Loading...
HomeMy WebLinkAboutENGINEERING LETTERNuefie Engineering Donald J. Nualls P.E. 815 Universfty Boulevard Apt. 301 Jupiter, FL 33458 Cellular 581.629.6975 GHO Homes 590 NW Mercantile Place Pon St. Lucie, FL 34985 Attn: Bill Handler Re: Termite Treatment Option Dear Mr. Handler.: =REGMEL) Date:1011712015 Per your request. I have Inspected the termile treatment requirements In the FBC and find the baiting method (which is used on aft GHO homes) should have been specified on the foundation notes Instead of the soil treatment The soft treatment note Is an error and should be emitted. R3f8.1.7 If a reg!slared termladde formulaled ans te8tsterbd as a bull system Is used for subterranean larmlte pmvaollon, section R318.1.1 meaugh seeaan R318.1.6 do not apply, however, a slgrad contract assuring the installation. maintenance and mon!ladng of the bating system that is In compliance whhale requirements of Chapter 482. Radda Statutes, shall be provided to the bu!Wing ofpdal prior to the pouting of the slab, and the system must be installed prior to final building approval It you or any other interested party has any questions or requires additional Information please reelflee to contact me at any time. Donal J. Nuelle P.E P.E.Y O46 SCANNED BY St. Lucie County