HomeMy WebLinkAboutSOLAR PAPAERWORKG SOLAR POW E R CREATED FOR: JISEL LEON SC ff
Iffy
434 SE TRANQUILLAAVE StlucieCour�v
PORT ST. LUCIE, FL 34983, USA
J88LEON@GMAIL.COM
SOLAR ENERGY SYSTEM DISCLOSURE DOCUMENT
13L-6 (05/2018)
SOLAR ENERGY SYSTEM DISCLOSURE DOCUMENT
This disclosure shall be printed on the front page or cover page of every
solar
energy contract for the installation of a solar energy system on a residential
building.
The TOTAL COST for the solar energy system (including financing and
energy /
power cost if applicable) is:
$34731.85
If the attached contract was not negotiated at the contractor's place of
business, you have a Three -Day Right to Cancel the contract, pursuant to
Business and Professions Code (BPC)section 7159, as noted below. For
further
details on canceling the contract, see the Notice of Cancellation, which
must
be included in your contract.
Three -Day Right to Cancel
You, the buyer, have the right to cancel this contract within three
business days. You may cancel by e-mailing, mailing, faxing, or
delivering a written notice to the contractor at the contractor's
SOLAR ENERGY SYSTEM DISCLOSURE DOCUMENT
place of business by midnight of the third business day after you
received a signed and dated copy of the contract that includes this
notice. Include your name, your address, and the date you received
the signed copy of the contract and this notice.
G OSO LAR P*W E R
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmall.com
PROJECT OVERVIEW
System size
Estimated Savings Over 25 Years with Solar
Estimated f irst year production
Down payment
Loan interest rate
Loan amortization
0
6.623 Trees planted 53.81 Vehicles off the road
9.76 kW DC
$17,544.39
14,911 kWh AC
$0.00
3.39%
20 years
600.66 Barrels not consumed
Go Solar Power 1 801 SE 6th Avenue, Suite 206 Delray Beach, FL 33483
1 Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
GRISOLAR POW E R
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmail.com
FINANCIAL ANALYSIS
PRICING SAVINGS
Price for turnkey solution
$33,731.85
Monthly loan payments
$143.80
Gross Cost
$34,731.85
(No payments for the first 2 months)
Total incentives
-$10,419.56
Old monthly bill
$66.46
Difference
$24,312.30
Monthly solar payment
$143.80
New utility bill
$834
New monthly bill
$152.14
Estimated Savings $17,544.39
Over 25 Years with
Solar
*The project incentives are being applied to the loan amount and change the final total loan amount to $24,457.98.
COST BREAKDOWN
-Base Price•'
'$33,731:85
Based on a 9.76 kW installation
- -
S
Aquanta Hot Water Monitoring System
^ `$0 00.
Tree Removal $ervice,_:_.:_
.. -
$1,000.00
;1 x $1,000.00
..
LED, bulbs. _;
Gross Cost r -
$34,731.85
-$0.00_ - $34,731.85.
Federal Tax: Credit
-$10,419.56, .: •
Residential Renewable EnergyTax Credit.
..'.
,Cost after Rebates & Incentives
$34,731.85
-$10,419.56 $24,31230
2 Go Solar Power 1 801 SE 6th Avenue, Suite 206 Delray Beach, FL 33483
Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License; EC13008806
G SOLAR P*W E R Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmail.com
USAGE BREAKDOWN
Monthly
1000 - - - - - - - -- -
750
Soo
250 -- - ---- -'-- — -- "----
0 r - - 7 - --r -- 7 - — --T-
41 P
Q
le
From solar 0 From utility
Yearly
® From utility: 0.0 % W From Energy Reducers: 4.0 % 10 From solar: 96.0 %
3 Go Solar Power 1 801 SE 6th Avenue, Suite 206 Delray Beach, FL 33483
Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
G.o SOLAR P®W E R
Created for: J isel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmaii.com
MONTH -BY -MONTH DETAILS
January 2020
1,022.6 kWh
3.7 kWh -
$0.00
' - $8.61
578.6 kWh
$43.04 -
.Februarg2020
--'1,105.8 kWh.
' rr.0.0 kWh _
$0.00, -..
$8.28 " .,
697.9 kWh
$39.51: r
-.5143.80
J
March 2020 .
1,399.1 kWh
0:0 kWh
$8.31
949A kWh
-$29.62
-'April 2020 ,1,440:4
kWh
"- 0.0 kWh'.
