HomeMy WebLinkAboutENGINEERING LETTERNuefie Engineering
Donald J. Nualls P.E.
815 Universfty Boulevard Apt. 301
Jupiter, FL 33458
Cellular 581.629.6975
GHO Homes
590 NW Mercantile Place
Pon St. Lucie, FL 34985
Attn: Bill Handler
Re: Termite Treatment Option
Dear Mr. Handler.:
=REGMEL)
Date:1011712015
Per your request. I have Inspected the termile treatment requirements In
the FBC and find the baiting method (which is used on aft GHO homes) should
have been specified on the foundation notes Instead of the soil treatment The
soft treatment note Is an error and should be emitted.
R3f8.1.7
If a reg!slared termladde formulaled ans te8tsterbd as a bull system Is used for
subterranean larmlte pmvaollon, section R318.1.1 meaugh seeaan R318.1.6 do not apply,
however, a slgrad contract assuring the installation. maintenance and mon!ladng of the
bating system that is In compliance whhale requirements of Chapter 482. Radda Statutes,
shall be provided to the bu!Wing ofpdal prior to the pouting of the slab, and the system must
be installed prior to final building approval
It you or any other interested party has any questions or requires
additional Information please reelflee to contact me at any time.
Donal J. Nuelle P.E
P.E.Y O46
SCANNED
BY
St. Lucie County