC 0.47
Vert(LL)
-0.18
9-11
>999
240
MT20 244/190
TCDL
15.0
Lumber Increase
1.25
BC 0.96
Vert(TL)
-0.64
9-11
>513
180
BCLL
0.0 '
Rep Stress Incr
YES
WB 0.27
HOrz(TL)
0.14
7
n/a
We
BCDL
10.0
Code FBC2010/TPI2007
(Matrix-M)
Weight: 121 lb FT=O%
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3 BOT CHORD
REACTIONS (lb/size) 1=108910-8-0 (min. 0-1-8), 7=115410-8-0 (min. 0-1-9)
Max Horz 1=-62(LC 6)
Max Uplift1=231(LC 8), 7=279(LC 8)
Max Grav1=1225(LC 2), 7=1300(LC 2)
FORCES (lb) - Max. Comp7Max. Ten. -All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=2906/605, 2-3=2517/503, 3-4=2366/497, 4-5=2363/496,
5-6=2503/501, 6-7=2896/601
BOT CHORD 1-1 1=-501/2707,9-11=-436/2621, 7-9=-497/2696
WEBS 2-11=-397/161, 3-11=571481, 4-11=419/101, 4-9=422/103, 5-9=56/480,
6-9=389/158
Structural wood sheathing directly applied or 3-1-4 oc
puriins.
Rigid ceiling directly applied or 2-2-0 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; 13=45ft; L=24ft;
eave=lft; Cat. 11; Exp B; End., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) Plates checked for a plus or minus 0 degree rotation about its center.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 231 lb uplift at joint 1 and
279 lb uplift at joint 7.
8) "Semi -rigid pitchbreaks including heels" Member end fixity model was used in the analysis and design of this truss.
9) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Oty
Ply
——=
24892
A10G
Hip Truss
1
1
Job Reference o tional
East Coast Truss, Fort Pierce, FL. 34946
-%A =
Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:30 2013 Page 1
'" „' 29 30 " 31 13 32
4x12 = 5x5 _ 6x6 _ 4x10 MiaSHS=
3x6 =
266.5N-611#
6x6 = 5x5 =
7-0-0 9412 I 1171 I 18-2-4 I 2030 2730
7A0 MIN 4b12 4b-12 M 7-0
Scale =1:46.4
Dead toad Dell. = 314 in
H
ti
' � N
d
4x12 =
29M-753#
Plate Offsets MY):
11:0-0-3,Edoel, 13:0-5-12 0-2-121
17:0-5-12,0-2-121, (9:0-0-3,Edge1
f11:0-2-8,0-3-01 [16:0-2-8,0-3-0]
LOADING (psf)
SPACING
2-0-0
CSI
DEFL
in
(loc)
Vdefl
Ud
PLATES
GRIP
TCLL 20.0
Plates Increase
1.25
TC 0.79
Vert(LL)
0.48
14
>683
240
MT20
244/190
TCDL 15.0
Lumber Increase
1.25
BC 0.90
Vert(TL)
-1.20
14
>272
180
M18SHS
244/190
BCLL 0.0 `
Rep Stress Incr
NO
WB 0.63
Horz(TL)
0.28
9
n/a
n/a
BCDL 10.0
Code FBC2010/iP12007
(Matrix-M)
Weight 135 lb
FT = 0%
LUMBER BRACING
TOP CHORD 2x4 SYP M 31 TOP CHORD
BOT CHORD 2x4 SYP M 31
WEBS 2x4 SP No.3 `Except` BOT CHORD
W3: 2x4 SP No.2, W4: 2x6 SYP No.2
REACTIONS (lb/size) 1=2351/0-8-0 (min. 0-2-3), 9=2600/0-8-0 (min. 0-2-7)
Max Horz 1=50(LC 6)
Max Uplift1=611(LC 8), 9=753(LC 8)
Max Grav 1 =2665(LC 2), 9=2955(LC 2)
FORCES (lb) -Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-6860/1635, 2-3=-6921/1652, 3-4=8284/2015, 4-5=904W2198,
5-6=9048/2198, 6-7=8149/2053, 7-8=7531/1924, 8-9=7425/1889
BOT CHORD 1-16=-1471/6402, 15-16=1466/6557, 14-15=1897/8284, 12-14=1935/8149,
11-12= 174477195, 9-11=1709/6930
WEBS 2-16=269/360, 3-15=-657/2687, 4-15=722/198, 4-14=229/933,
5-14=664/244, 6-14=165/1085, 6-12=916/226, 7-12=-291/1507,
7-11=268/918, 8.11=-281/408
Structural wood sheathing directly applied or 2-0-0 oc
pudins.
Rigid ceiling directly applied or 5-7-11 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) All plates are MT20 plates unless otherwise indicated.
5) Plates checked for a plus or minus 0 degree rotation about its center.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) `This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas when: a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 611 lb uplift at joint 1 and
753 lb uplift at joint 9.
(9A5%TM 'ig)dpatltzreaks including heels" Member end fixity model was used in the analysis and design of this truss.
Job
Truss
Truss Type
Qty
Ply
24892
A10G
Hip Truss
1
1
Job Reference (ootiona0 —:
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:30 2013 Page 2
ID' DhnOn9Y2cttr2ntOgRH7aGzSIBF-E8UToK_BA04UNo9TcVNIMgOS9ZmncbuoFsiHYHzSWiR
NOTES
10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 112 lb down and 100 lb up at 11-0-12, 112lb down
and 1001b up at 13-0-12, 1121b down and 100 Ib up at 14-2-4, 112 Ib down and 1001b up at 16-2-4, and 112lb down and 1001b up at 18-2-4, and
112 Ib down and 100 Ib up at 20-3-0 on top chord, and 1169 lb down and 319 lb up at 9-0-12, 66 Ib down and 2 Ib up at 11-0-12, 66 lb down and 21b
up at 13-0-12, 66 Ib down and 2lb up at 14-2-4, 66 Ib down and 2 Ib up at 16-2-4, and 66 lb down and 2 Ib up at 18-2-4, and 1040 lb down and 368 lb
up at 20-2-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
11) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always required.
12) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASES) Standard
1) Regular. Lumber Increase=125, Plate Increase=1.25
Uniform Loads (plf)
- - -Vert:1-3=-60,3-7=-60,7-10=-60,17-20=20- - -- - - - - ----- - - - - - -- - --
Concentrated Loads (lb)
Vert: 7=96(B) 15=-1022(B) 6=96(13) 12=-41(13) 11=902(B) 24=-96(B) 25=96(B) 26=96(B) 28=96(B) 29=-41(B) 30=-41(B) 31=-41(B)
32=-41(B)
Job
Truss
Truss Type
Oty
Ply
24892
B1H
Hip Truss
1
1
Job Reference (optiona0
East Coast Truss, Fort Pierce, FL. 34946
Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:31 2013 Page 1
m..nl..dw.ovo.a.wo"wt„ouver.ciouvvn...-.Mrl m, AP „"n.n577hl dMAWRrdbSWlr
Sale-1:72.9
Dead road Dell. =1/4 in
3x8 — 6x8 = 3x8 M18SHS=
3x8 =
Sx5 =
2112N/-837# 2112N/S37N
7-0-0
Tau
Plate Offsets (X,Y):
[5:0-5-12,0-2-121,[9:0-2-8,0-3-01
LOADING (pso
SPACING 2-0-0
CSI
DEFL
in
(loc)
Well
L/d
PLATES
GRIP
TCLL 20.0
Plates Increase 1.25
TC 0.63
Vert(LL)
0.23
9-11
>948
240
MT20
244/190
TCDL 15.0
Lumber Increase 1.25
BC 0.87
Vert(TL)
-0.47
9-11
>458
180
M18SHS
244/190
BCLL 0.0 '
Rep Stress Incr NO
WB 0.47
Horz(TL)
0.13
7
n/a
n/a
BCDL 10.0
Code FBC2010rrP12007
(Matrix-M)
Weight: 80 lb
FT=0%
LUMBER BRACING
TOP CHORD 2x4 SYP No.1 TOP CHORD
BOT CHORD 2x4 SYP No.1
WEBS 2x4 SP No.3 BOT CHORD
REACTIONS (lb/size) 2=184910<8 (min. 0-2-8), 7=1850/0-0-8 (min. 0-2-8)
Max Horz2=38(LC 6)
Max Uplift2=837(LC 8), 7=837(LC 8)
Max Grav2--2112(LC 2), 7=2112(LC 2)
FORCES (lb) - Max. Comp./Max. Ten. - Al forces 250 (lb) or less except when shown.
TOP CHORD 2-3=5217/1904, 3-4=5145/1888, 4-5=4940/1836, 5-6=5140/1887,
6-7=5215/1903
BOT CHORD 2-11=1734/4872, 9-11=-1717/4936, 7-9=1734/4870
WEBS 3-11=323/194, 4-11=-427/1142, 5-9=427/1145, 6-9=324/191
Structural wood sheathing directly applied or 2-5-3 oc
puriins.
Rigid ceiling directly applied or 4-11-1 oc bracing.
M7ek recommends that Stabilizers and required
cross bracing be Installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCOL=9.Opsf; BCDL=3.Opsf,, h=15ft; B=45ft; L=2411;
eave=oft; Cat 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left
and right exposed; porch left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) All plates are MT20 plates unless otherwise indicated.
5) Plates checked for a plus or minus 0 degree rotation about its center.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) "This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 837 lb uplift at joint 2 and
837 lb uplift at joint 7.
9) "Semi -rigid pilchbreaks including heels" Member end fixity model was used in the analysis and design of this truss.
Continued on page 2
Job
Truss
Truss Type
qty
Ply
24892
B1H
Hip Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 Mi fek Industries, Inc. Tue Apr 09 09:03:31 2013 Page 2
I D aDhnOn9Y2cAb2MOgRHZaGzSl8FdK2Ag jwKCL7ykfACuyvb(gSz7bL46KS W Rr4kzS W 1 Q
NOTES
10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 112 lb down and 100 lb up at 7-0-0, and 112 Ito
down and 100 lb up at 9-0-0. and 112 Ib down and 100 lb up at 11-0-0 on top chord, and 1040lb down and 338 lb up at 7-0-0, and 66 lb down and 2
Ib up at 9-0-0, and 1040lb down and 338 lb up at 10-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of
others.
11) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always required.
12) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Regular. Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (plf)
Vert: 1-4=-60, 4-5=-60, 5-8=60, 12-15=20
Concentrated Loads (lb) - -
Vert:4=96(B) 5=96(B) 11=902(B) 9=-902(B) 18=96(8) 19=41(121)
Job
Truss
Truss Type
Oty
Ply
24892
132
Common Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MiTek Industries, Inc. Tue Apr 09 09:03:31 2013 Page 1
IDxDhnOn9Y2cLtr2ntOgRHZaGZSl8F-0(2NgywKCL?yldACuyvbdOz9hL8=SW Rr4kzSW 70
-147-0 470.74 94}e 73-1-2 18" 79-0-0
�4}0 4-10.114 I 4-7-2 I 4-1-2 I 4-10-14
Scale =l]2A
Dead Load Dell. - 31161n
4x4 =
N
a
°"� = 3x4 =
LOADING (psf)
SPACING
2-0-0
CSI
DEFL
in
(loc)
Ildefi
L/d
TCLL
20.0
Plates Increase
1.25
TC 0.27
Vert(LL)
0.17
9-12
>999
240
TCDL
15.0
Lumber Increase
1.25
BC 0.73
Vert(rL)
-0.26
9.12
>827
180
BCLL
0.0 '
Rep Stress Incr
YES
WB 0.22
Horz(TL)
0.05
6
n/a
n/a
BCDL
10.0
Code FBC2010/TPI2007
(Matrix-M)
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
REACTIONS (lb/size) 6=78310-4-8 (min. 0-1-8), 2=78310-4-8 (min. G-1-8)
Max Horz2=50(LC 7)
Max Uplift6=-065(LC 8), 2=-465(LC 8)
Max Grav6=883(LC 2), 2=883(LC 2)
t7 M-465#
PLATES GRIP
MT20 244/190
Weight 75 lb FT = 0%
BRACING
TOP CHORD Structural wood sheathing directly applied or 4-4-6 oc
pudins.
BOT CHORD Rigid ceiling directly applied or 6-9-8 oc bracing.
Mi fek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
FORCES (lb) - Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=1697/811, 3-0=1267/686, 4-5=12671686, 5-6=1697/811
BOT CHORD 2-9=759/1570, 6-9=759/1570
WEBS 4-9=332/489, 5-9=-467/191, 3-9=-467/1911
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; porch left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Plates checked for a plus or minus 0 degree rotation about its center.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)' This truss has been designed for a live load of 20.Opsf on the bottom chord In all areas where a rectangle 3-6-O tall
by 2-0-0 wide will fit between the bottom chord and any other members.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 465 lb uplift at joint 6 and
465 lb uplift at joint 2.
7)'Semi-rigid pitchbreaks including heels' Member end fixity model was used In the analysis and design of this truss.
8) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Qry
Ply
24892
133
Common Truss
4
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:31 2013 Page 1
IDaDhnOn9Y2cMz2ntOgRHZaGzSI8F4M2AgjwKCL7ykfAClyvt &EzCDLBCXSWRr4kzSWlQ
•1-0-0 4-10.14 10.1-2 18-0-0 19-0-0
,V-- } 4.10.14 I 41-2 I 4-1-2 I 4-10.14 1-0-0
4121&240#
Sralo=1:32A
Dead Load Defl. =1181n
40 =
W = 30 =
1002#hi39#
41ZW-85#
LOADING (psf)
SPACING
2-0-0
CS]
DEFL
in
(too)
Vdefl
Ud
PLATES GRIP
TCLL 20.0
Plates Increase
125
TC 0.32
Vert(L-)
0.17
9-15
>652
240
MT20 244/190
TCDL 15.0
Lumber Increase
1.25
BC 0.57
Vert(TL)
-0.19
9-12
>579
180
BCLL 0.0 '
Rep Stress Incr
YES
WB 0.24
Horz(TL)
0.01
9
n/a
n/a
BCDL 10.0
Code FBC2010rrP12007
(Matrix-M)
Weight: 75lb FT = 0%
LUMBER
BRACING
TOP CHORD
2x4 SP No.2
TOP CHORD
BOT CHORD
2x4 SP No.2
WEBS
2x4 SP No.3
BOT CHORD
REACTIONS (lb/sIze) 6=34010-4-8 (min. 0-1-8), 9=886/0-8-0 (min. D-1-8), 2=340/0-4-8
Max Horz2=50(LC 7)
Max Uplift6=85(LC 8), 9=339(LC 8), 2=240(1-C 8)
Max Grav6=412(LC 20), 9=1002(LC 2), 2=412(LC 19)
FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=688/503, 3-0=-62/349, 4-5�64/349, 5-6=-688/72
BOT CHORD 2-9=5341745, 6-9=0r745
WEBS 4-9=461/119, 5-9=525/174, 3-9=525/235
Structural wood sheathing directly applied or 6-0-0 oc
puriins.
Rigid ceiling directly applied or 10-0-0 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation auide.
(min. 0-1-8)
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.OpsF, h=15ft; B=4511; L=24ft;
eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; porch left exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Plates checked for a plus or minus 0 degree rotation about its center.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0.0 wide will fit between the bottom chord and any other members.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 85lb uplift at joint 6, 339
lb uplift at joint 9 and 240 lb uplift at joint 2.
7)'Semi-rigid pitchbreaks including heels' Member end fixity, model was used in the analysis and design of this truss.
8) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Oty
Ply
24892
B4H
Half Hip Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:32 2013 Page 1
IDxDhnOn9Y2cM!2ntOgRHZaGzSIBF-AWCDD07MtlKCdalsjwPBSSUxNNY44Up5hABOUvSW1 P
-1-0-0 3.10-14
1-0O I 3-10-14 I 3-1-2 241-0
Scale =1:20.0
^--".cad Dell.=1116In
3x6 II
8147N369N
12677N-475N
7-0-0
93-0
7-0-0
2dU
LOADING (pst)
SPACING
2-0-0
CSI
DEFL
in
(loc)
I/defl
L/d
PLATES GRIP
TCLL
20.0
Plates Increase
1.25
TC
0.23
Vert(LL)
0.08
7-10
>999
240
MT20 244/190
TCDL
15.0
Lumber Increase
1.25
BC
0.53
Vert(TL)
-0.12
7-10
>940
180
BCLL
0.0 '
Rep Stress Incr
NO
WB
0.67
HOrz(TL)
0.02
6
n/a
nla
BCDL
10.0
Code FBC2010/TP12007
(Matrix-M)
Weight: 47lb FT = 0%
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3 BOT CHORD
REACTIONS (lb/size) 6=110710-8-0 (min. 0-1-8), 2=7151048 (min. 0-1-8)
Max Horz2=127(LC 7)
Max Uplift6=-475(LC 8). 2=369(LC 8)
Max Grav6=1267(LC 2), 2=814(LC 2)
FORCES (lb) -Max. CompJMax. Ten. - All forces 250 (Ib) or less except when shown.
