HomeMy WebLinkAboutTRUSSZREVIEWED ❑ REVISE AND RESUBMIT
❑ REVIEWED WITH NOTATIONS ❑ (NOTSEE EREREVIIEEWED
Corrections or comments made on equipment submittals
or shop drawings during this review do not relieve con-
tractor from compliance with requirements of the draw-
ings and specifications. This check is only for review of
general conformance with the design concept of the
project and general compliance with the Information given
in the contract documents. The contractor is responsible
for confirming and correlating all quantities and dimen-
sions; selecting fabrication processes and techniques of
construction; coordinating his work with that of all other
trades and performing his work in a safe and satisfactory
manner
FLORIDADESIGN SOLUTIONS, INC.
Date -7 1 11-7 (q By
Submittal No. Project No. Project Err9..4wb—
Project Name:
aa�a •..�„r°�"'wrmwooiomeC11Oo0 errmo`�mnoemw.owsxwu
SPANED
OT
St. ucie'Out
uas,wvm rests auarxoswleracmammws.cvno
IMPORTANT
This Drawing Must E4r Apprevad And
wiowrcr
Palmed Baf.. rabriamn MIS
aasacewwvrvi oce1O1vaamrwra rein aaeaouve tore
Begin For Your Protection Check All
weaa.emc.wmrasvmnmrneaaos
Dimensions And Conditions Prior To
Approval Of Plan
SIGNATURE BELOW INDICATES ALL
ROOF LOADING
FLOOR LOADING
NOTES AND DIMENSIONS HAVE
TCLL: 20 PSF
TCLL' 00 PSF
BEEN ACCEPTED.
TCDL: 07 PSF
TCDL: 10 PSF
BCDL 10 PSF
BCDL: 5 PSF
Oah_
TOTAL: OT PSF
TOTAL: s5 PSF
DURATION: 1.25
DURATION: 1.00
CAUTIONH.1
DO NOT ATTEMPT TO ERECT
TRUSSES WITHOUT REFERRING TO
THE ENGINEERING DRAWINGS AND
BSGAI SUMMARY SHEETS
ALL PERMANENT BRACING MUST BE
IN PLACE PRIOR TO LOADNG
TRUSSES. on. SHEATHING,
SHINGLES, ETC.)
ALL INTERIOR BEARING WALLS
MUST BE IN PLACE PRIOR TO
INSTALLING TRUSSES.
REFER TO FINAL ENGINEERING
SHEETS FOR THE FOLLOWING.
11 NUMBER OF GIRDER PLIES AND
NAILING SCHEDULE
2) BEARING BLOCK REQUIREMENTS.
2) SCAB DETAILS (IF REQUIRED)
a) UPLIFT AND GRAWTY REACTIONS.
WARNING
Backchar6es WIN Not Be Accepted
Ro9ar1lasa of Peek Wiftut Prior
Notification By Customer Within AS
Hours And Investigation By
Builde s First Some.
NO E2ECPTIONS.
And
ROOF PITCH: 9112
CEILING PITCH: N12
TOP CHORD SIZE: 2X4
BOTTOM CHORD Sf2E: 2 %4
OVERMANG LENGTH: IS -
ENO CUT: Plumb
CANBLEVER: —-
TRUSS SPACING: 2C
BUILDING CODE: MC2017
BEARING HEIGHT SCHEDULE
Hatch Legend
L-18'4' bearing
®10'-0" bear ng
PLAN DATE: 2019
L\Irs
4408 AirpeM Road
Plant Clty, FL 29562
PR (512) 3MI300
Fox (313)]OS-1201