Loading...
HomeMy WebLinkAboutGENERATOR PLANSJoshua Prince PV Module: LG 335W 11.725 KWDC 8.4KWAC Inverter. Enphase IQ7 (240v)(240va) (1) Branch circuit of 11 modules PV equipment (2) Branch circuits of 12 modules Inverter output. current: 1A located on roof Max system output current: 35A 2-Solar ArrayOutdoormounted #12/2 Ro mex in attic/ Photovotaic Combiner Box strings of 12 THWN in con dult o n extedo r (Model#IQ-AM-2403) m od Nl es Enphase Engage Cable 1bik1redlgr #12/2 THWN-2 Ro of Mounted Junction Box 240V AC 1blk1red (Soladeck model 0786-3115) sch 80 PVC N 240V Enph me Envoys mo ni4odng device2 strings of 12 Enphase IQ7 20A SCANNED Mic oimrerters CB (located under each panel) 2C3 at. Lucie 20A County CB 1 #12/2 Romexln attic/ Visible,lockable, and Solar Array THWN in mnduiton e#edor Labeled AC 1blkired1gr string of 11 Enph we Engage Cable 240V AC DISCONNECT LOCATED modules #12/2 THWN-2 sch 80 PVC Sblklred ON ACCESSIBLE 240V EXTERIOR WALL WITHIN 10 FEET OF UTILITY 11 Enphase IQ7 Mirroinverters Ell Directional #6THWN METER (located under each panel) 240V AC UtI-P Me eter srh BO PVC S4 w Service Side Tap e' No 81627 �9N N N AC Disconnect 6a�; 1 Lockable and FuslbS'33 STATE OF 14/Z Ire '���• Al Meter located on '-.,Fs 4 �a•"' ' ; the east side of the home ; Florida Firm No. 30649 Principal Engineering, Inc. LOCATION: 120 Riomar Court St Lucie, FL 34952 MARCJONESe Main Service Disconnect DESC: 11.725 kW solar panel system CONSTRUCTION 200 amp rated #6 THWN Utili • FPL 200A Main Breaker 240V AC resi4enlial•<ommercial•solar �• 240v sd,80PVC p' JURISDICTION: St Lude 1 �.�R DATE: 8.16.19 REV:1 SHEET: 1 OF 1 SOIAR fiOME SPECIALISTS S�J n�z. Layout One-Une Designer:..... Designer: K. Griffin 18' 6" 1. Metal roof bra kets require additional screws into purlins and deck. See calculation sheet, pg. 2 for requirements. 2. Do not install SolarFoot brackets into OSB deck without separate written instruc ions from Engineer. 3. Installers mustl verify metal panels are 26 gauge or thicker use of Protea rackets. 0 ry0� 1 RAIL: 14Fr LONG 2 RAIL SPLICE: JOIN RAILS TOGETHER W/ 4-N0.10 3W SCREW (#3) 4 L-FOOT: CONNECTS RAIL TO ROOF, EVERY 4FT @ RAFTERS CONNECT WITH %" BOLT (#S) AND %" NUT (#6) @ RAIL CONNECT WITH LAG SCREW AND SEALENT @ ROOF 2--0" L-FOOT LAYOUT NOT TO SCALE �• � uGE E Thh�''� Q No 81627 v : cc 90: STATE OF : u/ Florida Firm No. 30649 Principal Engineering, Inc Joshua Prince 120 Riomar Court Port Saint Lucie, FL 34952 Date: Sheet 8.2.19 No: 2 of 2 n SEP 2 4 °u19 ST. Lucie County, Pen Jra)valia FILE COPY ST.LUCIE COUNTY e, nu oanon, BLDG: DATE: E DATE Z"O PLUMB: DATE DATE