Loading...
HomeMy WebLinkAboutPLANSs € aty a U o N E W R E E FOR ENC Ul ° N C O ° ? ° m o= C MR* & MRS. JCJHN WISWELL 4� O ..yl ) W N Eco • I■■II CL N DIVISION ONE -GENERAL REQUIREMENTS Q 1-1 Interpretation of Plans -The Architects services does not include supervision 3-3 Reinforcement -reinforcing bars shall conform to ASTM specification A615. 6-4 Wood Trusses of construction. The Architect divest himself of the responsibility of the work, latest edition, including supplemental requirements and shall be grade 60. errors or emissions resulting from the interpretation of the plans. If the Contractor Splices in concrete, lap bars 42 bar diameters. Splices in masonry, lap bars 48 1. Wood trusses, beams and floor systems by truss company, shall be designed Dra W nIndex 'believes he has discovered errors or omissions in the plans the Contractor shall bar diameters. At corners, make horizontal bars continuous or provide corner and certified by a Florida Registered Structural Engineer. Shop drawings notify the Architect in writing for clarification before continuing work. bars. Bars intersecting at re-entrant corners shall cross, with each ending at the complete with structural load reactions must be submitted for approval. 3 far face of the wall with a standard hook at standard cover unless noted Installation and temporary field bracing shall be in strict accordance with o 1-2 Applicable Standards -All work under this Contract, or Sub -contracts shall otherwise on the drawings. Around openings and steps in walls, provide (2) #5's manufacturers specifications and applicable codes and standards. TI Cover Sheet a conform to recent editions of local, state and national codes, ordinances and extending 2'-0" beyond edge of opening or step. Horizontal bars at the top of Approved galvanized truss anchors shall be provided at each bearing.A o regulations pertaining to the work, F.B.C., A.C.I., A.N.S.I., A.S.T.M., O.S.H.A.,N.E.C. the beams shall be spliced only at midspan between columns and horizontal Installation shall separate bottom chord of trusses from concrete (where a D etc. bottom bars shall be spliced only at column centerline. applicable) with either 30# felt or FBC approved galvanized or stainless truss - Specifications seats. c 1-3 Scope of Work -Contractor shall furnish or provide for all items, articles,- 3-4 Concrete Formwork - Adequate and safe design of formwork and shoring A] Site Plan °' materials, operations or methods listed, mentioned or scheduled on drawings is the responsibility of the Contractor. Sleeve slab and footing as required for IF ARCHITECT FRAMING PLAN CAN NOT BE FACILITATED, NOTIFY ARCHITECT OF U and/or herein specified, including all labor, materials, equipment, and mechanical and electrical. PROBLEM OR SOLUTION PRIOR TO CONSTRUCTION. incidentals necessary and required to perform and complete work as shown in A2 - Floor Plan po S drawings and/or herein specified or as required for a completed project. 3-5 Crack Control -Provide 6x6, 10/10 gauge welded wire fabric in all slabs, 2. Provide 2 x 4 bridging at 8 - 0 c/c at the bottom chord and as otherwise walks, and drives Also provide "Fibermesh" (1.5 Ibs per cubic yard) crack control called for on the truss shop drawings. Adequate bracing and bridging shall be r - 1-4 The drawings were design per FBC 2017 additive per manufacturer's specifications in all building slabs and monolithic used during erection of the trusses to prevent collapse or damage to the trusses. Product Approval • Wind Pressures designed for Enclosed Structure footing. saw cut slabs within 5 days with 3/8" deep control joints max 400 sq.ft • Basic Wind Speed — 165 mph — 3 second gust square or 200 sq ft rectangle or at inside corners. 3. Supports for top chord or ceiling hung mechanical equipment and other o 4- • Wind Importance factor (Risk category) — II items supported by the wood trusses shall be attached to the trusses at panel W i n d O W/ D o o r Schedule • Wind Exposure— C 3-6 Vapor Barrier Membrane Provide .006" polyethylene vapor barrier points. The general contractor shall coordinate the installation of those items m beneath building slab. and assure that provisions are made in the design of the joist by manufacturer A3 - Elevations O 1 5 Verifying Conditions -Before commencing work, Contractor shall verify u for the concentrated loads imposed and dimensional size of the equipment. All a measurements and conditions at building site. Any differences between actual 3-7 Minimum concrete cover - Slab - 3/4" dynamic (with moving parts) shall be spring hung absorbing sound transmission (Dmeasurements and those shown on drawings shall be submitted to the Architect Exposed unprotected concrete - 1 1 /2" and mouvement. A4 - Electric Plan U in writing before proceeding. Formed concrete above grade — 1 1 /2" D Formed concrete below grade - 2" 6-5 Field Measurements - Truss manufacturer to take measurements in field as Electrical Calculations J 1-6 Permits - Contractor to provide all permits and fees as required from Uniformed concrete below grade - 3" required to verify or supplement dimensions on drawings and assume government agencies. 