Loading...
HomeMy WebLinkAboutTERMITE CERTIFICATEPatrick Exterminating, Inc,. 3226 SE Gram Park WaV, Sturart rL 34997 SCANNED rax 772.223-2114 BY, ��'. �IICiP P''rirrrrfiu Stuart 772-286-6812 Vero Beach 772.562.3700 Jupiter 561-744-2681 Port St Lucie 772.335.7370 Certificate of Compliance for Termite Protection (as required by Florida.Buiiding Code (FBC)1816.L7) Treatment Address: Builder: _ , SM Q—�Permit# II —e3O 11 Footing ❑ Slab ❑ Driveway Pool Deck ❑ Addition ❑ Other J ❑ Final Perimeter Treatment - Initial and Date for Final: Date: S` Time: Square Footage Product Gallons: %.Used: Chemical Nam Applicator: Method of Treatment: Soil Barrier The building has received a complete treatment for the prevention of Subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer Services. Notice to Builder It is the responsibility of the builder to notify Patrick Exterminating prior to the pouring of any that abuts the, above structure so that treatment can be completed and the required paperworl closing be submitted. Such slabs might be, but are not limited to: patios, porches, entryways, slabs, stoops, additions, bay windows, driveway additions, etc. Other areas that would require treatment would be: 1. Areas within the foundation that were disturbed after the initial treatment. 2. The foundation perimeter after final grade has been established. Note: As per FBC 104.2.3 - If soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. Note: WARRANTY WILL BE ISSUED UPON COMPLETION OF FINAL TREATMENT ONLY