Loading...
HomeMy WebLinkAboutTRUSSZREVIEWED ❑ REVISE AND RESUBMIT ❑ REVIEWED WITH NOTATIONS ❑ (NOTSEE EREREVIIEEWED Corrections or comments made on equipment submittals or shop drawings during this review do not relieve con- tractor from compliance with requirements of the draw- ings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the Information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimen- sions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades and performing his work in a safe and satisfactory manner FLORIDADESIGN SOLUTIONS, INC. Date -7 1 11-7 (q By Submittal No. Project No. Project Err9..4wb— Project Name: aa�a •..�„r°�"'wrmwooiomeC11Oo0 errmo`�mnoemw.owsxwu SPANED OT St. ucie'Out uas,wvm rests auarxoswleracmammws.cvno IMPORTANT This Drawing Must E4r Apprevad And wiowrcr Palmed Baf.. rabriamn MIS aasacewwvrvi oce1O1vaamrwra rein aaeaouve tore Begin For Your Protection Check All weaa.emc.wmrasvmnmrneaaos Dimensions And Conditions Prior To Approval Of Plan SIGNATURE BELOW INDICATES ALL ROOF LOADING FLOOR LOADING NOTES AND DIMENSIONS HAVE TCLL: 20 PSF TCLL' 00 PSF BEEN ACCEPTED. TCDL: 07 PSF TCDL: 10 PSF BCDL 10 PSF BCDL: 5 PSF Oah_ TOTAL: OT PSF TOTAL: s5 PSF DURATION: 1.25 DURATION: 1.00 CAUTIONH.1 DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND BSGAI SUMMARY SHEETS ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADNG TRUSSES. on. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 11 NUMBER OF GIRDER PLIES AND NAILING SCHEDULE 2) BEARING BLOCK REQUIREMENTS. 2) SCAB DETAILS (IF REQUIRED) a) UPLIFT AND GRAWTY REACTIONS. WARNING Backchar6es WIN Not Be Accepted Ro9ar1lasa of Peek Wiftut Prior Notification By Customer Within AS Hours And Investigation By Builde s First Some. NO E2ECPTIONS. And ROOF PITCH: 9112 CEILING PITCH: N12 TOP CHORD SIZE: 2X4 BOTTOM CHORD Sf2E: 2 %4 OVERMANG LENGTH: IS - ENO CUT: Plumb CANBLEVER: —- TRUSS SPACING: 2C BUILDING CODE: MC2017 BEARING HEIGHT SCHEDULE Hatch Legend L-18'4' bearing ®10'-0" bear ng PLAN DATE: 2019 L\Irs 4408 AirpeM Road Plant Clty, FL 29562 PR (512) 3MI300 Fox (313)]OS-1201