3-8 Expansion Bolts- where required shall be located at a min of 5 bolt responsibility for fit of wood trusses. diameters from the concrete edges and spaced a min of 10 bolt diameters Window/Door Details 1-7 Surveying -Owner to provide original survey and septic application. U.N.O. 6-6 Wood in direct contact with concrete, or masonry shall be pressure treated 1-12 Testingand Laboratory Services -Ins Inspections or tests required b code, with the requirements of the standards of the American Wood Preservers ry p q Y DIVISION FOUR - MASONRY Association. A5 - Sections ordinance or as indicated herein or on Drawings shall be the responsibility of the SBX Sodium Borate pressure treated wood shall be used against concrete or Contractor. 4-1 Unit Masonry -Concrete block units to conform with ASTM C-90. Provide masonry that is not exposed to water or exterior elements. A 6 - Foundation Plan shapes and sizes required to complete the work with a minimum of cutting and 1-3 Conflict of Information -if information is contradictory with different piecing. Provide reinforcement of the types shown on the Drawings. Alkaline copper (ACQ-C/D) or Copper Azole (CBA-A or CA-B) shall be used for instructions for the same aspect, contractor must report to architect. One exterior applications. Roof Plan information must not be used as more important as the other. the architect will 4-2 Mortar- Provide mortar type "S" conforming with ASTM 270. review and revise for the correct information. Wood in contact with soil shall be marine grade treated. 4-3 Grout - Provide grout in accordance with ASTM C476. Beam Schedule DIVISION TWO - SITE WORK 6-7 Rough Carpentry - Select material so that knots and defects will not i 4-4 Execution - Except as shown on the Drawings, lay up the concrete masonry interfere with placing bolts or proper nailing. Produce joints which are tight, true, Plumbing Riser Q 2-1 Demolition / Clearing - Remove organic / vegetation matter from building units in running bond, tooling all joints except where scheduled to be stucco. and well nailed, with members assembled in accordance with the Drawings ,F 0) and pavement area. Remove from site. Do not bury. Do not disturb deeper soils and with pertinent codes and regulations. N us needed and leave uncovered for proper fill and compaction procedures: 4-6 Miscellaneous Masonry Anchors - Fabricated from 16 gauge steel sheet or Lumber may be rejected by Architect or Owner, whether or not it has been vy LO 3/8" steel rod, 1.5 hot dipped zinc coating. installed, for excessive warp, twist, bow, mildew, mold, as well as for improper (� •� a` 2-2 Excavation -Excavate site to levels required for construction. Strip soil of all cutting or fitting. U M deleterious material 5'-0" past exterior of building lines. 4-7 Fill Masonry Cells - Q door and window iambs and sills solid with mortar or concrete. All metal stud walls shall be 24" on center. 25 go unless noted otherwise and U_ 2-3 Fill and Compaction -Provide clean well -graded sand placed in maximum shall be straight, true and plumb to a tolerance of 1/8" in 10 feet. Ceilings to be 00 12" lifts compacted to 95% of modified proctor maximum dry density, ASTM DIVISION FIVE - METALS shimmied as required to level to 1 /8" in 10 feet.Provide blocking as required for •N (D d-1557 at optimum moisture content. Compaction is to be verified by an installation to support all finish or trim items. Provide blocking above all windows t� independent testing laboratory. 5-1 Miscellaneous Metals - Contractor shall furnish and install, or furnish for and sliding glass doors for installation of drapery hardware. J other trades when required, all miscellaneous metal, steel, and metal Comply with "Fastening Schedule" of the F.B.C. 2014 edition and other fastening 2-4 Soil Bearing - Foundations are designed at assumed soil bearing value of fabrications including, but not limited to, hangers, anchors, bolts, plates, requirements contained in the pertinent regulations of governmental agencies Q 2500 pounds per square foot. Contractor is to verify and to notify Architect. If supports, lintels, brackets, and other miscellaneous items necessary to frame or having jurisdiction. c) such bearing values cannot be developed in the soil under the building, the support the Work.y Contractor is to notify the Architect in writing. The Architect will, as an addition 6-8 Finish Carpentry .o O to his contract, provide a revised foundation design based on conditions 5-2 Coordinate Metals - Metals in contact with each other must be selected to Interior trim to be paint grade poplar as shown on drawings, with painted finish. Z "Z N IL reported on -site in the testing engineer's report. This contract would also be avoid dielectric decomposition or supply adequate separating material Unconditioned areas shall have all wood primed all sides. revised accordingly. between the two different metals. Metals/fasteners exposed to weather shall be stainless steel unless noted otherwise on the drawings. 6-9 Metal fasteners, clips, holddowns - All model numbers are per Simpson N 2-5 Soil Treatment Treat compacted soil with an approved termite treatment Strong- Tie Company, Inc. If an alternative manufacture is used - submit Z at rates specified by manufacturer. Treatment shall not be made when ground is DIVISION SIX - WOOD AND PLASTICS allowable loads, capacities to the architect for approval. O I e it v r — cn FBC 30 .2 (1 Probabi ity t Ter ite Damage : Ve H avy 6-1 Lumber -All lumber permanently incorporated into the structure shall be air 6-10 Sheathing j Cq or kiln- dried and shall contain not more than 19% moisture. Elevate and cover 1. Roof / wall Sheathing - shall be 4' x 8' x 5/8"(min.) CDX plywood. Install the w 2-6 Site Grading and Drainage — All drainage must be kept on site or directed lumber on site to protect from moisture. All lumber and plywood shall be panel's long dimension perpendicular to the framing. Sheathing fasteners shall co to the street. identified by grade stamps. be 8d hot dipped galvanized ring shank nails unless noted otherwise: 1. Min allowable flexural bending stress for beams shall be 1500 PSI at normal Zone 1 - 6"o.c. at edges and 6"o.c. at intermediate framing ® Q 2-9 Well and Septic - Provide septic system as required by Health Department load duration. Zone 2 - 4"o.c. at edges and 6"o.c. at intermediate framing > , M 2 and installed to Health Department specifications and requirements. 