Loading...
HomeMy WebLinkAboutPLANSDrawin Index T 1 Title Sheet Al Floor Plan and Door/Window Schedule A2 Elevations A3 Foundation Plan and Footing Schedule A4 Roof Framing Plan and Details A5 Wall Sections and Details A6 Building Section, Plumbing Riser and Specifications A7 Electrical Plan, Calculations/Riser/Panel THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLICABLE CODES. SCMW By lat. uim Maw CONSTRUCTION I `M, 10 L U N i M CL .. E L OU ' cU � ca '— U � L 00 L Q W 0 (D U 0 I� C 0 �U J to M JOB # 03-0501 F DATE 10/08/03 SHEET T1 LIC. CGCO13084 DOOR SCHEDULE ....�., Wjrr ..4.. rA"do" V� pressure 1 " y 1 ZL411 hollow metal owing Stainle,atl. knob 2 2 - 3'-0" x 6-8" x 1 3/4" exterior ins I metal owiria ota'n ,ytl. knob 31.6/-39.8 weatherotrip w/ h.c. threshold. Upper window 3 2 - 3'-0" x 6'-8" x 1 3/4 exterior inyul metal owino otainle.Stl. knob 31.6/-59.8 4 2'-2" x 6'-8" swing cage door rJ 2'-8" w x 2'-8" h horiz Sliding metal door wall mounted; 5'-4" head hei ht 6 2'-8" w x 2'-8" h vent, oliJ!nl metal door remote '_ " wall mounted/ uillotine • 5 4 h a hei ht 7 6'-0" w x 6-8" h metal mesh Swing gate 8 9 NOTE: ALL HARDWARE TO 5E 5TAINLE55 STEEL Head heights are from 0'-0" at top of curb See Elevations OPN'G 4" DRAIN sst 811 31_411 MESH / / N O \O � I I I o UNIT #5 E o I I ' I I I-QOu gi_Q�i I L V I TO CHIMP SEPTIC F _ SYSTEM d I � 5 z O - Q 0 � � o t� (i I u O UNIT #6 L o i LIXIT WATER SUPPLY FOR i CHIMPS (TYP) CONC. PECK LVE BASE CABINET - WALL MTD, 5" 2 A.F.F, PROVIDE FILLED CELL BELOW SILL 1'-0" FROM WINDOW OPN'G EA. 51DE FOR BRACING F M LT L — FILLED CELL CV COLD ONLY OPN'G ABOVE FOR ` EXH. FAN EDGE OF GONG,5LAB % REMOTE'LIXIT' ON CONC. YARD PYLON (V.L.O.J,) 60 IN u H/C WINDOW/OPENING SCHEDULE size/model type frame glass head hght. desigrn remarks A 2 - 3'-V w x 3'-2 3/8" h awninm alum/white Single, tinted 6' - g" 31. /-34 6 metal security are mtd. over window oven mesh metal no lass 6' 8" 3 sided bay window "viewport" C ' "w Y 4'-n,, o en mesh metal no lays 6' - 8" interior mtl. ca e "window" n 10'-0" w x 4-0" wall o n' o en mesh metal no olaoo 6' - 8" interior mtl, ca e "window" F 7-8" w x 6-8" h open mesh metal 6' - all interior mtl, ca e "window" F 1'-71/8" w x '-2 30' h awrim4l alum/white yin letinted 6' - 8" 31.6/-34.6 G 2'-8" w x 2'-8" wall o n' o en meoh m Pta I no mla6o ' - " exterior mtl. ca e' "window" H I 91 OPN'C N ®� 0 \ = I UNIT #3 ° 0 �? 0 o I D I 5 I I QI� N IO<L 11 it 8" X 8" CAST = CONC.SURROUND 0 OPN'G5 O w / LU p I W UNIT #4 0+LU 0 o I � OJ-0 j �p I g o- I 0'I 10' 01, % -- — -- — O NNEN�� �--�--- OTHER UNIT #1 0. H. CAGE CHUTE 11 . nl nu 0 UNIT #2 0. H. CAGE CHUTE W,O. VALVE HICK 0 SERVICE AREA 5A5E CABINET- WALL MTD. 5" 5 A,F.F, PROVIDE FILLED CELL BELOW SILL 1'-0" FROM WINDOW WALL MTD UPPER oC OPN'G EA. SIDE FOR BRACING p„ LABINET5 91-81 _ s'••1 .'o. � 0 i .O' D4 i�0� • Floor Plan 1 /4" = 1 '-0" m r 1-0 M I =D CELL LT _ J Iq ' V COLD ONLY OPN'G ABOVE FOR EXH. FAN THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO A14Y CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLICABLE CODES. VJ P OF 2'LX4"W TRENCH DRAIN W/4" PIPE EDGE OF CONCRETE TOTAL SQ. FT. UNDER ROOF = 2313.81 I. M „II III I CONC. SLAB TO CONNECT BETWEEN 13UILDINC75 (TBD IN FIELD) CONSTRUCTION CORPORATION NF LIC. CGO013084 E \ E= L � V V v ::3 ^� W � N +� ry O . l J v m 4 ni .� ry 00 y-- _O a• L 4J LL av 4-J i ® C co A) z C/1 JOB # 03-0501 DATE 10/08/03 2 SHEET A I T T.O.B BAY WINDOW 5HAPED "VIEWPORT" W/WIRE MESH — —51DE5 &ALUM. PANEL ROOF — — — f El I J, TOP OF GONG. CURB — — — — — — ELEV — 0° — — — INTERIOR MTD, (Tyr O SLIDING METAL DOOR (TYP OF 3) �,; :,� . — — — — — — — — CAST GONG. SURROUND AT —� OPN'65 — BLOCK (TYP.) C — — — — — — — — — — — — — — — — — CEMENT15OAKD HORIZ. 51DING ABOVE GONG. BLOCK WALL I — TOP OF CONC. CURB ELEV. O' 0" - — — — — = O Rear Elevation 1 /4" = 1 1 -0" CEMENT BOARD HORIZ, SIDING ABOVE cQ PAINT (TYP,) 12 1 2 ED CONG.BLOCK TOP OF CONIC. CUR —ELEV. 0'-0" — Right Elevation 1 /4" = 1'-011 SOLAR PANELS o co o 0 TOP OF GONG, CURB 0 — ELEV_0'-0"— — — Left Elevation 1 /411 = 1 '-0" 12 21 PAINTED GONG.� f.+__. BLOCK (TYP.) — TOP CONIC. CUR ELEV.. B CEMENT BOARD HORIZ. SIDING ABOVE GONG. BLOCK WALL CAST GONG. SURROUND AT OPN'GS EXTERIOR MTD. — — — HORIZ. SLIDING METAL DOOR 1.. ` — TOPOF GONG. CURB — — ELEV. 0'-0" CHIMP ENTRY DOOR OPN'G T Concrete Ceilin 1 /4" = 1'-0" BAY WINDOW SHAPED "VIEWPORT' W/WIRE MESH 51DE5 & ALUM. PANEL ROOF F-� F-,--T7 ;.1 j I j PATIO SLAB TOP OF CONG, CURB — — — — — — ELEV, 0" - — — - Front Elevation 1 /411 = 1 '-011 Plan CEMENT BOARD CAST GONG. HORIZ. SIDING ABOVE INTERIOR MTD. HORIZ. SLIDING SURROUND AT CONC, BLOCK WALL — METAL DOOR OPN'G5 (TYP OF 3) — — — PAINTED GONG, TOP OF CONC, CURB — — c — — — BLOCK (TYP.) — — — — — — ELEV, 0'-0" THESE PLANS AND AIL FROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAYBE NECESvARY IN ORDER TO -COMPLY1iTi'I'H ALL APPLICABLE CODES. T.O.B - -10' -o" CONSTRUCTION CORPORATION � b F � � � :2 a o V � ,o b .4 d 9� 8 V- • O 3 O 'a' p a N N a n $ o O V= a 5 o A pa 6]E 'J' � yQ y (3) c L :3 � V v v 4J � .J N 4-; Ln C: rV `'0 T l 1 W .� , V 00 ru a� v 4-J i O nv v v '° JOB # 03-0501 DATE 10/08/03 F 5 SHEET A 2 LIC. CGC013084 PVC GRATE CV 1 1 ',.fir•;.• .. 1 2" X 2" X 1 /4" CONT. ' '•' - ' :''. • / ALUM ANGLE @ BOTH j SIDES & END OF TRENCH #4 X 6" REBAR @ 2'-0" O.C. WELD TO STEEL ANGLE FIBER REINFORCED PVC ►1 GRATE (250# LOAD RATING) Lu Lu J 0 2 - #4 CONT. 14 l' o #4 TRANSVERSE REINF. 30" O.C. — 3 - #4 CONT. 1 A - TRENCH DETAIL N.T.S. FOOTING 5CHEDULE lll/// TYPE DESCRIPTION T.O.F. N I I I 24" x 12" CONT. GONG THKN 5LA5 TOP OF • ; FT'G W/ 23 • #5 CONT CURB D �, • . •. 3" CLR 130TT 7 5/8" W GONG GUR5 W/ #4 BAR CONT /> / o" II 1' 6" x 1'=�V GONG MONO FT'G W/ 3 #5 CONT 2'-6" WIPE DD'L LAYER 6 X 610/10 TOP OF CURD -- WWF @ PERIMETER 3" CLR 50TT • • • ' 7 5/6" W GONG CURD W/ #4 BAR X CONT II II W V-6" x V-43" GONG MONO FT'G W/ 3 #5 CONT 3" CLR DOTT 2-10" W ( ONC CURB W/ 3 • #4 BAR TOP OF CURD D •' CONT ° 8" x 8" GONG MONO FTG W/ 1 • #5 VARIES •. CONT W/SLOPE D �\ 3" CLR DOTT N II w 16" x 12" CONT. GONG THKN 5LA5 ' • FT'G W/ 2 • #5 CONT TOP OF GUR5 -�= - 3" CLR 130TT 7 5/8" W GONG CURD W/ #4 DAR CONT 1'-4" D 0" 1J6" 2 TOP OF CURD 6} 6 CURB BEYOND �0 ....-- - - 1 •. r- _..... . . ._.- '�.....:-.. r - , 44%5 R'ENCH "I 8' RENCH 4" DRAIN GONG. GLEAN OUT W/ALUM. DIAMOND PLATE COVER / WASHOUT IN END OF TRENCH D-I-t 4 A GATE VALVE W/ CONTROL ABOVE id GRADE l 3Ld,PE 2" ` TO CHIMP SEPTIC SYSTEM #5 VERT REBAR 48" O.G. MAX (TYP) EXCEPT IN OPN'G5 3/4" RECESS FOR THRESHOLD 4" SLAB C ENTRY WASHOUT VALVE SECTION A -A PATIO SLAG RAISED 51-AB FOR BAY 4L2PE 2" SLOPE 2" au CONNECT TO - - - - - - - - — — — _ WINDOW VIEWPORT RAISED 5LAB FOR BAY ,OTHER C THER DRAIN WINDOW AEWPORT MATCH ELEV. HEIGHT 4 MATCH ELEV. HEIGHT -6" 9:d. . ---------------------- -- ---- ----------- --. KS " � _ WASHOUT IN END OF TRENCH o G, SLOPE 4" SLOPE 4" SLOPE 4" _2 -2� I L V R III L. _ • ______ _ _ _ 4 __ ___ ____ ___ _ _____ _ __ _ •\ IU i w 4" GONG 5LA13 3000 P51 6/0 X m p a 10/10 WWM ON 6 MIL POLY V. B. V O O I� OVER COMPACTED, TERMITE TREATED SAND FILL (TYP) O i i WASHOUT A VALVE 13 13 l ----------- --- --- Ir 2" - -------------- - - - ------------ ------ ---- -- ---- ---- 9' I -4" 5L0 rE 2" I I SLOPE 2" 4" SLOPE 2" I f - fir- — A L I i------------------ ------------------------------------ ------- ---- I I L7 IL. -. _j 4 II B TO SEPTIC SYSTEM (SEE CIVIL ENGINEER PLANS) I v -FLOOR DRAIN I I � 2" HIGH L'-' CURB (TYP) r ®� II o O I-411 II -�411 I I = B II p N I I N II 20'-0" II II I I I 91.4,E I -�--------- - ------------ m SLOPE 2" _ 3/4" RECESS I � � I_ - � FOP THRESHOLD � 4' LT ' I _4, L RV L 1o9M I REVERSE 05MO515 I I WATER EQUIPMENT, CONNECT ONLY TO I CHIMP'LIXIT' I DRINKING SUPPLY I WITH GPVC PIPE II II II II II II it TO SEPTIC SYSTEM �- (SEE CIVIL ENGINEER PLANS) THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS Foundation Plan REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLICABLE CODES. 1 /411 :,= 1 '—p 11 N IM #5 VERT REBAR 48" O.G. MAX (TYP) EXCEPT IN OPN'G5 4" GONG SLAB 2500 P51 616 X 10/10 WWM ON 6 MIL POLY V, B. OVER COMPACTED, TERMITE TREATED SAND FILL (TYP) 1 1/2" 4" GONG. SLAB DRAIN SLOPE 1 112" � � b � q A a ° � U ,d � O a �o M N m aN rl n h h •� O a e s a d. M o +r Y c � C' U W C L :3 0 ry V v J N 4-; 0 , 4 ` f v �> V'4-J/� c- LL .� ry 0 L � 0 4— a � LL V 0 .v L Q) = a �I �� I `v. 's •off JOB # 0LUQ-1 DATE 10/08/03 SHEET A3 CONSTRUCTION IL Ar CORPORATION IV LIC. CGCO13084 2 X 6 RATER5 24" OG 5EE FRAMING PLAN 2 X 4 51_113FA50A 1 X 6 FASCIA & 1 X 2 P.T. WO TRIM AND GALV DRIP - CONT. GABLE END 2 X 4 FRAMING 1611 5/8" PLYWD SHEATH'G 15" FELT HARDIBOARD LAP 51DING 2" LAP CELL SOLID CMU z 1 x P.T. BUCK W/ SHIMS g ANCHORED W/ 1/4" DIA x 3 1/4" MAS. SCREWS 1 B" O.C. AND AT ENDS EXT.POLYURETHANE SEALANT SEAM ALUM WINDOW SCREWED INTO SOLID CONC AS DESIGNATED BY WINDOW MANUF FOR 140 MPH/ SEC. GUST WIND LOAD —,/ Y_ CONT BEAD AT PERIMETER OF VULCAN'SEALANT O)A INDQW JAMB/HEAD N.T.S. ALUM WINDOW W/ MAS. BY WINDOW DESIGNATED (1 1/4" MIN. IMBED) CONT VULCAN T PERIMETER POLYURETHANE SEALANT SLOPE CONC. SILL 100 MIN CONC. SILL W/3/4" RECESS 8" CMU BELOW SILL (::)__Wvv,11ND0W SILL N.T.S. MES 10" T.0.13. LINTEL SCHEDULE 5AFE SAFE APPLIED APPLIED LINTEL LENGTH GRAVITY UPLIFT GRAVITY UPLIFT BEAM TYPE TOD NO LOAD PSF LOAD P5F LOAD P5F LOAD P5F 51 6'-4' 2260 1080 550 0 8 X 16 CMU SHORED AND CIP W/ #51T/15 SEE DETAIL A -Al B2 6'-0" 1255 1140 750 p 8 X 8 FORMED AND CIP W/ SEE ELEV #5 -1B E33 6-0" 2300 1575 1800 1020 8 X 12 FORMED AND CIP W/ 445 2TI213 AND #3 TIES 12" OC B4 10'-011 4100 2600 2100 p 8 X 56 CMU CIP W/ #51T/213 SEE C-Al TB5 CONT 4100 CLIP LOAD 1250 000 8 X 16 CMU CIP W/ #51T/115 POURED MONO W/ CONC 5LA5 SEE E-Al 11'-4" TB6 CONT 4100 CLIP LOAD 1250 600 8 X 16 CMU CIP W/ #51T/1B 5EE B-Al 101-6" TB7 CONT 4100 CLIP LOAD 250 150 8 x 16 CMU GIP W/ #51T/16 SEE B-Al 8'-10" T55 CONT 3000 1800 0 p 8 X 8 FORMED AND CIP W/ #51T/16 VARIE5 GENERAL NOTES: OPENINGS WITH SIMILAR LINTEL LENGTHS CALCULATED FOR THE WORST CASE SCENARIO TRU55 24" 01 1080# UP W/ LTA1 ANCHOR CENTER TFU55E5 24 OC 1080# UP W/ LTA1 ANCHOR 1080# UP W/ LTA1 ANCHOR '/7 LUSH AKE 5 2 I I I 52 I ( I ( BZ I I I B1 2 X 4155 I �l n BRACING 3 BAW U Lu LJ--- \1I QQ 1 1 1 1 J L L �L____ UNI[ -r� _f n ATTICG B11 X FACCN 2 BAI(5 IIII I I I 1 I BZ , 1 1 I Und B4 I I I I I I I g I I I I ( I ( I ¢¢I�- �I 2 I I I B4-- I I I I BZ I I I I I I I I 2 X4 CFO 5 BRACINGI DAY I+�---+-- A'LL CELL'S FILLED L1325fLIBD TCj CONG LAB � B2 1 l i 1 1. l 1 1 1 1 I L-- t- �J 5 f LID T IL jCONC�DALL LAB ( (---I II-5pL D T1BGONGFILLFDAB I I HE TINti UNITI J I I I I I -_- IN TTI¢¢ I IT 1 1 r- Tl IT---1----I--- --71 I I 1 1 1 1 12 X4 Z?0551 1 I I I; 15 RACIING 2 JAY5 I 1 1 I I 1 I I B2 I II II 1 I 11 1 1 1 1 I 1 I I1 11 1 I I I I I I r TR1�55 M F D FO I ( ( I I rF 55 TO o F0F PANEL5 Al 1/4" DIA I I ---I ---1; ;�-------I g2 , 12 I (4>(OTLAG ALT 2 1 1 1 1 1 4 I 1 1 1 1 I — B4 rI -- - - --- --- ---------- 11020#'UP W/ ITA1 A GHOF I B4 I 1 1It 82 #UP EEi/ LTA NCH F I B4 I 1021 # UP /LTAJ ANCH F 1 ' I I I I I I I I - WATINLE 1 1 r �fI I I I I i 1 1 1 1 I 1 I 1 1 1 III , ROW OF PANCLS 11 III 1 1 1 III 50LAF PANELS I 1 1 I I I 1 I I I I I I I I IIII I I �II III I I III I (M°D °N Pot I I I I I I I B1 1 1 1 1 1 1 I I 1 I -- I----------� ,I-------- ---- --It I I II B1 B1 11/4' DBL'T MOUNTING ANGLE AT 4 COFNEF5 (200# DL EA 1 ,) PER 50LAR PANEL SPEC ALIGN W/ TRU55 --------------- I ' TYPICAL SOLAR I /PANEL I I I I I PROVIDE 700 L135 TOP CHORD LOAD FOR EA 50LAR WATER PANELS TB6 380# UP W/ LTA1 ANCHOR Roof Framina Plan 1 /411 = 1 1-011 AFTER ALIGN W1 1♦. CENTER TRU55 AND PANELS 2 x 6 TOP CHORD AND FASCIA B1 B1 �2.2x6 GLUE AND GANG NAIL RAFTERS ALIGNED W/ PANEL MOUNTS (4 TOTAL) 380# UP W/ LTA1 ANCHOR THESE PLANS AND AIL F1 +POSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY HELD INSPECTORS THAT MAY BE NECESSARY III ORDER TO COMPLY WITH ALL APPLICA13LE CODES, m m CONSTRUCTION IIIV CORPORATION LIC. CGO013084 b � o a U 0 � � � � O o M ♦ a r, a 0vz:j 1; a � o a � y � I � W � U �V J N V ,V p -- 4.0 M. V O I O 0 L d � L 0 c— �, v _ 1L, V lW V d ILL v!I 0 H >n JOB # 03-0501 DATE 10/08/03 SHEET A4 CONT. ROUND GALVALUME TRIM TO COVER EDGE 12 2 CEMENT 5OARD PANELS W/ BATTENS CD SEAMS FOR CLG. GEMENTBOARD 51DING OVER 30# ROOFING FELT ON 518" CDX PLYWD SHEATHING 8" CONC. 5LAB, 3000 P51 SEE FRAMING PLAN 1----------- p LTA1 a NOM 8" X 8" X 10" CMU WALL WITH GALV. "OUR-O-WALL" LADDER TIES EVERY THIRD COURSE FILL ALL CELLS AT WALLS AROUND CAGE UNITS (INTERIOR AND EXTERIOR) _ & VIEWPORT WALLS FORM AND POUR 8" X 8" CONC. (HEAD, JAMS, SILL) AT ALL GAGE UNIT OPENINGS W/ 145 RE -BAR \ REINFORCED WIRE MESH, BAY WINDOW SHAPE VIEWPORT' W/2" X 2" X 1/4" ANGLE FRAMING W/REINF. GALVALUME ROOF PANEL y , " / REINFORCED WE MESH PANEL W/2" X 2" X 1/4" ANGLE FRAMING, 316" X 31/2" HVA FASTENER W/ HFA INSERTS 12" O.C. PATIO CAGE UNIT WALL SECTION Al SCALE 3/4"=1'-0" GALVALUME ROOFING 30# FELT W/PLASTIC TAG, 12 5/8" CDX PLYWD ON WD. TRUSSES 24" O.C. BY FL. �2 PEG. ENGINEER WD TRU55E5 24" O.C. (TYP) .���. .� Mom'... ; ♦.. .p,�,_. �. NOM 8"X8"X16"CMU WALL WITH GALV. DUR-O-WALL"LADDER TIES EVERY THIRD COURSE CAGE UNIT FILL ALL CELLS AT WALLS AROUND CAGE UNITS (INTERIOR & EXTERIOR) 5LOPE FLOOR TO TRENCH DRAIN (TYP) d WALL SECTION Al SCALE 3/4"=1'-0" CAGE UNIT #5 DOWELS W/ 6" 90 BEND &25" EXTENSION @ VERT. REINF. (SEE PLAN) METAL ROOF WD. TRUSS 12'-0" SMOOTH 'HARDIPLANI / PANELS W/BATTENS FOR CLG. IN HALLWAYS TYPICAL: 30# SLDG PAPER OF SPACE SEPARATION OF WE). TRU55 W1 CONC, 5LA5 LTA1 2 X 6 TOP CHORD TRUSS BEYOND >H10 5/8" 'HARDIPLANK' CLG IN HALLWAYS 2 X 6 P.T. LEDGER W/ 1/2" X 5" EXP. ANCHOR 30" O.C. 21 Beam @ Truss Step Down 12 2 FORMED CONCAVE EDGE OF CLG, 5LA5 ® WALL JOINT (TYP ALL CAGE UNITS) NOM 8" X 8" X 16" CMU WALL W/ GALV. "OUR-O-WALL" LADDER TIES EVERY THIRD COURSE REINFORCED WIRE MESH PANEL W/2" X 2" X 1/4" ANGLE FRAMING, 3/8" X 31/2" HVA FASTENER W/ HFA INSERTS 12" 0. C. CAGE UNIT FORM AND POUR 8" X 8" CONC. (HEAD, JAMS, SILL) AT ALL CAGE UNIT OPENINGS W/ 145 RE -BAR FILL ALL CELLS AT WALLS AROUND CAGE UNITS (INTERIOR AND EXTERIOR) — CONC. CURB P)) HEIGHT VARITYI�UE TO SLAB SLOPE LTA1 CMU OUTSIDE FACE FORM & INSIDE REMOVED H10 (2)10d TYP, EA. TRU55 (3) 16D TYP. 2" X 6" TOP CORD 12 a.._ LTA1 2 X 6 P.T. LEDGER W/ 1/2" X 5" EXP, ANCHOR 30" O.C. 5/8" CEMENT 50ARD CLG, IN 4' X 8' PANELS FOR SERVICE AREAS ALL CMU ABOVE WINDOW BM. TO BE W BLK., WITHOUT 8" X 15" C55 HEADER 055TRUCTION FOR W/ (2) #7 CONT. CONT. CONC. POUR SERVICE AREA NOM 8"X6"X16"CMU ' GALV. "DUR-O-WALL" L/ EVERY THIRD COURSE INTERIOR WALLS TO BE TYP. SERVICE AREA 2" CONC. CURB W/#4CONT. & DOWELS TO FT"G (SEE PLAN FOR LOCATION) \ 011\ D .p A .......... D WALL SECTION Al SCALE 3/4 " = 1 ' - 0 " CONNECTION DETAIL @ GABLE 14 SCALE 1 1/2" =1 ' - 0 " WALL SECTION EQUIF T5-1 IMMA1 EXTEND ROOF W/ 2" X 6" TOP CORD METAL ROOF OVER 5/8" PLYWD. VALUM50FFIT IP ER E� FASC 6 FA5 X6TO RD) ATED # —TOP OF CURS tp D D . SCALE 3/4"=1'-0" THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLICABLE CODES. ROOF SHEATHING NAIL PER SCHEDULE s CONT. 2x6 FASCIA BOARD W/ 1 X 2 TRIM (SEE WALL SECTION) NAIL TO TRU55 W116d @ 81,0/C k 2X4 DIAGONAL BRACE RESTRAINT LOCATION AS SHOWN ON PLAN STUCCO FIN15H OVER PAPERBACKED GALV g' HI -RIBBED MTL LATHE OVER 5/8" THICK CDX PLYWOOD p s GABLE END FASTEN TO SLEEPER W/ 16d NAILS @ 4" O/C TYPICAL CONT, 2X4 SLEEPER FASTEN TO BEAM W/ HILTI XDNI 2-5/8" LG. 0 6" O.C. 1 x 4 LATERAL BRACING IN-BETWEEN X' BRACING CONC BEAM/CMU WALL METAL ROOF OVER 5/8" PLYWD, EXTEND ROOF W12 X 4 TOP CORD LTA1 TYP GALV. DRIP EDGE & GUTTER 2X4 FASCIA CEMENT 5D. CLG. PERFORATED ALUM SOFFIT 8"X16"CMU HEADER W/((2 #5 CONT, KND)CK DOWN WEB SERVICE AREA CMU IN RUNNING 50ND SHORED AND FORM BOTT FOR CONC. FOUR WALL MT'D CABINET OPEN BELOW W/WALL BRACKET ANCHORED INTO FILLED CELL CONC. CURB (TYP) W/ #4 CONT. — #5 DOWELS W/ G" 90 DEG. BEND & 25" EXTENSION 6X6/1,4X1.4 WWF D5L 36" WIDE ERIMETER) MONO. CONC. FT'G - SEE FOUND PLAN, WALL SECTION Al SCALE 3/4"=1'-0" U V U � J Nc co Q .. E O ``- V 4-J •+_j � L O LL =O Q- L N � ma O c C7 V �u con 0 0" LOCI JOB # 03-0501 DATE 10/08/03 F SHEET A5 CONSTRUCTION CORPORATION LIC. CGCO13084 I CENTER FOR CAPTIVE CHIMPANZEE DIVISION ONE - GENERAL REQUIREMENTS 1-1 INTERPRETATION OF PLANS - THE ARCHITECTS SERVICES DOES NOT INCLUDE SUPERVISION OF CONSTRUCTION. THE ARCHITECT COMPLY WITH "FA5TENING 5CHEDULE" OF THE 5.13.C.C.1. 