TOP CHORD 2-3=1598/602, 3-4=12741496, 4-5=11771486, 5-8=1244/472
BOT CHORD 2-7=553/1485
WEBS 3-7=332/160, 5-7=624/1640
Structural wood sheathing directly applied or 4-6-9 oc
puriins, except end verticals.
Rigid ceiling directly applied or 7-8-12 oc bracing.
M7ek recommends that Stabilizers and required
cross bracing be Installed dudng truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=4ft; Cat. II; Exp B; End., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; porch left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) Plates checked for a plus or minus 0 degree rotation about its center.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) " This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 475 Ib uplift at joint 6 and
369 lb uplift at joint 2.
8) "Semi -rigid pitchbreaks including heels" Member end fixity model was used In the analysis and design of this truss.
9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 112 lb down and
100 lb up at 7-0-0 on top chord, and 1040 lb down and 338lb up at 7-0-0 on bottom chord. The design/selection of
such connection device(s) is the responsibility of others.
10) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
(16MMM Wp %QASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
Job
Truss
Truss Type
City
Ply
24892
B4H
Half Hip Truss
1
1
Job Reference o tional
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:32 2013 Page 2
IDxDhnOn9Y2cMz2ntOgRHZaOzS[BF-AWCDDe1RhdKCd6Js)wPBSSUxNNY44Up5KBBOcAzSW 7 P
LOAD CASE(S) Standard
1) Regular. Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (pif)
Vert: 1-4=60, 4-5=-60, 6-8=20
Concentrated Loads (lb)
Vert: 4=96(F) 7=-902(F)
Job
Truss Type
Oty
ply24892
FB5G
Monopitch Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MIT& Industries, Inc. Tue Apr 09 09:03:32 2013 Page 1
IDxDhnOn9Y2cMz2rM1OgRHZaGzSISF-AWCDD07RhdKCdeJsjwPBSSUw3Nxk4VD5hABOeAzSWIP
N
LOADING (psf)
SPACING
2-0-0
CSI
DEFL
in
(loc)
Vdefi
L/d
TCLL
20.0
Plates Increase
1.25
TC 0.31
Vert(LL)
-0.03
5-7
>999
240
TCDL
15.0
Lumber Increase
1.25
BC 0.62
Vert(TL)
-0.08
5-7
>999
180
BOLL
0.0 '
Rep Stress Incr
NO
WB 0.58
Horz(TL)
0.02
4
nla
n/a
BCDL
10.0
Code FBC2010rrP12007
(Matrix-M)
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
BOT CHORD 2x6 SYP No.2
WEBS 2x4 SP No.3 BOT CHORD
REACTIONS (lb/size) 1=876/0-8-0 (min. D-1-8), 4=1042IMechanical
Max Horz 1=115(LC 5)
Max Uplift1=215(LC 8), 4=265(LC 8)
Max Grav1=998(LC 2), 4=1189(LC 2)
FORCES (lb) -Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=1882/415
BOT CHORD 1-5=376/1756, 4-5=37611756
WEBS 2-5=200/989, 2-4=1835/433
2[4 n
4x4 =
Scale=1:16.5
PLATES GRIP
MT20 244/190
Weight: 36 lb FT = 0%
Structural wood sheathing directly applied or 4-0-3 oc
puriins, except end verticals.
Rigid ceiling directly applied or 10-0-0 oc bracing.
MITek recommends that Stabilizers and required
cross bracing be Installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=4511t; L=24ft;
eave=oft; Cat. II; Exp B; End.. GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
2) Plates checked for a plus or minus 0 degree rotation about its center.
3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
4)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-M wide will fit between the bottom chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 215 lb uplift at joint 1 and
265 lb uplift at joint 4.
7) "Semi -rigid pitchbreaks including heels" Member end fixity model was used in the analysis and design of this truss.
8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 392 lb down and
10516 up at 1-0-12, 392 lb down and 105 lb up at 3-0-12, and 392 lb down and 105 lb up at 5-0-12, and 392 lb down
and 105 lb up at 5-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of
others.
9) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
Coftlfltl tlftn page 2
Job
Truss
Truss Type
Oty
Ply
24892
B5G
Monopitch Truss
1
1
Feference
o tional
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 a Jun 22 2012 Print: 7.350 s Jun 22 2012 Mi rek Industries, Inc. Tue Apr 09 09:03:32 2013 Page 2
IDxDhnOnMdAz2ntOgRH7aGzSIBF-AWCDDO?RhdKCdaJs)wPa65Uw3NXk4VD5hABOU1zS W 1P
NOTES
10) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Regular. Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (plf)
Vert: 1-3=-60, 1-4=20
Concentrated Loads (lb)
Vert: 7=-342(F) 8=342(F) 9=342(F) 10=342(F)
Job
Truss
Truss Type
City
Ply
24892
VM6
Valley Truss
1
1
Job Reference o tional
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:32 2013 Page 1
ID:xDhnOn9Y2cMIImOgRHZaGzS18F-AWcDD04RhdKCdSJsjwPB55UmCNYe4eD5hASOcAzSW I P
600
' 60-0
2(4 4
a411 Scale =1:132
9t4 II
LOADING (psf)
SPACING
2-0-0
CSI
DEFL
in (loc)
Vdeti
L/d
PLATES GRIP
TCLL 20.0
Plates Increase
1.25
TC 0.95
Vert(LL)
n/a -
n/a
999
MT20 2441190
TCDL 15.0
Lumber Increase
1.25
BC 0.56
Vert(rL)
n/a -
n/a
999
BCLL 0.0 '
Rep Stress Incr
YES
WB 0.00
Horz(rQ
-0.00 3
n/a
n/a
BCDL 10.0
Code FBC2010rrP12007
(Matrix)
Weight 19 lb FT = 0%
LUMBER BRACING
TOP CHORD 2x4 SP No.3 TOP CHORD
BOT CHORD 2x4 SP No.3
WEBS 2x4 SP No.3 BOT CHORD
REACTIONS (lb/size) 1=198/6-0-0 (min. 0-1-8), 3=198/6-0-0 (min. 0-1-8)
Max Horz 1=84(LC 5)
Max Upliftl=-40(LC 8), 3=-44(LC 8)
Max Grevl=223(LC 2), 3=223(LC 2)
FORCES (lb) -Max. CompJMax. Ten. -All forces 250 (lb) or less except when shown.
Structural wood sheathing directly applied, except end
verticals.
Rigid ceiling directly applied or 10.0-0 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be Installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCOL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45f; L=24ft;
eave=oft; Cat. 11; Exp B; End., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
2) Plates checked for a plus or minus 0 degree rotation about its center.
3) Gable requires continuous bottom chord bearing.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 40 lb uplift at joint 1 and
44 lb uplift at joint 3.
7) "Semi -rigid pitchbreaks including heels' Member end fixity model was used in the analysis and design of this truss.
8) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Qty
Ply
24892
VMH4
Valley Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:32 Zulu Page 1
ID: DhnOngY2cMz2ntOgRHZaGzSISF-AWCDDe7RhdKCdaJsjwPBS5Uy5Ne24eD5hABOGAz5W1P
300 4-0"
3-M I 1-0
2x4 s
2x4 II
3 Dt411 Scale =1.7.7
LOADING (psf)
SPACING
2-M
CSI
DEFL
in (loc)
I/defi
Vd
PLATES GRIP
TCLL 20.0
Plates Increase
1.25
TC 0.16
Vert(LL)
n/a -
n/a
999
MT20 244/190
TCDL 15.0
Lumber Increase
1.25
BC 0.15
Vert(TL)
n/a -
n/a
999
BCLL 0.0 '
Rep Stress ]nor
YES
WB 0.00
Horz(TL)
0.00 4
n/a
nla
BCDL 10.0
Code FBC20101TPI2007
(Matrix)
Weight: 11 lb FT = 0%
LUMBER
BRACING
TOP CHORD
2x4 SP No.3
TOP CHORD
BOT CHORD
2x4 SP No.3
WEBS
2x4 SP No.3
BOT CHORD
REACTIONS (lb/size) 1=11814-0-0 (min. 0-1-8), 4=11814-0-0 (min. 0-1-8)
Max Horz 1=36(LC 7)
Max Uplift1=24(LC 8), 4=26(LC 8)
Max Grav1=133(LC 2), 4=133(LC 2)
FORCES (Ib) -Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
Structural wood sheathing directly applied or 4-0-0 oc
pudins, except end verticals.
Rigid ceiling directly applied or 10-0-0 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. II; Exp B; End., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) Plates checked for a plus or minus 0 degree rotation about its center.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 24 lb uplift at joint 1 and
26 lb uplift at joint 4.
9) "Semi -rigid pilchbreaks including heels' Member end fixity model was used in the analysis and design of this truss.
10) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Qty
Ply
24692
VMH6
Valley Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:33 2013 Page 1
IDxDhnOn9Y2cMb2ntOgRHZaGZS18F-PbRMO4SxS3EGu2HdxQL1031mvy5TEwgwx9¢SW t O
3.1-0 6-0L
r 31-0 2.11-0 - -
4.00 F12
2x4
3x4 =
LOADING (psf)
SPACING
2-0-0
CS'
DEFL
In (loc)
VdeO
L/d
TCLL
20.0
Plates Increase
1.25
TC 0.45
Vert(LL)
n/a -
n/a
999
TCDL
15.0
Lumber Increase
1.25
BC 0.42
Vert(Q
n/a -
nla
999
BCLL
0.0 '
Rep Stress Incr
YES
WB 0.00
Horz(TL)
0.00 4
nla
n/a
BCDL
10.0
Code FBC2010/TPI2007
(Matrix)
LUMBER BRACING
TOP CHORD 2x4 SP No.3 TOP CHORD
BOT CHORD 2x4 SP No.3
WEBS 2x4 SP No.3 BOT CHORD
REACTIONS (lb/size) 1=19816-0-0 (min. 0-1-8), 4=198/E0-0 (min. 0-1-8)
Max Herz 1=37(LC 5)
Max Upliftt=42(LC 8), 4=-46(LC 5)
Max Gravl=223(LC 2), 4=223(LC 2)
FORCES (Ib) - Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-324f71, 2-3=-276/72
BOTCHORD 1-4=-65/276
Scale=1:11.3
3x4 II
3x4 II
PLATES GRIP
MT20 244/190
Weight: 17lb FT = 0%
Structural wood sheathing directly applied or 6-0-0 oc
puriins, except end verticals.
