HomeMy WebLinkAboutEVALUATION REPORTSCANNED MEMO I etc.
k BY Certificate of authorization #32455
St. Lucie County 353 Christian Street, Unit #13
T Oxford, CT 06478
(203) 262-9245
ENGINEER EVALUATE TEST CONSULT CERTIFY
EVALUATION REPORT
GAF Evaluation Report 01506.04.08-R14
1Campus Drive FL30626-1114
Parsippany, NJ 07054 Date of Issuance:04/25/2008
(800) 766-3411 Revision 14: 06/06/2018
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for compliance with the 61h Edition (2017) Florida Building Cade
sections noted herein.
DESCRIPTION: GAF Roof Underlayments
LABELING: Labeling shall be in accordance with the requirements of the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This Evaluation Report Is valid until the named product(s) changes, the referenced Quality
Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this
Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. of any changes to the
product(s), the Quality Assurance or the production facility location(s). NEMO J etc. requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "NEMO Ietc. Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 11.
Prepared by:
cam.
Robert J.M. Nieminen, P.E.
Florida Registration No. 59166, Florida DCA ANE1983
The facsimile seal appearing was authorized by Robert
S'q^.....
Nieminen,P.E.on 06/052018. This does not serve as an
electronically signed document.
CERTIFICATION OF INDEPENDENCE:
1. NEMO ETC, LLC does not have, nor does it intend to acquire, or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. NEMO ETC, LLC is not owned, operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued. '
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
product.
S. This is a building code evaluation. Neither NEMOletc. nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any
project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained
specifically for that purpose.
FILE COPY
ONEMOletc.
ROOFING COMPONENT EVALUATION:
Product Category: Roofing — --- — - - — - - - --
Sub-Category: Underlayment
Compliance Statement: GAF Roof Underlayments, as produced by GAF, have demonstrated compliance with the w
following sections of the Florida Building Code through testing in accordance with the following Standards.
Compliance is subject to the Installation Requirements and Limitations / Conditions of Use set forth herein.
Section
Property
Standard
Year
1504.3.1
Wind Uplift
FM 4474
2011
1507.1.1, R905.1.1 Exception
Unrolling, Breaking Strength,
ASTM D226
2009
Pliability
1507.1.1, R905.1.1 Exception
Tear Strength
ASTM D4533
2015
1507.2.3 / 1507.1.1
Physical Properties
ASTM D6757
2016
1507.2.4 / 1507.1.1, 1507.2.9.2
Physical Properties
ASTM D1970
2015
1507.3.3
Physical properties
FRSA/TRI April 2012 (04-12)
2012
1507.11.2
Physical Properties
ASTM D6164
2011
3. REFERENCES:
Enti
Examination
Reference
Date
ERD (TST 6049)
Physical Properties
R3360.02.07-2-R1
03/13/2007
ERD (TST 6049)
Physical Properties
G12110.12.08
12/02/2008
ERD (TST 6049)
FRSA/TRI April 2012 (Slippage)
G34150.08.11
11/14/2011
ERD (TST 6049)
ASTM D6164
G40630.01.14-2B
01/07/2014
ERD (TST 6049)
ASTM D6164
G46160.09.14-3A
09/09/2014
ERD (TST 6049)
ASTM D1970
GAF-SC13285.03.17-3
03/O1/2017
ERD (TST 6049)
ASTM D1970
GAF-SC13285.03.17-4
03/01/2017
PRI (TST 5878)
Physical properties
BRY-003-02-01
03/19/2002
PRI (TST 5878)
ASTM D1970
GAF-026-02-01
03/26/2002
PRI (TST 5878)
ASTM D1970
GAF-027-02-01
03/26/2002
PRI (TST 5878)
Physical properties
GAF-042-02-01
06/03/2005
PRI (TST 5878)
Physical properties
GAF-224-02-01
07/27/2009