2001 EDITION AND OTHER FASTENING REQUIREMENTS CONTAINED IN THE DIVEST HIMSELF OF THE RESPONSIBILITY OF THE WORK, ERRORS OR EMISSIONS RESULTING FROM THE INTERPRETATION OF THE PERTINENT REGULATIONS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION. PLANS IF THE CONTRACTOR BELIEVE5 HE HAS DISCOVERED ERRORS OR OMI55ION5 IN THE PLANS THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING FOR CLARIFICATION BEFORE CONTINUING WORK. 6-10 METAL FASTENERS, CLIPS, HOLDDOWNS - ALL MODEL NUMBERS ARE PER 51MP5ON 5TRONG- TIE COMPANY, INC, IF AN ALTERNATIVE MANUFACTURE 15 USED - SUBMIT ALLOWABLE LOADS, CAPACITIES TO THE ARCHITECT FOR APPROVAL. 42 APPLICABLE STANDARDS - ALL WORK UNDER THIS CONTRACT, OR 51,113-CONTRACT15 SHALL CONFORM TO RECENT EDITIONS OF LOCAL, STATE AND NATIONAL CODES, ORDINANCES AND REGULATIONS PERTAINING TO THE WORK, A.C.I., A.N,5.1, A.5.T.M, 0.5.H.A., 6-11 SHEATHING ETC. 1. WALL SHEATHING - SHALL BE 4' X 8' X 5/8" (MIN.) CDX PLYWOOD AND SHALL BE NAILED WITH HOT DIPPED GALVANIZED BOX OR COMMON NAILS AS FOLLOWS: 1-4 VERIFYING CONDITIONS - BEFORE COMMENCING WORK, CONTRACTOR SHALL VERIFY MEA5UREMENT5 AND CONDITIONS AT EDGE NAILING- 10D AT 4'O.C. BUILDING SITE. ANY DIFFERENCES BETWEEN ACTUAL MEASUREMENTS AND THOSE SHOWN ON DRAWINGS SHALL BE SUBMITTED TOP AND BOTTOM PLATE NAILING -10D AT 4'O.C. TO THE ARCHITECT IN WRITING BEFORE PROCEEDING. INTERMEDIATE NAILING -10D AT 8"O.C, 2. ROOF SHEATHING - SHALL BE W X 8' X 5/8-(MIN.) COX PLYWOOD, INSTALL THE PANEL'S LONG DIMEN510N PERPENDICULAR TO 1-6 SURVEYING - OWNER TO PROVIDE ORIGINAL SURVEY, CONTRACTOR TO PROVIDE ALL SURVEYING AS REQUIRED DURING THE FRAMING. SHEATHING FASTENERS SHALL BE 10D HOT DIPPED GALVANIZED BOX OR COMMON NAILS AT 4"O.C. AT EDGES CONSTRUCTION AND SHALL VERIFY ALL SET BACKS AND ELEVATIONS, AND 4"O.C. AT INTERMEDIATE FRAMING EXCEPT AS FOLLOWS: USE 8D RING -SHANK NAILS AND ADHESIVE FOR ALL FASTENING WITHIN 5' OF A GABLE END. 1-16 DIMENSIONS - DIMENSIONS FOLLOWED BY+/- GENERALLY ARE TAKEN TO EXISTING WORK. THESE DIMENSIONS SHOULD BE USE 4" FASTENER SPACING AT GABLE ENDWALL OR GABLE TRUSS. REVIEWED AND ALL NECESSARY ADJUSTMENTS MADE PRIOR TO FABRICATION AND/OR INSTALLATION OF AFFECTED WORK. NOTIFY ARCHITECT -ENGINEER IF DISCREPANCIES ARI5E THAT MAKE IT IMP055113LE TO COMPLETE THE WORK A5 INTENDED. DIVISION SEVEN - THERMAL AND MOISTURE PROTECTION 1-17 FLORIDA BUILDING CODE - THE CONSTRUCTION DOCUMENTS FOR TH15 PROJECT HAS 7-1 WATERPROOFING - COORDINATE WATERPROOFING WITH OTHER TRADES AND MAKE PROVISIONS FOR THEIR WORK TO AVOID BEEN DESIGNED TO CONFORM WITH THE REQUIREMENTS OF A 120 MPH WIND SPEED. CUTTING AND PATCHING, DIVISION TWO - 51TE WORK 7-2 FLASHING AND SHEET METAL - PROVIDE FLASHING AND SHEET METAL NOT SPECIFICALLY DESCRIBED IN OTHER SECTIONS OF THESE SPECIFICATIONS BUT REQUIRED TO PREVENT PENETRATION OF WATER THROUGH THE EXTERIOR SHELL OF THE BUILDING 2-4 CLEARING - REMOVE VEGETATION AND ORGANIC MATTER FROM BUILDING AND PAVEMENT AREA. REMOVE FROM SITE, DO NOT COMPLYING WITH PERTINENT RECOMMENDATIONS CONTAINED IN CURRENT EDITION OF 5MAACNA'5 "ARCHITECTURAL SHEET BURY, METAL MANUAL" 2-5 EXCAVATION - EXCAVATE 51TE TO LEVELS REQUIRED FOR CONSTRUCTION. STRIP SOIL OF ALL DELETERIOUS MATERIAL 6-0" ALL FLASHING TO BE GALVALUME COMPATIBLE WITH ROOFING MATERIAL UNLESS OTHERWISE NOTED, PAST EXTERIOR OF BUILDING LINES. 7-4 SEALANTS AND CAULKING - STANDARD CAULKING COMPOUND SHALL BE A ONE PART ACRYLIC LATEX COMPOUND 2-6 FILL AND COMPACTION - PROVIDE CLEAN WELL -GRADED SAND PLACED IN MAXIMUM 12" LIFTS COMPACTED TO 95% OF POLY -SEAM SEAL CAULKING OR EQUAL, COLOR SHALL BE MANUFACTURER'S STANDARD PAINTABLE GRADE. MODIFIED PROCTOR MAXIMUM DRY DENSITY, A5TM D-1557 AT OPTIMUM MOISTURE CONTENT. COMPACTION 15 TO BE VERIFIED BY AN INDEPENDENT TESTING LABORATORY AND REPORTED TO ARCHITECT PRIOR TO COMMENCEMENT OF FOUNDATION 7-10 ROOFING METAL STANDING SEAM - PROVIDE A 12" WIDE 26 GA GALVALUME ROOF PANEL AND A 50 YEAR GUARANTEE CONSTRUCTION. (MANUF FROM MARTIN CO. APPROVED LIST). INSTALL THE PANELS CONTINUOUS WITHOUT SEAM PERPINDICULAR TO SLOPE, INSTALLATION SHALL BE FOR A COMPLETE WEATHERPROOF SYSTEM WITH ALL APPLICABLE ACCESSORIES AND AS 2.7 501L BEARING - FOUNDATIONS ARE DESIGNED A55UMING 2500 P5F BEARING CAPACITY. CONTRACTOR 15 TO VERIFY AND TO RECOMMENDED BY THE MANUFACTURER. NOTIFY ARCHITECT. IF SUCH BEARING VALUES CANNOT BE DEVELOPED IN THE SOIL UNDER THE BUILDING, THE CONTRACTOR 15 TO NOTIFY THE ARCHITECT IN WRITING. 7-11 UNDERLAYMENT - 30 I.D. FELT PLASTIC TAGGED TO 6/8" EXTERIOR PLYWOOD. 2-8 601L TREATMENT - TREAT COMPACTED 501L WITH AN APPROVED TERMITE TREATMENT AT RATES SPECIFIED BY DIVISION EIGHT - DOORS AND WINDOWS MANUFACTURER. TREATMENT SHALL NOT BE MADE WHEN GROUND 15 EXCESSIVELY WET OR DIRECTLY AFTER HEAVY RAINS. 8-1 DOORS AND FRAMES - PROVIDE ALL DOORS AND FRAMES PER THE SCHEDULE, HOLLOW AND INSULATED DOOR5 SHALL BE 2-9 61TE GRADING AND DRAINAGE - SEE CIVIL ENGINEER SITE PLAN FOR DETAILS. TOTAL ENCL05ED WITHOUT RODENT GAP INTO PANEL. ALL DOORS AND FRAMES SHALL BE EXTERIOR CONDITION METAL (GALV. OR SIMILAR) AND PRIMED. DIVISION THREE - CONCRETE 8-2 WINDOWS - PROVIDE ALL WINDOWS WHITE'PGT MANUF, OR SIMILAR TRUE AND PLUMB AS INDICATED ON 5CHEDULE, 3-2 CONCRETE - STRUCTURAL CONCRETE SHALL DEVELOP A MINIMUM STRENGTH OF 3000 FBI AT 26 DAYS. ALL CONCRETE WINDOW AND ACCE55CRIE5 TO CONFORM TO 120 MPH WIND REQUIREMENTS, ALL GLAZING SHALL BE GREY TINTED. SHALL BE READY MIXED AND IN ACCORDANCE WITH ASTM C-94. MAXIMUM ALLOWABLE SLUMP TO BE 5". ALL 5LA55 TO BE 3000 8-3 WINDOW AND DOOR FRAMES SHALL BE ANCHORED DIRECTLY INTO A 50LID CONCRETE OR P51 AT 28 DAYS, GROUT JAMB WITH 1/4" X 31/4" MASONRY SCREW (IE. TAq=CON) FOR 11/4" MIN. EMBEDMENT AT 12" OC AND EACH END. 3-3 SCOPE - PROVIDE ALL STRUCTURAL CONCRETE, FILLED CELLS, 5LA55, BEAM5, FOOTINGS, EQUIPMENT PADS, DRIVES, WALKS, DIVISION NINE - FINISHES ETC. AS SHOWN ON DRAWINGS OR AS NEEDED TO COMPLETE JOB, 9-1 STUCCO - 2.2-COATS OVER CONCRETE UNIT MASONRY: 3-4 CONCRETE FORMWORK - ADEQUATE AND SAFE DESIGN OF FORMWORK AND SHORING 15 THE RESPONSIBILITY OF THE BASE COAT-1 PART PORTLAND CEMENT, 3/4 TO I V2 PART LIME, 34PART5 SAND CONTRACTOR. SLEEVE SLAB AND FOOTING AS REQUIRED FOR MECHANICAL AND ELECTRICAL, VERIFY MECHANICAL AND 3, FINISH COAT: ELECTRICAL REQUIREMENTS FROM OWNERS FIXTURE'5 SPECIFICATION. 1 PART PORTLAND CEMENT, 3/4 TO 1 1/2 PART LIME, 3 PARTS SAND 9-2 WALLBOARD 3-5 CRACK CONTROL - PROVIDE 6X6, 10/10 GAUGE WELDED WIRE FABRIC IN ALL 5LA55, WALKS, AND DRIVES ALSO PROVIDE ALL WALL AND SOFFIT BOARD SHALL BE A CEMENTIOU6 PANEL AND BATTEN (IE'HARDIBOARD'). SCREW 6" OC AT EDGES AND 12" "FI5ERME5H" (1.5 1_55 PER CU51C YARD) CRACK CONTROL ADDITIVE PER MAN UFACTURER'5 SPECIFICATIONS IN ALL SLABS AND IN FIELD WITH GALV (RUST RESISTANT SCREWS), MONOLITHIC FOOTING. 91. -4 PREPARE SUBSTRATE AND APPLY PAINT COATINGS IN STRICT ACCORDANCE WITH RECOMMENDATIONS OF THE 3-7 REINFORCEMENT - REINFORCING BARS SHALL CONFORM TO A5TM SPECIFICATION A615, LATEST EDITION, INCLUDING MANUFACTURER OF THE APPROVED PAINT 5Y5TEM. SUPPLEMENTAL REQUIREMENTS AND SHALL BE GRADE 60, SPLICES IN CONCRETE, LAP BAR542 BAR DIAMETER5, SPLICES IN 2. ALL SURFACES SHALL BE COVERED WITH THE MINIMUM NUMBER OF COATS AS LISTED. ADDITIONAL COVERAGE SHALL BE MA50NRY, LAP BARS 48 BAR DIAMETERS. AT CORNERS, MAKE HORIZONTAL BARS CONTINUOU5 OR PROVIDE CORNER BARS. PROVIDED A5 REQUIRED TO COVER ALL HOLIDAYS. BARS INTERSECTING AT RE-ENTRANT CORNERS SHALL GROSS, WITH EACH ENDING Al THE FAR FACE OF THE WALL WITH A 9-5 FLOORING SHALL BE EXP05ED CONCRETE WITH SMOOTH TROWEL FINISH, APPLY 2 COATS OF CLEAR PENETRATING SEALER, STANDARD HOOK AT STANDARD COVER UNLE55 NOTED OTHERWISE ON THE DRAWING5. AROUND OPENINGS AND STEPS IN WALLS, PROVIDE (2) #65 EXTENDING 2'-0" BEYOND EDGE OF OPENING OR STEP, HORIZONTAL BARS AT THE TOP OF THE BEAMS DIVISION TEN - 5PECIALTIE5 \, SHALL BE SPLICED ONLY AT MID5PAN BETWEEN COLUMNS AND HORIZONTAL BOTTOM BARS SHALL BE SPLICED ONLY AT COLUMN CENTERLINE. _ PROVIDE SPECIALTIES AND INSTALL SPECIALTIES AS NOTED, PROVIDE ALL BLOCKING, RECESSES, ETC. AS REQUIRED FOR INSTALLATION OF SPECIALTIES. 3-8 EXPAN51ON 15OLT5- WHERE REQUIRED SHALL BE LOCATED AT A MIN OF 5 50LT DIAMETERS FROM THE CONCRETE EDGES AND SPACED A MIN OF 10 BOLT DIAMETERS U.N.O. 10-8 CABINETS SHALL BE PLYWOOD AND PLASTIC LAMINATE FINISH LOCATED PER THE DRAWINGS AND THE CONTRACTOR FOR COORDINATION OF SHOP DRAWINGS AND INSTALLATION. DIVISION FOUR - MASONRY DIVISION ELEVEN - EQUIPMENT 4-3 FILL MASONRY CELLS - AS STATED WITH VERT. REINFORCEMENT AND AT ALL DOOR / WINDOW JAMB5 AND SILLS SOLID WITH CONCRETE. ALSO FILL ALL CELLS OF PERIMETER WALLS OF CHIMP ROOMS. 11-3 ATTIC ACCE55: PROVIDE PULL DOWN STAIR AND ATTIC HATCH AS INDICATED ON PLANS. 4-1 Unit Masonry - Concrete block units to conform with ASTM C-90. Provide shapes and §izes required to complete the work with a DIVISION TWELVE - FURNISHINGS minimum of cutting and piecing. Provide reinforcement of the types shown on the Drawing@? NOT APPLICABLE 4-2 Mortar - Provide mortar type "5" conforming with A5TM 270, DIVISION THIRTEEN - SPECIAL CONSTRUCTION 4-3 Grout - Provide grout in accordance with A5TM C476, 13-1 SOLAR WATER HEATER PANELS- PROVIDE 10 e 4'X 8' PANELS TO BE MOUNTED ON THE ROOF, THE PANELS ARE PT-50-GN PER 'PROGKE551VTU5E'. THE MOUNTS ARE ADJUSTABLE AND FIXED TYPE AND INSTALLED PER THE MANUFACTURE'S SPECIFICATIONS. 4-4 Execution - Except as shown on the Drawings, lay up the concrete masonry units in running bond, tooling all joints except where MOUNTING CLIP5 SHALL BE SURFACE ANCHORED THROUGH THE ROOFING MATERIAL IN A PERMANENT ELASTIC POLYURETHANE scheduled to be stucco. SEALANT BED. 4-5 Horizontal reinforcement DIVISION FIFTEEN - MECHANICAL 2. Masonry contractor shall provide 9-GA "Ladder" type "Dur-O-wal" horizontal joint reinforcement at alternate courses (16" c/c), typ, all walls. Dur-O-wal shall be continuous, with a minimum splice of 6". Provide prefab tees and corner sections as required. All lintel 15-1 HEATING SYSTEM reinforcing bars shall extend not less than 24" beyond each side of all openings, 1. PROVIDE SYSTEMS AS SHOWN ON DRAWINGS, THERMOSTAT AND CONTROLS A5 REQUIRED TO RUN SYSTEM, HVAC CONTRACTOR SHALL BECOME FAMILIAR WITH SITE, DOCUMENTS PERTAINING TO SCOPE OF WORK, AND GENERAL CONSTRUCTION. READ AND DIVISION FIVE - METALS BECOME FAMILIAR WITH SPECIFICATIONS AND SHALL PERFORM HIS WORK IN FULL ACCORDANCE WITH ALL APPLICABLE PARAGRAPHS, LAYOUT, BALANCING AND TESTING NECESSARY FOR COMPLETE INSTALLATION OF HEATING SYSTEMS AS 5-3 COORDINATE METALS - METALS IN CONTACT WITH EACH OTHER MUST BE SELECTED TO AVOID DIELECTRIC DECOMPOSITION REQUIRED BY CLIMATE, NATURE OF CONSTRUCTION, AND SITE TO THE 5ATI5FACTION OF THE OWNER. THE RETURN AIR 15 A OR SUPPLY ADEQUATE SEPARATING MATERIAL BETWEEN THE TWO DIFFERENT METALS. METAL5/FA5TENER5 EXP05ED TO DIRECT GRILL TO UNIT. WEATHER SHALL BE 5TAINLE55 STEEL UNLE55 NOTED OTHERWISE ON THE DRAWIN65. 2. PROVIDE CONDENSATE DRAIN, 26 GAUGE GALVANIZED AUXILIARY PAN AND DRAIN TO EXTERIOR. 3, DUCTWORK SHALL BE R-6 DUCTBOARD WITH SINGLE EXTENTION5 OF FLEXIBLE DUCT (NO FLEX TO FLEX CONNECTION). DIVISION SIX - WOOD AND PLA5TIC5 4. SUPPLY GRILLS SHALL BE WHITE PAINTED ALUMINUM WITH DIRECTIONAL BLADE DAMPERS. 6-2 LUMBER - ALL LUMBER PERMANENTLY INCORPORATED INTO THE STRUCTURE SHALL BE AIR OR KILN- DRIED AND SHALL 15-2 PLUMBING CONTAIN NOT MORE THAN 19% MOISTURE. ELEVATE AND COVER LUMBER ON SITE TO PROTECT FROM MOISTURE. ALL LUMBER AND 1. PROVIDE PLUMBING SYSTEM, COMPLETE IN PLACE, TESTED AND APPROVED, WHERE SHOWN ON THE DRAWING5, AS SPECIFIED PLYWOOD SHALL BE IDENTIFIED BY GRADE STAMPS, HEREIN, AND AS NEEDED FOR A COMPLETE AND PROPER JOB, 1. MIN ALLOWABLE FLEXURAL BENDING STRESS FOR BEAMS SHALL BE 1500 PSI AT NORMAL LOAD DURATION, 2. ALL PLUMBING WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE 5TANDARD PLUMBING 2, MIN ALLOWABLE HORIZONTAL SHEAR 5TRE55 FOR BEAMS SHALL BE 90 PSI. CODE, LOCAL ORDINANCES AND IN COMPLIANCE WITH THE ENERGY CONSERVATION CODE. 3. MIN ALLOWABLE MODULUS OF ELASTICITY FOR POST OR BEAMS SHALL BE 1,500,000 PSI. 3. HOSE 61B5 SHALL BE DPA55 OR BRONZE, FASTENED SECURELY 18" ABOVE GRADE WHERE SHOWN ON DRAWINGS, ALL HOSE ALL EXTERIOR WALL 5TU05 TO BE GROUP 2 LUMBER, KILN -DRIED 2X6'S MINIMUM FB 1100 PSI, 2X4'5 MIN. FB 1&00, EXCEPT BIBS SHALL HAVE A NON -REMOVABLE ANTI -SYPHON DEVICE INSTALLED, WHERE NOTED. ALL STUDS TO BE STRAIGHT AND TRUE. FRAMING LUMBER TO BE #1 OR BETTER, MINIMUM 1`5=1200 P51, 4. FIXTURES SHALL BE PROTECTED AGAINST WATER HAMMER WITH AIR CHAMBERS WHEN REQUIRED, BLOCKING, BRACING, AND NAILER5 SHALL BE UTILITY GRADE AND PROVIDED AS REQUIRED. PROVIDE BLOCKING AT ALL WINDOWS 5. PROVIDE SHUT OFF VALVES TO ALL MAINS ENTERING THE BUILDING AND EACH PIECE OF EQUIPMENT, AND DOORS FOR DRAPERY INSTALLATION. 6. INSTALL DIELECTRIC UNION AT INLET AND OUTLET OF WATER HEATER. 7. BUILDING SEWERS, VENTS, AND ALL UNDERGROUND DRAINAGE LINES SHALL BE SCHEDULE 40 PVC. 6-4 WOOD IN DIRECT CONTACT WITH CONCRETE, OR MASONRY SHALL BE PRESSURE TREATED WITH THE REQUIREMENTS OF THE 6. WATER PIPING TO BE 50FT TYPE L. COPPER, UNDER SLAB, HARD ABOVE SLAB. STANDARDS OF THE AMERICAN WOOD PKE5ERVER5 ASSOCIATION. WOOD IN CONTACT WITH SOIL SHALL BE MARINE GRADE TREATED. 10. INSULATION - PROVIDE PIPE INSULATION ON REFRIGERANT LINES AND DOMESTIC WATER LINES AS PER INDUSTRY STANDARDS. INSULATION EXP05ED TO WEATHER SHALL BE PROTECTED AS REQUIRED. 