2. Min allowable horizontal shear stress for beams shall be 90 PSI. Zone 3 - 3"o.c. at edges and 3"o.c. at intermediate framing use 8d ring -shank 3. Min allowable modulus of elasticity for post or beams shall be 1,500,000 PSI. nails and adhesive within 5' of a gable end. $D w DIVISION THREE - CONCRETE By I 3 All exterior wall studs to be Group 2 lumber, kiln -dried 2x6/2x8 minimum Fb=1100 6-11 Metal fastener materials St. LUCIecouill ty 3-1 Concrete - Structural concrete shall develop a minimum strength of 3000 PSI, 2x4's min. Fb 1800, except where noted. All studs to be straight and true. Standard (G-90) treated metals may be used on untreated, Chromated Copper � 0 ` psi at 28 days. All concrete shall be ready mixed and in accordance with ASTM Framing lumber to be # 1 or better, minimum Fb=1200 PSI. Blocking, bracing, and Arsenate (CCA-C), or Sodium Borate (SBX) treated wood only. > C-94. Maximum allowable slump to be 5". All slabs to by 3000 psi at 28 days. nailers shall be utility grade and provided as required. Provide blocking at all ZMAX (G-185) , Hot Dipped Galvanized (HDG), or stainless steel treated metals FILE w Water shall not be added on site without record and compression test of altered windows and slidinglass or french doors for drapery COPY g p ry installation. must be used in Alkaline copper (ACQ-C/D) or Copper Azole (CBA-A or CA-B) mix. treated woods. 6-2 Furring shall be 22 go steel hat channel or 1 X pressure treated wood 3-2 Scope - Provide all structural concrete, filled cells, slabs, beams, footings, installed as required using shims, if necessary, to provide a true planer surface 6-12 Mill Work —kitchen and bath cabinet drawings for style, finish, color, 1 (p JOB # equipment pads, drives, walks, etc. as shown on drawings or as needed to for finish materials, Ceiling is to be shimmied for smooth gypsum board finish. hardware shall be rovided b owner. VIEWED FOR 7/ 22 / 19 p Y MPLIANCE .� Q DATE complete job. ��® CO COUN Y Q SHEET 0 BOCC �. o Q TI 0 U DIVISION SEVEN - THERMAL AND MOISTURE PROTECTION PAINTING SCHEDULE DIVISION FIFTEEN - MECHANICAL a 7-1 Waterproofing - Coordinate waterproofing with other trades and make provisions for their work to avoid cutting and patching. 7- F C R 302.10 : lame In ex for Insulation not to exceed 5, with a co pan ing mo e-d velo ed ind x not to exce d 4 0. 0 7-3 Insulation - Provide bait / foam Insulation system for total insulation. A min. of 12" foam thickness shall be applied to the ceiling for r-20. Provide the following insulation: All ceilings - R-20. Exterior frame walls (R19). Exterior masonry wall insulation - R-4.1 (min) fi -foil. 7-4 Roofing -Provide EXTREME METAL FAB. snap loc V standing seam 26GA roofing or approved eq and a 30 year guarantee. Installation shall be for a complete weatherproof system with all applicable accessories (including but not limited to hips, valleys, eaves, flashing, mortar, color, vents, color coord.) as recommended by the manufacturer. Provide POLYGLAS peel and stick TU-MAX (FL5259.1) underlayment and all nail fasteners shall be HDG or stainless steel w/ plastic tabs. 7-5 Flashing and Sheet Metal - Provide flashing and sheet metal not specifically described in other sections of these specifications but required to prevent penetration of water through the exterior shell of the building complying with pertinent recommendations contained in current edition of SMAACNA's "Architectural Sheet Metal Manual." All flashing to be min 16 ounce copper or roof matching roof metal unless otherwise noted. 7-6 Sealants and Caulking - Standard caulking compound shall be a one part urathane sealant. Color shall be manufacturer's standard paintable grade. Window and Door perimeter and buck Sealant shall be continuous Vulcum. 7-7 Infiltration Barrier - Building to comply with Florida Energy Efficiency Code for Building Construction Infiltration practice #2. Provide code approved infiltration barrier. 7-8 Flashing - Concealed flexible through wall flashing shall be AFCO, copper fabric for excellent mortar bonding properties or equal. 7-9 Building (Felt) Paper- Install where indicated on drawings. Shall be Asphalt saturated felt, non -perforated ASTM D 226. 7-10 Vapor Barrier - Installed at all vertical, exterior wood stud and sheathed walls shall be "TYVEK". Use compatible 3M 8086 Contractor Sheating tape at all laps and leading edges and installed per manufacturer recommendations. DIVISION EIGHT - DOORS AND WINDOWS 8-1 Doors and Frames - Provide all doors and frames hung true and plumb as indicated on schedule. All exterior doors ( except front door, garage door) shall be Thermatur panel as selected by owner. Interior wood to be paint grade unless noted otherwise. Color and hardware selected from manuf. standards. All interior doors shall be 1 3/8 paint grade unless noted otherwise. 