Loading...
HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE.. Services g: RQyelmeit Servicesi T. fie, ON 1 on Dixfision ft F 9s2 SCANNED 77�65 Fax 772-452-6443 BY St. Lucie Countv Request for 30-0ay Temporary Power Release Date: l 0 2 0�� Permit Number: 1JZ� %— ProjectaddreSS: '/f// ( _�iqv �c� i -�9 j�/ A4 S Gil. � >O tre C��e2�I� C� O�� /'vL�.SL ©c)_ 14 THE UNDERSIG HEREBY REQ RELEASE OF ELECTRICAL POWER TO THE ABOVE'DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. This temporary power release is requested for the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement, including Building Division Policy, which is incorporated herein by reference. 3. All conditions and requirements listed in the attached document entitled "Requirements for 30 Day Power for Testing" have been fulfilled and the premise Is ready for compliance inspection. 4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work Order Issued if the Final inspection has not been approved Wthin 30 days. A fee of $100.00 will be required to lift the Stop.Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE.COUNTY, AND THEIR EMPLOYEES FROM ALL' LIABILITIES AND CIlMS;0F ANY' PE:OF NATURE'. CH -MAY ARLS@.NOW OR IN THE FUTURE OUT OF THIS•TRANWN10N, INCLUVING ANY DAMAGE WHICH MAY BE,INCURRED D.UE TO THE' DISCONNECTION OF'ELECTRICAL POWER IN THE -EVENT OF VIOLATION OF THIS AGREEMENT. a link �I��irk VlapmeMBervices SCANNED pit"Ilfl9 de:Re9ulat1dinivvislon BY St. LucieCount� br r e� L 34982 t-' S Fax 7%2-4G2-6443 Request for-30-Day Temporary Power Release Date: � Permit Number: 122 -a70� Project Address::�O/ THE UNDERSIGNED HE!ftM REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVEDESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR AFINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. This temporary power release Is requested for the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signatures, we hereby agree to abide by all terns and conditions of this agreement' • Including Building DIVislon Policy, which Is Incorporated herein by reference. 3. Ali conditions and requirements listed in the attached document entitled "Requirements for 30 Day Power for Testing" have been fulfilled and the premise is ready for compliance Inspection. 4 An the reason or the request. pofor an ectension wer maybe d 30 re removed from the site anmust be made In d/oorr a Stop Wthe ing ork OMtlerlstating issued If the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to IIR the Stop Work Order. AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM CIAIMS•00 ANY;TYPE�.OF NATURE WHICH MAY ARISE NOW FOR IN THE FUTURE OUT IN, INCLUDING ANY. DAMAGE WHICH MAY BE INCURRED DUE TO THE aECTRIFAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT. �2_, /9, dam/ /3.26