6-6 WOOD TRUSSES - PROVIDE TRU55E5 ENGINEERED WITH METAL ROOFING (15#/FT DEAD LOAD EXCEPT AT SOLAR PANEL 11. GATHER VENTS IN ATTIC A5 ALLOWED AND VENT TOWARD REAR OF HOUSE. LOCATIONS SEE DRAWINGS), 12, PROVIDE 3.120 GAL. WATER HEATERS IN AN APPROVED PAN, INSTALL DIELECTRIC UNION AT THE INLET AND OUTLET OF THE WATER HEATER. 1. WOOD TRUSSES SHALL BE DESIGNED AND CERTIFIED BY A FLORIDA REGISTERED STRUCTURAL ENGINEER. INSTALLATION AND TEMPORARY FIELD BRACING SHALL BE IN STRICT ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS AND APPLICABLE CODES 13, ALL PLUMBING FIXTURES AND FAUCETS SHALL BE PROVIDED BY THE OWNER. AND STANDARDS, DIVISION SIXTEEN - ELECTRICAL APPROVED GALVANIZED TRU55 ANCHORS SHALL BE PROVIDED AT EACH BEARING. INSTALLATION SHALL SEPARATE BOTTOM CHORD OF TRU55E5 FROM CONCRETE (WHERE APPLICABLE) WITH EITHER 30# FELT OR515CCI APPROVED GALVANIZED OR 16-1 SCOPE: FURNISH ALL EQUIPMENT AND MATERIALS AND PERFORM ALL LABOR AND 5EI VICES NECESSARY TO INSTALLATION STAINLESS TRU55 SEATS, FOR A COMPLETE SYSTEM FOR LIGHTING AND POWER. EACH SYSTEM SHALL BE COMPLETE IN ALL RESPECTS AND SHALL BE TURNED OVER TO OWNER IN A FIR5T-CLA55 OPERATING CONDITION AND FULLY TESTED AND COMPLETE WITH ALL DEVICES WHICH 2. PROVIDE 2 X 4 BRIDGING AT 6- 0" C/C AT THE BOTTOM CHORD AND AS OTHERWISE CALLED FOR ON THE TRU55 SHOP ARE NORMAL FOR INTENDED 5Y5TEM5 AND THOSE REQUIRED FOR THEIR SAFE OPERATION. DRAWING5, ADEQUATE BRACING AND BRIDGING SHALL BE USED DURING ERECTION OF THE TRUSSES TO PREVENT COLLAPSE OR DAMAGE TO THE TRUSSES, 16-2 MATERIALS AND MANNER OF INSTALLATION OF ELECTRICAL SYSTEM SHALL BE IN STRICT ACCORDANCE WITH THE REQUIREMENTS F THE LOCAL GOVERNING AUTHORITIES Q 0 0 A 0 E5 HAVING UR 5 IC J I D TION, AND THE STANDARDS SET FORTH BY NFPA, U,L„ 3. SUPPORTS FOR ROOF TOP OK CEILING HUNG MECHANICAL EQUIPMENT AND OTHER O'EM5 SUPPORTED BY THE WOOD OR OTHER RECOGNIZED TESTING LABORATORIES. THE INSTALLATION SHALL CONFORM TO THE LATEST EDITION OF THE NEC. TRUSSES SHALL BE ATTACHED TO THE TRUSSES AT PANEL POINTS, THE GENERAL CONTRACTOR SHALL COORDINATE THE SLLATION OF TH05E ITEMS AND A55URE THAT PROVISIONS ARE MADE IN THE DE 16N OF THE JOIST BY MANUFACTURER 16-3 EQUIPMENT MOUNTED ON THE EXTERIOR OF THE BUILDING SHALL BE DESIGNED, LABELED, AND INSTALLED FOR EXTERIOR, IHE CONCENTRATED LOADS IMPOSED AND DIMENSIONAL SIZE OF THE EQUIPMENT. WEATHERPROOF SERVICE CONDITIONS, IELD MEASUREMENTS - TRU55 MANUFACTURER TO TAKE MEA5UREMENT5 IN FIELD AS REQUIRED TO VERIFY OR 'LEMENT DIMENSIONS ON DRAWINGS AND A55UME RESPONSIBILITY FOR FIT OF WOOD TRUSSES, 16-4 SERVICE: CONTRACTOR SHALL CARRY OUT ALL REQUIRED ARRANGEMENTS WITH FPL FOR INSTALLATION OF THE SERVICE, PERMITS, AND INSPECTION, 16-7 PANEL SCHEDULE: PANEL SHALL BE CLEARLY MARKED AS TO ALL CIRCUITS. 16-8 ALL WIRING SHALL BE IN CONDUIT WITH THW COPPER, 16-12 PROVIDE GROUND FAULT PROTECTION ON ALL CIRCUITS SHOWN ON THE PANEL SCHEDULE, USING GROUND FAULT INTERRUPTING BREAKERS, OR DEVICES, 16-13 LIGHT FIXTURES - ALL FIXTURES WILL BE PROVIDED BY OWNER AND INSTALLED BY CONTRACTOR. 4" VTR � I 2"51NK �� I AND �� I WASHER r� I \ I I \\1 1112" FL I I 4" FL DRAIN I W/TRAP W, 3. I 3" WC 4" FL DRAIN W/ TRAP PLUMBING FIXTURE RISER 8" OPEN CONC TRENCH - GROUT SLOPED 6" REDUCTION TO PIPE GROUT 5LOPED REDUCTION TO I 6" OPEN TRENCH R15ER 4" DRAIN 4" 8" OPEN CONC TRENCH 4" Building Section THESE PLANS AliD ALL PROPOSED WORK ARE ANY CORRECTIONS CT TO A RRE TIONS 1 /4" = 1 '-0" REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLICABLE CODES. FS 3" 4' DRAIN 4" 2" SINK AND WASHER 6" DIA FL DRAIN TO HUMAN SEPTIC 5Y5TEM GATE VALVE W/ MANUAL CONTROLS TO CHIMP 5EPTIC 5Y5TEM LIC. C00013084 I C (3)U U _0 U J W 4j • e E ® .S.- "/ 4-, '- V � L 00 _ LL IL CU 4-J m O C �- L.- 0 N V Co E u_ �4(� JOB # 03-0501 DATE 10/08/03 SHEET A6 2154 AIR CONDITIONED 5Q. FT. 9 3 W PER 5Q FT 6552 (2) HEATER WITH 5000W HEATSTRIP 10000 3 - WATERHEATER5 AT450OW EA 13500 4 LIGHTING CIRCUITS AT19DOW EA AT125% AF,nn TOTAL FIRST 10000 W CAS 100 % 10000 REMAINDER 9 50% 17626 ' 27626 W@ 240 V I 115 A M P5' THEREFORE USE 150 AMP SERVICE ELECTRICAL LEGEND DUPLEX KECPT.12" A.F.F. 42" DUPLEX RECPT. OTHER HGT. AFF DEDICATED DUPLEX RECPT. QUADRAPLEX RECPT. 240 VOLT RECPT, ;�G.F.L GROUND FAULT INTERUPTED RECPT. W.P. WATER PROOF G.F.I. GROUND FAULT INTERUPTED RECPT. —(�— SINGLE POLE SWITCH THREE WAY SWITCH W- ---r f��T CEILING FAN REO5TAT JUNCTION BOX EXT. FOR SURFACE MOUNTED LIGHT FIXTURE �84" WALL MOUNTED LIGHT FIXTURE W/ MPG HOT, = CEILING MTD. FLUOR. LIGHT FIXTURE SINGLE FLUOR. STRIP - LENGTH A5 INDICATED i--,■■I 4' 2 LAMP FLUOR. STRIP - LENGTH AS INDICATED SMOKE DETECTOR 0 EXHAUST FAN L= DISCONNECT METER -®- ELECTRIC PANEL W/ CIRCUIT BREAKERS (RECE55ED) TELEPHONE JACK 1 1 4' DIA COMPUTER NETWORK CONDUIT W/ FISH LINE FOR CAT 7 CABLE �..,/ CEILING FAN WALL MTD EMERG. EXIT LIGHT a WALL MTD SECURITY LIGHTS C ON BATTERY PACK MAIN D15C 15OA-2P-NEMA-3R 120/24OV-1PHA5E / 3W /5N 00 v y 1/0, 1/0,1/0, THW CU IN 1 1/2" DIA C 150 AMP A DISC w o Q ,a Q � 0.V1 ��// 150 AMP � tr—� METER MCBPANEL o #4 CU IN 3/4" C �y a a ' N FPL TO SUPPLY A SERVICE TO METER CLAMP TO MTL WATER tI v-- SUPPLY O S a DIRECT BURIAL CLAMP TO FOUNDATION5VL REINF. W/ s NOTES: PVC GLUE COVER & 5/6" DIA. X � * ELEC. CONTR. TO VERIFY 8' GROUND ROD LOAD OF ACTUAL EQUIP. y d INSTALLED ALL WIRE SHALL BE THW COPPER ELECTKICAL R15ER Y NO SCALE a a ti SUPPLY DUCT FOR HTR WALL MTD OSCILLATING FAN LP 7-6" A.F.F. SUPPLY DUCT FOR HTR WALL MTD OSCILLATING FAN &D 7-8" A.F.F. TO OTHER EXT DOOR LIGHTS j TO ROOFTOP FLOODLIGHTS IV, GFI TO OTHER WALL EXH FAN EXH, FAN ABOVE IN WALL CPN'G *NOTE: SOLAR HEATED WATER STORAGE TANKS Electrical Plan 1 /411 = 11-011 EXH, FAN ABOVE IN WALL OPN'G 1 , TO OTHER WALL EXH FAN THESE PLANS AND kvL PROPOSED WORK ARE SUBJECT TO A`,'y CORRECTIONSREQUIRED BY FIELD fh'ZPECTORS THAT MAY BE NECES�,A';y IN ORDER TO COMPLY WITH ALL t„ PL ABLE CODES, I WALL MTD 0 74" A50VE EXTERIOR SLAB (TYP) ----> TO OTHER EXT DOOR LIGHTS I :3 ^' i u U W � N c/) ■ ■ E V 'C""' mn `N C. U :3 L a:Q� 2 — Q ( U 4-J m N O N �a CD U a LL Con n A JOB # 03-0501 DATE 10/08/03 SHEET A7 LIC. CGC013084 Parcel 1 - Area Calculations Total Site Area: 15262 Ac. Impervious Area: 36.89 Ac. (24%) Cacrete PavernenUSidewaks a4 At Access Road (steel m* a8 At Bllild'mgs and Built ft Pads: I (62,122 SF) 119 At Lake (water surfacek = At Pervious Area: 115.73 Ac. (761-) open space IE73 At Parcel 2 - Future Ancillary Site Area Calculations Total Site Area: 38.04 At Impervious Area 5.07 Ac. (13x) Access Road/Padit 171 Aa Bill kW : 0.36 Aa Lake (water a0acek 3.0 Am Pervious Area 3297 Ac. (87z) open Space 3297 Aa General Notes 1. All building, parking and access areas shall document compliance with the requirements of the American Disabilities Act prior to the issuance of a building permit, 2. Fire protection to be provided in accordance with minimum governing requirements. 3. Security lights to be provided on individual buildings. 4. Landscaping on North berm to be field adjusted to allow views from future education facility to Parcel 1. 5. Temporary irrigation provided for establishment of xeriscape landscaping. Orange Avenue, S.R. 68 a 'x o Vj v 3 Wo tdsmlf A R7t .110 1, Subject Site TWP: 35S Range: 38E Section: 25 Location Map The Northwest 114 of Section 25, Township 35 South, Range 38 East in St. Lucie County, Florida. Less and except that part thereof owned in fee simple by any party for roods, canals, ditches, drainage and water management purposes. Together with: That plot filed May, 2002 known as Header Ranches Suhdivision, as recorded in Plot Book 40, Page 38 of the Public Records of St. Lucie County, Florida. S.R. 712 4"E 1 Parcel 2 38.04 Acres i__ (Future Development "t and Temporary Spoil ri M StockpileArea) Future Land Use: AG-5 (Agricultural-1 du/5 cc.) L,•I W 600 S.F. cv :n Research Cottages N o z ti rn BUS O o PARKING 13 m h 0 0 O Lake sting - 3.0 AC. 7d Crossing 6,000 S.F. MUSEUM J PUB(ICSEDUCATION FACILITY 6:1 min. Access to Top of Berm Proposed Levee rn U) ao U„ 3 �- J Z Detail A (Ses Shoot 2) Future Land Use: AG-5 (Agricultural-1 du/5 ac.) Existing Zoning: AG-5 Existing Use: Citrus Grove Detail B - (See Sheet 2) M See Sheet 2 `to Cr Lo v u; � M N 3 r0 04 O >` N N Future Land Use: AG-5 (Agricultural-1 du/5 ac.) Existing Zoning: AG-5 Existing Use: Citrus Grove Proposed Levee Goldsmith Road onl / Existing 50' R.O.W. yr ee Shee - a ----- ------ MCI, 5,000 S.F. — — — — .. — .. Fenced Area EXISTING :.—�� .. ca— — — — .. — .. _� I Parking — 1,000 S.F. Maint. Building EXISTING d y� Optional Future 140' Fire deportment �)'i ; Development Area/ I 11 Administration p/aHoimyfor sump i y „i , Building r pump. ,.i� �^ / ,� Ill I Temporary Spoil Stockpile r � ,;;.I ) Area Prroposed Kitchen �!/� v wi i ♦ ��� -� 30 _I 1,200 S.F. LI / t s ;; (\ %/ Iru.11rw shed �. \V;e I. I Phase Line ( Proposed Clinic wpm 1,500 S.F. cow r ��I _ 1 E�Ist. Chimpanzee ,' I I l i J:`Id Introduction Unitr' � --- i. _ i ♦♦ ��i I Pam' �I -- k, _., 1 .i.l I I .a Y�ii/' ' g \ \ I barbed-wire . �. 'i \\\, �- :. I � Pod 2 Isecurify fence !It. Chimp Housing Set F.F.E. ® l I 23.5 NGVD _%— ------ I I i ® Exisg Pod 1 I y Chimp laicnd Lake 1 2,400 S.F. /.--------:: -- --- ---. Residence ((Caretaker) 1 fA.. \ � . - ^; •\�t, la I I I:I,iir ii ^' i irk �II I Y� Pod 3:\ I I ,,. Pod 4' / /r,l I 1 4 I DRAINFIELD AREA II Y�A \ I (Typical) Chimp Housing ,r ' I 1 ♦� \i/t '12s4 (TYPical) �/ Lake \��-- ) <//, 19.97 Ac. ;I 12' high security O E.O.W. 1 1291�' wall 5' cantilever Parcel I I extendedded Into Joke. Outdoor Area I (2.2 acres)(tYP (%%� i Pod 5,- too' - I' At rrP L IIIIII YY;,% Gate ; 2,400 S.F. I I o a I I I Caretaker 'srTr1 .,. ' Residence�'u I:I I MIDI M, F.F.E.=24.5 �:I I 50i „= 1 C-7':; D III I Pod 7 ;::I: I I :I:; Pod 8 Chimp Housing �i i,? \ r r \ `> ♦ ♦ / , \ -_.� / \ �__=:: �� �`•' �, � %� I I I \ —' Lake i! `i CONTROL �� cii /:' v 1,000 S.F. EL=17.4 lnt. Building ----------- -- � Pod �`-----Lake-- %,I 4 .\ \\\\\\ Pod 10 III -I ii^♦\' I > \ Lake t 11.53 Ac. I O E.O.W. Pod 11 �l, I Lake G „I I \\\\� Pod 12 6:1 min. Access to Top of Berm ILL IF —� 30' Perimeter Road 6' high bmrbed—wire secl.urity fence . M1 F.F.E.=24.5 5,000 S.F.13 `... —.. Fenced Area— `----- J ----- e� ---- ------- S89.2818 E 252 Caretaker's 2,400 S.F. Fire department platform for 6' high 30, Perimeter Road barbed-wire Access Residence F.F.E.=24.5 sump pump security fence tomin. to Top of Berm Detail C Future Land Use: AG-5(Agricultural-ldu/5ac.) (See Sheet 2) Existing Zoning: AG-5 Existing Use: Citrus Grove h Z^ Future Land Use: Agricultural 3 Existing Zoning: AG-5 Existing Use: Citrus Grove V t� O V O_ Z CI - Jr tit t — ��� N V Luc do & Associates Land Planning / Landscape Architecture 701 E Ocean Blvd. Stuart, Florida 34994 (772) 220-2100, Fax (772) 223-0220 100 Avenue A Suit 2A, Fort Pierce, Florida 34950 (772) 467-1301, Fax (772) 467-1303 827 North Thorntoi i Avenue, Orlando, Florida 32803 (407) 898-9521, Fax (407) 898.9768 a'I+, hirim s,()lR Site Dat Project Nam e. Center for Captive Chimpanzee Care Location: 3000 Header Canal Road Ft Pierce, Florida 34945 Owner. Institute for Captive Chimpanzee Care and Well -Being, Inc. P.O. Box 12220 Fort Pierce, FL 34979 (772) 429-0403 FAX (772) 460-0720 Planner/Lan Iscape Architect: Lucido & Associates 701 E Ocean Blvd. Stuart, FL 34994 (772) 220-2100 FAX (772) 223-0220 Engineer. Rudd Jones, RE & Associates, PA 512 SW St Lucie Cresent Stuart, FL 34994 (772) 221-8600 Surveyor Dhiristian Fenex, Professional Surveyor and Mapper 1657 South Dixie Highway Stuart, FL 34994 (772)283-2977 FAX (772)283-2979 Total Site A ea (Parcel 1 & 2k 190.66 Ac. Existing LanJ Use: AG-5 (Agricultural-1 du/5 acJ Zoning AG-5 Current Use. Agricultural Setbacks Front 50' Rear 39 Side 20' Side Cor 30' Note All 3eftcks based off of Property Lines Maximum Height (allowed by AG-5k 89 Maximum B ildinq Coverage: 10% J SCALE 0 100' 200' 400' SM Ce ter for Captive SUSION HE4UfREM��ic '��RE Ch mpanzee Care uP1pC: + 6 �s brn r 0o3 Site i C, REP: Y1 2 J� _ frr.,.L / ,1r,.I St. Li Sca Is I" = 200' Drawn by S.L.S. Check ied 13V M.G. NORTH Computer 11e chimp-sp3.dwg Computer Station SL.S. Project N imber SI45.SS Date 123.03 Revisions 85ID3 . 1029.03. Sheet 1 of 2 FOR fj C', .- POD EXPANSION LIU F-7-- U- ST. LUCIE COUNTY, FLORIDA Orange Avenue, S.R. 68 rn rn 0 0 d L � � � a a � o = _ r `o V) U Goldsmith Rd L 5�� INDEX OF SHEETS Midway Rd, S.R. 712 10 ST. LUCIE COUNTY HEALTH DEPT. S.R 01 COVER ENVIRONMENTAL HEALTH SECTION Subject SITE PLAN APPROVED FOR CONSTRUCTION SUPERCE ES AL P IOUS SITE PLANS FO Site 02 EXISTING CONDITIONS OSDS N DATE t t REVIEWER TWP: 35S Range: 38E Section: 25 03 OVERALL SITE LAYOUT Location Map & GRADING PLAN Propery Description: Lot No. 211-0001-00012 04 TYPICAL POD PLAN & TYPICAL SECTIONS THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS 05 PHASE 2 WELL AND SEPTIC REQUIRED BY FIELD INSPECTORS THAT DETAIL PLAN MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLICABLE CODES. OF PHASE 2 WELL AND SEPTICr D ETAI L PLAN • ll�� Ol1L'S, f ,L, SSOCICIIC'S, f ,,i 07 DETAILS & SPECIFICATION Cansul�ing�nlrrreers 4 T3S Colorado eve•. S111t� 1- 25 zwadrt ,�I3,;;qP4 OD w _ f 1to11e.• /TTZ/ ZZ186C� FLORIDA CERTIFICATE OF ADTHOPI. A-.1014 Fio- 00008303 M o N q r' a oa m o� o N K O m � d : W o�M�' N .— L� W m L� O z w H W Q o z LLJp U ED J Q < F/)<w0o0 U Li Or ar<—i m oo az(,)a z 0 c LLJ > J Q � Of w w Z w C7 M 0 i W H M � O, 0 �J cn r r4 co Eci. ti CV (u Cr ,I Q 0 w x J W �w V 0 '�I V b O� Ca H z w o VU LLJ J H PROJECT H . 02 07 SHEET OF SEED AND MULCH ALL DISTURBED AREAS 20' 20' 3• 10.1 SLOPE 10: 1 SLOPE EL 23.03 3 - - - - - - - NATURAL GROUND EL20_0 - 21.0t- -M - - - - EL. 17.4 - - - T 10 Ui J , 3 MAX, VARIES PER NSLRWCD REGULATION OF HEADER CANAL STAGES BOTTOM ELFv. 14.a NORMAL DRY SEASON (HIGH WATER) CONTROL EL �17.40 OUTFALL DITCH DETAIL NOT TO SCALE z V) DO m (Y LQ U z Q z Z 5 Q m Of 0 MIN 4 4 I TO MEET E TYPICAL SECTION PERIMETER BERM (FOR ALL AREAS NOT ADDRESSED BY SECTIONS BELOW) NOT TO SCALE 30' i''ERIMETER ROAD MIN. PERIMETER ELEV, 22.00 EL.=21.40 EXISTING DRAINAG' DITCH VARIES 20'-4 1 PERIMETER ROAD COMPACTED TO F, 95% OF MAX. DENSITY PER AASHTO T-99 \ EL. 17.4 / \ / EXISTING DITCH / \ TO BE CLEANED / / VARIES PER NSLRWCD REGULATION OF HEADER CANAL STAGES _ - NORMAL DRY SEASON (HIGH WATER) CONTROL EL.=17.40 TYPICAL PERIMETER SECTION SOUTH AND EAST BOUNDARIES NOT TO SCALE 30' PERIMETER ROAD 40' 4 1 4 20 TOP EL.