8-2 Windows - Provide all fixed glass and operative windows true and plumb as indicated on schedule. •AII windows shall be Vinyl white with laminated glass as manuf by PGT 5500 series or equal. All operable windows shall provide insect screen. 8-4 Door Bucks shall be 2x thickness and anchored into a solid concrete or grout jamb with 1 /4" x 3 1 /4" masonry screw (ie. tap -con) for 1 1 /4" min. embedment at 12" oc and each end.,,: DIVISION NINE - FINISHES 9-1 Stucco -Alight texture finish field where indicated. Provide sample board for owner approval. Finish shall be uniform through -out entire house. 1. Plastic heavy gage Corner beads- small nose corner beads fabricated from zinc alloy, with expanded flanges of large mesh diamond lathe to allow full encasement be plaster. 4 .Casing beads- square -edge style, with expanded flanges and removable protective tape, of PVC material. Portland cement plaster mixes and composition: 1. 3-coats over metal lath: scratch coat- 1 part portland cement, 3/4 part lime, 2 1 /2 to 4 parts sand. brown coat- 1 part portland cement, 3/4 part lime, 3-5 parts sand 2. 2-coats over concrete unit masonry: base coat- 1 part portland cement, 3/4 to 1 1 /2 part lime, 3-4 parts sand 3. Finish coat: 1 part portlopid cement, 3/4 to. 1 /2 part lime, 3 pests sand 9-2 FBC R302.9 : Flame Index for Wall & Ceiling Finish not greater than 200 10 9-3 Gypsum Wallboard 1. Work shall be done in strict accordance with the standards established in the U.S.G. Drywall Construction Handbook, latest edition, or comparable publication by other manufacturer, particularly in regard to fastener spacing and treatment of joints ancorners. 2. Ceilings to be slick smooth finish, all walls to be smooth finish. 3. Fasten wallboard with 1-1/4" type W bugle head screws. Space screws 4" OC at perimeter and 8" OC in the field on 24" OC framing min. 4. Provide 1 /2" wall board on walls, 5/8" on ceilings. 5. Provide a complete system of metal trim formed from zinc -coated steel not lighter than 26 gauge. (Corners, J-mold, etc.) 6. All gypsum board in damp locations such as porch ceilings, baths, laundries, etc. to be moisture resistant. All tub and shower tile surrounds (including tub skirts, and decks) tobe cementitious backing board such as wonderboard to six feet above finish floor. 9-4 Ceramic Tile and Marble l . Comply with recommendations contained in the current edition of "Handbook for Ceramic Tile Installation" of the Tile Council of America. 2. Provide the ceramic tiles, and stone as directed by owner and coordinate recesses for finish levels. 9-5 Painting 1. Prepare substrate and apply paint coatings in strict accordance with recommendations of the manufacturer of the approved paint system. 2. All surfaces shall be covered with the minimum number of coats as listed. Additional coverage shall be provided as required to cover all holidays. 3. Verify all stucco surfaces are properly cured before painting. All paints to be Benjamin Moore or approved equal or as noted. Exterior Stucco: 2 coats Moorgard Exterior Wood (stain): 1 coat Moorwood semi -transparent Latex Stain 098 Exterior Wood (painted): 1 coat exterior Moorgard primer 2 coats Moorgard Interior Wallboard: 1 coat Moorcraft Latex Primer Sealer 1 coat Moore's Regal Wall Satin Interior Ceilings: 2 coats Regal Wall Satin, Decorator's White. Interior Doors and Trim: 1 coat Moore's Latex Enamel Underbody 2 coats Moore's Satin Latex Enamel Provide a paint sample on each and every specific material of color and sheen for owner approval prior painting actual material. DIVISION TEN - SPECIALTIES Provide specialties and install specialties as noted. Provide all blocking, recesses, etc. as required for installation of specialties. 10-1 Bath Accessories 1. All bath accessories are to be coordinated with Owner. 10-2 bedroom clothes Shelving - Provide vinyl coated wire shelving with color selected by Owner. 1 shelf and 1 hangar bar as indicated on drawings LINO 10-4 Shower Doors - Provide shower doors or enclosures as shown on drawings, Diston Industries, Biscayne series, matt silver or approved equal as selected and approved by owner. Glass shall be clear 3/8" tempered w/ clear silicone sealant for bidding. Submit sample and allowance to owner for approval or changes prior installation. 10-5 Kitchen/bath cabinets - architectural drawings suggest design only. the owner shall provide cabinet shop drawings, hardware, finish and detailing as required for a complete system. DIVISION ELEVEN - EQUIPMENT Provide and install equipment as indicated. Provide all blocking, recesses, chases, power, etc. for installation of equipment. Provide Owner with all operation manuals, warranties, etc. as provided with all equipment. 11-5 Bathroom Exhaust - provide a bathroom exhaust system as manufactured by 'Broan' from their QTXE Series with indicator light switch and light as indicated on the plan. 15-1 Air Conditioning Systems 1. Provide systems as shown on drawings, thermostat and controls as required to run system. HVAC contractor shall become familiar with site, documents pertaining to scope of work, and general construction. He shall read and become familiar with specifications and shall perform his work in full accordance with all applicable paragraphs. Layout, balancing and testing necessary for complete installation of heating, ventilating, and air conditioning systems as required by climate, nature of construction, and site to the satisfaction of the Owner. This work includes, but is not limited to, heating and cooling equipment, duct work, insulation, temperature controls, grilles and other items of equipment for a complete operating system. 