PRI (TST 5878)
ASTM D1970
GAF-238-02-01
03/03/2010
PRI (TST 5878)
ASTM D1970
GAF-275-02-01
11/11/2010
PRI (TST 5878)
Physical properties
GAF-349-02-01
07/03/2012
PRI (TST 5878)
Wind Uplift
GAF-434-02-01
09/16/2013
PRI (TST 5878)
Wind Uplift
GAF-434-02-03
09/16/2013
PRI (TST 5878)
Wind Uplift
GAF-434-02-04
09/16/2013
PRI (TST 5878)
FBC 1507.1.1 (Exception)
GAF-818-02-01
12/05/2017
PRI (TST 5878)
FBC 1507.1.1 (Exception)
GAF-826-02-01
06/04/2018
PRI (TST 5878)
FBC 1507.1.1 (Exception)
GAF-847-02-01
06/04/2018
UL (TST 1740)
Physical properties
02NK22569
06/04/2002
UL (TST 1740)
ASTM D6757
IONK11990
05/18/2011
Miami -Dade (CER 1592)
HVHZ compliance
16-1216.02
02/02/2017
Miami -Dade (CER 1592)
HVHZ compliance
18-0119.15
02/22/2018
ICC-ES(EVL2396)
IBC/IRC compliance
ESR-2053
07/01/2017
ICC-ES(EVL2396)
IBC/IRC compliance
ESR-2808
07/01/2017
ICC-ES(EVL2396)
IBC/IRC compliance
ESR-1322
01/01/2018
ICC-ES(EVL2396)
IBC/IRC compliance
ESR-3286
02/O1/2018
UL, LLC (QUA 9625)
Quality Control
Inspect, File R10689 (BC)
06/27/2017
UL, LLC (QUA 9625)
Quality Control
Inspect, File R10689 (CA)
07/07/2017
UL, LLC. (QUA 9625)
Quality Control
Inspect, File R10689 (GA)
02/02/2018
UL, LLC. (QUA 9625)
Quality Control
Inspect, File R10689 (IN)
01/10/2018
NEMO ETC, LLC
Evaluation
Report 01506.04.08-1134
Certificate of Authariiation#32455
r EDITION (2017) FBC NON-HVHZ EVALUATION
FL30626-R14
GAF Roof Underlayments; (800)
766-3411
Revision 14:06/05/2018
Page 2 of 11
5t
ONEMOjetc.
EnDy Examination Reference Date
UL, LLC. (QUA 9625) Quality Control Inspect, File R10689 (NC) 03/14/2018
UL, LLC (QUA 9625) Quality Control Inspect, File R10689 (OK) 06/20/2017
UL, LLC (QUA 9625) Quality Control Inspect, File R10689 (ON, QC) 05/18/2018
UL, LLC (QUA 9625) Quality Control Inspect, File R10689 (SC) 06/16/2017
UL, LLC (QUA 9625) Quality Control Inspect, File R10689 (TX) 05/24/2016
UL, LLC (QUA 9625) Quality Control Inspect, File R10689 (INDIA) 04/13/2018
UL, LLC (QUA 9625) Quality Control Inspect, File R10689 (LA) 04/23/2018
PRODUCT4.
4.1 Self -Adhering Underlayments:
4.1.1 Liberty'"" SBS Self -Adhering Base/Ply Sheet is a smooth -surfaced, fiberglass -reinforced, self -adhering SBS modified
bitumen roof underlayment; meets ASTM D1970.
4.1.2 StormGuard® Film Surfaced Leak Barrier is a film -surfaced, fiberglass -reinforced, self -adhering SBS modified
bitumen roof underlayment; meets ASTM D1970. StormGuard® Film Surfaced Leak Barrier is also used as a
secondary water barrier to seal roof decks.
4.1.3 WeatherWatch® Mineral Surfaced Leak Barrier is a mineral -surfaced, fiberglass -reinforced, self -adhering SBS
modified bitumen roof underlayment; meets ASTM D3970. WeatherWatch® Mineral Surfaced Leak Barrier is also
used as a secondary water barrier to seal roof decks.
4.2 Mechanically Fastened Underlayments:
4.2.1 VersaShield® Fire -Resistant Roof Deck Protection is a non -asphaltic, fiberglass -based roof underlayment and/or
fire barrier; meets physical requirements of ASTM D6757.
4.2.2 Deck-Armorr" Premium Breathable Roof Deck Protection is a non -woven, spun -bonded polypropylene laminated
polyethylene scrim sheet roof underlayment, available in 48-inch or 54-inch roll widths; meets FBC 1507.1.1 &
R905.1.1 (Exception).
4.2.3 RoofProm SBS-Modified All -Purpose Underlayment is a fiberglass -reinforced, SBS modified bitumen roof
underlayment; meets AC165.
4.2.4 Shingle -Mate® Roof Deck Protection is a fiberglass reinforced, asphaltic roof underlayment; meets FBC 1507.1.1 &
R905.1.1 (Exception).