$143.80".
- $8:28:
921.1 kWh ".
-$22.67"=
May 2020
1,508.3 kWh
0.0 kWh _.
$143.80-
$8.29--
836.4 kWhi .
$7.67 --
- _
` "-
June 2020 -
1,341.0 kWh
0.0 kWh
$,143.80
$8.2.8
544.9 kWh
. $4..516 -
July 2020
1,412.3 kWh
"0.0 kWli
$143.80
$8.29
494.8 kWh
'$15.97
:. A,ugust20,20
1t339.3 kWh
0.010h
.$143.80.
$8.28
471.4 kWh'
$11.38 `
Septembec2020
1,225.0 kWh
0.0 kWh
$143.80
"" $8.28
533.5 kWh
$5.37 1
0ctober2020 ''
1;196.0 kWh
:0.0 kWh
$143.80-
- $8.29
- '637.7 kWh''
, :-$17.97
November 2020 --
-' 1,026.0 kWh
--- 0.0 kWh _-' -
"-$143.80
.'-' $8.28 -'
- _ - 573.6RWh
_ _--$27.96 "' I
December 2020 . 895.0 kWli 0.0 kWh $14180 $8.29 • 45-
Total 14,910.6 kWh 3.7 kWh $1,438.02 •$99.75
*The monthly roll-over of NET credits ends at December of each year.
t Production and Solar Saving values shown on this chart are an Estimate.
i
i.9 kWh * -- $29.19
W 4
$90520` -- _$25.99
Go Solar Power ] 801 SE 6thAvenue, Suite 206 Delray Beach, FL 33483
4 Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
G 11 SOLAR POW E R` Created for: , isel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
j88Leon@gmail.com
YEARLY BREAKDOWN
$2500.00
$2000.00
$1500.00
$1000.00
$500.00
$0.00
r--7--T--T--T--7--F--T---J--T--T--L T--T- T--T--T--I--F---r'_T„-T--T.--?.-.-r--1
1py0 1py'1. 1011 lop 101p *') '�101 4lec, '01 1pl~ 1p1 1p3, 101, 101, le, 1091 1p�0 4C, 11p 1LO lie
Bill Without Solar M New Utility Bill M New Solar Bill
Assuming a 4.00% escalation rate on utility rate.
Go Solar Power 1 801 SE 6th Avenue, Suite 206 Delray Beach, FL 33483
5 Phone: (800) 530-9597 1 Email: info@gosolarpower.com initials
License Number: CVC56962, Electrical License: EC13008806
G011 SOLAR POW E R"
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmaii.com
MATERIALS & SPECIFICATIONS
-------------------------------------------------------------------------------------------------------- ---- --.......... ---------------------------------
Panels 32 x S-Energy - SN305M-15 (305W) at 1340 1 MINES ,
(SE) (Tilt of 18°)
Mount Type Flush I...■'
Energy Efficiency key=OAquanta Hot Water Monitoring System
Products key=1 LED - LED bulbs (Lifetime:15 years)
Other Balance of System
6 Go Solar Power 1 801 SE 6th Avenue, Suite 206 Delray Beach, FL 33483
Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
G re SOLAR P®W E R
PROJECT STEPS
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmail.com
Aug 17th;19 .
`Contract Signature
File 6pening and centralizing all information
: Aug 24th;19' '
•Site Assessment in;Site . -
:: Complete Site E4aluati6n & FinalMeasure ments .-
Capture
Sep 8th 19
Permits and Applications
Completing paperwork for incentives and .regulatory + J�
steps
4ep11th19.•
.Installation&Inspection.
Delivering Materials toLocation, Installation and. ..
Wiring ..
[lep21st.19 -`
Final Connection
Installing Meter:and Con necting'Inverters -. 4
-
Sep 22nd,19 :
Monitoring ;� . - -,
r
. Providing Access to System, Performance ,• '
7 Go Solar Power 1 801 SE 6thAvenue, Suite 206 Delray Beach, FL 33483
Phone:(800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
G SOLAR P®W E R"
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmail.com
CUSTOMER SIGNATURE
I hereby agree to move forward with the solar project as described above and agree to terms of the contract provided
bythe installer, Go Solar Power, joined to this proposal.