=32.0 4 4 40' BENCH MARK Hi, X-CUT IN HEAD WALL, ELEVATION 23.496' WITNESS CORNER N 5045.6894 E 4886.9816 Existing Road Crossing D.O.T. STATION 147+30.32 FOUND NAIL PNSLLRWCDN 4981,7654 E 4833.1669 STATION EXISTING 36" METAL CULVERT EAST INVERT 16.1• WEST INVERT 166' I I 6:1 min. Access to Top of Berm Proposed Levee See Section this Sheet (Typ. West/North) In W I N OZ O U W N i I Q W z � L W ' I Q� ( (O� r �Cr- V) I Z UO T_ N ICN r'� CD al9 Iq CD a Q O Ln _ z Q W v Q W W ILL z 2�w 25.0' I z w U 7.0 77 � 65. ' 65 af O af F Ln N 2 I X w NW CORNER OF THE NW 1/4 25-35-38 NW PROPERTY CORNER FALLS BETWEEN DITCHES BENCH MARK Q2, 3/8 IRON ROD, ELEVATION 22,00• WITNESS CORNER Proposed Levee E 50066.2253 See Section this Sheet EXISTING 36' METAL CULVERT (Typ. West/North) EAST INVERT 15.2' WEST INVERT 15.9' O e NORTH LINE SECTION 25-35-38 Gold sr�"�' f h Road A20' WIDE DIRT ROAD N ROAD RIGHT-OF-WAY FOR GOLDSMITH ROAD (50'R/W) - 'XIS ING - - -- , FUTURE AREA ASSUMPTIONS & ELEVATIONS SHELL ROAD .30 AC. 21.0-22.0 SWALES .50 AC. 18.0-21,6 CONCRETE PAVEMENT .10 AC. 22.0-24.5 BUILDING PAD 1.10 AC. 22.0-24.5 BUILDINGS .30 AC. 24.50 BENCH MARK #3, 3/8 IRON ROD, ELEVATION 19.95' WITNESS CORNER N 4932.3930 E 7473,1471 1/4 CORNER OF THE \ /NW 1/4 25-35-38 O a -" -- - -_ 1 fl 0 30' PERIMETER ROAD 00 � s � INV- IS 30 --r 5,000 S.F. I Fenced Area u / V-1800 �Q INV.=78.20 T6 g0 \RLSIDENCE wv.=18.00 INV.=18.aD 1,9a0,fr}p-. S.F. I a z Existing \ / / - "Minding ry N o� / EXISTING \ , Or 1 field`` Proposed Option Future A .n sI Well Orion .0 N INV.=18.00 �O ROL STRUCTURE \ �,'.' �� of OSed Development ArealArea/ o TO BE EMOVED ' _ / Septic Tank Temporary Spoil Stockpile 180.400 S. Area 30 flog Shad /� F.F.. 23.6 E' • �-tC'1� �\79 (Typical) 1q. �CONCRETEWELL H -� MP POD 2 II I _ INV 18 90 �j �. ,/ �/ \ 13,400 S.F. - - / AVAILABLE w 1fi•3a - / POD - {/{ INV.=18.00 I 1550 / 0, I / \ 230 LF INV.=18100 INV.=18.00 NV.= I Lake INV.- /------- \� POD 3 1r1��, ,' POD 4 / / I %i�l; 0 to ROI-1 I IMP VEME11 // I '.' �1�l I HA %��='=�� / / %� I, , � \� POD /140 I/ sa \ Sepflc 7 nk ,6 i \ �� I CD Proposed CD ocaNan 1 �-9,7 °�1C. w Propo Wall LG AVAV itWBlfo %v .ter �:. C 1T � � �-- � . I (n ti 24.3o Lake ,ear ��,.'. ® E.O.W. 100' I „1 , I i� v-i D 6D 5 I S.F.100. TYP >11 INV=13.50 (TYPICAL) ISLAND CONTROL p a INV.=18.00 I �„ �II1 INV.=18.00 STRUCTURE (TYP. ' SEE DETAIL _ ( 1 70 �. \ -- I W zQ W J 2 - - � INV,=18.00 I � Z Q INV.=13.50 I a OU 20.40 I�-'r� III\�'� I __(TYPICAL) Lake I z U o F,,U I EVM'NT / �tiD ,------- I �z f�\ POD 7 „ I I e. w w - I I 11, _ a,l POD 8 / { I /- r ` I o W /ul OfI- - 18400 SF /B '_ir I o- Q w 12 POD fi'0 I I p - - Lake Nv.=18.oD ✓$,S INV.=18.00 r• 19 /; INV- CONTROL 6.00 // I 5 v� 1,000 S..= F. INvlaso EL=1/.4 \` / 2zaG Building INv=16.30 F.F.E.=24.5 ._ - 1820 -� INvIN=v1. 830 / 8,800 SF / AVAILABLE 5,1000 S.F. - INv. 18.50 0 /// / j\ \ Fenced Area INv.=18.40 - - D.O.T. STATION N o0 120+68.50 - XISTING DITCH SW PROPERTY UTH LINE NORTHWEST QUARTER 25-35-38 LINE PROCEEDS THROUGH CENTER OF D CORNER FALLS N 2319,9459 BETWEEN DITCHES DRAINFIELD AREA E 4531.4635 N 2318,7664 E 4974,0628 6:1 min. Access (Typical) SW CORNER OF THE NW to Top of Berm 1/4 25-35-38 EXISTIN VARIES EXISENOGG 0 140mini trot' n Adn• rA'14" 11on = I Buildirfg 23.s _N W "1. I ist. e6dlo6 ahv Introd uctio`rf'ECRif Extsfing Drainfleld §t. Grj?9R 31494r99llgg Set Fw2 f.E.(� 23.5 2 GV'y 1 INV.=18 20 2,4004111 Resi��PiE��� .INV.=1810 (typical) Proposed o Septic Tank vj GroupG,F[gw4j1g m (Tyiijea y A 2�00 A O F( 9 E� 0 EXISTING. GRADE - - - - - - - - - - - - - - _ - ELEV=20.03 EL. 17.4 I� - PERIMETER ROAD COMPACTED TO \ 95% OF MAX. DENSITY PER AASHTO T-99 EXISTING PITCH VARIES PER NSLRWCD REGULATION TO BE CLEANED / OF HEADER CANAL STAGES \ I NORMAL DRY SEASON (HIGH WATER) / CONTROL EL.=17.40 - TYPICAL PERIMETER SECTION NORTH AND WEST BOUNDARIES NOT TO SCALE (2.2 ad�iffflgWP) �170 LF-36" CMP INV.=14.50 Proposed Ora/neidWN'OSSB CONTROL S (SEEOETAIL PROPOSED 140 LF _ OUTFALL DITCH 1 36" CMP INV.=1810 2,400 S.F. 2 4 ee e2aP. , Resident� F.F.E.=24.Z=18.20- AVAILABLE Group Housing (Typical) INV =18 30 2, / o , INV.=18.60 30' PERIMETERS ROAD S89j 8'18"E 2522,30' 2,400 S.F. Residence F,F.E.=24.5 30' Perimeter Road See Section this Sheet (Typ, East/South) 6.1 min. Access to Top of Berm 30' Perimeter Road See Section this Sheet (Typ, East/South) FUTURE DEVELOPMENT "'I'\ PROPERTY CORNER FALLS IN DITCH N 2295.5D82 E 7496.2527 LEGEND PROPOSED SHELLROCK ROAD PROPOSED SPOT ELEVATION 06 EXISTING .SPOT ELEVATION THESE PLANS AND ALL PgOpOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIWLD INSPECTORS THAT MAY SE NECESSARY Iq ORDER TO COMPLY MTN ALL APPLRCASLE CC DES, Ir o N O ' } N � Q O Q O] o m O N ED U :II � c Lim W N O z W C) LLJ fO Q z W U J O J W g U� W H aF-cn¢w00O U Q W Of 2 X Q_ J v,000c.ln.Ua z _o Or O WN W Q 0' LL z �W a 0 Ld 40 0 � Y rr- Q .s'L LU Q 0 CD r, Iw1 U_ J 0 Flo Vl W-4 C{�i_s, V H 1�1 O W J SCALE: 1 "=20U' 0 200 400 800 RRo3ECT +l 03 07 SHEET OF Exist. Group Housing Set F.F.E. @ 1 23.5 NGVD 1 1 1 1 ?5400 S.F._ Residence L-/ - J Proposed Drainfield Area (typical) Proposed Septic Tank Group Housing (Typical) Proposed Septic Tank cell Outdoor Area (2.2 ocres)(typ.) Proposed Drainfield Area (typical) 2,400 S.F. Residence F. F. E. ®24.5 1 — - - - - - - - / / / i— — — — — — — — — — — — — — — — — — — I � I � , 1 I 2ryry6• // �' ' \\ I I I r�\`\ POD 3 \ \ / 1 s; v 1, Proposed 1 Well Location Lake 19.97 Ac. @ E. 0. W. Lake � /' , /2 I / _--------------- I I \ I POD 4 Proposed << `/„ \\ Septic Tank \ � Proposed I ,: Well Location Proposed \ -----_ Septic Tank :F - - / Al �I '24- POD 6 \ ' I I\ 1 1 1 \ THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLIC1,';3LE CODES. ---------------=---------\ \ I ik POD 8 , try 11 / ryo-2b' 1 f ,- SC LE: ,1 '_ 5-0 3 \ 60 120 oLj N p o� � o mw c 0 a N W W m w O Z w Z Z W U J p J1.\i0�U��� < m < w 0 0 0 O a w d 2 Of a J m O m p Ula- U m Z O > Zo W cr N j W j J Q i W Z W M � � ao p .- = C. rd N l-MI a w _p O J I� W w ®Z NA Ali } U V w 0 U U W J PROJECT # . 06 07 SHEET OF L IIt0111,4!ln -ill I 11 !1f - a o 0 � tF N L a o N ° � d z X PLAN 4,-4" 3" r Grate c-- -}- 2" CI. Eye Bolts See Index 201 N � � 4 , 2 12' Ctrs. SECTION TYPE E INLET Recommended Maximum Pipe Size: S-O" Wall-24" Pipe 4'-6" Wall-42" Pipe TOP VIEW FRC)N i VILLA Iroirwio�oo� Irooiroarirol 1rrrrir iri I rooiriar+ rri. r000irir aria ...i...i..Li...1 - �� Irrrrri irrl r000iriririri� vraririririr� r....o........." ME rirrooiri►oi� Irirririririri I StraightBars V, ill Bonds TYPE E GRATE (FOR CONTROL STRUCTURE) GRATE EL.=21.5 CIRCULAR BLEEDER PIPE INV,=14.5 STRUCTURE BOT. EL. 13.0 ISLAND CONTROL STRUCTURE TYPE "E" INLET IMODIFIED] TOP VIEW EL. 19.60 BOTTOM EL.=17.70 BOLTED 3" ON CENTER W/ 24„ 42" MASONRY BOLTS. 0 o NOTCH INV,.=17.4 i VP j \\ LL PIPE i\ITT 11,4 L J i SIDE VIEW FRONT VIEW CONTROL STRUCTURE TYPE "E" INLET IMODIFIEDI 4" MIN, EXISTING GROUND REMAINING BACKFILL 6" MAX. SIZE GRANULAR BACKFILL BEDDING MATERIAL 5-1/2" UNREINFORCED CLASS 1 CONCRETE (WITH FIBERMESH ADDED) 12" STABILIZED SUBGRADE COMPACTED TO 98% OF MAXIMUM DENSITY AS PER AASHTO T-180 & A MINIMUM FLORIDA BEARING VALUE OF 75 PSI. CONCRETE PAVEMENT SECTION N. T S NOTES; 1. BEDDING MATERIAL SHALL BE HAND PLACED IN 6" LIFTS AND SHALL CONSIST OF IN -SITU GRANULAR MATERIAL OR WASHED AND GRADED LIMEROCK 3/8"-7/8" SIZING. UNSUITABLE IN -SITU MATERIALS SUCH AS MUCK, DEBRIS AND LARGER ROCK SHALL BE REMOVED. 2. THE PIPE SHALL BE FULLY SUPPORTED FOR ITS ENTIRE LENGTH WITH APPROPRIATE COMPACTION UNDER THE PIPE HAUNCHES, 3. THE PIPE SHALL BE PLACED IN A DRY TRENCH, 4. BACKFI LL SHALL BE DON P E WITH APPROVED MATERIAL CLEAN E AND FREE Or ROCKS, MUCK AND OTHER DELETERIOUS MATTER AND COMPACTED BENEATH THE HAUNCHES OF THE PIPE USING MECHANIC4.:_ TAMPERS TO 100% MAXIMUM DENSITY AS DETERMINED BY AASHTO T--S9. 5. BACKFILL TO BE COMPACTED ALONG THE SIDES OF THE PIPE AND Tu A POINT ONE FOOT ABOVE THE TOP OF THE PIPE TO 100% MAXIMUM DENSITY AS DETERMINED BY AASHTO T-99. 6. A. WHERE PAVEMENT IS TO BE CONSTRUCTED OVER THE PIPE THE REM AINING A G BACKFILL LL SHALL BE COMPACTED IN 6 INCH LAYERS AND COMPACTED TO 95% MAXIMUM DENSITY AS DETERMINED BY AASHTO T-180. B. WHERE "NO" PAVEMENT IS TO BE CONSTRUCTED OVER THE PIPE THE REMAINING FILL SHALL BE COMPACTED IN 6 INCH LAYERS TO.A DENSITY 90% MAXIMUM DENSITY AS DETERMINED BY AASHTO T-180. 7. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL TRENCH SAFETY REGULATIONS TYPICAL TRENCH DETAIL - N 5' 20' ACCESS w 15' SWALE O EXISTING NAT. GROUND �^ Pao/Zy AVERAGE EL. 19.00t VARIES 4%, `V�- EL. 20.6-21,6 - J1 3 VARIES PER PLAN SLOPE TO MEET EXISTING GROUND EL. 19.0f. MAX, SLOPE 3:1 GRATE EL.=19.30 BOT; BAFFLE EL.=17.2 r PIPE INV.=14.0 STRUCTURE BOT. EL, 13.0, w � 15' SWALE 7 0 x �� vARIES EL 20.6-21.6 3 VARIES PER PLAN 6" COMPACTED SHELLROCK FBV 50 psi, 98% MAX PER AASHTO T-180. 12" STABILIZED SUBGRADE 98% MAXIMUM DENSITY PER AASHTO T-180. TYPICAL SECTION STABILIZED SHELLROCK ROAD NOT TO SCALE RECOMMENDED TOE -IN NOTE* SILT FENCE SHALL BE INSTALLED PER MANUFATURER SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. SILT FENCE DETAIL v t EROSION AND SEDIMENTATION CONTROL NOTES Construction activities con result in the generation of significant amounts of pollutants which may reach surface or ground waters. One of the primary pollutants of surface waters is sediment due to erosion. Excessive quantities of sediment which reach water bodies of floodplains have been shown to adversely affect their physical, biological and chemical properties. Transported sediment can obstruct stream channels, reduce hydraulic capacity of water bodies of floodploins, reduce the design capacity of culverts and other works, and eliminate benthic invertebrates and fish spawning substrates by siltation. Excessive suspended sediments reduce light penetration and therefore, reduce primary productivity. MINIMUM STANDARDS 1. Sediment basin and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land -distributing activity and shall be made functional before unslope land disturbance takes place. 2. All sediment control measures are to be adjusted to meet field conditions at the time of construction and be constructed prior to any grading or disturbance of existing surface material on balance of site. Perimeter sediment barriers shall be constructed to prevent sediment or trash from flowing or floating on to adjacent properties. 3. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization Shall be applied within seven days to denuded areas that may not be at final grade but will remain undisturbed for longer than 30 days. Permanent stabilization shall be applied to areas that are to be left undisturbed for more than one year. 4. During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site cs well as soil intentionally transported from the project site. 5. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that, in the opinion of the Reviewer, is uniform, mature enough to survive and will inhibit erosion. 6. Stabilization measures shall be applied to earthen structures such as corns, dikes and diversions immediately after installation. 7. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equpl to three acres shall be controlled by a sediment basin. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading from the land -disturbing activity. The outfoll device or system design shall take into account the total drainage area flowing through the disturbed area to be Served by the basin. 8. After any significant rainfall, sediment control structures will be inspected for integrity. Any damaged devices shall be corrected immediately. 9. Concentrated runoff Shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 10, Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 11. Sediment will be prevented from entering any storm drain system, ditch or channel. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 12. Before temporary or newly constructed stormwoter conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining Shall be installed in both the conveyance channel and receiving channel. 13. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 14. When a live watercourse must be crossed by construction vehicles, a temporary stream crossing constructed of nonerodible material shall be provided. 15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. Periodic inspection and maintenance of all sediment control structures must be provided to ensure intended purpose is accomplished. The Developer, owner and/or contractor shall be continually responsible for all sediment leaving the property. Sediment control measures shall be in working condition at the end of each working day. 17, Underground utility lines shall be installed in accordance with the following standcrds in addition to other applicable criteria: A. No more than 500 linear feet of trench may be opened at one time. B. Excavated material shall be placed on the uphill side of trenches. C. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off -site property. D. Restabilization shall be accomplished in accordance with these regulations. 18. Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by tracking onto the paved surface, where sediment is transported onto a public road surface with curbs and gutters, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner.This provision shall apply to Individual subdivision lots as well as to larger land -distributing activities. 19. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, in the opinion of the Reviewer. Disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 20. Properties and waterways downstream from construction site shall be protected from sediment disposition and erosion. 21. Phased projects should be cleared in conjunction with construction of each phase. 22. Erosion control design and construction shall follow the requirements in Index Nos. 101, 102 and 103 of FDOT Roadway and Traffic Design Standards. 23. The Reviewer may approve modifications or alter plans to these erosion control criteria due to site specific conditions. Technical Specifications The Center for Captive Chimpanzee Care 1, Clearing and Grubbing: Clearing and grubbing shall be performed within the limits of the project work in accordance with Section 110, Florida Department of Transportation (FDOT) Specifications. This item shall include, but is not limited to, the complete removal and legal disposal of all trees, brush, stumps, roots, grass, weeds, rubbish and other undesirable material to a depth of 18 inches below natural ground or proposed finished grade, whichever is lower. The areas to be cleared generally consist of that area on the plans designated as the project area and consists of about 14.6 acres. All areas immediately adjacent to the clearing operation shall be protected by the installation of temporary silt barriers in accordance with the requirements of the South Florida Water Management District (SFWMD). Further erosion control shall be accomplished by seeding and mulching all disturbed areas as soon as they are at final grade, per the specifications for seeding and mulching, Section 3 below. All material shall be removed from the site and shall be disposed of in accordance with all local, state and federal requirements. Material may be burned, upon Contractor receiving all necessary burn permits. Any unburned debris shall be disposed of as specified above. 