CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREAT MEN T
r
PERMIT #: 01/9� .. JOB
BUILDER/CONTRACTOR:
PEST CONTROL CONTRACTOR:
PEST CONTROL LICENSE #:
SCANNED
. BY
3t. Lucie County
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: P
Percentage of solution: 6
Date of Treatment: �1
Footing
1't Treatment
Re -Treat
Driveway
1st Treatment
Re -Treat
Other.
1t Treatment
Re -Treat
Chemicals used: ' Al)* 1o►- SC
Total gallons used: ' bD
Time of Treatment: 4 - 0
Slab
1s` Treatment
Re -Treat
Pools
_-X-1s` Treatment
Re -Treat -
Perimeter for Final Inspection
(/ Signature of,Bx g4inator
Note.. There musf be a completed form for each required treatment or-re-b eatinent and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection' will fail and a re -inspection
fee charged..
FBC104.2.6-Certificate60m- tective.Treatmentforprevention:offemiite. Aweatherresistantjobsitepostingboard
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building pennit files. The Treatment
Certificate shall provide the product used,. identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number ofgallons.used, to establish a verifiable record of
Protective treatment. If the soil chemcal barrier method for termite prevention is used, final exterior treatment shall -
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
iwonD Pre -pour
��� T-e,w,k yna_fr