2. Provide condensate drain, 26 gauge galvanized auxiliary pan and drain to exterior. 3. Ductwork shall be R-6 flexible duct or ductboard. 4. Supply grills shall be white painted aluminum with opposed blade dampers. All dampers to have individual controls. All grills to be Metalaire or equal. 5. Provide air supply to all walk-in closets. 6. The A/C Contractor to guarantee the system to maintain 75 Degrees F. at 95 Degree F. outside temperature for cooling and 75 Degrees F. at 40 Degrees F. outside for heating. 7. All grills to be standard size. 15-2 Plumbing 1. Provide plumbing system, complete in place, tested and approved, where shown on the Drawings, as specified herein, and as needed for a complete and proper job. 2. All plumbing work and materials shall be in accordance with the latest edition of the Standard Plumbing Code, local ordinances and in compliance with the Energy Conservation Code. 3. Hose bibs shall be brass or bronze, fastened securely 18" above grade where shown on Drawings. All hose bibs shall have a non -removable anti -syphon device installed. 4. Fixtures shall be protected against water hammer with air chambers when required. 5. Provide shut off valves to all mains entering the building and each piece of equipment. 6. Install dielectric union at inlet and outlet of water heater. Install water heater in approved pan and provide drain line as required. 7. Building sewers, vents, and all underground drainage lines shall be schedule 40 PVC. 8. Water piping to be soft Type L. Copper, under slab, Pex above slab. 10. Insulation - Provide pipe insulation on refrigerant lines and domestic water lines as per industry standards. Insulation exposed to weather shall be protected as required. 11. Gather vents in attic as allowed and vent toward rear of house. 12. Provide electric AO smith 50 gal, waterheater. 0 O Z rim U O z O r 0 6 Z U o a N 0 0 0 4- C O U (ll U D J +- cn O W LO t/'1 LO 0)3 U •. Q\ LL O N •U) J O 06 L > J "o Z mn N IL Z 0 a \ 00 N Lu OJ JOB # DATE 7/ 22 9 SHEET n t F DIVISION SIXTEEN - ELECTRICAL 16-1 Scope: Furnish all equipment and materials and perform all labor and services necessary to installation for a complete system for lighting and power. Each system shall be complete in all respects and shall be turned over to Owner in a first-class operating condition and fully tested and complete with all devices which are normal for intended systems and those required for their safe operation. 16-2 Materials and manner of installation of electrical system shall be in strict accordance with the requirements of the local governing authorities having jurisdiction, and the standards set forth by NFPA, U.L., or other recognized testing laboratories. The installation shall conform to the latest edition of the NEC. 16-3 Equipment mounted on the exterior of the building shall be designed, labeled, and installed for exterior, weatherproof service conditions. 16-4 Service: Contractor shall carry out all required arrangements with FPL for installation of the service, permits, and inspection. 16-5 Telephone and Cable: Contractor shall furnish entrance service and distribution system with receptacles. 16-6 HVAC Wiring: Contractor shall provide wiring to air conditioning equipment including power wiring, control wiring, and interlocking wiring in accordance with diagram as provided by Mechanical Sub -contractor. 16-7 Panel Schedule: Panel shall be clearly marked as to all circuits. 16-9 All wiring shall be THW copper. 16-11 Load centers shall be Square D, (or equal) QD circuit breakers type. See panel schedule for complete panel description. 16-12 General duty receptacles shall be 20 amp specification grade, 125 volt AC, NEMA 5-15 configuration. white. 16-13 All receptacles shall be installed 12" from the finish floor nless noted - 16-14 All receptacles (in dwelling units) shall be arc -fault circuit interrupter type or afci as repuirod per 2014 NEC.2101112 and provided on similar circuit branch., 16-16 Switches shall be specification grade 125-277 volt 20 amp. White, rocker. 16-18 Cover plates shall be hard plastic white or as directed by owner 16-19 Provide junction boxes as required and feed all lighting circuits through appropriate junction boxes. 16-19 Owner shall provide electrician with a complete schedule of lights and appliances. Electrician shall coordinated all electric demands with the electrical calcs. FA DOOR SCHEDULE ID TYPE DOOR LEAF ORIENTATION REQ. PRESSURE REMARKS WIDTH HEIGHT 1 D2 Sliding 21 8' 7' L +31.7 / -40.1 PSF 2 D1 21 3' 7' L +34.1 / -37.1 PSF 3 D2 Bifold 21 2'-8" 6-8" 4 D 1 21 3' 6-8" L 5 DI 21 2'-8" 6-8" R 6 DI Pocket 21 2'-8" 7' R 7 D1 Sliding 3' 7' L 8 Dl Sliding 2'-6" 6'-8" R 9 D2 21 3' 6'-8" L ST. LUCIE County Building Department Product Approval Project Address: Contractor: WISWELL Residence Pressures Port St. Lucie, Florida PSF Product Product Manuf. Agency # ID Glass Model # Expire Required Windows - SINGLE HUNG PGT SH5500 See Provided Produ NOA +70 / -110 SEE IMPACT -7/16" Approval Installation 17-0630.05 PLAN 0.09'ANJ PVB LAM/ VYNIL Spec. 7-30-20 SEE SCHED. 3/16" H.S. E Y Moors SEE SLIDING DR PGT Sl i5 / i See Provided Produ NOA +80 / -80 SCHED IMPACT -7/16" Approval Installation Spec. 17-0420.06 SEE SCHED. 