2. Earthwork and Grading: All earthwork and grading shall be performed as required to achieve the final grades, typical sections and elevations shown on the plans. In all other respects, materials and construction methods for earthwork, embankment, excavation and grading shall conform to the requirements of FDOT Specifications, Section 120. Any plastic or otherwise undesirable material within 36 inches of finished road grade shall be removed and replaced with suitable material. The contractor shall separate topsoil from the rest of the backfill material and shall place the topsoil as the lost lift on the island to aid in the establishment of a good grass cover after seeding and mulching, 3. Roadways: Roadways shall be stabilized and finished with a course of shellrock as detailed on the drawings. Subgrade and shellrock specifications shall be as specified below, A. Shellroek: Cemented Coquina (shellrock) base material shall be compacted to 98% of maximum density per AASHTO T-180. All limerock shall meet the minimum requirements of FDOT Section 915. B. Sub -grade: Sub -grade shall be compacted to 98% of maximum density per AASHTO T-180, and stabilized to a minimum FBV of 50psi. Sub -grade shall be thoroughly rolled with a pneumatic tired roller prior to scheduling any sub -grade inspection. C. Sod: A two -foot wide strip of bahia sod shall be placed along the edge of the constructed roadways to aid in prevention of erosion and soil stabil ty. Sod shall be placed in conformance to FDOT Section 570, 575 and 981. D. Seed , Fertilize and Mulch: All disturbed areas shall be stabilized with seed, fertilizer and mulch upon completion and acceptance by Engineer of final grading. Seed, fertilizer and mulch shall be in conformance to FDOT Sections 570, 575 and 981. The Contractor is responsible for establishing a stand of grass sufficient to prevent erosion and to allow removal of the terri silt fences. The seed mixture shall be 40% millet and 60% bahia E. Testing: The Contractor shall secure the services of an approved independent testing laboratory to conduct all required testing on sub -grade, base and concrete. Locations required for these tests shall be as det rmin e ed by the Engineer during the progress of work. Should any tests fail, contractor shall at his own expense, repair the deficiencies and retes: the work until compliance with the specifications is demonstrated. 4. Drainage Improvements: All labor, materials and construction methods shall be in conformance to the minimum engineering and construction standards of St. Lucie County and FDOT Specifications. Trench excavation and back -filling operations shall meet or exceed the requirements of FDOT Specifications, Section 125. The Contractor shall provide the necessary back -fill compaction testing required to demonstrate compliance with this section. The pipe trench shall be dry when pipe is laid and the pipe shall be bedded per the details and per FDOT specifications. The Contractor shall comply with Chapter 90-96, Laws of Florida, which requires the Contractor performing trench excavations over five feet in depth comply with all applicable trench safety standards and shoring requirements as set forth in the Occupational Safety and Health Administration's (OSHA) excavation and safety standards, 29 C.F.R. 19926.650, Sub -part P and incorporated as the State of Florida standard, as revised and/or updated. The cost of compliance with this requirement shall be included as a separate line item on the Contractor's bid. Otherwise, Contractor certifies that the cost of compliance is included in the unit cost of all items of work to which this requirement applies. A. Corrugated Metal Pipe (CMP): All CMP shall be aluminum alloy, round, helical -wound corrugated pipe conforming to AASHTO-M 196-74 and FDOT Section 945. Pipe ends at joints shall be reformed to annular corrugations for the complete band width. All joints shall be soil- tight. All connecting bands shall be corrugated annular coupling bands. A Neoprene gasket of at least 7 inches wide by 3/8 inch thick shall be used for all pipes of 36-inch diameter and smaller. Larger pipe sizes require gaskets of at least 10-1/2 inches in width. All CMP shall be installed at maximum lengths to reduce the number of joints. B E-Inlets/Control Structures: Pre -cast catch basins sholl meet the requirements of ASTM Specifications C-478 and 64T and FDOT Specifications, Section 425. Concrete for catch basins shall have a minimum compressive strength of 4,000psi at 28 days. All grates shall be valley gutter type, cast iron, traffic bearing design. C, Trench Backfill shall be as shown in the Drainage Details. In addition, testing under paved areas shall be as follows: One test location midway between structures and one test location adjacent to each structure. Engineer may request additional locations. Testing in each location shall begin in the first foot above the culvert with tests every two feet to within two feet of the sub -grade. Density shall be to 100 percent of maximum as determined by AASHTO T-99. THESE PLANS AND ALL PPOPOWD 6r' ;; ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS T�IAT MAY BE NECESSARY ]N ORDER TO COMPLY WITrI ALL APIPLICA3LE CODES. O iN O > uwi o: CID N D_i R0 '0_ W 0,� N' W C) W 0 z L ¢ W Z Z Li Lu J 0 W Y W Lu < 0Q¢w0op w�=0�¢w (/7��OUd Ud Z I _0 0 > Z o > it z w M Lu H ¢ \ o o d: z Cq O ^'s. H- �, CC c9- Z " U1 ff IL U PROJECT # . 07 07 SHEET OF FOUND 4"x4"PRM #3435 (0.37'WEST S89-04'14"E 1256.53'(P) FOUND OF R/W LINE) S89'0220"E 1256.38'(M) #3435 4 x4"PRM 72.5' 72.5' 30' DRAINAGE & UTILITY EASEMENT EXISTING DITCH 65.6' _- LOT 4 I II s - I Z N LOT 5 I w EXISTING BUILDING LOT 3 I 18'x24' 0 r `,yam �,,5� o a 0 4.5 ✓ ✓ - N U1 I \ a M r-- -- I 16 frl rrl �& I N 'O WDRAN_ UTILITY EASEMENT I W o N (� HEADER RANCHES SUBDIVISION, PB40, PG38 C4 Z0 w� CONTAINING 38.04 ACRES MORE OR LESS N LOT 2 I I CITRUS GROVE Z 66 W ROWS ARE NORTH/SOUTH IZia ,ati� I I M� DIRECTIONAL �eit / tz< LOT 6 CITRUS GROVE BENCH MARK #1, X-CUT IN HEAD WALL, ELEVATION 23.496' I �m n'P� PORTION 24-35-38 WITNESS 89RNER N FOUND 4"x4"PRM',y I I F �( w� NOT INCLUDED 4886.9816 E a8as.981s 31,09'(M) r/ 30.00'(P) #3435 (1.56'WEST LOT 1 �✓ I� OF R/W LINE) �cF, NW CORNER OF THE BENCHMARK yz. 3/e IRON Rom, I I �z- a mcw FOUND 4"x4"PRM #3435 NW 1/4 25-35-38 I ELEVATION 22.00' WITNESS CORNER 30' DRAINAGE & , „ a I 34.14'(M) 30.00'(P) N 50P3691 UTIUTY EASEMENT O E 5006.2253 N89'28 10 W 1257.78 J �- (M) NORTH LINE SECTION 25-35-38 D.O.T. STATION 20' N E pIRT N 147+30.32 ROAD RIGHT-OF-WAY FOR GOLDSMITH ROAD 50'R W ANAGEMENT - - - - - - - - - - - - - - - - - -' '- - - - - - - - NORTH PRQEEQW - - - LINE - - 589�� 9'S1 "E 2527.2T FOUND NAIL ISTRUCTURE CONTROL .� `"..- BERM TOP EL-29.0' TOE EL-20.0' !y N 4981.7664 0 -..-„- -- ---e ,.. E 4833.1669 -' - - �' �" I EXISTING 36' METAL CU 7.0' 77.0 EAST INVERT 18.1' NEST INVERT 15.9' NW PROPERTY CORNER FALLS BETWEEN DITCHES 1-STORY RESIDENCE i BERM LAKE P R w SHELL DRIVE M WELL WITH ADMINIS BUI ING AiION I CONCRETE JrY I IN UNIT OUP N BUILDING HOUSING i N 0UILDiN3;! Z z BLAND o m w I IJ (N w 'v �.,y✓ 3 LAKE 'may r 20.6' r WELL LOCATION 69, 20.6' INSIDE PROPERTY LINE M rK N_ CV U) __j O z � o 1n Q I I Q W W - TOE EL=BERM TOP EL-26.0' - - - - 20-7 W DEAD CITRUS GROVE Z ROWS ARE EAST/WEST DIRECTIONAL LLJ I IZ 25 0' U 3 s5. Q O $ a V = x w 0 i NORTHWEST QUARTER SECTION 25-35-38 CONTAINING 152.62 ACRES MORE OR LESS DEAD CITRUS GROVE .lie ROWS ARE EAST/WEST DIRECTIONAL Im BENCH MARK #5, 5/8 IRON ROD, ELEVATION 20.22' WITNESS CORNER N 011.2136 NORTH I VE METAL CUL T E 5012.2136 NORTH INVERT 14.9' SOUTH INVERT 14.7 D.O.T. STATION w 120+68.50 EXISTING DITCH r SW PROPERTY SOUTH LINE NORTHWEST CORNER FALLS QUARTER 25-35-38 LINE PROCEEDS THROUGH CENTER OF DITCH S89*2818'E 25 N 2319.9459 BETWEEN DITCHES E 4831.4635 N 2318 7664 E 4974.0628 SW CORNER OF THE NW SW1/4 25-35-35 1/4 25-35-38 NOT INCLUDED CITRUS GROVE SOUTH BENCH MARK y3, 3/8 IRON ROD, ELEVATION 19.95' WITNESS CORNER N 4032.3930 73.1471 1/4 CORNER OF THE hl /NW 1/1 25-35-38 NE PROPERTY CORNER FALLS IN DITCH BENCH MARK #4, 5/8 IRON ROD, ELEVATION 23.58' \ WITNESS CORNER N 2347.2780 E 7467.08280828 EXISTING DITCH 54.5' CITRUS GROVE NE1/4 25-35-38 NOT INCLUDED s,T SCALE 1" = 200' CHANGED TITLE: 10/20/2003 REVISED: 9/23/2003 REVISED: 9/2/2003 PROPERTY REVISED: 4/26/2000 CORNER REVISED: 3/20/2000 FALLS IN DITCH FIELD SURVEY DATE: 12/9/99 N 2295s0e2 DRAWING COMPLETION DATE: 12/9/99 E 7496.2527 F.B.: L1 PG: 32 FILE:-99205.dwg #91 \9S GOLDSMITHROAD 712 MIDWAY ROAD) y FzP�L�P G• LQQ61ION MAP (NOT TO SCALE) SURVEYOR'S NOTES: 1. BEARINGS REFER TO RIGHT-OF-WAY MAP SECTION NO. 9452. BEARING BASE IS THE BASE LINE OF SAID MAP. 2. (P) = PLAT MEASUREMENT: (M) = FIELD MEASUREMENT 3. PROPERTY LIES IN FLOOD ZONE A, FEMA MAP #12111CO165 F, 8-19-91. 4. THE LANDS SHOWN HEREON WERE NOT ABSTRACTED FOR RIGHT-OF-WAYS, EASEMENTS, OR OTHER ENCUMBRANCES. 5. UNDERGROUND UTILITIES NOT LOCATED PER THIS SURVEY. 6. R/W = RIGHT-OF-WAY 7. FENCES, DITCHES, AND IMPROVEMENTS NOT LOCATED. S. ALL MONUMENTS SHOWN ARE FOUND UNLESS STATED OTHERWISE. 9. COORDINATES VALUES SHOWN ARE BASED ON AN ARBITRARY DATUM AND BEAR NO REFERENCE TO GEODETIC CONTROL. SURVEYOR'S NOTES: ELEVATIONS REFER TO NAVD88. ELEVATIONS SHOWN ARE BASED FROM BENCH MARK #1, X-CUT IN HEADWALL, 7.1617 METERS, 23.496 FEET, NORTH AMERICAN VERTICAL DATUM 1988. ALL OTHER BENCH MARKS ARE ESTABLISHED THERE FROM. CONVERSION FROM NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) TO NATION GEODETIC VERTICAL DATUM 1929 (NGVD29): NAVD88 + 1.475 = NGVD29. BOUNDARY AND TOPOGRAPHIC SURVEY OF THE NORTHWEST ONE QUARTER (N W. 1/4) OF SECTION 25, TOWNSHIP 35 SOUTH, RANGE 38 EAST SITUATED IN ST. LUCIE COUNTY, FLORIDA. LESS AND EXCEPT THAT PART THEREOF OWNED IN FEE SIMPLE BY ANY PARTY FOR ROADS, CANALS, DITCHES, DRAINAGE AND WATER MANAGEMENT PURPOSES. AND THAT PLAT FILED MAY, 2002 KNOWN AS HEADER RANCHES SUBDIVISION, AS RECORDED IN PLAT BOOK 40, PAGE 38 OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA FOR INSTITUTE FOR CAPTIVE CHIMPANZEE CARE AND WELL-BEING, INC. a corporation existing under the laws of the State of Florida CERTIFICATION: 1. INSTITUTE FOR CAPTIVE CHIMPANZEE CARE AND WELL-BEING; INC. o corporation existing under the laws of the State of Florida. 2. COMMONWEALTH LAND TITLE INSURANCE COMPANY 3. THOMAS A. FOGT, ESQ. I HEREBY CERTIFY THAT THE SKETCH SHOWN HEREON IS A CORRECT REPRESENTATION OF A SURVEY DONE UNDER MY DIRECTION AND IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. NO SEARCH OF THE PUBLIC RECORDS MADE FOR ERRORS OR OMISSIONS OF SAID DESCRIPTION. EASEMENTS OF RECORD NOT SHOWN UNLESS FURNISHED. I FURTHER CERTIFY THAT .THIS SURVEY MEETS THE MINIMUM TECHNICAL STANDARDS SET FORTH UNDER RULE 61G17-6 F.A.C. BY THE FLORIDA BOARD OF SURVEYORS AND MAPPERS. THESE PLANS AND ALL AROPOS :D �,:� _.� „... , , ARE SUBJECT TO ANY CORRECTIG; REQUIRED BY FIELD INSPECTORS TXAT MAY BE NECESSARY IN ORD R T9 COMPLY WITH ALL APPLICABLE 001 'C' CHRISTIAN FENEX PROFESSIONAL SURVEYOR AND MAPPER-%� 1657 S. DIXIE-HWY., STUART, FL. P.O. BOX 2533, PALM CITY, FL. 34991 CHRISTIAN FENEX, PSM (772)283-2977 (772)283-2979 fax FLA. REG. #5102 NOT VAUD WITHOUT THE SIGNATURE AND THE. ORIGINAL. RAISED SEAL OF A FLORIDA LICENSED SURVEYOR: AND MAPPER. ,, 11 hollow metal swing Stminle.stl. knob 2 2 - 3'-D" x 6'-8" x 1 3/4" exterior i s I metal swin St ' le,stl. knob 31.6/-39.8 veatheratrip w/ h.c, threshold. Upper window 3 2 - 3'-0" x 6-8" x 1 3/4 exterior insul metal owing stainle.stl. knob 31.6/-39.8 4 2'-2" x 6-8" swing cage door rJ 1 2'-8" w x 2'-8" h horiz sliding metal door wall mounted; 5'-4" head hei ht 6 2'-8" w x 2'-8" h vert, 5liclinq metal door remote wall mounted/ uillotine • 5'-4" head height 7 6'-0" w x 6-8" h metal mesh swing gate 8 9 NOTE: ALL HARDWARE TO ESE STAINLESS STEEL Head heights are from 0'-0" at top of curb See Elevations 2'LX4"W -- — — — — — — � TRENCH DRAIN — — — — — — — W/4" PIPE GONNEC TO OTHE TRENCH O 2 UN_ IIT #1 0, H. CAGE CHUTE 1_O11 Cl G1-01, 21-011 2' L. 1 • � it EDGE OF CONCRETE N Q UNIT #2 SLAB _ i' 0, H. CAGE CHUTE N Q GONG. SLAB TO CONNECT BETWEEN BUILDINGS (TBD IN FIELD) EDGE OF SLAB OPN'G A 2 - 3'-1" w x 3'-2 3/8" h awning alum/white Single, tinted 6' - all 31,0/- 6 metal security bars mtd, over window " " open mesh metal no alaoo 6' - 8" 3 Sided bay window "viewport" C o en mesh metal no qlaoo 6' - 8" Interior mtl, ca e "window" 10'-0" w x 4'-0" wall o n' o en mesh metal no c1laoc, 6' - 8" interior mtl, ca e "window" E 7-8" w x 6'-8" h o en mesh metal 6' - 8" interior mtL ca e "window" F 1'-71/8" w x 2'-2 3/8" h awnin alum/white Sin le tinte 6' - 8" 31.6/-34.6 G 2'-8" w x 2'-8" wall o n' o en mcoh metal no alaoo 5'- " exterior mtl. ca e "window/' H I T:: I i 811 31_411 all MESH N O iv B G O I I U N_ IT#3 � � O I I \ I 0 1 4 2 8 8 6 -C 2 II d' O I O I o z I p 8" X 8" CAST DZ w I CONG.5URROUI wIII 0 OPN'GS � I LU UNIT#4 ' w U -�awG II Q G o'J II O o I 1 4 4 10' 0" --- ---- ------II _ O I>e< O H/C W.O. VALVE BASE CABINET - WALL MTD. 5" 5EKVICE AREA A.F.F, PROVIDE FILLED CELL O BELOW 51LL 1'-0" FROM WINDOW Ej WALL MTD UPPER OPN'G EA. 51DE FO, ZRAGIly 9=8 2 I CABINETS I M 1' 0" -rn 11 LT L — FILLED O O COLD ONLY OPN'G ABOVE FOR EXH, FAN THESE PLANS HAVE BEEN REVIEWED 11 BUILDING CDEE WITH THE FLOAIUA FIOO1 Plan X u REMOTE 'LIXIT' ON GONG. YARD PYLON (V.L.O.J,) O O ST LUCIE COUNT BUILDING DIVISIO REVIEWED FOR COMPIL N REVIEWED BY >oa �t- H/C COi X UNIT #5 UNIT #6 'LIXIT' WATER SUPPLY FOR CHIMPS (TYP) O M d 'b � o a ro o s a N � h � 0 g U o � � o o �i a N N • a � � � o 3 a ST. LUCIE COL_NTA' FIRE DISTRICT12 REl7EN;-ED FOR COitpLLA-iNCE a SUBJECT TO FIELD INSPECTIONS SEE ATTACHED REVISION S rn ET lot RENTERED BY: 77Q DATE: - - s 314" W 4'-0" OPN'G o { 4" DRAIN 8 31 411 all y ON B N \ \ \ \ >11 ♦.. \ \ 4-J C9 \ el I c 1 � lOJ Q c? p ,I I I I i I � 111 -0 I� ry U _ LU Q I TO CHIMP SEPTIC SYSTEM ■ ■ �+a E I -0 U z I I u, I - w Ww ' I � 1 — o � ® � O .o TT 1V W. VALVE 51-01, ro CONC. PECKAL BASE CABINET - WALL MTD, 5" A,F.F. PROVIDE FILLED CELL O7 BELOW SILL T-O" FROM WINDOW OPN'G E SIDE Fill? BRACING T-0" 1'-0" M I L7 FILLED CELL — J o — OPN'G COLD ONLY ABOVE FOR EXH. FAN Mill m TOTAL 5Q. FT. UNDER ROOF = 2315.81 O y— _O 2 LL W 4-J i TH A E Ply IE SUE eftti� ;, EC`I i ALL PROPOSED WORK a ANY CORRECTIONS 4j � U LL RE QUIRED BY FIE LD INSPECTORS THAT MAY B NECE SARY IN ORDER TO Z COMPLY) ITH At L APPLICABLE CODES. O 0 0 5 ET, T L ONMENTAL HEALTH SITE PLAN A F OVED IOR OI SUPERCED� r �� �o F OSDS # EDGE OF V_J CONCYtj)#1ER a JOB # 03-0501 DATE 10/02/03 SHEET Ala CONSTRUCTION CORPORATION LIC. CGCO13084 �K� — o```'1'f"p �� 1 CENTER FOR CAPTIVE CHIMPANZEE DIVISION ONE - GENERAL REQUIREMENTS r 1-1 INTERPRETATION OF PLANS - THE ARCHITECTS SERVICES DOES NOT INCLUDE 5UPEKVI6ION OF CONSTRUCTION. THE ARCHITECT DIVEST HIMSELF OF THE RESPONSIBILITY OF THE WORK, ERROK5 OR EMI5510N5 RESULTING FROM THE INTERPRETATION OF THE PLANS, IF THE CONTRACTOR BELIEVES HE HAS DISCOVERED ERRORS OR OMIS5100 IN THE PLANS THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING FOR CLARIFICATION BEFORE CONTINUING WORK, 1-2 APPLICABLE STANDARDS - ALL WORK UNDER THI5 CONTRACT, OR 5U6-CONTRACT5 SHALL CONFORM TO RECENT EDITIONS OF LOCAL, STATE AND NATIONAL CODES, ORDINANCES AND REGULATIONS PERTAINING TO THE WORK, A.C.I., A,N.5.1., A.5.T.M., 0.5.H.A., ETC. /1-4 VERIFYING CONDITIONS - BEFORE COMMENCING WORK, CONTRACTOR SHALL VERIFY MEASUREMENTS AND CONDITIONS AT BUILDING SITE. ANY DIFFERENCES BETWEEN ACTUAL MEASUREMENTS AND THOSE SHOWN ON DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT IN WRITING BEFORE PROCEEDING, 1-6 SURVEYING - OWNER TO PROVIDE ORIGINAL 5UKVEY. CONTRACTOR TO PROVIDE ALL SURVEYING A5 REQUIRED DURING CONSTRUCTION AND SHALL VERIFY ALL SET BACKS AND ELEVATIONS. 