Go Solar Power
08/14/19
Date of Signature (M M/D D/YY)
08/14/19
Date of Signature (M M/DD/YY)
YOUR REPRESENTATIVE
Ross Erstling
Email: ross@gosolarpower.com
Phone:73257015186
8 Go Solar Power 1 801 SE 6thAvenue, Suite 206 Delray Beach, FL 33483
Phone: (800) 530-9597 1 Email: info@gosolarpower.com
License Number: CVC56962; Electrical License: EC13008806
G•r SOLAR P®W E R`
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmail.com
TERMS & CONDITIONS
GO SOLAR POWER INSTALLATION AGREEMENT (FL LIC. CVC 56962, FL LIC.EC13008806 , GA LIC. EC 216145, AL LIC EC
02301, NC LIC. EC U.32638)
Financed projects are funded by the finance company and re -payment start date(s) are dictated byfinance company.
Therefore, in consideration of the mutual promises contained in this AGREEM ENT, the parties agree as follows:
1. The Work. CONTRACTOR shall perform the work listed in the Solar Installation Agreement (above) and incorporated herein
by reference (the "Project"). The Project will be constructed at the location listed and according to the drawings and
specifications that will be generated by Go Solar Power and submitted to the local building department jurisdiction by
reference listing the property address (the "Property'l.THE INVESTMENT TAX CREDIT IS NOT A REBATE BUT A 30%
FEDERAL TAX CREDIT. On a CASH PURCHASE, it is 25% Down Payment, 25% Permit Approval, and 50% Installed and Passed
Inspection.
2. Starting and Completion Dates. The Completion Date shall be the date when the Work is substantially completed.
.3. Contract Documents. The contract documents, which comprise this entire AGREEM ENT between OWNER and CONTRACTOR
concerning the Work, consist of this AGREEMENT, and all Change Orders if created.
4. Permits and Inspections. CONTRACTOR shall obtain and pay for all construction and building permits. OWNER shall assist
Contractor, when necessary, in obtaining such permits. By signing this contract OWNER authorizes CONTRACTOR to apply and
sign for permits on OWNER'S behalf for this project.
5. Change Orders. The CONTRACTOR and OWNER recognize that CONTRACTOR'S original cost and time estimates may prove
too low due to unforeseen events, or to factors unknown to the CONTRACTOR when the contract was made; OWNER may
desire a mid -job change in the specifications that would add time and cost to the specified work possibly inconvenience the
CONTRACTOR; or Other provisions of the contract may be difficult to carry out because ofunforeseenevents, such as a
materials shortage or a labor strike. If these or other events beyond the control of the parties reasonable require adjustments
to this contract, the parties shall make a good faith attempt to agree on all necessary particulars. Such agreements shall be
put in writing, signed by the parties and added to this contract. Failure to reach agreement shall be deemed a dispute to be
resolved as agreed herein.
6. Access to the Property. OWNER shall be responsible for removing anything located in an area where PV inverters or
equipment shall be located (i.e. carpets, rugs, drapes, furniture, shrubs, and plantings). CONTRACTOR shall not be held
responsible for damage to or loss of any items of personal property due to OWNER'S failure to remove or properly protect
such personal property. OWNER shall grant free access to the Property for workers and vehicles and shall provide areas for
storage of materials and debris. OWNER agrees to keepdriveways clear and available for movement and parking of trucks
during scheduled working hours. OWNER shall be responsible for securing all entrances to the Project jobsite in a manner
adequate to prevent persons other than OWNER, CONTRACTOR, and any authorized workers or material suppliers from
gaining access to that site. CONTRACTOR shall keep OWNER advised as to the hours during which work is scheduled to be
performed at thejobsite.If OWNER denies access to anyworker or supplier of materials during scheduled working hours, then
OWNER will be deemed in breach of this AGREEMENT and subject to liability for any damages caused by the breach. OWNER
waives any and all claims against CONTRACTOR, its agents, and/or employees, for bodily injuries or damages caused by, arising
out of, or relating to the Work performed at the Property.
7. Contractor's Equipment. CONTRACTOR shall be responsible, at the end of every workday, for storing all equipment and
materials in the facilities provided by OWNER (collectively, the "Equipment"). OWNER shall keep and maintain the Equipment
with proper care so that it shall not be damaged and OWNER will use best efforts to protect equipment while it's on OWNER's
property. Further, if Work is interrupted resulting from events such as weather, Delays, Project Damage, and/or Work
Stoppage, OWNER shall provide for storage of the Equipment with the same level of care as if it is the end of a workday.