3/16" AN./ VYNIL 0.09 PVB LAM/ 4-14-21 3/16" H.S. SWING DOOR THERMA- TRUE See Provided Produ FL +75/-75 Approval installation 10537.1 FIBERCLASSICFIBER Spec. SEE SCHED. GLASS SMOOTH Misc. Exterior Materials Roof Extreme Metal See Provided Produc FL 20378.2 +/ - 121.75 Fabricators Approval Installation WORSE CASE Snopmax Spec. ZONE 2/3 + 64.2 / - 82.0 Underlayment: FL 5259.1 Pofyglcss peel and stir TU MAX Siding Stucco on CMU 5 COAKS Stucco on hi -rib 15# felt back hi -rib + / - 92.0 Soffit mtl lath mil lath #8 screw Z1/2 -77 8 clip framing 8" oc Z3 -77 8 2 coat 5/8" thick RESIDENCE SQUARE FOOTAGE A/C COVERED PORCH TOTAL UNDERROOF 752 SQ FT 451 S Q FT 11203 S Q FT WINDOW SCHEDULE ID TYPE UNIT SIZE HEAD HT. REQ. PELSSURE REMARKS A W Single Hungl 21 7-8" x5 7' + 35.6 / -38.6 PSF B W Single Hung] 21 2'-8'x5' 7' + 35.6 / -38.6 PSF C W Single Hung 1 21 3'-1"x5' 7' + 35.6 / -38.6 PSF EGRESS WINDOW D W Single Hung 21 3'-1"x5' 7' +35.6/-38.6 PSF EGRESS WINDOW E W Single Hung] 21 2'-21/2"x3'-1" 7' +35.6 /-47.7 PSF F W Single Hung 21 2-2 1/2"x3'-]" 7' +35.6 /-47.7 PSf oor Plan D4- ALEl /4" =0 CODE COMPLIANCE T I. UCIE COUNTY BOCC N 4i 0 LU W U) W LD J J Q D` 0 0 t L .T Q. O U .r. U N U J N O� 3 Vf L0 � ('7 LL C3 O N C4 J N 1 A.Q% �O - Z o N 0 V) Z Oa 00 00 w JOB # DATE 7/ 22 / 19 SHEET A2 A u EXTERIOR MATERIALS 1❑ METAL ROOF 2❑ STUCCO F 13 I SYNTHETIC WOOD TRIM Left Side Elevation 1/4 = I EXTERIOR MATERIALS F1❑ METAL ROOF I [ I STUCCO Right Side Elevation scAl P 1 /4" = 1'-!1° Rear Elevation SCAT F- 1 /4" = 1'-n,, Front Elevation SCALE: 1 /4" = F-0" REVIEWED ON,H; CODE CO PUANi� ''.- ` 7', A. u �0 �3 cS 41 a� LL N J 0 04 U QC J _ to Z mn N a- V) Z O V) w Lu u, w 7- 7- 9 JOB # Q DATE 7/ 22 / 19 SHEET 0 04 A3r n. 0 U MAIN DISC 150A-2P-NEMA-3R 120/24OV-1PHASE/ 3W /SN 22000 AIC 150 AMP DISC 1 /0, 1 /0, 1 /0, TH W N CU OVERHEAD AND/OR IN 2" DIA C TO PAD MOUNT TRANS- FORMER NOTES: • ELEC. CONTR. TO VERIFY LOAD OF ACTUAL EQUIP. INSTALLED * ALL WIRE SHALL BETHWN COPPER WINDOW SCALE 3" = 1 ' 0 " 1/0, 1/0, 1/0,THWN CU IN 2" DIA C 150 AMP MCB PANEL #3 CU IN 3/4" C /{_ CLAMP TO MT'L WATER SUPPLY DIRECT BURIAL CLAMP TO FOUNDATION ST'LREINF.W/ ELECTRICAL RISER PVC GLUE COVER NO SCALE STUCCO MTL FLASH'G SET IN MASTIC OVER 2"X2" SYN. WD SLOPED TOP BAND W/ 1X8SYN WD WINDOW TRIM W/ CONT. ADHESIVE 1/2" PT PLYWD BUCK ANCHORED W/ 3/16" DIA x 2" MAS SCREWS 12"OC 2X6 PT BUCK W/ SHIMS ANCHORED W/ 1 /4" DIA x 3 1/4" MAS SCREWS W/ 2 CONT. BEAD OF SEALANT AND EXTERIOR PERIMETER SEALANT. SYN WD JAMB EXTENTION WINDOW DRILLED AND SCREW AS DESIGNATED BY WINDOW MANUF CONT BEAD AT PERIMETER OF 'VULCAN' SEALANT STUCCO FILL CMU CELL SOLID 2 x 6 P.T. BUCK W/ SHIMS ANCHORED W/ 1 /4" DIA x 3 1 /4" MAS SCREWS 12" OC AND AT ENDS W/ 2 CONT. BEAD OF SEALANT AND EXTERIOR PERIMETER SEALANT, 1 X HARDI JAMB EXTENTION AND CASING ON BLKG #14 PAN HEAD -VERIFY W/ WINDOW MANUF. WINDOW SCREWED AS DESIGNATED BY WINDOW MANUF FOR 140 MPH WINDS W/ CONT BEAD AT PERIMETER OF 'VULCAN' SEALANT / DOOR JAMB WINDOW DRILLED & SCREW AS DESIGNATED BY WINDOW MANUF CONT BEAD AT PERIMETER OF'VULCAN' SEALANT 5/4 WD SILL W/ BULLNOSE AND APRON TRIM SEALANT ALUM THRESHOLD SEALED ANCHORS 2X SILL W/ SLOPED TOP IN MASTIC BASE SURFACE AND CHAMFER FL FIN. EDGE AND 1 X3 SYN WD TRIM FILL SOLID ALL SILL BLK'S WINDOW SILL SCALE 3" = 1 ' 0 " V ELECTRICAL PANEL cir description poe' wire cir description pole' wire 1 RV EQ 50.2 8 2 AIRHANDLER 50.2 8 3 4 5 RANGE 60.2 6 6 CONDENSER 40.2 8 9 WATER HEATER 30.2 10 10 DISHWASHER/DISP 20.1 12 11 12 13 DRYER 30.2 10 14 REFRIGERATOR 20.1 12 15 16 WASHER 20.1 12 17 KITCHEN APPLIANCE 20.1 12 18 MICROWAVE 20.1 12 19 KITCHEN APPLIANCE 20.1 12 20 RECEPTACLE -GFI 20.1 12 21 LIGHTING 15.1 14 22 RECEPTACLE -GFI 20.1 12 23 LIGHTING 15.1 14 24 RECEPTACLE AFCI 15.1 14 25 LIGHTING 15.1 14 26 RECEPTACLE AFCI 15.1 14 27 28 RECEPTACLE AFCI 15.1 14 29 30 NOTES: • ELEC. CONTR. TO VERIFY LOAD OF ACTUAL EQUIP. INSTALLED * ALL WIRE SHALL BE THWN COPPER ELECTRICAL CALCULATION 752 AIR CONDITIONED SQ. FT. @ 3 W PER SQ FT 2256 RANGE 12KW 12000 DRYER 5000 WATERHEATER 4500 REFRIGERATOR 1900 DISHWASHER 1900 DISPOSAL 1500 (2) KITCHEN APPLIANCE CIRCUITS - 20 AMP EA. 3800 WASHER 1900 MICROWAVE 1500 RV EQUIPMENT 50AMP 10000 TOTAL 46256 FIRST 10000 W @ 100% 10000 REMAINDER @ 40% 14502 (1) HVAC WITH 1000OW HEATSTRIP EA. 10000 34502 W @ 240 V 144 AMPS THEREFORE USE 150 AMP SERVICE 0 DOOR SILL SCALE 3" = 1 ' - 0 " O�QOR / FRAME DRILLED & SCREW AS DESIGNATED BY MANUF NON -SHRINK GROUT AS NEEDED FOR THRESHOLD HGHT CONT. UREATHANE SEALANT STUCCO SKIM COAT AT EXPOSED CONC ELECTRICAL LEGEND DUPLEX RECPT. 12" A.F.F. SINGLE POLE SWITCH �42" DUPLEX RECPT. OTHER HGT. THREE WAY SWITCH —E1— Q DIMMER SWITCH REF. DEDICATED RECPT. QUADRAPLEX RECPT. INTERNET JACK G.F.I. GROUND FAULT INTERUPTED RECPT. SD SMOKE DETECTOR TELEVISION COAXIAL 220V RECPT CARBON MONOXIDE DETECTOR JUNCTION BOX - SURFACE Q ELECTRIC PANEL W/ CIRCUIT MOUNTED LIGHT FIXTURE BREAKERS (RECESSED) 84" WALL MOUNTED LIGHT FIXTURE W/ ELECTRIC METER MT'G HGT. LED SURFACE MT'D BOX FIXTURE - ABBREVIATIONS: LAMP TYPE AS INDICATED Ld--= V.P. VAPOR PROOF DISCONNECT ACFI ARC CURRENT FAULT INTERCEPT O SURFACE MOUNTED CL'G GFI GROUND FAULT INTERCEPT P PENDANT LIGHT FIXTURE LED LIGHT EMITTING DIODE O RECESSED CL'G LIGHT FIXTURE Electric Plan SCAT F, 114" = vz, 0 0 ry- Lu w V) r O J Q rn N } L Q 0 } N L �3 L0 V _ � M ILL H r O Qj U J N•o L ZMn N0- N Z O V) > w JOB # DATE 7/ 22 / 19 SHEET m Al 3X4 DECO OUTRIGGER 48" OC ANCHOR W/ 2.1 /4" X 6" GALV. LAG BOLT PLUGGED AND ALIG"/ 2X BLKG 4x4 PT WD COL W/ CCQ44- CAP TYIP. FASCIA CONSTRUCTION I TYP. SYN WD WRAP OVER 4x4 PT WD COL SEE COL PROFILE 04 4x4 PT WD COL W/ CBSQ- _ SDS2 BASE 2"X6" PT HEADER W/ A33 