1-16 DIMENSIONS - DIMENSIONS FOLLOWED BY+/- GENERALLY ARE TAKEN TO EXISTING WORK. THESE DIMENSIONS SHOULD BE REVIEWED AND ALL NECE55ARY ADJUSTMENTS MADE PRIOR TO FABRICATION AND/OR INSTALLATION OF AFFECTED WORK. NOTIFY ARCHITECT -ENGINEER IF DISCREPANCIES AK15E THAT MAKE IT IMP055113LE TO COMPLETE THE WORK A5 INTENDED, 1-17 FLORIDA BUILDING CODE - THE CONSTRUCTION DOCUMENTS FOR THI5 PROJECT HAS BEEN DESIGNED TO CONFORM WITH THE REQUIREMENTS OF A 120 MPH WIND SPEED, DIVISION TWO - SITE WORK 2-4 CLEARING - REMOVE VEGETATION AND ORGANIC MATTER FROM BUILDING AND PAVEMENT AREA, REMOVE FROM SITE, DO NOT BURY. 2-5 EXCAVATION - EXCAVATE SITE TO LEVELS REQUIRED FOR CONSTRUCTION. STRIP SOIL OF ALL DELETERIOUS MATERIAL 6-0" PAST EXTERIOR OF BUILDING LINES. 2-6 FILL AND COMPACTION - PROVIDE CLEAN WELL -GRADED SAND PLACED IN MAXIMUM 12" LIFTS COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DRY DEN5ITY, A5TM D-1557 AT OPTIMUM M015TUKE CONTENT. COMPACTION 15 TO BE VERIFIED BY AN INDEPENDENT TESTING LABORATORY AND REPORTED TO ARCHITECT PRIOR TO COMMENCEMENT OF FOUNDATION CONSTRUCTION, 2-7 SOIL BEARING - FOUNDATIONS ARE DESIGNED ASSUMING 2500 PSF BEARING CAPACITY, CONTRACTOR 15 TO VERIFY AND TO NOTIFY ARCHITECT, IF SUCH BEARING VALUES CANNOT BE DEVELOPED IN THE 501L UNDER THE BUILDING, THE CONTRACTOR 15 TO NOTIFY THE ARCHITECT IN WRITING, 2-8 SOIL TREATMENT -TREAT COMPACTED SOIL WITH AN APPROVED TERMITE TREATMENT AT RATES SPECIFIED BY MANUFACTURER, TREATMENT SHALL NOT BE MADE WHEN GROUND IS EXCE551VELY WET OR DIRECTLY AFTER HEAVY RAINS, 2-9 61TE GRADING AND DRAINAGE - SEE CIVIL ENGINEER 51TE PLAN FOR DETAILS, DIVISION THREE - CONCRETE 3-2 CONCRETE - STRUCTURAL CONCRETE SHALL DEVELOP A MINIMUM STRENGTH OF 3000 P51 AT 28 DAYS. ALL CONCRETE SHALL BE READY MIXED AND IN ACCORDANCE WITH A5TM C-94, MAXIMUM ALLOWABLE SLUMP TO BE 5". ALL 5LAB5 TO BE 3000 P51 AT 28 DAYS, 3-3 SCOPE - PROVIDE ALL STRUCTURAL CONCRETE, FILLED CELLS, 5LAB5, BEAM5, FOOTINGS, EQUIPMENT PADS, DRIVES, WALKS, ETC, A5 SHOWN ON DRAWINGS OR AS NEEDED TO COMPLETE JOB. 3-4 CONCRETE FORMWORK - ADEQUATE AND SAFE DESIGN OF FORMWORK AND SHORING 15 THE RESPONSIBILITY OF THE CONTRACTOR. SLEEVE 5LAB AND FOOTING AS REQUIRED FOR MECHANICAL AND ELECTRICAL, VERIFY MECHANICAL AND ELECTRICAL REQUIREMENTS FROM OWNERS FIXTUKE'5 SPECIFICATION, 3-5 CRACK CONTROL - PROVIDE 6X6,10/10 GAUGE WELDED WIRE FABRIC IN ALL 5LAB5, WALKS, AND DRIVES AL50 PROVIDE "FOERME51-l" (1.5 L55 PER CUBIC YARD) CRACK CONTROL ADDITIVE PER MANUFACTURER'S SPECIFICATIONS IN ALL SLABS AND MONOLITHIC FOOTING. 3-7 REINFORCEMENT - REINFORCING BARS SHALL CONFORM TO A5TM SPECIFICATION A615. LATEST EDITION, INCLUDING SUPPLEMENTAL REQUIREMENTS AND SHALL BE GRADE 60. SPLICES IN CONCRETE, LAP BARS 42 BAR DIAMETERS. SPLICES IN MA5ONRY, LAP BARS 48 BAR DIAMETERS. AT CORNERS, MAKE HORIZONTAL BARS CONTINUOUS OR PROVIDE CORNER BAR5. 13AR5 INTERSECTING AT RE-ENTRANT CORNERS SHALL CROSS, WITH EACH ENDING AT THE FAR FACE OF THE WALL WITH A STANDARD HOOK AT STANDARD COVER UNLE55 NOTED OTHERWISE ON THE DRAWINGS, AROUND OPENINGS AI?� O STEPS IN WALLS, PROVIDE (2) #65 EXTENDING 2'-0" BEYOND EDGE OF OPENING OR STEP, HORIZONTAL BARS AT THE 1 O)' OF THE BEAMS SHALL BE SPLICED ONLY AT MIDSPAN BETWE' H COLUMN: AND HORIZONTAL BOTTOM BARS SHALL BE 5PLICEi ONLY AT COLUMN CENTERLINE. 3-8 EXPANSION BOLTS- WHERE REQUIRED SHALL BE LOCATED AT A MIN OF 5 BOLT DIAMETERS FROM THE CONCRETE EDGES AND SPACED A MIN OF 10 BOLT DIAMETERS U.N.O. DIVISION FOUR- MASONRY 4-3 FILL MASONRY CELLS - AS STATED WITH VERT. REINFORCEMENT AND AT ALL DOOR / WINDOW JAMB5 AND51LL5 SOLID WITH CONCRETE. AL50 FILL ALL CELLS OF PERIMETER WALLS OF CHIMP ROOMS. 4-1 Unit Masonry - Concrete block units to conform with ASTM C-90; Provide shapes and sizes required to complete the work with a minimum of cutting and piecing. Provide reinforcement of the types shown on the Drawings, 4-2 Mortar - Provide mortar type "5" conforming with ASTM 270. 4-3 Grout - Provide grout in accordance with A5TM C476. 4-4 Execution - Except as shown on the Drawings, lay up the concrete masonry units 1M running bond, tooling all joints except where 5�hCduled to be stucco. 4-5 Horizontal reinforcement 2- Masonry contractor shall provide 9-GA "Ladder" type "Dur-O-wal" horizontal jolnt reinforcement at alternate courses (16" c/c), typ, all walls.Dur-O-wal shall be continuous, with a minimum splice of 6". Provide prefab teae and corner sections as required. All lintel reinforcing bars shall extend not less than 24" beyond each side of all openings. DIVISION FIVE - METALS 5-3 COORDINATE METALS - METALS IN CONTACT WITH EACH OTHER MUST BE SELECTED TO AVOID DIELECTRIC PECOMFO61TION OR SUPPLY ADEQUATE SEPARATING MATERIAL BETWEEN THE TWO DIFFERENT METALS. METAL5/FASTENER5 EXPOSED TO WEATHER SHALL BE 5TAINLE55. STEEL UNLE55 NOTED OTHERlW15E ON THE DRAWINGS. DIVI510N 51X - WOOD AND PLASTICS 6-2 LUMBER - ALL LUMBER PERMANENTLY INCORPORATED INTO THE STRUCTURE SHALL BE AIR OR KILN- DRIED AND SHALL CONTAIN NOT MORE THAN 19% MOISTURE. ELEVATE AND COVER LUMBER ON 61TE TO PROTECT FROM M015TUKE ALL LUMBER AND PLYWOOD SHALL BE IDENTIFIED BY GRADE STAMPS, 1. MIN ALLOWABLE FLEXURAL BENDING STRESS FOR BEAMS SHALL BE 1500 PSI AT NORMAL LOAD DURATION, 2. MIN ALLOWABLE HORIZONTAL SHEAR STRESS FOR BEAMS SHALL BE 90 1'51. 3. MIN ALLOWABLE MODULUS OF ELASTICITY FOR P05T OR BEAMS SHALL BE 1,500,000 PSI. ALL EXTERIOR WALL 5TUD5 TO BE GROUP 2 LUMBER, KILN -DRIED 2X65 MINIMUM F6=1100 P51, 2XW5 MIN. FB 1800. EXCEPT WHERE NOTED, ALL STUDS TO BE STRAIGHT AND TRUE. FRAMING LUMBER TO BE #1 OR BETTER MINIMUM F5=1200 1,51. BLOCKING, BRACING, AND NAILERS SHALL BE UTILITY GRADE AND PROVIDED AS REQUIRED. PROVIDE BLOCKING AT ALL WINDOWS AND DOORS FOR DRAPERY INSTALLATION. 6-4 WOOD IN DIRECT CONTACT WITH CONCRETE, OR MASONRY SHALL BE PRE55URE TREATED WITH THE REQUIREMENT5 OF THE STANDARDS OF THE AMERICAN WOOD PRE5EKVER5 ASSOCIATION. WOOD IN CONTACT WITH SOIL SHALL BE MARINE GRADE TREATED. 6-6 WOOD TRUSSES - PROVIDE TRU55E5 ENGINEERED WITH METAL ROOFING (15#/FT DEAD LOAD EXCEPT AT SOLAR PANEL LOCATIONS SEE DRAWINGS). 1. WOOD TRU55E5 SHALL BE DESIGNED AND CERTIFIED BY A FLORIDA REGISTEP50 STRUCTURAL ENGINEER, INSTALLATION AND TEMPORARY FIELD BRACING SHALL BE IN STRICT ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS AND APPLICABLE CODES AND STANDARDS. APPROVED GALVANIZED TRU55 ANCHORS SHALL BE PROVIDED AT EACH BEARING, INSTALLATION SHALL SEPARATE BOTTOM CHORD OF TRUSSES FROM CONCRETE (WHERE APPLICABLE) WITH EITHER 30# FELT OR 515CCi APPROVED GALVANIZED OR 5TAINLE55 TRU55 5EAT5., 2, PROVIDE 2 X 4 BRIDGING AT 6- 0" CIC AT THE BOTTOM CHORD AND AS OTHERWISE CALLED FOR ON THE TRU55 SHOP DRAWINGS, ADEQUATE BRACING AND BRIDGING SHALL BE USED DURING ERECTION OF THE TRUSSES TO PREVENT COLLAPSE OR DAMAGE TO THE TRU55E5. 3. SUPPORTS FOR ROOFTOP OR CEILING HUNG MECHANICAL EQUIPMENT AND OTHER ITEMS SUPPORTED BY THE WOOD TRU55E5 SHALL BE ATTACHED TO THE TRU55E5 AT PANEL POINTS, THE GENERAL CONTRACTOR SHALL COORDINATE THE gLLATION OF THOSE ITEMS AND A55UPE THAT PROVISIONS ARE MADE IN THE PE51GN OF THE JOIST BY MANUFACTURER rHE CONCENTRATED LOADS IMPOSED AND PIMEN51ONAL SIZE OF THE EQUIPMENT, 9ELD MEASUREMENTS - TRU55 MANUFACTURER TO TAKE MEASUREMENTS IN FIELD AS REQUIRED TO VERIFY OR 'CEMENT DIMENSIONSONDRAWINGS AND A55UME RE5PON51BILITY FOR FIT OF WOOD TRU55E5. COMPLY WITH "FASTENING SCHEDULE" OF THE S:B.C.C.1; 2001 EDITION AND OTHER FASTENING REQUIREMENTS CONTAINED IN THE PERTINENT REGULATIONS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION, 6-10 METAL FASTENERS, CLIPS, HOLDDOWN5 - ALL MODEL NUMBERS ARE PER 5IMP5ON STRONG- TIE COMPANY, INC. IF AN ALTERNATIVE MANUFACTURE 15 USED - SUBMIT ALLOWABLE LOADS, CAPACITIES TO THE ARCHITECT FOR APPROVAL, 6.11 SHEATHING 1. WALL SHEATHING - SHALL BE 4' X 8' X 5/8" (MIN.) COX PLYWOOD AND SHALL BE NAILED WITH HOT DIPPED GALVANIZED BOX OR COMMON NAILS AS FOLLOWS: EDGE NAILING -10D AT 4"O.C. TOP AND BOTTOM PLATE NAILING -10D AT 4"O.C. INTERMEDIATE NAILING -10P AT 6"O.C. 2. ROOF SHEATHING - SHALL BE 4' X 8' X 5/8"(MIN•) CDX PLYWOOD. INSTALL THE PANEL'S LONG DIMENSION PERPENDICULAR TO THE FRAMING. SHEATHING FA5TENER5 SHALL BE 101) HOT DIPPED GALVANIZED BOX OR COMMON NAILS AT 4"O.C, AT EDGES AND 4"O,C. AT INTERMEDIATE FRAMING EXCEPT A5 FOLLOWS: USE 8D RING -SHANK NAILS AND ADHESIVE FOR ALL FASTENING WITHIN 5' OF A GABLE END. USE 4" FA5TENEK SPACING AT GABLE ENDWALL OR GABLE TRU55. DIVISION SEVEN - THERMAL AND MOISTURE PROTECTION 7-1 WATERPROOFING - COORDINATE WATERPROOFING WITH OTHER TRADES AND MAKE PROVISIONS FOR THEIR WORK TO AVOID CUTTING AND PATCHING. 7-2 FLASHING AND SHEET METAL - PROVIDE FLASHING AND SHEET METAL NOT SPECIFICALLY DE5CRIBED IN OTHER 5ECTION5 OF THESE 5PECIFICATION5 BUT REQUIRED TO PREVENT PENETRATION OF WATER THROUGH THE EXTERIOR SHELL OF THE BUILDING COMPLYING WITH PERTINENT RECOMMENDATIONS CONTAINED IN CURRENT EDITION OF 5MAACNA'5 "ARCHITECTURAL SHEET METAL MANUAL." ALL FLASHING TO BE GALVALUME COMPATIBLE WITH ROOFING MATERIAL UNLESS OTHERWISE NOTED 7-4 SEALANTS AND CAULKING - STANDARD CAULKING COMPOUND SHALL BE A ONE PART ACRYLIC LATEX COMPOUND POLY -SEAM SEAL CAULKING OR EQUAL. COLOR SHALL BE MANUFACTURER'S STANDARD FAINTA13LE GRADE. 7-10 ROOFING METAL STANDING SEAM - PROVIDE A 12" WIDE 26 GA GALVALUME ROOF PANEL AND A 50 YEAR GUARANTEE (MANUF FROM MARTIN CO. APPROVED LIST). INSTALL THE PANELS CONTINUOUS WITHOUT SEAM PEKPINDICULAR TO SLOPE, INSTALLATION SHALL BE FOR A COMPLETE WEATHERPROOF 5Y5TEM WITH ALL APPLICABLE ACCESSORIES AND AS RECOMMENDED BY THE MANUFACTURER. 7-11 UNDERLAYMENT - 30 LB. FELT PLASTIC TAGGED TO 5/8" EXTERIOR PLYWOOD. DIVISION EIGHT - DOORS AND WINDOWS 6-1 DOORS AND FRAMES - PROVIDE ALL DOORS AND FRAMES PER THE SCHEDULE. HOLLOW AND INSULATED DOORS SHALL BE TOTAL ENCL05ED WITHOUT RODENT GAP INTO PANEL. ALL DOOK5 AND FRAMES SHALL BE EXTERIOR CONDITION METAL (GALV, OR SIMILAR) AND PRIMED. 8-2 WINDOWS - PROVIDE ALL WINDOWS WHITE'PGT' MANUF, OR 51MILAR TRUE AND PLUMB AS INDICATED ON SCHEDULE. WINDOW AND ACCESSORIES TO CONFORM TO 120 MPH WIND REQUIREMENT5, ALL GLAZING SHALL BE GREY TINTED, 8-3 WINDOW AND DOOR FRAMES SHALL BE ANCHORED DIRECTLY INTO A 50LID CONCRETE OR GROUT JAMB WITH 1/4" X 3114" MASONRY SCREW (IE. TAP -CON) FOR 11/4" MIN. EMBEDMENT AT 12" OC AND EACH END. DIV15ION NINE - FIN15HE5 9-1 STUCCO - 2. 2-COAT5 OVER CONCRETE UNIT MASONRY: BASE COAT-1 PART PORTLAND CEMENT, 3/4 TO 11/2 PART LIME, 3-4 PARTS SAND 3. FINISH COAT: 1 PART PORTLAND CEMENT, 314 TO 11/2 PART LIME, 3 PARTS 5AND 9-2 WALLBOARD ALL WALL AND SOFFIT BOARD SHALL BE A CEMENTIOU5 PANEL AND BATTEN (IE'HAKDIBOARD'), SCREW 6" OC AT EDGES AND 12" IN FIELD WITH GALV (RUST FE515TANT SCREWS), 9-4 PAINTING 1. PREPARE SUBSTRATE AND APPLY PAINT COATINGS IN STRICT ACCORDANCE WITH RECOMMENDATIONS OF THE MANUFACTURER OF THE APPROVED PAINT SYSTEM. 2. ALL 5URFACE5 SHALL BE COVERED WITH THE MINIMUM NUMBER OF COATS A5 LISTED. ADDITIONAL COVERAGE SHALL BE PROVIDED AS REQUIRED TO COVER ALL HOLIDAYS. 9-5 FLOORING SHALL BE EXPOSED CONCRETE WITH SMOOTH TROWEL FINISH, APPLY 2 COATS OF CLEAR PENETRATING SEALER. DIVISION TEN - SPECIALTIES PROVIDE SPECIALTIES AND INSTALL SPECIALTIES A5 NOTED, PROVIDE ALL BLOCKING, RECE55E5, ETC. A8 KEO; 7ED FOR INSTALLATION OF SPECIALTIES. 10-8 CABINETS SHALL BE PLYWOOD AND PLASTIC LAMINATE FINISH LOCATED PER THE DRAWINGS AND THE CON. RACTOR FOR COORDINATION OF SHOP DRAWINGS AND INSTALLATION, DIVISION ELEVEN - EQUIPMENT 11-3 ATTIC ACCE55: PROVIDE PULL DOWN STAIR AND ATTIC HATCH A5 INDICATED ON PLANS DIVISION TWELVE - FURNISHINGS NOT APPLICABLE DIVISION THIRTEEN - SPECIAL CONSTRUCTION 13-150LAF WATER HEATER PANELS- PROVIDE 10 0 47 8' PANELS TO BE MOUNTED ON THE ROOF. THE PANELS ARE PT-50-CN PER 'PKOGKE551VTUBE', THE MOUNTS ARE ADJUSTABLE AND FIXED TYPE AND INSTALLED PER THE MANUFACTURE'S SPECIFICATIONS. MOUNTING CLIPS SHALL BE SURFACE ANCHORED THROUGH THE ROOFING MATERIAL IN A PERMANENT ELASTIC POLYURETHANE SEALANT BED. DIVISION FIFTEEN - MECHANICAL 15-1 HEATING SYSTEM 1. PROVIDE SYSTEMS AS SHOWN ON DRAWINGS, THERMOSTAT AND CONTROLS AS REQUIRED TO RUN SYSTEM, HVAC CONTRACTOR SHALL BECOME FAMILIAR WITH SITE, DOCUMENTS PERTAINING TO SCOPE OF WORK, AND GENERAL CONSTRUCTION. READ AND BECOME FAMILIAR WITH SPECIFICATIONS AND SHALL PERFORM HIS WORK IN FULL ACCORDANCE WITH ALL APPLICABLE PARAGRAPHS. LAYOUT, BALANCING AND TESTING NECE55ARY FOR COMPLETE INSTALLATION OF HEATING SYSTEMS AS REQUIRED BY CLIMATE, NATURE OF CONSTRUCTION, AND SITE TO THE SATISFACTION OF THE OWNER. THE RETURN AIR 15 A DIRECT GRILL TO UNIT. 2. PROVIDE CONDENSATE DRAIN 26 GAUGE GAL VANIZED AUXILIARY PAN AND DRAIN TO EXTERIOR, 3. DUCTWORK SHALL BE K-6 DUCTBOARD WITH SINGLE EXTENTION5 OF FLEXIBLE DUCT (NO FLEX TO FLEX CONNECTION). 4. SUPPLY GRILLS SHALL BE WHITE PAINTED ALUMINUM WITH DIRECTIONAL BLADE DAMPERS. 15-2 PLUMBING 1. PROVIDE PLUMBING 5Y5TEM, COMPLETE IN PLACE, TESTED AND APPROVED, WHERE SHOWN ON THE DRAWING5, A5 SPECIFIED HEREIN, AND A5 NEEDED FOR A COMPLETE AND PROPER JOB. 2. ALL PLUMBING WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE 5TANDARO PLUMBING CODE, LOCAL ORDINANCES AND IN COMPLIANCE WITH THE ENERGY CONSERVATION CODE. 3. HOSE BIBS SHALL BE 13RA55 OR BRONZE, FASTENED SECURELY 18" ABOVE GRADE WHERE SHOWN ON DRAWINGS. ALL HOSE BI135 SHALL HAVE A NON -REMOVABLE ANTI -SYPHON DEVICE INSTALLED. 4. FIXTURES SHALL BE PROTECTED AGAINST WATER HAMMER WITH AIR CHAMBERS WHEN REQUIRED. 5. PROVIDE SHUT OFF VALVES TO ALL MAINS ENTERING THE BUILDING AND EACH PIECE OF EQUIPMENT. 6. INSTALL DIELECTRIC UNION AT INLET AND OUTLET OF WATER HEATER, 7. BUILDING 5EWER5, VENTS, AND ALL UNDERGROUND DRAINAGE LINES SHALL BE SCHEDULE 40 M. 8. WATER PIPING TO BE SOFT TYPE L. COPPER, UNDER 5LAB, HARD ABOVE 5LAB. 10. INSULATION - PROVIDE PIPE INSULATION ON REFRIGERANT LINES AND DOMESTIC WATER LINES AS PER INDUSTRY STANDARDS. INSULATION EXF05EP TO WEATHER SHALL BE PROTECTED AS REQUIRED. 11. GATHER VENTS IN ATTIC A5 ALLOWED AND VENT TOWARD REAR OF HOUSE. 12, PROVIDE 3 # 120 GAL. WATER HEATERS IN AN APPROVED PAN. INSTALL DIELECTRIC UNION AT THE INLET AND OUTLET OF THE WATER HEATER. 13, ALL PLUMBING FIXTURES AND FAUCETS SHALL BE PROVIDED BY THE OWNER. DIVISION SIXTEEN - ELECTRICAL 16-15COPE: FURNISH ALL EQUIPMENT AND MATERIALS AND PERFORM ALL LABOR AND SERVICES NECE55ARY TO INSTALLATION FOR A COMPLETE SYSTEM FOR LIGHTING AND POWER, EACH SYSTEM SHALL BE COMPLETE IN ALL RESPECTS AND SHALL BE TURNED OVER TO OWNER IN A FIR6T-CLA55 OPERATING CONDITION AND FULLY TESTED AND COMPLETE WITH ALL DEVICES WHICH ARE NORMAL FOR INTENDED 5Y5TEM5 AND TH05E REQUIRED FOR THEIR SAFE OPERATION. 