Loading...
HomeMy WebLinkAboutPROPOSALbuild design reinvent Client Info: Jonathan Greene 1615 Buttonbush Cir Palm City, FL 34990 Attn: Mr. Jonathan Greene Phone:561- Email: jtpokerman@aol.com 130 S Indian River Dr, Suite 202 Fort Pierce, FL 34950 (772) 742.1200 Office bdropsmarO,Qmail.com Email State Certified Building Contractor CBC1253459 RECEIVED -- --35 p�CA��� - -LT. - BY AUG 14 2019 S`• LUC 041o"911V Lucie County, Permitting We are pleased to present the following specifications for the Garage Addition Including specifications for other upgrades and spaces. Proposal for Scope of Work. Exhibit - A 07/29/19 Project Info: Mr. Jonathan Greene 1815 Buttonbush Cir Palm City, FL 34990 GENERAL REQUIREMENTS • Permits will be required for the scopes of work specified herein are by other. • BDR will NOT provide a dumpster/trash container during the construction of shell at a spot on the property approved by the Owner. • BDR will NOT provide a ports -potty next to the recycle container for workers to use during the construction of project. Specifications • The purpose of the Custom Specifications is to provide the Owner with all the information and details of the project. The following information is based on our professional opinion as to which materials will are specified in the approved architectural plans. The Owner may reflect on the Contractor's interpretations of the project and clarify all !is correct, or request changes to the Contractor which in turn may affect the final Contract Price. • Any existing condition that becomes a permitting issue contract item by signed orders for changes in the work 11we have read and understood the content herein and hereby requires a remedy will become a new :fore proceeding with project. r Contract Documents • The Terms and Conditions • The Specifications, exhibit -A • Revisions and addenda • Orders for changes in the work • SOW (scope of work) General Conditions -&-Demolition - - - — - — • Trash Receptacle Placed Onsite during demolition orjobsite bag. (if necessary) • Cleanup and removal of all demolition related debris The Provisions of this contract Is inclusive of materials and labor for the following Scope of Work. General Construction: Scope of work Exterior Entry Doors • Remove existing double front door, sidelights and glassfiron storm doors from main entrance. • Rework existing opening to fit new double 6/0 x 8/0 • Prep and clean all rough openings • Supply fasteners and sealants for installation of door. • Provide and install new dbl doors in modified opening. Door type to be DRG2980 6/0 x 8/0. Brickmould, composite jambs and door prep inclusive. • Provide and Install new 610 x 7/0 Garage door raised panel type w/smart opener inclusive. Demolition • Master Bathroom Ceiling — Modify trusses, cutout bottom chords. • Cutout all floors per marks laid out by customer's plumber. • Remove 11' of concrete wall to allow for new garage addition per plan specifications dated 07/18/19 by Architectonic • Cutout header @ slider off breakfast nook area to allow 6/0 x 8/0 sliding glass door. • Cutout existing sliding door opening @ living room to allow for installation of new doors. Cutout existing slab outside where new Garage addition slab is located. Garage Addition • Provide new slab per plan specification by Architectonic dated 07/18/19. • Provide and install masonry walls per plan specifications by Architectonic dated 07/18/19 • Provide and Install trusses per truss manufacturers engineering and plan specification by Architectonic to be revised. • Provide and Install decking for roof structure per plan specification by Architectonic dated 07/18/19 • Provide and Install fascia to match existing house Uwe have read and understood the content herein and hereby agree: Initial: i� f • Provide and install stucco at exterior to match existing house • Provide and install New beam to support existing house structure @ removal of wall northside In kitchen area • Provide and install all drywall and finishing for new garage addition areas only. Finish level 3 walls and ceilings. • Provide and install all trim work at frame walls only • Provide and install prehung door for pantry. • Provide and paint ceiling walls and trim. (customer to select colors) • Provide final clean for addition areas. HVAC • No HVAC Electrical • No Electrical (by others) Plumbing • No Plumbing (by others) Permits & Engineering • Permits & product approvals for this scope are necessary and provided. Project Investment as described: Garage Addition: $20,859.93 (Twenty Thousand Eight