8. Abnormal Conditions. CONTRACTOR is not responsible for any existing illegal conditions such as non -permitted or non -code -
compliant conditions. If any public body, municipal or governmental authority, utility, and/or inspector (collectively, "Public
Body') directs any modification or addition to the Work covered by this AGREEM ENT, CONTRACTOR may alter specifications
in order to comply with the requirements imposed by a Public Body ("Public Body Imposed Work'J. The cost of any alteration
undertaken to comply with Public Body Imposed Work shall be set forth in a Change Order and shall be in addition to the Total
Agreement Price.
9 Go Solar Power 1 801 SE 6th Avenue, Suite 206 Delray Beach, FL 33483
Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
G SOLAR P*W E RTM
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmail.com
TERMS & CONDITIONS
9. Utility Interconnection and Meter Replacement . a) CONTRACTOR's Responsibilities. (i) CONTRACTOR shall complete and
submit the interconnection paperwork required by the local electric utility; (ii) (iv) pay all local electric utility interconnection
fees unless otherwise agreed to in writing by both parties, b) OWNER Responsibilities. (i) OWNER shall complete, review and
sign the required interconnection paperwork; (ii) comply with the local electric utility in regards to the replacement of the
OWNER'S electrical meter (as needed); (iii) meet with the local electrical utility and be the main point of contact in order to set
an appointment for the replacement of the OWNER'S; Further, OWNER agrees not to delay payment whatsoever prior to
meter replacement or due to meter replacement date being. beyond completion.
10. Removal of Material and Debris. CONTRACTOR agrees to keep the work premises and adjoining ways free of waste
material and rubbish. CONTRACTOR further agrees to remove all such waste material and rubbish on termination of the
project, together with all the tools, equipment, machinery, and surplus materials. CONTRACTOR agrees, on terminating his
work at the site, to conduct general clean-up operations, including the cleaning of all glass surfaces, paved streets and walks,
steps, and interior floors and walls as needed.
11. Delays. CONTRACTOR shall not be responsible for delays caused by'any of the following: failure of a Public Body to issue
Permits within a reasonable length of time; funding of loans; disbursement of funds into funding control or escrow; acts of
neglect or omission by OWNER or OWNER'S employees or agents; and/or delays caused by extra work confirmed by a Change
Order, including but not limited to Public Body Imposed Work, and which such extra work extends the Completion Date
(collectively, "Delays").
12. Force Majure/Excusable Event. CONTRACTOR shall not be liable for any delay, damage or warranty claim due to
circumstances beyond its control including, but not limited to, strikes, casualty, general unavailability of materials, failure to
properly maintain or repair the equipment, weather, shade or any other act beyond CONTRACTOR'S control. Any starting or
completion dates stated by CONTRACTOR shall be subject to clarification of all technical details. Moreover, CONTRATOR'S
obligation to meet any deadlines or warranty obligations shall be based on the punctual and proper fulfillment of the
OWNER'S obligations. In the event of strikes, lockouts, Force Majeure, Excusable Event, delayed shipments by suppliers or
subcontractors or other causes hindering CONTRATOR'S obligation for reasons that CONTRACTOR are not accountable for,
CONTRACTOR shall be entitled to contract price adjustment, IF APPLICABLE and to extend the Completion dates) by a
reasonable amount of time and shall otherwise be excused from performance.
13. Damage to Project. If the Project is destroyed or damaged by any accident, disaster, or calamity, such as fire, storm, flood,
landslide, subsidence, or earthquake, or by theft or vandalism (collectively "Project Damage"), during the Project Time, any
work done by CONTRACTOR in rebuilding or restoring the Project shall be paid for by CONTRACTOR'S INSURANCE and
pursuant to a Change Order.
14. Warranty. Solar Panels have a 25 year Performance Warranty. The micro inverters have a 25 year manufacturer warranty.
CONTRACTOR provides a 10-year workmanship warranty on the installation which covers negligent or faulty workmanship on
all project components causing breakdown or degradation in electrical output of more than 10% of the "typical" production as
estimated by manufacturer's manual.The CONTRACTOR assigns the PV module manufacturer's limited warranty to the OWNER
warranting that the PV modules provided as part of the specified work will be free from defects for a period of 10 years from
the date of project completion. ANY WARRANTIES PROVIDED HEREIN ARE EXCLUSIVE OF ALL IMPLIED WARRANTIES
INCLU DING TH E IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICU LAR PURPOSE.