16-2 MATERIALS AND MANNER OF INSTALLATION OF ELECTRICAL SYSTEM SHALL BE IN STRICT ACCORDANCE WITH THE A GOVERNING AUTHORITIES THELOC L TH REQUIREMENTSOF 6 HAVING JURISDICTION, AND THE STANDARDS J ION T HOARDS SET FORT H BY NFPA, U.L., OR OTHER RECOGNIZED TESTING LABORATORIES. THE INSTALLATION SHALL CONFORM TO THE LATEST EDITION OF THE NEC, 16-3 EQUIPMENT MOUNTED ON THE EXTERIOR OF THE BUILDING SHALL BE DESIGNED, LABELED, AND INSTALLED FOR EXTERIOR, WEATHERPROOF SERVICE CONDITIONS, 16-4 SERVICE: CONTRACTOR SHALL CARRY OUT ALL REQUIRED ARRANGEMENTS WITH FPL FOR INSTALLATION OF THE SERVICE, 2 PERMITS, AND INSPECTION. o O e Q 16-7 PANEL SCHEDULE: PANEL SHALL BE CLEARLY MARKED A5 TO ALL CIRCUITS. � o U 16-8 ALL WIRING SHALL BE IN CONDUIT WITH THW COPPER, q � 16-12 PROVIDE GROUND FAULT PROTECTION ON ALL CIRCUITS SHOWN ON THE PANEL SCHEDULE, USING GROUND FAULT F INTERRUPTING BREAKERS, OR DEVICES. �r 0 16-13 LIGHT FIXTURES -ALL FIXTURES WILL BE PROVIDED BY OWNER AND INSTALLED BY CONTRACTOR. � o o N N F � a � r 4" VTR <1�' SINK AND I WASHER rn � m I 1 6 11/2"FL I a I I ii I W/TRAPAIN I ANDNK 4" 3" WA5HER �� O I pp 3" WC O *'FL DRAIN W/TRAP 3" PLUM [31NG FIXTURE RI •�� 4" 6" RA FL DRAIN 3" n -1" PPAIN U TO HUMAN SEPTIC 0 / SYSTEM 4" V U 8" OPEN CONC TRENCH 4" DRAIN N \ ON ITSLOP('D 6" REDUCTION :) FIFE 4" 8" OPEN CONC TRENCH C.O. U _ GROUT SLOPED REDUCTION TO PI GATE VALVE W/ 6" MANUAL a' 1 CONTROLS `�,J 0 OPEN TRENCH 4" J R15ER c� . r , 6 TO CHIMP SEPTIC 0 0 LL SYSTEM L CU CL (1) L THESE PLANS AND ALL PROPOSED WORK = 4-J U ARE SUBJECT TO ANY CORRECTIONS ^�^�� FL 12 � W REQUIRED BY FIELD INSPECTORS THAT � f ;l U � 2 I q , MAY BE NECESSARY IN ORDER TO HARDIBD � 1` * � _. b v,:; 2s I , � �, . MAY Vti ,... �: 5 DING ��, 1T R 3 z $ SLAB H ALL APPLiCx ES %$� n r.II �, £,,#� rt •� .S ,,, $ .. ��e q;�18 x. %� �s ',.yi a. n€ kg S r `TikY - d&i �` �k` xa� �1��* y"E e F£�' �•� n � xa, f, �n����. &�i,' `t5k� . �'i � y. i r+ con ► r. °...' r..:' ,� M... d',6.:A ?`' b HARDIBD ..:•......b•... ......... .... .. ..':. .. :::'. .o.• •.'P;DING 0 ' i a< x' .. yr" 'I�� r ,.: u• �y �0 OVERHEAD y CHUTE i J EXPOSED O� CMU PTD O N Building -1/4" = 1 '-011 Section CONSTRUCTION CORPORATION LIC, CGO013084 '0"'1 w JOB # 03-0501 DATE 10i02iO3 SHEET A 6 (tK1) orIY„X (MA) wH CENTER FOR CAPTIVE CHIMPANZEE -01VI510N ONE - GENERAL REQUIREMENTS 1-1 INTERPRETATION OF PLANS - THE ARCHITECTS SERVICES DOES NOT INCLUDE 5UPEKVI6ION OF CONSTRUCTION. THE ARCHITECT DIVEST HIMSELF OF THE RESPONSIBILITY OF THE WORK, ERRORS OR EMISSIONS RESULTING FROM THE INTERPRETATION OF THE PLANS. IF THE CONTRACTOR BELIEVES HE HAS DISCOVERED ERROR5 OR OMISSIONS IN THE PLANS THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING FOR CLARIFICATION BEFORE CONTINUING WORK. 1-2 APPLICABLE STANDARDS - ALL WORK UNDER THIS CONTRACT, OR SUB -CONTRACTS SHALL CONFORM TO RECENT EDITIONS OF LOCAL, STATE AND NATIONAL CODES, ORDINANCES AND REGULATIONS PERTAINING TO THE WORK, A.G.I., A.N.5.1., A.S.T.M., 0.5.H.A„ ETC. 1-4 VERIFYING CONDITIONS - BEFORE COMMENCING WORK, CONTRACTOR SHALL VERIFY MEA5UREMENTS AND CONDITIONS AT BUILDING SITE. ANY DIFFERENCES BETWEEN ACTUAL MEASUREMENTS AND THOSE SHOWN ON DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT IN WRITING BEFORE PROCEEDING. 1-6 SURVEYING - OWNER TO PROVIDE ORIGINAL SURVEY, CONTRACTOR TO PROVIDE ALL SURVEYING AS REQUIRED DURING CONSTRUCTION AND SHALL VERIFY ALL SET BACKS AND ELEVATIONS, 1-16 DIMENSIONS - DIMENSIONS FOLLOWED BY+/- GENERALLY ARE TAKEN TO EXISTING WORK, THESE DIMENSIONS SHOULD BE REVIEWED AND ALL NECE55ARY ADJU5TMENT5 MADE PRIOR TO FABRICATION AND/OR INSTALLATION OF AFFECTED WORK. NOTIFY ARCHITECT -ENGINEER IF D15CREPANCIE5 ARISE THAT MAKE IT IMPOSSIBLE TO COMPLETE THE WORK AS INTENDED. 1-17 FLORIDA BUILDING CODE - THE CONSTRUCTION DOCUMENTS FOR THIS PROJECT HAS BEEN DESIGNED TO CONFORM WITH THE REQUIREMENTS OF A 120 MPH WIND 5PEED, DIVISION TWO - 517E WORK 2-4 CLEARING - REMOVE VEGETATION AND ORGANIC MATTER FROM BUILDING AND PAVEMENT AREA. REMOVE FROM SITE. DO NOT BURY. 2-5 EXCAVATION - EXCAVATE 51TE TO LEVELS REQUIRED FOR CONSTRUCTION, STRIP SOIL OF ALL DELETERIOUS MATERIAL 6-0" PAST EXTERIOR OF BUILDING LINES. 2-6 FILL AND COMPACTION - PROVIDE CLEAN WELL -GRADED SAND PLACED IN MAXIMUM 12" LIFTS COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DRY DENSITY, A57M 0-1557 AT OPTIMUM M016TUKE CONTENT, COMPACTION 15 TO BE VERIFIED BY f AN INDEPENDENT TESTING LABORATORY AND REPORTED TO ARCHITECT PRIOR TO COMMENCEMENT OF FOUNDATION CONSTRUCTION, 2-7 SOIL BEARING - FOUNDATIONS ARE DESIGNED ASSUMING 2500 P5F BEARING CAPACITY. CONTRACTOR 15 TO VERIFY AND TO NOTIFY ARCHITECT, IF SUCH BEARING VALUES CANNOT BE DEVELOPED IN THE 501L UNDER THE BUILDING, THE CONTRACTOR 15 TO NOTIFY THE ARCHITECT IN WRITING. "i 2-8 501L TREATMENT - TREAT COMPACTED SOIL WITH AN APPROVED TERMITE TREATMENT AT RATES SPECIFIED BY Fc" MANUFACTURER. TREATMENT SHALL NOT BE MADE WHEN GROUND 15 EXCESSIVELY WET OR DIRECTLY AFTER HEAVY RAINS. 2-9 SITE GRADING AND DRAINAGE - SEE CIVIL ENGINEER 51TE PLAN FOR DETAILS. DIV15ION THREE - CONCRETE 3-2 CONCRETE - STRUCTURAL CONCRETE SHALL DEVELOP A MINIMUM STRENGTH OF 5000 P5I AT 28 DAYS. ALL CONCRETE SHALL BE READY MIXED AND IN ACCORDANCE WITH A5TM C-94, MAXIMUM ALLOWABLE SLUMP TO BE 5". ALL SLABS TO BE 3000 PSI AT 28 DAYS, 3-3 SCOPE - PROVIDE ALL STRUCTURAL CONCRETE, FILLED CELLS, SLABS, BEAMS, FOOTINGS, EQUIPMENT PADS, DRIVES, WALKS, ETC. AS SHOWN ON DRAWINGS OK AS NEEDED TO COMPLETE JOB. 3-4 CONCRETE FORMWORK - ADEQUATE AND SAFE DE51GN OF FORMWORK AND SHORING 15 THE RESPONSIBILITY OF THE CONTRACTOR. SLEEVE SLAB AND FOOTING AS REQUIRED FOR MECHANICAL AND ELECTRICAL. VERIFY MECHANICAL AND ELECTRICAL REQUIREMENTS FROM OWNERS FIXTURE'5 SPECIFICATION. 3-5 CRACK CONTROL - PROVIDE 6X6,10/10 GAUGE WELDED WIRE FABRIC IN ALL SLABS, WALKS, AND DRIVES AL50 PROVIDE "FI15ERME5H" (1.5 LB5 PER CUBIC YARD) CRACK CONTROL ADDITIVE PER MANUFACTURER'S SPECIFICATIONS IN ALL 6LA55 AND MONOLITHIC FOOTING, 3-7 REINFORCEMENT - REINFORCING BARS SHALL CONFORM TO A5TM SPECIFICATION A615. LATEST EDITION, INCLUDING SUPPLEMENTAL REQUIREMENTS AND SHALL BE GRADE 60. SPLICES IN CONCRETE, LAP BARS 42 BAR DIAMETERS, SPLICES IN MASONRY, LAP 5AR5 48 BAR DIAMETERS. AT CORNERS, MAKE HORIZONTAL BARS CONTINUOUS OR PROVIDE CORNER BARS. BARS INTERSECTING AT RE-ENTRANT CORNERS SHALL CROSS, WITH EACH ENDING AT THE FAR FACE OF THE WALL WITH A STANDARD HOOK AT STANDARD COVER UNLE55 NOTED OTHERWISE ON THE DRAWIN05. AROUND OPENINGS AND STEPS IN WALL5, PROVIDE (2) #66 EXTENDING 2-O" BEYOND EDGE OF OPENING OR STEP, HORIZONTAL BAR5 AT THE TOP OF THE BEAMS SHALL BE SPLICED ONLY AT MID5PAN BETWEEN COLUMNS AND HORIZONTAL BOTTOM BAR5 SHALL BE SPLICED ONLY AT COLUMN CENTERLINE. 3-8 EXPANSION BOLTS- WHERE REQUIRED SHALL BE LOCATED AT A MIN OF 5 BOLT 01AMETER5 FROM THE CONCRETE EDGES AND SPACED A MIN OF 10 BOLT DIAMETERS U.N.O. DIVISION FOUR- MASONRY 4-3 FILL MASONRY CELLS - A5 STATED WITH VERT. REINFORCEMENT AND AT ALL DOOR / WINDOW JAM55 AND SILLS SOLID WITH CONCRETE. AL50 FILL ALL CELL5 OF PERIMETER WALL5 OF CHIMP ROOMS, 4-1 Unit Masonry - Concrete block units to conform with A5TM C-90. Provide shapes and Sizes required to complete the work with a minimum of cutting and piecing. Provide reinforcement of the types shown on the Drawingo• 4-2 Mortar - Provide mortar type "5" conforming with A5TM 270. 4-3 Grout - Provide grout in accordance with A5TM C476. 4-4 Execution - Except ae shown on the Drawings, lay up the concrete masonry units in running bond, tooling all jointaexcept where scheduled to be stucco. 4-5 Horizontal reinforcement 2. Masonry contractor shall provide 9-GA "Ladder" type "Dur-O-wal" horizontal joint reinforcement at alternate coureee (16" cic), typ, all walls. Dur-O-wal shall be continuous, with a minimum eplice of 6". Provide prefab tees and corner sections ae required. All lintel reinforcing bare shall extend not less than 24" beyond each side of all openings, DIVISION FIVE - METALS 5.3 COORDINATE METALS - METALS IN CONTACT WITH EACH OTHER MUST BE SELECTED TO AVOID DIELECTRIC DECOMPOSITION OR SUPPLY ADEQUATE SEPARATING MATERIAL BETWEEN THE TWO DIFFERENT METALS. METAL5/FA5TENER5 EXPOSED TO WEATHER SHALL BE 5TAINLE55 STEEL UNLE55 NOTED OTHERWISE ON THE DRAWIN05. DIVISION 51X - WOOD AND PLASTICS 6-2 LUMBER - ALL LUMBER PERMANENTLY INCORPORATED INTO THE STRUCTURE SHALL BE AIR OR KILN- DRIED AND SHALL CONTAIN NOT MORE THAN 19% MOISTURE. ELEVATE AND COVER LUMBER ON 51TE TO PROTECT FROM M015TURE. ALL LUMBER AND PLYWOOD SHALL BE IDENTIFIED BY GRADE STAMPS. 1. MIN ALLOWABLE FLEXURAL BENDING STRESS FOR BEAMS SHALL BE 1500 P51 AT NORMAL LOAD DURATION.'. 2. MIN ALLOWABLE HORIZONTAL SHEAR 5TRE55 FOR BEAMS SHALL BE 90 PSI, 3. MIN ALLOWABLE MODULUS OF ELASTICITY FOR P05T OR 5EAM5 SHALL BE 1,500,000 P51. ALL EXTERIOR WALL STUDS TO BE GROUP 2 LUMBER, KILN -DRIED 2X65 MINIMUM FB41100 P51, 2X475 MIN. FB 1800, EXCEPT WHERE NOTED. ALL STUDS TO BE STRAIGHT AND TRUE. FRAMING LUMBER TO BE #1 OR BETTER, MINIMUM FB=1200 P51. BLOCKING, BRACING, AND NAILEKS SHALL BE UTILITY GRADE AND PROVIDED AS REQUIRED. PROVIDE BLOCKING AT ALL WINDOWS DOOR5 FOP DRAPERY INSTALLATION. VOOD IN DIRECT CONTACT WITH CONCRETE, OR MASONRY SHALL BE PRESSURE TIKEATED WITH THE REQUIREMENTS OF THE JDARD5 OF THE AMERICAN WOOD PRE5ERVEK5 ASSOCIATION. WOOD IN CONTACT WITH SOIL SHALL 4E MARINE GRADE TEP, MOOD TRUSSES - PROVIDE TRUSSES ENGINEERED WITH METAL ROOFING (15#/FT DEAD LOAD EXCEPT AT SOLAR PANEL 5 SEE DRAWING5). TRUSSES SHALL BE DESIGNED AND CERTIFIED BY FLORIDA REGISTERED STRUCTURAL ENGINEER. INSTALLATION AND KY FIELD BRACING SHALL BE IN STRICT ACCORDANCE WITH MANUFACTURERS 5PECIFICATION5AND APPLICABLE CODES JDARD5, D GALVANIZED TRUSS ANCHOR5 SHALL BE PROVIDED AT EACH BEARING. INSTALLATION SHALL SEPARATE BOTTOM 35E5 FROM CONCRETE (WHERE APPLICABLE) WITH EITHER 30# FELT OR 5BCCI APPROVED GALVANIZED OK J55 SEATS. 4 BRIDGING AT 8' - 0" C/C AT THE BOTTOM CHORD AND AS OTHERWI&E CALLED FOR ON THE TRUE5 SHOP ' EQUATE BRACING AND BRIDGING SHALL BE USED DURING ERECTION OF THE TRUSSES TO PREVENT COLLAPSE THE TRUSSES. OR ROOF TOP OR CEILING HUNG MECHANICAL EQUIPMENT AND OTHER ITEMS SUPPORTED BY THE WOOD .ATTACHED TO THE TRUSSES AT PANEL POINTS. THE GENERAL CONTRACTOR SHALL COORDINATE THE 105E ITEMS AND A55URE THAT PROVI510N5 ARE MADE IN THE OF51GN OF THE J015T BY MANUFACTURER ATED LCAD5 IMPOSED AND DIMEN51ONAL SIZE OF THE EQUIPMENT. MENT5 - TKU65 MANUFACTURER TO TAKE MEASUREMENTS IN FIELD A5 REQUIRED TO VERIFY OR J510N5 ON DRAWIN55 AND A55UME RE5PON51BILITY FOR FIT OF WOOD TRUSSES. COMPLY WITH "FASTENING SCHEDULE" OF THE S.B.GC.1.2001 EDITION AND OTHER FASTENING REQUIREMENTS CONTAINED IN THE PERTINENT REGULATIONS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION, 6-10 METAL FASTENERS, CLIPS, HOLDDOWN5 - ALL MODEL NUMBERS ARE PER SIMPSON STRONG- TIE COMPANY, INC. IF AN ALTERNATIVE MANUFACTURE IS USED - SUBMIT ALLOWABLE LOADS, CAPACITIES TO THE ARCHITECT FOR APPROVAL. 6-11 SHEATHING 1. WALL SHEATHING -SHALL BE 4' X 8' X 5/8" (MIN.) CDX PLYWOOD AND SHALL BE NAILED WITH HOT DIPPED GALVANIZED BOX OR COMMON NAILS AS FOLLOWS: EDGE NAILING -100 AT 4" O.C. TOP AND BOTTOM PLATE NAILING -10D AT 4'O.C. INTERMEDIATE NAILING - 10D AT 8"O.C. 2. ROOF SHEATHING - 5HALL BE 4' X 8' X 5/8"(MIN.) CDX PLYWOOD. INSTALL THE PANEL'S LONG DIMENSION PERPENDICULAR TO THE FRAMING. SHEATHING FASTENERS SHALL BE 101) HOT DIPPED GALVANIZED BOX OR COMMON NAILS AT 4"O.C. AT EDGES AND 4"O.C. AT INTERMEDIATE FRAMING EXCEPT AS FOLLOWS: USE 80 RING -SHANK NAILS AND ADHESIVE FOR ALL FASTENING WITHIN 5' OF A GABLE END. USE 4" FASTENER SPACING AT GABLE ENDWALL OR GABLE TRUSS. DIVISION SEVEN - THERMAL AND MOISTURE PROTECTION 7-1 WATERPROOFING - COORDINATE WATERPROOFING WITH OTHER TRADES AND MAKE PROVISIONS FOR THEIR WORK TO AVOID CUTTING AND PATCHING. 7-2 FLASHING AND SHEET METAL - PROVIDE FLASHING AND SHEET METAL NOT SPECIFICALLY DESCRIBED IN OTHER SECTIONS OF THESE SPECIFICATIONS BUT REQUIRED TO PREVENT PENETRATION OF WATER THROUGH THE EXTERIOR SHELL OF THE BUILDING COMPLYING WITH PERTINENT RECOMMENDATIONS CONTAINED IN CURRENT EDITION OF 5MAACNA'6 "ARCHITECTURAL SHEET METAL MANUAL." ALL FLASHING TO BE GALVALUME COMPATIBLE WITH ROOFING MATERIAL UNLE55 OTHERWISE NOTED. 7-4 SEALANTS AND CAULKING - STANDARD CAULKING COMPOUND SHALL BE A ONE PART ACRYLIC LATEX COMPOUND POLY -SEAM 5EAL CAULKING OK EQUAL. COLOR SHALL BE MANUFACTURER'S STANDARD PAINTA13LE GRADE. 7-10 ROOFING METAL STANDING SEAM - PROVIDE A IT WIDE 26 GA GALVALUME ROOF PANEL AND A 50 YEAR GUARANTEE (MANUF FROM MARTIN CO. APPROVED LIST). INSTALL THE PANELS CONTINUOUS WITHOUT SEAM PERPINDICULAR TO SLOPE. INSTALLATION SHALL BE FOR A COMPLETE WEATHERPROOF SYSTEM WITH ALL APPLICABLE ACCESSORIES AND AS RECOMMENDED BYTHE MANUFACTURER. 7-11 UNDERLAYMENT - 30 LB. FELT PLASTIC TAGGED TO 5/8" EXTERIOR PLYWOOD. DIVISION EIGHT - DOORS AND WINDOWS 8-1 DOORS AND FRAMES - PROVIDE ALL DOOR5 AND FRAMES PER THE SCHEDULE, HOLLOW AND INSULATED DOORS SHALL BE TOTAL ENCL05ED WITHOUT RODENT GAP INTO PANEL. ALL DOORS AND FRAMES SHALL BE EXTERIOR CONDITION METAL (GALV. OR SIMILAR) AND PRIMED. 8-2 WINDOWS - PROVIDE ALL WINDOWS WHITE'PGT MANUF, OR 51MILAR TRUE AND PLUMB AS INDICATED ON SCHEDULE, WINDOW AND ACCE55ORIE5 TO CONFORM TO 120 MPH WIND REQUIREMENTS. ALL GLAZING SHALL BE GREY TINTED. 8-3 WINDOW AND DOOR FRAMES SHALL BE ANCHORED DIRECTLY INTO A SOLID CONCRETE OR GROUT JAMB WITH V4" X 31/4" MASONRY SCREW (IE. TAP -CON) FOR 1 1/4" MIN. EMBEDMENT AT 12" OC AND EACH END. DIVISION NINE - FINISHES 9-1 STUCCO - 2. 2-COAT5 OVER CONCRETE UNIT MASONRY: BASE COAT-1 PART PORTLAND CEMENT, 3/4 TO 1 1/2 PART LIME, 3-4 PARTS SAND 3..FINI5H COAT: 1 PART PORTLAND CEMENT, 314 TO 11/2 PART LIME, 3 PARTS SAND 9-2 WALLBOARD ALL WALL AND SOFFIT BOARD SHALL BE A CEMENTIOU5 PANEL AND BATTEN (IE'HAKDIBOARD'), SCREW 6" OC AT EDGES AND 12" IN FIELD WITH GALV (KU5T RESISTANT SCREWS), 9-4 PAINTING 1. PREPARE 5UB5TIZATE AND APPLY PAINT COATfNG5 IN 5TRICT ACCORDANCE WITH RECOMMENDATIONS OF THE MANUFACTURER OF THE APPROVED PAINT SYSTEM. 2. ALL 5URFACE5 SHALL BE COVERED WITH THE MINIMUM NUMBER OF COATS AS LISTED. ADDITIONAL COVERAGE SHALL BE PROVIDED AS REQUIRED TO COVER ALL HOLIDAYS, 9-5 FLOORING SHALL BE EXPOSED CONCRETE WITH SMOOTH TROWEL FINISH. APPLY 2 COATS OF CLEAR PENETRATING SEALER. DIVISION TEN - 5PECIALTIE5 PROVIDE SPECIALTIES AND INSTALL SPECIALTIES AS NOTED, PROVIDE ALL BLOCKING, RECESSES, ETC. AS REQUIRED FOR INSTALLATION OF SPECIALTIES. 