Rigid ceiling directly applied or 10-0-0 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. II; Exp B; End., GCpl=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water pending.
4) Plates checked for a plus or minus 0 degree rotation about its center.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 42 lb uplift at joint 1 and
46 lb uplift at joint 4.
9) "Semi -rigid pitchbreaks including heels" Member end furity model was used in the analysis and design of this truss.
10) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Truss
Truss Type
qty
Ply
rb
892
VMHB
Valley Truss
1
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek
4.00 12
Inc. Tue Apr 09 09:03:33 2013 Page 1
,,1x53EGu2Hdx0_l04dnzFp4OEwgxx9nzSW 10
e-0 o
3X4 = Scale: 314'=1'
24 II
v 4
2X4 a 1X4 II a4 II
LOADING (psf)
SPACING
2-0-0
CS'
DEFL
in (loc)
Udefl
L/d
TCLL
20.0
Plates Increase
1.25
TC 0.33
Vert(LL)
n/a -
n/a
999
TCDL
15.0
Lumber Increase
1.25
BC 0.22
Vert(TL)
n/a -
n/a
999
BCLL
0.0 '
Rep Stress Incr
YES
WB 0.07
Horz(TL)
-0.00 5
n/a
n/a
BCDL
10.0
Code FBC20101TPI2007
(Matrix)
PLATES GRIP
MT20 2441190
Weight: 27 lb FT = 0%
LUMBER BRACING
TOP CHORD 2x4 SP ND.3 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc
BOT CHORD 2x4 SP No.3 puriins, except end verticals.
WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-" oc bracing.
OTHERS 2x4 SP No.3 MiTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation nuide.
REACTIONS (lb/size) 1=98/8-0-0 (min. 0-1-8), 5=133/8-0-0 (min. 0.1-8), 6=325/8-0-0 (min. 0-1-8)
Max Horz 1=105(LC 5)
Max Upliftl=10(LC 8), 5=29(LC 5), 6=84(LC 8)
Max Grav1=110(LC 2). 5=150(LC 2), 6=366(LC 2)
FORCES (lb) -Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
WEBS 2-6=281/106
NOTES
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10: 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. 11; Exp B; Encl., GCpi=0.18: MWFRS (directional); cantilever left and right exposed; end vertical left
and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3) Provide adequate drainage to prevent water ponding.
4) Plates checked for a plus or minus 0 degree rotation about its center.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 10 lb uplift at joint 1, 29 lb
uplift at joint 5 and 84lb uplift at joint 6.
9)'Semi-rigid pitchbreaks including heels' Member end fixity model was used in the analysis and design of this truss.
10) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Oty
Ply
24892
—C 11
Jack -Open Truss
12
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 73.350 s 5 Jun 22 2012 Print: 7.350 s Jun 22 2012 MiTek Industries, Inc. Tue Apr 09 09:03:24 2013 Page 1
IDxDhnOn9Y2cMz2n<OgRHZaGZSISF-P7BYHvOaAIL6UFEGJ7P9anWCAEvmFZK,WSWiX
-0-0i 1-0-0
141r
LOADING (psi)
SPACING
2-0-0
CSI
DEFL
in
(loc)
Vdeg
L/d
TCLL
20.0
Plates Increase
1.25
TC 0.14
Vert(LL)
-0.00
5
>999
240
TCDL
15.0
Lumber Increase
1.25
BC 0.01
Vert(TL)
-0.00
5
>999
180
BCLL
0.0 •
Rep Stress Incr
YES
WB 0.00
Horz(TL)
-0.00
2
n/a
n/a
BCDL
10.0
Code FBC2010/TP12007
(Matrix-M)
LUMBER
TOP CHORD 2x4 SP No.3
BOT CHORD 2x4 SP No.3
BRACING
TOPCHORD
BOTCHORD
REACTIONS (lb/size) 2=12210-8-0 (min. 0-1-8), 3=0/Mechanical, 4=19/Mechanical
Max Horz2=46(LC 8), 3=21(LC 2)
Max Uplift2=-67(LC 8), 4=2(LC 5)
Max Grav2=141(LC 2), 4=28(LC 13)
FORCES (lb) -Max. CompJMax. Ten. -All forces 250 (lb) or less except when shown.
Scale =1:6.1
PLATES GRIP
MT20 244/190
Weight: 5 lb FT = O%
Structural wood sheathing directly applied or 1-0-0 oc
purlins.
Rigid ceiling directly applied or 10-0-0 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=458; L=24ft;
eave=oft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left
and right exposed; porch left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
2) Plates checked for a plus or minus 0 degree rotation about its center.
3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
4) " This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 67lb uplift at joint 2 and 2
Ito uplift at joint 4.
7) "Semi -rigid pitchbreaks including heels" Member end fixity model was used in the analysis and design of this truss.
8) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Qty
Ply
24892
—CJ3
Jack -Open Truss
12
1
Job Reference o tional
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MiTek Industries, Inc. Tue Apr 09 09:03:25 2013 Page 1
IDaDhnOn9Y2cMz2n"RHZaGzSIeFuAhalcv2LUSCHlWpynYfchlWYGBxTU34a Ws4—.....