15. Work Stoppage. If CONTRACTOR has stopped work for a minimum of 60 days as a result of OWNER'S failure to make
timely payments ("Work Stoppage'l, CONTRACTOR may, in its sole discretion, on five days written notice to Owner, terminate
this contract and demand payment for all work performed, materials ordered and/or supplied and any other loss sustained in
accordance with Florida law.
16. Signage. During the term of this AGREEMENT, CONTRACTOR may erect one temporary sign showing its name, service
mark, trade name or other commercial name, identifying CONTRACTOR as performing services at the Property. The sign will be
appropriate in appearance, style and size, and will conform to any applicable federal, state and local laws including HOA
requirements.
17. Owner's Representations and Warranties. OWNER represents and warrants the following:
a. The Roof. The proposed roof area is structurally sound and requires no further engineering and/or review in order to obtain
a permit from a Public Body in order to complete the Work;
1 ® Go Solar Power 1801 SE 6thAvenue, Suite 206 Delray Beach, FL 33483
Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
G•N SOLAR POW E R"
Created for: J isel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmail.com
TERMS & CONDITIONS
b. The Electrical System. The existing electrical systems located on the Property: (i) is adequate to carry the load imposed for
the Work (the "Electrical System'j; (ii) is code compliant.; (III) will accept solar installation without addition of new equipment
that may be beyond code requirements for the installation of a new solar PV system (NEC).
OWNER understands that CONTRACTOR is relying entirely on the information supplied to CONTRACTOR and OWNER warrants
and represents that all such information is entirely accurate and truthful. If any investigation is initiated or if any action is
brought by any individual, company or entity whatsoever regarding any of the OWNER'S Representations and Warranties
against CONTRACTOR, then OWNER agrees to cooperate fully in any such investigation or action and shall provide all relevant
supporting documentation. Further, OWNER shall defend and indemnify CONTRACTOR and their agents and employees, from
and against any and all claims, damages, losses, and expenses, including reasonable attorneys' fees relating to OWNER'S
Representations and Warranties.
18. DISCLAIMERS. CONTRACTOR CANNOT GUARANTEE THE PERFORMANCE OF THE SOLAR ELECTRIC SYSTEM DUE TO
VARIANCES IN WEATHER OVER TIME. ALL PERFORMANCE I5 BASED ON NREL HISTORICAL DATA AND IS SUBJECT TO
WEATHER. CONTRACTOR CANNOT GUARANTEE THE ACTUAL RESALE VALUE ORADDED VALUE TO A HOME BASED ON THE
INSTALLATION OF SOLAR. CONTRACTOR CANNOT ACCURATELY GAUGE THE CURRENT HEALTH OF ANY LOCAL UTILITY
TRANSFORMER, CONTRACTOR IS NOT RESPONSIBLE FORANY DAMAGE TO ANY LOCAL UTILITY TRANSFORMERTHAT MAY
DIRECTLY OR INDIRECTLY OCCUR BASED ON THE ADDITION OFA PV SYSTEM AT THE PROPERTY. CONTRACTOR DOES NOT
GUARANTEE ANY MATERIALS,, EQUIPMENT, ASSEMBLIES, OR UNITS THAT CONTRACTOR HAS PURCHASED OR WILL
PURCHASE AS PART OF THE WORK COVERED BY THIS AGREEMENT. CONTRACTOR WILL NOT BE LIABLE FORANY INDIRECT
OR CONSEQUENTIAL DAMAGES, LOSSES, COSTS OR EXPENSES HOWEVER ARISING, INCLUDING WITHOUT RESTRICTION
ANY ECONOMIC LOSSES OF ANY KIND, ANY LOSS OR DAMAGE TO PROPERTY, ANY PERSONAL INJURY, ANY DAMAGE OR
INJURY ARISING FROM OR AS A RESULT OF MISUSE OR ABUSE, OR THE INCORRECT OPERATION OF THE EQUIPMENT.
CONTRACTOR'S LIABILITY WILL NOT EXCEED THE CONTRACT PRICE REGARDLESS OF CAUSE OF ACTION.