10-8 CABINETS SHALL BE PLYWOOD AND PLASTIC LAMINATE FINISH LOCATED PER THE DRAWINGS AND THE CONTRACTOR FOR COORDINATION OF SHOP DRAWINGS AMC) INSTALLATION. DIVISION ELEVEN - EQUIPMENT 11-3 ATTIC ACCE55: PROVIDE PULL DOWN STAIR AND ATTIC HATCH A5 INDICATED ON PLANS DIVISION TWELVE - FURN15HINC75 NOT APPLICABLE DIV151ON THIRTEEN - SPECIAL CONSTRUCTION 13-1 SOLAR WATER HEATER PANELS- PROVIDE 10 r 4'X 8' PANELS TO BE MOUNTED ON THE ROOF. THE PANELS ARE PT-50-CN PER 'PROGRE551VTU5E'. THE MOUNTS ARE ADJUSTABLE AND FIXED TYPE AND INSTALLED PER THE MANUFACTURE'S SPECIFICATIONS MOUNTING CLIPS SHALL BE SURFACE ANCHORED THROUGH THE ROOFING MATERIAL IN A PERMANENT ELASTIC POLYURETHANE SEALANT BED. DIVISION FIFTEEN - MECHANICAL 15-1 HEATING SYSTEM 1. PROVIDE 5Y5TEM5 A5 SHOWN ON DRAWINGS, THERMOSTAT AND CONTROLS A5 REQUIRED TO RUN SYSTEM. HVAC CONTRACTOR SHALL BECOME FAMILIAR WITH SITE, DOCUMENTS PERTAINING TO SCOPE OF WORK, AND GENERAL CONSTRUCTION, READ AND BECOME FAMILIAR WITH SPECIFICATIONS AND SHALL PERFORM HIS WORK IN FULL ACCORDANCE WITH ALL APPLICABLE PARAGRAPHS, LAYOUT, BALANCING AND TESTING NECESSARY FOR COMPLETE INSTALLATION OF HEATING SYSTEMS AS REQUIRED BY CLIMATE, NATURE OF CONSTRUCTION, AND 511E TO THE SATISFACTION OF THE OWNER. THE RETURN AIR 15 A DIRECT GRILL TO UNIT. 2, PROVIDE CONDENSATE DRAIN, 26 GAUGE GALVANIZED AUXILIARY PAN AND DRAIN TO EXTERIOR. 3. DUCTWORK SHALL BE R-6 DUCTBOARD WITH SINGLE EXTENTION5 OF FLEXIBLE DUCT (NO FLEX TO FLEX CONNECTION). 4. SUPPLY GRILLS SHALL BE WHITE PAINTED ALUMINUM WITH DIRECTIONAL BLADE DAMPERS. 15-2 PLUMBING 1. PROVIDE PLUMBING SYSTEM, COMPLETE IN PLACE, TESTED AND APPROVED, WHERE SHOWN ON THE DRAWINGS, AS SPECIFIED HEREIN, AND AS NEEDED FOR A COMPLETE AND PROPER JOB. 2. ALL PLUMBING WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE 5TANDARD PLUMBING CODE, LOCAL ORDINANCES AND IN COMPLIANCE WITH THE ENERGY CONSERVATION CODE, 3. H05E 13I135 SHALL BE BRA55 OR BRONZE, FASTENED SECURELY 18" ABOVE GRADE WHERE SHOWN ON DRAWING5. ALL HOSE 5I135 SHALL HAVE A NON -REMOVABLE ANTI -SYPHON DEVICE INSTALLED, 4. FIXTURE5 SHALL BE PROTECTED AGAIN5T WATER HAMMER WITH AIR CHAMBERS WHEN REQUIRED. 5. PROVIDE SHUT OFF VALVES TO ALL MAIN5 ENTERING THE BUILDING AND EACH PIECE OF EQUIPMENT. 6. INSTALL DIELECTRIC UNION AT INLET AND OUTLET OF WATER HEATER. 7. BUILDING SEWERS, VENTS, AND ALL UNDERGROUND DRAINAGE LINES SHALL BE SCHEDULE 40 PVC. 8. WATER PIPING TO BE SOFT TYPE L. COPPER, UNDER SLAB, HARD ABOVE SLAB. 10. INSULATION - PROVIDE PIPE INSULATION ON REFRIGERANT LINES AND DOMESTIC WATER LINES AS PER INDUSTRY STANDARDS. INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED AS REQUIRED. 11. GATHER VENTS IN ATTIC AS ALLOWED AND VENT TOWARD REAR OF HOUSE. 12. PROVIDE 3 r 120 GAL. WATER HEATERS IN AN APPROVED PAN. INSTALL DIELECTRIC UNION AT THE INLET AND OUTLET OF THE WATER HEATER. 13. ALL PLUMBING FIXTURES AND FAUCETS SHALL BE PROVIDED BY THE OWNER 5ION SIXTEEN - ELECTRICAL SCOPE: FURNISH ALL EQUIPMENT AND MATERIALS AND PERFORM ALL LABOR AND SERVICES NECE55ARY TO INSTALLATION A COMPLETE SYSTEM FOR LIGHTING AND POWER. EACH SYSTEM SHALL BE COMPLETE IN ALL RESPECTS AND SHALL BE JED OVER TO OWNER IN A FIR6T-CLA55 OPERATING CONDITION AND FULLY TESTED AND COMPLETE WITH ALL DEVICES WHICH NORMAL FOR INTENDED 5Y5TEM5 AND TH05E REQUIRED FOR THEIR SAFE OPERATION. ER1AL5 AND MANNER OF INSTALLATION OF ELECTRICAL SYSTEM SHALL BE IN STRICT ACCORDANCE WITH THE AENT5 OF THE LOCAL GOVERNING AUTHORITIES HAVING JURISDICTION, AND THE STANDARDS SET FORTH BY NFPA, U.L., '. RECOGNIZED TESTING LABORATORIES. THE INSTALLATION SHALL CONFORM TO THE LATEST EDITION OF THE NEC. PMENT MOUNTED ON THE EXTERIOR OF THE BUILDING SHALL BE DESIGNED, LABELED, AND INSTALLED FOR EXTERIOR, .F )F SERVICE CONDITIONS, 16-4 SERVICE: CONTRACTOR SHALL CARRY OUT ALL REQUIRED ARRANGEMENTS WITH FPL FOR INSTALLATION OF THE SERVICE, PERMITS, AND INSPECTION, 16-7 PANEL SCHEDULE: PANEL SHALL BE CLEARLY MARKED AS TO ALL CIRCUITS. 16-8 ALL WIRING SHALL BE IN CONDUIT WITH THW COPPER. 16-12 PROVIDE GROUND FAULT PROTECTION ON ALL CIRCUITS SHOWN ON THE PANEL SCHEDULE, U5ING GROUND FAULT INTERRUPTING BREAKERS, OR DEVICES. 16-13 LIGHT FIXTURES - ALL FIXTURES WILL BE PROVIDED BY OWNER AND INSTALLED BY CONTRACTOR. I 12" VTR TO HL 5YST Flu i lcbmz Section Lz 1(4„ = it -Olt LI I V SYSTEM __ V LIC. CGO013084 OEM - pi 0 U CIO U U N V) ^�^ Cfir It r t,O •r.n T `r/ r Vm+l r1r OWNS CL r1r rnU LL U 4-J CO ' 0 0. C U G. CL BENCH MARK #1, X-CUT IN HEAD WALL, ELEVATION 23.496' WITNESS CORNER N 5045.6894 E 4886.9816 31.09'(M) 30.00'(P) NW CORNER OF THE NW 1/4 25-35-38 D.O.T. STATION i 147+30.32 FOUND NAIL N 4981.7654 E 4833.1669 FOUND 4"x4"PRM #3435 (0.37'WEST S89'04'14"E 1256.53'(P) ' " � FOUND 4"x4"PRM OF R/W LINE) S89°02 20 E 1256.38 (M) #3435 30' DRAINAGE & UTILITY EASEMENT EXISTING DITCH LOT 4 II 14, LOT 5 � �w z Iw IL4.5' EXISTING BUILDING oz RI g LOT 3 18'x24' V) I a-0 r O o h I'7 H XIS N DITCIS -- O N M � � 1� ` (n - i 2,0 w W CV I tO I I m r _ _ 30' DRAINAGE UTILITY EASEMENT I'" Lo (A U IwF HEADER RANCHES SUBDIVISION, PB40, PG38 L4 0o CONTAINING 38.04 ACRES MORE OR LESS rn z ww� 6zi LOT 2 I I CITRUS GROVE ROWS ARE NORTH/SOUTH NZ. Iam '>*'� I I uw DIRECTIONAL v bow Wm `a �w LOT 6 II I = z w 00 N) 1 Ir� 1 N Z Z CJ J U � w o w a z I J N I W � 13 M yCID N �3 N L N o 0 J O (n ¢ U 0_ W 0 Q W S LI _ 0 W z _J w z WU 25.0' 7.0' 77.0' � 65. " D' o II 0 Ln N o z " zI W Im D.O.T. STATION 120+68.50 N 2319.9459/ E 4831,4635 o_ F CITRUS GROVE nm wF PORTION 24-35-38 ,y 5F NOT INCLUDED FOUND 4 x4 PRM wn / I �#3435 (1.56'WEST LOT 1 N43 r OF R/W LINE) I<W BENCH MARK #2, 3/8 IRON ROD, I I z<� o-, FOUND 4"x4"PRM ELEVATION 22,00' bow #3435 `WITNESS CORNER 30' DRAINAGE & 34.14'(M) 30.00'(P) N 5000.3691 r a r E 5006.2253 UTILITY EASEMENT o N89°28 10 W 1257.78 (M) _ ---- -� = - _ - ORTH LINE SECTION 25-35-38 20' WIDE DIRT AD N - - ROAD RIGHT-OF-WAY FOR GOLDSMITH ROAD (50'R/W) - - - - - - - - - - - - - - - C- - - - - - - - - - ---- -- R --� S89°19'51"E 2527. T c 1 BERM 70P EL=29.0' TOE EL=20.0' cu R � - - - EXISTNG 3 METAL CUL EAST INVERTT 15.2' _ I WEST INVERT 15.9' NW PROPERTY rn CORNER FALLS FORM BOARD TIE IN BETWEEN DITCHES 1-STORY / ELEVATION 24.5' RESIDENCE SEE BUILDING DETAIL ` M -) POD 2B PERMIT #23110856 LAKE \/� 909 �\ SHELL DRIVE WELL WITH ADMINIS ATION C \\ -WELL NTH BUIL ING \ \ INTRO UNIT ROUP BUILDING HOUSING I \ \ I BUILDIN ISLAND I II a,�� I I n LAKE 20.6' / WELL LOCATION - - - - - - - - - - - - - I 20.6' INSIDE PROPERTY LINE BERM FORM BOARD TIE IN �� \ TTOP OE EL=26 -�.7' I I ELEVATION 24.5' �- - _ SEE BUILDING DETAIL POD 38 \ I C PERMIT #23110872 ^ 1 1 649.5' 906. FORM BOARD TIE IN/ ELEVATION 24.5' // FORM BOARS TIE IN \/ SEE BUILDING DETAIL / I I �/\ \ ELEVATION 24.5' POD 5A / , I I \ \ SEE BUILDING DETAIL POD BU PERMIT #23110861 / / I I \ \ PERMIT #23190867 NORTHWEST QUARTER ISECTION 25-35-3� I CONTAINING 15J.62 ACRES MORE OR LES� I DEAD CITRUS GROVE I I I (DEAD CITRUS GROVE ROWS ARE EAST/WEST DIRE TONAL _ _ _ _ / _ _ _ _ _ - / ROWS IRE EAST/WEST DIRECTIONAL 1 0 I I °' o BENCH MARK #5, 5/8 IRON ROD. ELEVATION 20,22' E WITNESS122CORNER EXISTING 15. METAL CULVERT NORTH SOUTH INVERT 14.9' \ INVERT 14.7' J J VV YKUYtK I T SOUTH LINE NORTHWEST QUARTER 25-35-38 LINE PROCEEDS CORNER FALLS BETWEEN DITCHES N 2318.7664 E 4974.0628 SW CORNER OF THE NW 1/4 25-35-38 CENTER OF DITCH SW1/4 25-35-38 NOT INCLUDED CITRUS GROVE SOUTH POD 39 DETAIL (NOT TO SCALE) POD 28 DETAIL (NOT TO SCALE) BENCH MARK #3, 3/8 IRON ROD, DETAIL knul Iu SCALE) ELEVATION 19.95' WTNESS CORNER N 4932.3930 73.1471 1/4 CORNER OF THE L6 /NW 1/4 25-35-38 NE PROPERTY CORNER FALLS IN DITCH BENCH MARK #4, 5/8 IRON ROD, ELEVATION 23.59' \ WITNESS CORNER \ N 7467.0828 E 7467.0828 Jew EXISTING DITCH O U IM N t 54. CITRUS GROVE I NE1/4 25-35-38 NOT INCLUDED PROPERTY CORNER FALLS IN DITCH N 2295.5082 E 7496,2527 DD 6B DETAIL OT TO SCALE) a 0 o: J z z a U' Lj w W x SCALE 1" = 200' FORMBOARD TIE-IN (POD 6B): 3/15/2004 FORMBOARD TIE-IN (POD 3B): 2/2/2004 FORMBOARD TIE-IN (POD 5A): 1/21/2004 FORMBOARD TIE-IN (POD 2B): 1/13/2004 CHANGED TITLE: 10/20/2003 REVISED: 9/23/2003 REVISED: 9/2/2003 REVISED: 4/26/2000 REVISED: 3/20/2000 FIELD SURVEY DATE: 12/9/99 DRAWING COMPLETION DATE: 12/9/99 F.B.: Lt PG: 32 FILE: _99205.dwg GOLDSMITH ROAD 915 F 2 (MIDWAY LOCATION MAP (NOT TO SCALE) SURVEYOR'S NOTE 1. BEARINGS REFER TO RIGHT-OF-WAY MAP SECTION NO. 9452. BEARING BASE IS THE BASE LINE OF SAID MAP. 2. (P) = PLAT MEASUREMENT; (M) = FIELD MEASUREMENT 3. PROPERTY LIES IN FLOOD ZONE A, FEMA MAP #12111CO165 F, 8-19-91. 4. THE LANDS SHOWN HEREON WERE NOT ABSTRACTED FOR RIGHT-OF-WAYS, EASEMENTS, OR OTHER ENCUMBRANCES. 5. UNDERGROUND UTILITIES NOT LOCATED PER THIS SURVEY. 6. R/W = RIGHT-OF-WAY 7. FENCES, DITCHES, AND IMPROVEMENTS NOT LOCATED. 8. ALL MONUMENTS SHOWN ARE FOUND UNLESS STATED OTHERWISE. 9, COORDINATES VALUES SHOWN ARE BASED ON AN ARBITRARY DATUM AND BEAR NO REFERENCE TO GEODETIC CONTROL. SURVEYOR'S NOTES: ELEVATIONS REFER TO NAVD88 ELEVATIONS SHOWN ARE BASED FROM BENCH MARK #1, X-CUT IN HEADWALL, 7.1617 METERS, 23.496 FEET, NORTH AMERICAN VERTICAL DATUM 1988. ALL OTHER BENCH MARKS ARE ESTABLISHED THERE FROM. CONVERSION FROM NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) TO NATION GEODETIC VERTICAL DATUM 1929 (NGVD29): NAVD88 + 1.475 . NGVD29. BOUNDARY AND TOPOGRAPHIC SURVEY OF THE NORTHWEST ONE QUARTER (N.W. 1/4) OF SECTION 25, TOWNSHIP 35 SOUTH, RANGE 38 EAST, SITUATED IN ST. LUCIE COUNTY, FLORIDA. LESS AND EXCEPT THAT PART THEREOF OWNED IN FEE SIMPLE BY ANY PARTY FOR ROADS, CANALS, DITCHES, DRAINAGE AND WATER MANAGEMENT PURPOSES. AND THAT PLAT FILED MAY, 2002 KNOWN AS HEADER RANCHES SUBDIVISION, AS RECORDED IN PLAT BOOK 40, PAGE 38 OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA FOR INSTITUTE FOR CAPTIVE CHIMPANZEE CARE AND WELL-BEING, INC. a corporation existing under the laws of the State of Florida CERTIFICATION: 1. INSTITUTE FOR CAPTIVE CHIMPANZEE CARE AND WELL-BEING, INC. a corporation existing under the laws of the State of Florida. 2. COMMONWEALTH LAND TITLE INSURANCE COMPANY 3, THOMAS A. FOGT, ESQ. I HEREBY CERTIFY THAT THE SKETCH SHOWN HEREON IS A CORRECT REPRESENTATION' OF A SURVEY DONE UNDER MY DIRECTION AND IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. NO SEARCH OF THE PUBLIC RECORDS MADE FOR ERRORS OR OMISSIONS OF SAID DESCRIPTION. EASEMENTS OF RECORD NOT SHOWN UNLESS FURNISHED. I FURTHER CERTIFY THAT THIS SURVEY MEETS THE MINIMUM TECHNICAL STANDARDS SET FORTH UNDER RULE 61G17-6 F.A.C. BY THE FLORIDA BOARD OF SURVEYORS AND MAPPERS. St. Lu PROFESSIONAL SURVEYOR MAPPER 1657 S. DIXIE HWY., STUART, FL. P.O. BOX 2533, PALM CITY, FL. 34991 (772)283-2977 (772)283-2979 fax CHRISTIAN FENEX, PSM FLA. REG. #5102 i 4 ('1nn n 6 Pc� LAKE \/� 909 �\ SHELL DRIVE WELL WITH ADMINIS ATION C \\ -WELL NTH BUIL ING \ \ INTRO UNIT ROUP BUILDING HOUSING I \ \ I BUILDIN ISLAND I II a,�� I I n LAKE 20.6' / WELL LOCATION - - - - - - - - - - - - - I 20.6' INSIDE PROPERTY LINE BERM FORM BOARD TIE IN �� \ TTOP OE EL=26 -�.7' I I ELEVATION 24.5' �- - _ SEE BUILDING DETAIL POD 38 \ I C PERMIT #23110872 ^ 1 1 649.5' 906. FORM BOARD TIE IN/ ELEVATION 24.5' // FORM BOARS TIE IN \/ SEE BUILDING DETAIL / I I �/\ \ ELEVATION 24.5' POD 5A / , I I \ \ SEE BUILDING DETAIL POD BU PERMIT #23110861 / / I I \ \ PERMIT #23190867 NORTHWEST QUARTER ISECTION 25-35-3� I CONTAINING 15J.62 ACRES MORE OR LES� I DEAD CITRUS GROVE I I I (DEAD CITRUS GROVE ROWS ARE EAST/WEST DIRE TONAL _ _ _ _ / _ _ _ _ _ - / ROWS IRE EAST/WEST DIRECTIONAL 1 0 I I °' o BENCH MARK #5, 5/8 IRON ROD. ELEVATION 20,22' E WITNESS122CORNER EXISTING 15. METAL CULVERT NORTH SOUTH INVERT 14.9' \ INVERT 14.7' J J VV YKUYtK I T SOUTH LINE NORTHWEST QUARTER 25-35-38 LINE PROCEEDS CORNER FALLS BETWEEN DITCHES N 2318.7664 E 4974.0628 SW CORNER OF THE NW 1/4 25-35-38 CENTER OF DITCH SW1/4 25-35-38 NOT INCLUDED CITRUS GROVE SOUTH POD 39 DETAIL (NOT TO SCALE) POD 28 DETAIL (NOT TO SCALE) BENCH MARK #3, 3/8 IRON ROD, DETAIL knul Iu SCALE) ELEVATION 19.95' WTNESS CORNER N 4932.3930 73.1471 1/4 CORNER OF THE L6 /NW 1/4 25-35-38 NE PROPERTY CORNER FALLS IN DITCH BENCH MARK #4, 5/8 IRON ROD, ELEVATION 23.59' \ WITNESS CORNER \ N 7467.0828 E 7467.0828 Jew EXISTING DITCH O U IM N t 54. CITRUS GROVE I NE1/4 25-35-38 NOT INCLUDED PROPERTY CORNER FALLS IN DITCH N 2295.5082 E 7496,2527 DD 6B DETAIL OT TO SCALE) a 0 o: J z z a U' Lj w W x SCALE 1" = 200' FORMBOARD TIE-IN (POD 6B): 3/15/2004 FORMBOARD TIE-IN (POD 3B): 2/2/2004 FORMBOARD TIE-IN (POD 5A): 1/21/2004 FORMBOARD TIE-IN (POD 2B): 1/13/2004 CHANGED TITLE: 10/20/2003 REVISED: 9/23/2003 REVISED: 9/2/2003 REVISED: 4/26/2000 REVISED: 3/20/2000 FIELD SURVEY DATE: 12/9/99 DRAWING COMPLETION DATE: 12/9/99 F.B.: Lt PG: 32 FILE: _99205.dwg GOLDSMITH ROAD 915 F 2 (MIDWAY LOCATION MAP (NOT TO SCALE) SURVEYOR'S NOTE 1. BEARINGS REFER TO RIGHT-OF-WAY MAP SECTION NO. 9452. BEARING BASE IS THE BASE LINE OF SAID MAP. 2. (P) = PLAT MEASUREMENT; (M) = FIELD MEASUREMENT 3. PROPERTY LIES IN FLOOD ZONE A, FEMA MAP #12111CO165 F, 8-19-91. 4. THE LANDS SHOWN HEREON WERE NOT ABSTRACTED FOR RIGHT-OF-WAYS, EASEMENTS, OR OTHER ENCUMBRANCES. 5. UNDERGROUND UTILITIES NOT LOCATED PER THIS SURVEY. 6. R/W = RIGHT-OF-WAY 7. FENCES, DITCHES, AND IMPROVEMENTS NOT LOCATED. 8. ALL MONUMENTS SHOWN ARE FOUND UNLESS STATED OTHERWISE. 9, COORDINATES VALUES SHOWN ARE BASED ON AN ARBITRARY DATUM AND BEAR NO REFERENCE TO GEODETIC CONTROL. SURVEYOR'S NOTES: ELEVATIONS REFER TO NAVD88 ELEVATIONS SHOWN ARE BASED FROM BENCH MARK #1, X-CUT IN HEADWALL, 7.1617 METERS, 23.496 FEET, NORTH AMERICAN VERTICAL DATUM 1988. ALL OTHER BENCH MARKS ARE ESTABLISHED THERE FROM. CONVERSION FROM NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) TO NATION GEODETIC VERTICAL DATUM 1929 (NGVD29): NAVD88 + 1.475 . NGVD29. BOUNDARY AND TOPOGRAPHIC SURVEY OF THE NORTHWEST ONE QUARTER (N.W. 1/4) OF SECTION 25, TOWNSHIP 35 SOUTH, RANGE 38 EAST, SITUATED IN ST. LUCIE COUNTY, FLORIDA. LESS AND EXCEPT THAT PART THEREOF OWNED IN FEE SIMPLE BY ANY PARTY FOR ROADS, CANALS, DITCHES, DRAINAGE AND WATER MANAGEMENT PURPOSES. AND THAT PLAT FILED MAY, 2002 KNOWN AS HEADER RANCHES SUBDIVISION, AS RECORDED IN PLAT BOOK 40, PAGE 38 OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA FOR INSTITUTE FOR CAPTIVE CHIMPANZEE CARE AND WELL-BEING, INC. a corporation existing under the laws of the State of Florida CERTIFICATION: 1. INSTITUTE FOR CAPTIVE CHIMPANZEE CARE AND WELL-BEING, INC. a corporation existing under the laws of the State of Florida. 2. COMMONWEALTH LAND TITLE INSURANCE COMPANY 3, THOMAS A. FOGT, ESQ. I HEREBY CERTIFY THAT THE SKETCH SHOWN HEREON IS A CORRECT REPRESENTATION' OF A SURVEY DONE UNDER MY DIRECTION AND IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. NO SEARCH OF THE PUBLIC RECORDS MADE FOR ERRORS OR OMISSIONS OF SAID DESCRIPTION. EASEMENTS OF RECORD NOT SHOWN UNLESS FURNISHED. I FURTHER CERTIFY THAT THIS SURVEY MEETS THE MINIMUM TECHNICAL STANDARDS SET FORTH UNDER RULE 61G17-6 F.A.C. BY THE FLORIDA BOARD OF SURVEYORS AND MAPPERS. St. Lu PROFESSIONAL SURVEYOR MAPPER 1657 S. DIXIE HWY., STUART, FL. P.O. BOX 2533, PALM CITY, FL. 34991 (772)283-2977 (772)283-2979 fax CHRISTIAN FENEX, PSM FLA. REG. #5102 i 4 ('1nn n 6 Pc