STL ANGLE p o a 2.2X8 AND PLYWD G/G PT ¢ X HEADER W/ 1 /2"X8" HDG THRU BOLT AT COL AND `O HTSM16 EA SIDE OF PIER `" 12" SQ COL BLK P 22" X 8" 900 BEND AND STUCCO Fl n tHIDA HEEL-- 12 8 �- ROOF MTL FLASH'G / COUNTER FLASH'G AT � BROKEN PITCH yy 12 3 I i 6 HETAL20 - 12 1 X T/G SOFFIT OVER 15# FELT W/ BRICK MOLD EDGE TRIM 4'-6" WDBMW/1XWD WRAP AND BRICK MOLD TRIM 5/4 SYN. WD DECK'G BUTT JT. W/ I 2.3" #8 DECK SCREW 32" OC / ALT. SINGLE SCREW 32" OC 2"X6" FRAMING 16" OC _ — r N U26 EA_END_ • 2X6 PT LEDGER W/ 1 /2" DIA X 5" EXP ANCHOR 24" OC PORCH WALL SECTION 3/4"= 1'-0" PORCH Al 1 SCALE:1/4" = F-0" CATH. CLG 8'-10 1/2" BR'G 01 011 P. .. FIN SLAB 11 — TI5 TREATED - 6MIL IMPACTED R FILL i r �(T/ // , OMPACTED i.'Pa(AAR FILL " -2'-8 T.O.F. L GRADE D FOR ICS ®III�III'I""III 8'-10 1/2" BR'G 12 3 BOTT. OF LINTEL 0'-01, - 5 FIN SLAB V; TERMITE TREAT S L;' VB - COMPACTEa GRANULAR 12" LIFT COMPf� GRANULAR FILCiiiiiiiiii/ -2'-8' LL / J 1 LL T.O.F. .. P' .'. , . . ... NATURAL GRADE moo. • . . SCRAPED FOR ORGANICS HVAC IN ATTIC MTL ROOF PEEL/STICK WATERPROOF MEMBRANE 5/8" CDX PLYWD R- 20 FOAM INSUL WD TRUSSES 24"OC DESIGNED BY FL ENG SAS 0 N 0 U < 6 c Lt / HETAL 20 TRUSS ANCHOR UNO o 8" 2 COURSE BOND BM ° W/ #5 T/B CONT o 0 2 X 4 WD SUB E F-,5/4 X 6 HARDIBD o W/ ROOF MTL DRIP CONT. z 3 2'-0' �STUCCO ONFELT BACKED HI -RIBBED LATH AND TYVEK t 3/4" RAISED STUCCO BAND o STUCCO TEX. FIN. (5/8" THK) 1 8" CMU ° #5 VERT IN SOLID GROUT. SEE PLAN FOR LOCATION. R-4.1 INSUL o 1 X FURRING 24" OC o 1 /2" GYPBD. j 0 AA A ^^ A II > 0 L N 0 C 0 #5 W/ 8" 900 DOWEL EXTEND 28" MIN ABOVE t SLAB IN SOLID FILL CELL ALIGN W/ VERT REINF 1 1/2"CMU RECESS 8"X12" THK EDGE W/ #5 CONT FILL ALL CELLS SOLID BELOW SLAB 34"X 8" #5 900 REINF 24" OC TYPICAL WALL SECTION 3/4" = 1 0 " REVIEWED FOR 'ODE COMPLIANCE ST. LUCIE COUNTY BOCC N a` U 0 u u z N U o `-0 U � � U a � m 3 3 �p OZ� N V^ v a v M J t a N 0 0 0 N N O In a • • L � 00 -' v •- O) u- .y No .— —' ry N Al ]t c L � U JJ G^ N W o � i Z —s N CL O P C6 > W N C6 w w w w 2 L) JOB # a DATE 7/ 22 / 19 a 1 SHEET N o A5 0. 0 U BEAM SCHEDULE O SIZE WxD REINFORCING STIRRUPS ELEV T.O.B. REMARKS /CONNECTORS TOP MID O T B1 2.2' X 10" WOOD W/ 1/2" PLYWD G/G 8'-10 1/2" CONT. OVER MULTI SPANS WHERE POSSIBLE 62 2.2' X 8" PT WOOD W/ 1/2" PLYWD G/G 1. - 1-� CONT. OVER MULTI SPANS WHERE POSSIBLE B3 3 • 2' X 8" PT WOOD W/ 1/2" PLYWD G/G - 1'-01. Ll 8' x T CMU FILLED SOLID W/ CONC. BOTT LINTEL @ 7'-2" OFLACCTUDALJDR.OND / WINDOW SSE EOCTED/ 8 BRG - VERYIFY M.O. TB1 Tx 16" CMU 1 #5 1 #5 v-a, CONT. BOND BM NOTE: BEAM DEPTH MAY BE INCREASED. IF DEPTH OF BEAM IS INCREASED MORE THAN 4' THEN ADDITION #5 MUST BE ADDED TO THE BOTTOM OF THE BEAM IF A WINDOW HEAD IS GREATER THAN T BELOW THE MIN. BEAM DEPTH, THAN A L1 FILLED SOLID MAY BE USED AS THE WINDOW HEAD. THE BOND BEAM MUST STILL BE INSTALLED REINFORCEMENT SPLICES AND BENT BARS IN A BEAM (DIFFERENT FROM TIE BEAM) MUST CONFORM TO THE BEAM REINFORCEMENT CRITERIA 2�'� .Z 2 .� 3 2 5 � I � I 3 \` 4 4 I I I I I I 15 I 5 I I i I FASCIA design per FBC 2017 • Wind Pressures designed for Enclosed Structure • Basic Wind Speed - 165 mph - 3 second gust • Building Risk category - 2 • Wind Exposure -C • Internal pressure coefficient-+(-) .18 • FBC R301.2(1) Damage from Weathering: Negligible • Components and Cladding - 22 feet mean roof • Truss Design Criteria - Live Load : 38 PSF - Dead Load: - iSPST�- Total 56 PSF • Roof slope range 0-30 degrees (0 : 12 to 6 : 12) • ALLOWABLE LOADS Vosd WORSE CASE ZONE AREA PSF 1 10 22.9 - 36.3 2 10 22.9 - 63.2 3 10 22.9 - 93.4 OVERHANGS 1 10 0.0 - 77.9 2 10 0.0 - 77.9 2' 10 0.0 - 0.0 3 10 0.0 -126.9 3' 10 0.0 - 0.0 4 10 38.6 - 41.9 5 10 38.6 - 51.7 SEE WINDOW AND DOOR SCHED FOR ZONE 5 = 3'-D" FROM EDGES I O O I o I v I -- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - -I 1 I 0 - - - - - - - - - - - - I I I I I O I o I I 2 I v I I RIDGE I O O O 4,_0„ I O I o I I 2 I "v I I I- - - - - - - - - - - - - - H �\e O JPO O 9<<F/ O I O - - - - - - - - - - - - - L - - - - - - - - L - - - - - - - - I I O O w O O o I o I YASI.IA KAr:t OZONE 1- USE 8d RING SHANK NAILS AT 6" OC (field) 6" OC (edge) OZONE 2- USE 8d RING SHANK NAILS AT 6" OC (field) 4" OC (edge) OZONE 3- USE 8d NAILS RING SHANK AND CONT. CONSTRUCTION ADHESIVE BEAD AT 3" OC (field) 3" OC (edge) FASCIA ROOF NAILING PATTERN NTS iYP: WD CO CAP CCQ44 UNO �1 JACK TRUSS 24" OC W/ METAL 12 MBHU3.56/9.25KT I I I I 1 TB1 I i I I I I I I I I I J. _. L. TR S_ _ _GIRDER - -•-•-,_ SHADE AREA _. CATH: CLG BOT _.-._._.� _._ L1 CHORD' - - _,_ _ _ 24•_'X30" ATTIC A CES _ _ _• _ ALL ACCESS /rTRUS FRAME ' RAG T. I� I I I I I GIRDER TIRUSS 1 2 Roof Plan SHADE AREA W CATH. CLG BOT - T. CHORD _._._._. _._.- ..r. MBF --- GIRDER TR S - 1. r - -. _. _. I I I I I 0;; Al JACK TRUSS 24" OC W/ METAL 12 N FLAT BOTT CHORD W/ ' HVA MECH C� U O v N Lo w m Q J J U- LL 2" SIN DISP / DW 3' GRADE 4" INCREASE PIPE SIZE AT GRADE TO SEPTIC SYSTEM I 3" VTR JI✓ I L, \ I I 1 1 1/2" LAV W K/ WASH PLUMBING RISER )" WC 6 Al B2 rr. �r.----------------------� 10 I' - 9 II I II Al r1-. I. LI B2 I M �1 I .1 I it I II I .I I B2 -1 I rif-� I r �t•� I I s AI I III I I 1 rl. I. 22 I I II I I I rl •FIT - � I < -4 _I. 12" TREAD X 6" RISER CONC. STEPS �} _ S • �- -I• 3" I - 11 O q o N rl­� 4" I. 1 ' PAD FT Ir I I HP 1- I I I I I, I^ I I I I I I I I 1 O I N I � I > I LO I >�Q I >J 1 ::)O I UC Co J I J LL J I QJ w I �U I o �Q LL\ I I s I AI I I I I I I I I I I I I I I I I I I I I I I C' ' -i I MBHU5.5/9.25 30"X30"X 12"PAD _._._ _. =-L.= _.- - -•-•1 -•-.