19. Severability. Whenever possible, each provision of this AGREEMENT shall be interpreted so as to be effective and valid
under applicable law, but if any provision of this AGREEMENT is held to be prohibited by or invalid under applicable law, such
provision shall be ineffective only to the extent of such prohibition or invalidity, without invalidating the remainder of this
AGREEMENT. Successors and Assigns. This AGREEMENT shall be binding upon and shall inure to the benefit of the Parties,
their respective successors, legal representatives and permitted assigns. No Party shall have the right to assign this
AGREEMENT or any of its obligations, rights or interests under this AGREEMENT, without the prior written consent of the
other Party.
20. Cancellation Policy: Following the initial 3 business day cancellation time frame, if OWNER cancels, the one -time cost for
the cancellation will be $2,500.00 due upon cancellation.
21. Governing Law. This AGREEMENT and all transactions contemplated by this AGREEMENT shall be governed by, and
construed and enforced in accordance with, the internal laws of the State of Florida without regard to principles of conflicts of
laws.
22. Jurisdiction and Venue. The Parties expressly consent to (1) the jurisdiction of the state and/or federal courts in and for
Palm Beach County, Florida; and (ii) Palm Beach County, Florida as the exclusive venue. Each Party hereby expressly waives the
right to challenge such venue based upon forum non -convenience or otherwise.
23. Attorneys' Fees and Costs. In the event of a legal action or other proceeding arising under this AGREEM ENT or a dispute
regarding any alleged breach, default, claim, or misrepresentation arising out of this AGREEMENT, whether or not a lawsuit or
other proceeding is filed, the prevailing party shall be entitled to recover its reasonable attorneys' fees and costs, whether
Incurred before suit, during suit, or at the appellate level. The reasonable costs to which the prevailing party is entitled shall
include casts that are taxable under any applicable statute, rule, or guideline, as well as non-taxable costs, including, but not
limited to, costs of investigation, copying costs, electronic discovery costs, telephone charges, mailing and delivery charges,
information technology support charges (i.e. research charges), consultant and expert witness fees, travel expenses, court
reporter fees, and mediator fees, regardless of whether such costs are otherwise taxable.
24. Headings. The paragraph headings in this AGREEMENT are for convenience purposes only and shall not in anyway affect
the meaning and interpretation of this AGREEM ENT.
25. Plural and Gender. Whenever used in this AGREEMENT, the singular number shall include the plural, the plural the singular,
and the use of any gender (including the neuter) shall be applicable to all genders.
Go Solar Power 1 801 SE 6thAvenue, Suite 206 Delray Beach, FL 33483
1 1 Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
G r®SOLAR P*W E R"
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmail.com
TERMS & CONDITIONS
26. Entire Agreement. This AGREEMENT (including any exhibits and schedules referred to in this AGREEMENT and hereby
incorporated into this AGREEMENT) contains the entire agreement among the Parties with respect to the subject matter
addressed in this AGREEMENT and supersedes all agreements relating to the subject matter addressed in this AGREEMENT,
and there are no prior representations, agreements, arrangements or understandings, oral or written, between or among the
Parties relating to the subject matter of this AGREEMENT which are not fully expressed in this AGREEM ENT.
27. Waiver of Breach. The waiver or inaction by any Party of a breach of any condition of this AGREEMENT shall not be
construed as a waiver of any subsequent breach by such Party or Parties, nor shall it constitute a waiver of such Party's or
Parties' rights, actual or inherent. The failure of a Party in any instance to insist upon a strict performance of the terms of this
AGREEMENT or to exercise any option in this AGREEMENT shall not be construed as a waiver or a relinquishment in the future
of such term or option, but that the same shall continue in full force and effect.
28, Notice. All notices, demands, requests, offers or responses permitted or required to be given under this AGREEMENT shall
be made in writing and shall be delivered by (i) hand -delivery, (ii) registered or certified mail, postage prepaid, or (iii)
recognized international overnight carrier; and addressed to the Party at the address provided on the first page of this
AGREEMENT. Any Party to this AGREEMENT may change the address to which notices shall be sent by written notice of such
new or changed address when given to the Party.
29. Counterparts. This AGREEMENT may be executed by facsimile delivery of original signatures and in counterparts, each of
which shall be considered one and the same agreement, and shall become effective when such counterparts have been signed
by each party and delivered to the other party. Signatures delivered in portable document format (pdf) shall be binding for all
purposes hereof.
