Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPlanning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: I%o74 �9$a JOB ADDRESS:
BUILDER/CONTRACTOR:
PEST CONTROL CONTRACTOR: �\cK
PEST CONTROL LICENSE
SCANNED
BY
St. Luce c©uuty
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated:
Percentage of solution: i
Date of Treatment: Iiq
Footing
1st Treatment
Re -Treat
Driveway
1't Treatment
Re -Treat
Other
1s` Treatment
Re -Treat
Chemicals used:
Total gallons used:
Time of Treatment: '�:V s�
Slab
in Treatment
Re -Treat
1
Exterminator
Nate: There must be a completed form for e ch required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time bf each inspection or the scheduled inspection will fail and a re -inspection
fee charged.
FBC104.2.6 Certificate of Protective Treatment forpreventlon oftemmltes. A weather res/stantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is Issued to and another copy for the building permit files The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a veririable record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014
Planning &'Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE. TREATMENT
CONSTRUCTION SOIL TREATMENT
RECEIVED
JAN 141010
Permitting Department
St. Lucle Countv
SGANNED
By
St. � „riPCOUntV
PERMIT #: SLC19070682 JOB ADDRESS: 7913 Planatation Lakes Drive, Port St Lucie
BUILDER/CONTRACTOR: Design Concrete
PEST CONTROL CONTRACTOR:Patrick-Exterminating
PEST CONTROL LICENSE #:4864
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: 550
Percentage of solution: .25%
Date of Treatment: 01 /14/2020
Footing
is Treatment
Re -Treat
—Driveway
i" Treatment
Re -Treat
X Other Patio screenroom
Treatment
Re -Treat
Chemicals used: Cyperroethrin
Total gallons used:
Time of Treatment: 1:00
Slab
is Treatment
Re -Treat
Pools
1'r Treatment
Re -Treat
Perimeter for Final inspection
7`,`0 f4/2020
Signature of Exterminator Date
Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled.lnspert/on will fail and a re-/aspegtr'on
fee charged.
FBC304.2.62'ert/frcateofProtect/veTreatmentforpreventionoftermil Aweatherresistantjofisltepostingboard
shall be provided to receive duplicate Treatment Cet Acates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the trui/ding permit files. The Treatment
Celtiticate shall provide the product used, identity of the applicator, time and date of6're treatments site location, area
treated, chemical used, percent concentration and number ofgallons used, to establish a verNable record of
protective treatment 1'f the soil chemical barrier method for term/te prevention Is used, /!na/:exterior treatment shall
be campl&Ld prior to final bullding approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.