Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST CERTIFICATEPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FIL 34982 Phone; 772-462-2165 Fax: 772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method W., -vj v'i M� !-J9 APR 2 0 Z020 Permlithig S�L. Lijcie County, FL Date: b3i, Permit #: 1gos- 0 k_11 SGANNEU Contractor: M-a-0- JobAddress: 4�'C)4 EA<\- M, 17—F. "X10 W A'q P Construction: New Construction - Complete Existing- After Addition House Infiltration Test Results SLC Climate Zone 2 CFM (50) = 15';4 Test Date: ­ac/ Volume= AD-103 ACH(S0)=CFIy1(S0)x60/VoIume= 4-:�9 Mechanical Ventilation required less than 3 ACH Passing results must be & ACH (50) or less A Pass ( ) Fail FBC, Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding Z air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4A.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Testing Company CompanyName: W -C-961(4E�—:QI*6��tESYLMtAddress: 'T? Q� -19)' 6_11 I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation requirements iff4Fcordance with,,Section R402.4.1.2 Climate Zone 2. Signature: Printed Name: License/Certification#: 2020-04-14 14:55 CDT +12568343688 Planning & Development Services RE:CWED Building & Code Regulation Division 2300 Virginia Ave, Rm 101 APR Fort Pierce, Ft 34982 orm 7 -46 -2165 Fax: "2.462-.6443 SCANNED FQTMII plp,,trient St. Lucle C940V BY BLOWER DOOR TEST FORM 'e.ccita*/ House Infiltration Test Certification prescriptive and Performance method Date. Permit #: 110 Contractor: gxe_ JobAddress: <'04 Construction: )New Construction —Complete Existing— After Addition House Infiltration Test. Results SLCCJImateZone2 CFIVI (56) Test Date: Volume = A n-1 03 ACH.(So)=CFM(_9G)X60jVolume= Mechanical Ventilation required less than 3 ACH Passingresults must be & ACH (50) or less Q110 Pass Fail Ill Energy The building or dwelling unit shall be tested and verified as hav . Ing an air leakage rate of not exceeding Z27r Changes per hour in Climate Zone 1, 2 and 3 air changes per hourin Climate Zones 3 through S, Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in .Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 499.105 (3)(f), (g) or (I) or an approved third party. A written report of the results of the test Shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after Creation of all penetrations of the building thermal envelope. FBC, Residential Where the air Infiltration rate of a dwelling unit is less.than Aair changes per hour when tested with a blol door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402,4.1.2 of the Florida fluilding Code, Energy Conservation the dwelling unit shall be. provided with whole -house mechanical ventilation in accorclance.with Section M1,507.3. Testing Comoa CompanyName: Y!t5_m illge�41*6�-�tttMlAddress,.. YQ., RQ� .. 16- all :5�SM A M- 2 -16 I hereby ce rtify that the , above House Infiltration results demonstrate compliance with Fac Energy Conservation requirements ifflafcordanc!'with eCtion ll Climate Zone 2. Signature. Printed Name. e"11 zc,/ License/Cerlifficatlarl MIN Ill 'i�1111111' all .72, MIT-w7pri"I'l 'T