30. Miscellaneous.
a. FL Statute §163.04 - Energy devices based on renewable resources - This FL state statute, referred to as the Florida Home
Owners Solar Rights Act, details that 'A property owner may not be denied permission to install solar collectors or other
energy devices based on renewable resources by any entity granted the power or right in any deed restriction." "Such entity
may determine the specific location where solar collectors may be installed on the roof within an orientation to the south or
within 45 degrees east or west of due south provided that such determination does not impair the effective operation of the
solar collectors."
b. ACCORDING TO FLORIDAS CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES), THOSE WHO
WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO
ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF
YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB -SUBCONTRACTORS, OR MATERIAL
SUPPLIERS, THOSE PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF YOU HAVE
ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO
HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL
TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE
FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS AGREEMENT THAT BEFORE ANY PAYMENT IS
MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR
COMPANY THAT HAS PROVIDED TO YOU A"NOTICE TO OWNER." FLORIDAS CONSTRUCTION LIEN LAW IS COMPLEX, AND
IT IS RECOMMENDED THAT YOU CONSULT AN ATTORNEY.
C.
CONTRACTOR shall file a termination of Notice of Commencement regarding the ability to file a lien following the Customer's
execution of the Certificate of Completion. This will transpire prior to any funds being received by CONTRACTOR.
31. LIMITED POWER OF ATTORNEY PERMITTING AUTHORIZATION FORM
Go Solar Power 1901 SE 6th Avenue, Suite 206 Delray Beach, FL 33483
12 Phone: (800) 530-9597 i Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
G I SOLAR P*W E RTM
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmaii.com
TERMS & CONDITIONS
I DO HEREBY AUTHORIZE RAFAEL GONZALEZ AND COURTLAND WEISLEDER, THE PERMITTING DEPARTMENT OF GO
SOLAR POWER LLC TO SIGN AND APPLY FORA BUILDING PERMIT and INTERCONNECTION AGREEMENT ON MY BEHALF.
THIS AUTHORIZATION IS VALID ONLY FOR THE PURPOSE OF OBTAINING A PERMIT TO PERFORM THE SOLAR
INSTALLATION WORK CONTRACTED FOR BYAND BETWEEN OWNERAND GO SOLAR POWER. THE ONLY PERMIT(S)WHICH
MAY BE APPLIED FOR UNDER THE TERMS OF THIS LETTER ARE THOSE WHICH THE AUTHORITY HAVING JURISDICTION
(CITY OR COUNTY) DEEMC(S) NECESSARY UNDER THE CURRENT FLORIDA BUILDING CODE, GIVEN THE SCOPE OF WORK
CONTRACTED FOR. GO SOLAR POWER WILL BE RESPONSIBLE FOR ANY AND ALL FEES ASSOCIATED WITH THIS PERMIT
APPLICATION THE AUTHORIZATION WILL REMAIN VALID UNTIL SUCH PERMIT(S) IS/ARE ISSUED BY THE RESPECTIVE
BUILDING DEPARTMENT, OR UNTIL ONE HUNDRED TWENTY (120) CALENDAR DAYS FROM THE DATE LISTED BELOW
HAVE TRANSPIRED, WHICHEVER IS LESS.
1 Go Solar Power 1 801 SE 6th Avenue, Suite 206 Delray Beach, FL 33483
Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806
G.N SOLAR P*W E R"
Created for: Jisel Leon
434 SE Tranquilla Ave
Port St. Lucie, FL 34983, USA
J88Leon@gmail.com
TERMS & CONDITIONS
Additional information specific to your solar project:
Client name: jisel Leon
Address of project: 434 SE Tranquilla Ave, Port St. Lucie, FL 34983, USA
Solar Panels:
• Manufacturer: S-Energy
• Model:SN305M-15
• Watts:305
• Count:32
Pricing & Payment information:
Loan option:
• Loan Amount:
$34,731.85
Extra costs: -
• Aquanta Hot Water Monitoring System:1 x $0.00
$0.00
• Tree Removal Service: I x $1,000.00
$1,000.00
• LED bulbs:25 x $0.00
$0.00
Rebates & Incentives applied to the project:
• Residential Renewable Energy Tax Credit:
-$10,419.56
Gross price of system
$34,731.85
Cost after rebates and incentives:
$24,312.30
Project specs:
• System Size:
9.76kW
Go Solar Power 1 801 SE 6thAvenue, Suite 206 Delray Beach, FL 33483
14 Phone: (800) 530-9597 1 Email: info@gosolarpower.com Initials
License Number: CVC56962, Electrical License: EC13008806