-0-0 3-0-01:% 30-0
Scale =1:9.4
2w4=
300
LOADING (psf)
SPACING 2-0-0
CSI
DEFL in
(loc) Well Ud
PLATES GRIP
TCLL 20.0
Plates Increase 1.25
TC 0.14
Vert(LL) 0.00
9 >999 240
MT20 244/190
TCDL 15.0
Lumber Increase 1.25
BC 0.10
Vert(TL) -0.01
6-9 >999 180
BCLL 0.0
Rep Stress ]nor YES
WB 0.00
Horz(rL) 0.00
2 n/a n1a
BCDL 10.0
Code FBC2010rrPI2007
(Matrix-M)
Weight: 11 lb FT = 0%
LUMBER
BRACING
TOP CHORD 2x4 SP No.3
TOP CHORD
Structural wood sheathing directly applied or 3-0-0 oc
BOT CHORD 2x4 SP No.3
pur ins.
BOT CHORD
Rigid ceiling directly applied or 10-0-0 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
REACTIONS (lb/size) 2=200/0-4-8 (min. 0-1-8), 3=67/Mechanical, 6=34/Mechanical
Max Horz2=63(LC 8)
Max Uplift2=121(LC 8), 3=34(LC 8), 6=27(LC 8)
Max Grav2=228(LC 2), 3=76(LC 2), 6=53(LC 3)
FORCES (Ib) -Max. CompJMax. Ten. - All forces 250 (lb) or less except when shown.
NOTES
1) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.0psf; h=15ft; B=45ft; L=2411t;
eave=oft; CaL II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and fight exposed; end vertical left
and right exposed; porch left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
2) Plates checked for a plus or minus 0 degree rotation about its center.
3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurtent with any other live loads.
4) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-641 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 121 lb uplift at joint 2, 34
lb uplift at joint 3 and 27 Ito uplift at joint 6.
7) "Semi -rigid pitchbreaks including heels" Member end fixity model was used In the analysis and design of this truss.
8) Warning: Additional permanent and stability bracing for truss system (not part of this component design) Is always
required.
LOAD CASE(S) Standard
Job
Truss
Truss Type
Dty
Ply
24892
—CJ5
Jack -Open Truss
12
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:25 2013 Page 1
IDxDhnOngY2cNU2rdOgRHZaGzSIBF-uAhalc 2LUSCH1HVpynyfchglYD=TU34a_Ws4zSW1 W
V1-0d 5-0-0
r 5-DU
Scale =1:12.7
2[4 =
LOADING (psf)
SPACING
2-0-0
CSI
DEFL
in
(loc)
Vdeti
L/d
PLATES GRIP
TOLL 20.0
Plates Increase
1.25
TO 0.48
Vert(LL)
0.04
6.9
>999
240
MT20 244/190
TCDL 15.0
Lumber Increase
1.25
BC 0.32
Vert(TL)
-0.05
6-9
>999
180
BCLL 0.0 '
Rep Stress Incr
YES
WB 0.00
Horz(TL)
0.00
2
n/a
n/a
BCDL 10.0
Code FBC2010rrPI2007
(Matrix-M)
Weight: 171b FT = O%
LUMBER BRACING
TOP CHORD 2x4 SP No.3 TOP CHORD
BOT CHORD 2x4 SP No.3
BOTCHORD
REACTIONS (lb/size) 2=298/0-4-8 (min. 0-1-8), 3=113/Mechanical, 6=50/Mechanical
Max Horz2=90(LC 8)
Max Uplift2=174(1_C 8), 3=55(LC 8), 6=-45(LC 8)
Max Gmv2=338(LC 2), 3=130(LC 2), 6=83(LC 3)
FORCES (Ib) -Max. CompJMax. Ten. -All forces 250 (Ib) or less except when shown.
TOP CHORD 2-3=516/278
BOT CHORD 2-6=347/583
Structural wood sheathing directly applied or 5-0-0 oc
pudins.
Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; B=45ft; L=24ft;
eave=oft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; porch left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
2) Plates checked for a plus or minus 0 degree rotation about its center.
3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
4)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 174 lb uplift at joint 2, 55
lb uplift at joint 3 and 45lb uplift at joint 6.
7) "Semi -rigid pilchbreaks including heels" Member end fixity, model was used in the analysis and design of this truss.
8) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
c C-
Job
Truss
Truss Type
Oty
Ply
24892
—EJ7
Jack -Open Truss
18
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:25 2013 Page 1
IDxDhnOn9Y2cMIIntDgRHZaGZS18FwMalcv2LUSCH11NpynYfche9Y7MMiU34a_Ws4zSW1 W
Sale: 3/4'=1
Load Defl. =1/8 in
3x4 =
7-M
LOADING (psf)
SPACING 2-0-0
CSI
DEFL in
(loc) Well Lld
PLATES GRIP
TCLL 20.0
Plates Increase 1.25
TC 0.61
Vert(LL) 0.13
4-7 >628 240
MT20 244/190
TCDL 15.0
Lumber Increase 1.25
BC 0.66
Vert(TL) -0.19
4-7 >429 180
BCLL 0.0 '
Rep Stress Incr YES
WB 0.00
Hoa(fL) 0.01
2 nla n/a
BCDL 10.0
Code FBC2010/TPI2007
(Matrix-M)
Weight: 23 lb FT = 0%
LUMBER
BRACING
TOP CHORD 2x4 SP No.2
TOP CHORD
Structural wood sheathing directly applied or 4-11-8 oc
BOT CHORD 2x4 SP No.3
puriins.
BOT CHORD
Rigid ceiling directly applied or 10-0-0 oc bracing.
MTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
REACTIONS (Ib/size) 3=1561Mechanical, 2=400/0-4-8 (min. 0.1-8), 4=61/Mechanical
Max Hoa 2=117(LC 8)
Max Uplilt3=75(LC 8), 2=230(LC 8), 4=64(LC 8)
Max Gmv3=182(LC 2), 2=453(LC 2), 4=106(LC 3)
FORCES (lb) -Max. CompJMax. Ten. - All forces 250 (lb) or less except
when shown.
TOP CHORD 2-3=-1207/670
BOT CHORD 2.4=754/1283
NOTES
1) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.0psf; h=15ft; B=45% L=24ft;
eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and right exposed; porch left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
2) Plates checked for a plus or minus 0 degree rotation about its center.
3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
4) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 75 lb uplift at joint 3, 230
lb uplift at joint 2 and 64 lb uplift at joint 4.
7) "Semi -rigid pitchbreaks including heels' Member end fedty model was used in the analysis and design of this truss.
8) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always
required.
LOAD CASE(S) Standard
1 4 J
Job
Truss
Truss Type
Oty
Ply
24892
—HJ7
Diagonal Hip Girder
6
1
Job Reference (optional)
East Coast Truss, Fort Pieme, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MiTek Industries, Inc. Tue Apr 09 09:03:26 2013 Page 1
1d0 5a15 IDxDhnOn9Y2cM>:2ntOgRHZaGzS18F-h1NFyzywh6na2vBsiNtJnCgEo7yoogmCJEk4PWzSW1V
1S-0 5315 41r1
p1
Scale =1:20.7
Dead Load Des. = 5116 in
2[4 II
4x4 = 316 =6
631rN-310p
LOADING (psf)
SPACING
2-M
CSI
DEFL
in
(too)
War
Ud
TCLL
20.0
Plates Increase
1.25
TC 0.67
Vert(LL)
0.25
7-10
>448
240
TCDL
15.0
Lumber Increase
1.25
BC 0.89
Vert(TL)
-0.43
7-10
>263
180
BCLL
0.0 '
Rep Stress Incr
NO
WB 0.37
Horz(TL)
0.02
7
n/a
n/a
BCDL
10.0
Code FBC2010ITPI2007
(Matrix-M)
LUMBER BRACING
TOP CHORD 2x4 SP No.2 TOP CHORD
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.2 *Except* BOT CHORD
W 1: 2x4 SP No.3
REACTIONS (lb/size) 5=361/Mechanical, 2=558/0-7-6 (min. 0-1-8), 7=880/Mechanical
Max Horz2=119(LC 5)
Max Uplift5=434(LC 2), 2=310(LC 8), 7=389(LC 4)
Max Grav5=112(LC 5), 2=631(LC 2), 7=1016(LC 2)
FORCES (lb) -Max. CompJMax. Ten. -All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=1122/595, 4-7=631/160
BOT CHORD 2-7=668/1153
WEBS 3.7=851/395
PLATES GRIP
MT20 244/190
Weight: 41 lb FT=O%
Structural wood sheathing directly applied or 5-1-14 oc
pudins, except end verticals.
Rigid ceiling directly applied or 8-13 oc bracing.
MiTek recommends that Stabilizers and required
cross bracing be installed during truss erection, in
accordance with Stabilizer Installation guide.
NOTES
1) Wind: ASCE 7-10; 170mph (3-second gust) Vasd=132mph; TCDL=9.Opsf; BCDL=3.Opsf; h=15ft; 13=4511; L=24ft;
eave=oft; Cat 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left
and fight exposed; porch left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
2) This truss is not designed to support a ceiling and is not intended for use where aesthetics are a consideration.
3) Plates checked for a plus or minus 0 degree rotation about its center.
4) This truss has been designed for a 10.0 psf bottom chord live load noncencurrent with any other live loads.
5)' This truss has been designed for a live toad of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall
by 2-0-0 wide will fit between the bottom chord and any other members.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 434 lb uplift at joint 5, 310
lb uplift at joint 2 and 389 lb uplift at joint 7.
8) "Semi -rigid pitchbreaks including heels" Member end fixity model was used in the analysis and design of this truss.
Continued on page 2
A 4 t W
Job
Truss
Truss Type
Oty
Ply
24892
—HJ7
Diagonal Hip Girder
6
1
Job Reference (optional)
East Coast Truss, Fort Pierce, FL. 34946 Run: 7.350 s Jun 22 2012 Print: 7.350 s Jun 22 2012 MTek Industries, Inc. Tue Apr 09 09:03:26 2013 Page 2
ID: DhnOn9Y2cMz2ntOgRHZaGzS18F-MNFyzywh6na2rBSNfJnCgEo?yQOgrvCJEk4PWzsW7V
NOTES
9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 12 Ib down and 65 Ib up at 4-1-14, 12 Ib down and
65 lb up at 4-1-14, and 60 lb down and 87 lb up at 6-11-13, and 60lb down and 87 Ib up at 6-11-13 on top chord, and 22 lb down and 17 lb up at
1-3-15, 22 Ib down and 17 lb up at 1-3-15, 16 lb down and 18 lb up at 4-1-14, 16 lb down and to lb up at 4-1-14, and 43 lb down and 36 lb up at
6-11-13, and 43 Ib down and 36 Ib up at 6-11-13 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
10) Warning: Additional permanent and stability bracing for truss system (not part of this component design) is always required.
11) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Regular. Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (plf)
Vert: 1-4=60, 4-5=60, 6-8=20
Concentrated Loads (lb) -
Vert: 10=1(F=1, B=1) 11=14(F=7, 13=7) 12=106(F=53, 13=53) 13=28(F=14, 131=14) 14�60(F=30, 13=30)