Hundred and 591100 U.S. Dollars) Entry Door Purchase and Install: $3,760.00 (Three Thousand Seven Hundred and 501100 U.S. Dollars) Master Bathroom Ceiling: $450.00 (Four Hundred and 50I100 U.S. Dollars) Total Investment: $26,059.93 (Twenty Five Thousand and 591100 U.S. Dollars) Nothing is included that is not contained herein. Any increase in material costs beyond thirty days of your agreement acceptance date may be charged to you. The charge will be due at the next progress payment. Due to the volatility of the marketplace, prices may vary and may be reviewed at any time. This proposal is subject to review and re -negotiation should enactment of new code regulations become effective during the term of this contract. Ilwe have read and understood the content herein and hereby agree: Initial: Payment structure: 30% at Contract signing ($7,517.98), 35% at commencement ($8,770.98) 25% at completion of Roof sheathing ($6,264.98), & balances upon substantial completion ($2,505.99) Notes/Clarifications: Uwe have read and understood the content herein and hereby agree: Inlua . Acceptance of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. The signer authorizes BDR to do the work as specified. Anything not mentioned in this proposal is not included and will be added onlythru a standard change order agreed upon by both parties. Payment will be made as outlined above. I HAVE READ AND FULLY UNDERSTAND THE TERMS AND CONDITIONS Date: Date: Required Disclosures ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTION 713.001.713.37, FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIAL OR SERVICE AND ARE NOT PAID IN FULL HAVE THE RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIMIS KNOWN AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB -SUBCONTRACTORS, MATERIAL SUPPLIERS, SERVICE PROVIDERS, OR FAILS TO MAKE ANY OTHER LEGALLY REQUIRED PAYMENT, THE PEOPLE WHOM ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF YOU HAVE PAID THE CONTRACTOR IN FULL. IF YOU FAIL TO PAY THE CONTRACTOR IN FULL, YOUR CONTRACTOR MAY ALSO FILE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED, FOR NONPAYMENT BY YOU, OR BY YOUR CONTRACTOR AND SUBCONTRACTORS, YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO SATISFY ANY LIEN ARISING FDROM THIS CONTRACT. CONSTRUCTION LIEN LAW IS COMPLEX, AND IT IS RECOMMENDED THAT YOU CONSULT AND ATTORNEY WHENEVER A SPECIFIC PROBLEM ARISES. FLORIDA HOMEOWNER'S CONSTRUCTION RECOVERY FUND PAYMENT, UP TO A LIMITED AMOUNT, MAY BE AVAILABLE FROM THE FLORIDA HOMEOWNER'S CONSTRUCTION RECOVERY FUND IF YOU LOSE MONEY ON A PROJECT PERFORMED UNDER CONTRACT, WHERE THE LOSS RESULTS FROM SPECIFIED VIOLATIONS OF FLORIDA LAW BY A LICENSED CONTRACTOR. FOR INFORMATION ABOUT THE RECOVERY FUND AND FILING A CLAIM, CONTACT THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD AT THE FOLLOWING TELEPHONE NUMBER AND ADDRESS: Construction Industry Licensing Board 2601 Blairstons Road Tallahasee, FL 32399.1039 850-487.1395 You may review all changes made to the Florida Homeowner's Construction Recovery Fund by house Bill 535 at the following link: Laws of Florida Chapter2016.129 11we have read and understood the content herein and hereby agree: Initial: — ITEM DESCRIPTION ESTIMATE ARCHITECTURAL FEES/CALCULATIONS $ SURVEYS & ENGINEERING $ PERMITS $ IMPACT FEES $ CONCRETE DEMO FOR ADDITION AND RENO $ 4.928.00 SITE PREPARATION $ 320.00 FILL & GRADING as Needed $ SOIL POISIONING $ 165.00 STRUCTURALSTEEL__ — $ — 940.00+ CONCRETE $ 832.00 CONCRETE LABOR $ 650.00 FRAMING&WALL SHEATHING $ 166.00 MASONRY LABOR $ 1,600.00 MASONRY BLOCK $ 800.00 WINDOWS & DOORS $ GARAGE DOOR & OPENER $ 969.00 STAIRS & PORCHES $ FLOORIROOF TRUSSES $ 585.00 ROOF DECKINGIDRYIN $ 1,300.00 PLUMBING $ ELECTRICAL WIRING $ AIR-CONDITIONING & HEAT $ INSULATION $ 375.00 DRYWALL $ 1,625.00 TILE & MARBLE $ STUCCO & PLASTERING $ 1,950.00 STONE & OTHER EXTERIOR TRIM $ KITCHEN CABINETS, VANITIES COUNTERTOPS $ MIRRORS & MEDICINE CABINETS $ PAINT & INT/EXT $ ELECTRICAL FIXTURES $ INTERIOR DOORS/TRIM $ 450.00 FINISH HARDWARE $ APPLIANCES SHOWER & TUB ENCLOSURE $ FINISH FLOORS $ LANDSCAPING & SOD $ WALKS, DRIVES & PATIOS $ SWIMMING POOL $ SCREEN ENCLOSURE $ SEPTIC SYSTEM $ WELL & PUMP $ WATER & SEWER HOOKUP FEE $ PORTABLE TOILET $ FIREPLACE FANS SPRINKLER SYSTEM INTERCOM SECURITY SYSTEM CLEANING & TRASH REMOVAL $ 175.00 HURRICANE SHUTTERS $ DAY LABOR $ REAL ESTATE COMMISSION OTHER COST NOT INCLUDED ABOVE SUBTOTAL $ 17,829.OD LAND $ FINANCING COST INTEREST $ OVERHEAD $ 2,139A8 PROFIT $ 891.45 SUPERVISION GRAND TOTAL 20,85 .93 66