- - -•-. W/ 4(C#5 EA ENTER OWAY N COL) I I 4 6 17' 0" i BOTT OFFTG _._._.+._._._ _,-.-•+•-.-•-._.-•-. �I I i II o B3 - - -B3 1 - - - __B3 o ~I . I I 1 • I I 4'_9„ 11 6" 49" i 6" r{ 4 ��T r l -1� 7 I I T'B' I'T'�- -� -f rr. I I I I I I I II I I I I III 9 I I I h 04 q _I�L.J� 63 63 2.-0" B3 2'-0" 6 Al TO SEPTIC 4" SYSTEM 0 �+- 9 - h 1 3" WC LAV 12/'�SH� II LL/2 6"SHWI I RECESS I I I I I 3, 1 ( ( I I I I I I ( I I 21 1 1 I 1 I I I I 2"IWASHER L---J I I I 3, ' II II 2" SINK / I DW / DISP I I I I � I I I 3" I I I I 1 I 4" THK 3000 psi CONC. SLAB 1 W/6"x6" 10/10 WWM AND FIBERMESH ON 6 MIL. VAPOR I BARRIER ON CLEAN 95% D.D. I 1 COMPACTED TERMITE 1 I TREATED FILL (TYP) STEM FTG: I 24"W X 12"TH SPREAD I FT'G (CENTER ON WALL I 1 UNO) W/ 3 • #5 CONT BOTT OF FTG I LMBHU5.57�. 5 I - - - --MBHD5.5/rT.23 - Found P(D- �an REVIEWED FOR CODE COMPLIANCE 5T. LUCIE COUNTY BOCC 0 0 z 8 D U U J N W 1 � �_/ •� L0 Ml \"� U- •N N .J O � U 06 QC a J 4- A— Z M01 N il- V) O V a. 00 > N LU tY w w Lu w ce JOB # DATE 7/ 22 / 19 Q 1 SHEET 0 N s A6 Q o U ViEWED ,,ODE COMPLWMCk� 6T. ! UCIE COUNTY socc v m L O N L o z �° cV vi `n V �� O� _ A LL •y 7C) U N U Oa 0 D J 3= ® L] zM�$ oIL z O w ry 0 W Lu w Lu w x LD JOB # o- Q DATE 7/ 22 / t 9 a 1 SHEET 0 N @ M&A 0- 0 *WARNING* -THIS IS A PLACEMENT PLAN FOR ENGINEERED 'BUILDER"S -BRACING WARNING" -SEE FINAL ENGINEERING SHEETS FOR THE -BACK CHARGES WILL NOT BE ACCEPTED UNLESS OUR ENGINEERED TIMBER TRUSS SYSTEMS PRODUCTS ALL BEARING POINTS MUST BE COMPONENTS AS DEFINED BY WTCA 1 - 1995. HAVE NDT 1) FOR THE ERECTION BRACING FOLLOW STRUCTURAL DATA, NUMBER OF GIRDER AND TRUSS DESIGN DEPARTMENT APPROVES THEM IN ADVANCE DIAPHRAMS BEEN ANALYZED BY INSTRUCTIONS ON THE BCSI431 SUMMARY SHEETS PLIES AND THECONNECTION INFORMATION. -ALL HANGERS ARE SIMPSON STRONG -TIE OR USP EIT INSTALLED PRIOR TO INSTALLING EAST COAST TRUSS. 2) PERMANENT BRACING FOR THE STRUCTURE IS HE -OUR DESIGN r7PARTMENT MUST APPROVE UNLESS OTHERWISE NOTED. INSTALL HANGERS O ANY TRUSSES! -FOR ERECTION AND INSTALLATION OF TRUSSES RESPONSIBILITY OF OTHERS. ALTERATIONS AND/OR REPAIRS TO TRUSSES IN ACCORDING TO THE CURRENT SIMPSON STRONG -TIE T"" FAILURE TO DO SO MAY RESULT FOLLOW INSTRUCTIONS ON THE BCSI-B1 SUMMARY 3) INSTALL WEB BRACING AS STATED ON SEALED ADVANCE. OR USP CATALOG FAST COAST TRUSS IN DAMAGED TRUSSES AND WILL VOID ALL WARANTIES. SHEETS AND SEALED ENGINEERED TRUSS DRAWINGS ENGINEERING TRUSS DRAWINGS. N --- --- - - _ — -- - - 5285 ST. LL9CIE BLVD. IT, PIERCE, FL 34946 OFFICE: (7721466-2480 FAX: (772)466-5336 ^� I..L TOMER:Wiswell NAME: Wiswell RESS:Dyer Road /COUNTY:Port St Lucie # J38207 5' 1" 01-111111 171" IMODEL:Custom SFR 6 1/4"- 4' 6 3/4" LO r- r-- It, P� r- to co .tP w w w w w U U U N ------ --- NNNNNNN NN--- -----------------'-----N----- 1`Z' ZCJ1' I ZCJ3' ZCJ5' o N 0 ' N 0 N 0 ' CV 0 ' CV I ,o ' CV , '2' 0 1 �o CN . ;o CN C> N ;o N. 0 N C) N CN 0 N 0 N o N. o � N 0 N I ZCJ5' , ZCJ3; , ZCJ1' ;ZCJ1A ZCJ3A 'ZCJ5A , , I 1 I , , I , IZCJ5B 'ZCJ3 ZCJ1 --- ---- ---- - - ---- ---- - �✓ ' LO U U m m m m C) .- 'L� U U U t__ Fl- It- r" LO N N N w w W w w U N N N N N N N N 5111, N 171 1" ' --- - - —- b-- ---- ---- ---- - -- U U I A03 A01 A01 , A01 A01 A02 5.9.. 11' 9" 4' 8" ►� - ►�IMP A02 I A01 A01 ; A01 ; , A01 A01 A01 A01 / /i A01 A01 I ,' , A01 A04 5' 9" 11. 9" '4' 8" H U N U , 2 I M , , Ell o � LO m 111--1 11 22' 2" 0 v v CN 0 t N LO T 21-011 zzz Indicates Left End Of Truss On Layout & Engineering Sheets �-6 1 /40 51-911 11 �11 _. ... _. . _.. _. _.. 111-9" TYPICAL TRUSS A01 PROFILE OVERHANG AND HEEL DETAIL TYPICAL ALL TRUSSES TRUSS PLACEMENT PLAN a f•Mllll ! FT 1216 TE 08/06/19 (LATEST=/ / :6S-31.003 (3) (e), EAST COAST TRUSS is the "Truss Design Engineer" Trusses are designed in acrordanee with the Florida Building Code NOTE: By approving this placement plan(s), signatured anywhere on this sheet, the customer or his representitive acknowledges that this placement plan complies with the structural intent of the project. The customer also acknowledges that this approval authorizes EAST COAST TRUSS to manufacture these trusses and deliver them to the project indicated on this drawing. The customer also acknowledges that he/she accepts financial responsibility for any repair, engineering, and labor required due to errors other than those of EAST COAST TRUSS. Signed: DDE = FBC 2017lTP12014 ASCE 7-10 ESIGN CRITERIA =MWFRS CCUPANCY CATEGORY=11 KPOSURE = C WF SPEED =160 JILDING TYPE =ENCLOSED EAN HEIGHT: 15 GRAVITY LOADS ROOF: DUR FACTOR=1.25 PSF=TCLL-TCDL-BCLL-BCDL 20.0,10.0, 0.0,10.0 LOADS PER FBC & FRC 'NON -CONCURRENT BC LL 10psf CONCURRENT BC STORAGE LL 20 psf DEFINITIONS MWF = MAIN WIND FORCE C&C = COMPONENTS AND CLADDING TOB = TOP OF BEARING TIC = TOP CHORD BC = BOTTOM CHORD LL = LIVE LOAD DL = DEAD LOAD psf = POUNDS PER SQUARE FOOT # =POUNDS UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. ALL GIRDER/COLUMN LOADS MUST BY-PASS FLOOR TRUSS UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. RECOMMENDED ON FLOOR TRUSSES SPANNING 20'-O" OR MORE UST BE SET WITH A SPREADER BAR. THE REVIEWED FOR PREADER BAR SHOULD BE AT LEAST 1/2 o CODE COMPLIANCE /3 IN LENGTH AS THE SPAN OF THE TRUSS ST. LUCIE COUNTY 3EING SET. BOCC REFER TO BCI-B1 FOR COMPLETE RECTION AND SAFETY PROCEDURES. ALL BEAMS BY BUILDER j NOTE: TRUSSES DO NOT SUPPORT ANY PLANT SHELVES REVISIQ19 Je, u1 L 111 ' 1- .�� EMqR �s 3 No 047182 *: 6- : 9 STATE O F ' (1/4" if plotted 2406) . Designed By: BH LL W 0- G laaaaaa U) W J Z U) �W�/)� VJ la- - W O VJ O Z O ID L.L O U J \Q 0 I^.L r 0 C13 0-