4.2.5 StormSafem Anchor Sheet is a polypropylene woven fabric which serves as an anchor sheet in two-ply roof
underlayment systems; meets FBC 1507.1.1 & R905.1.1 (Exception).
4.2.6 Tiger Pawn' Roof Deck Protection is a non -woven, polypropylene reinforced, polymer coated roof underlayment;
meets FBC 1507.1.1 & R905.1.1 (Exception).
4.3 Asphalt -Applied Underlayments:
4.3.1 Ruberoid® Mop Granule is a granule -surfaced, polyester -reinforced, asphalt -applied SBS modified bitumen roof
underlayment; meets ASTM D6164.
4.3.2 Ruberoid® Mop Granule FR is a granule -surfaced, polyester -reinforced, asphalt -applied SBS modified bitumen roof
underlayment; meets ASTM D6164.
NEMO ETC, LLC Evaluation Report 01506.04.08-R34
Certificate of Authorization a324SS OEDITION(2017)FBC NON-HVHZ EVALUATION FL10626-R14
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/2018
Page 3 of 11
ONEMOletc.
S.�This isabuild ng code evaluation. Neither NEMO ETC, LLC nor Robert Nieminen, P.E. are, in anyway, the Designer
of Record for any project on w luation Report,—orprevious versions -thereof, is/ -was used for permitting
or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions.
5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory or test
report from accredited testing agency for fire ratings of this product.
5.4 GAF Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced
within FBC approval documents. If not listed, a request may be made to the Authority Having Jurisdiction for
approval based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable Roof Covers:
5.5.1
TABLE
1: ROOF COVER
OPTIONS
Wood
Slate or
Underlayment
Asphalt
Nall -On Tlle
Foam -On
Metal
Shakes&
Simulated
Shingles
Tile
Shingles
Slate
Deck-ArmorT Premium Breathable
Yes
No
No
Contact
Contact
Contact
Roof Deck Protection
GAF
GAF
GAF
RoofPrOT"SBS-Modified All -Purpose
Yes
No
No
No
Yes
Yes
Underlayment
Shingle -Mate° Roof Deck Protection
Yes
No
I No
No
I No
No
Contact
Contact
Contact
Tiger Paw" Roof Deck Protection
Yes
No
No
GAF
GAF
GAF
Versa Shield® Fire -Resistant Roof Deck
Yes
No
No
No
No
No
Protection
LibertyT SBS Self -Adhering Base/Ply
Yes
No
No
No
No
No
Sheet
StormGuard® Film Surfaced Leak
Yes
No
No
Yes
No
No
Barrier
WeatherWatch® Mineral Surfaced
Yes
No
No
No
No
No
Leak Barrier
Ruberoida Mop Granule
Yes
Yes
See es
5.Ruberoid®
No
Yes
Yes
Mop Granule FR
Yes
Yes
See es
5.
No
Yes
Yes
"Foam -On Tile" is limited to use of the following Approved tile adhesives / underlayment combinations.
'Refer to Tile Manufacturer's or Adhesive Manufacturer's Florida Product Approval for Overturning Moment Resistance Performance.
NEMO ETC, LLC Evaluation Report 01506.04.08-R14
Certif,[ate of Authorization#32455 6" EDITION(2017) FBC NON-HVHZ EVALUATION FL10626-R34
GAF Roof Underlayments; (8001766-3411 Revision 14: 06/05/2018
Page 4 of 11
Ell
ONEMOletc.
5.6 Allowable Substrates:
5.6.1 Direct -Bond to Deck:
✓ Liberty'" SBS Self -Adhering Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier and Weather Watch®
Mineral Surfaced Leak Barrier self -adhered to new untreated plywood or existing untreated ASTM D41
primed plywood.
✓ Ruberoid® Mop Granule and Ruberoid® Mop Granule FR in hot asphalt to ASTM D41 primed structural
concrete.
- 5.6.2 Bond to Mechanically Attached Base Laver:
✓ Liberty'"" SBS Self -Adhering Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier and WeatherWatch®
Mineral Surfaced Leak Barrier self -adhered to ASTM D226, Type 11 felt
✓ Ruberoid® Mop Granule and Ruberoid® Mop Granule FR in hot asphalt to GAFGLAS® #80 Ultima" Base Sheet
or Ruberoid® 20 Smooth.
5.6.3 Bond to Other Substrate Types:
✓ ASTM D41 primed metal (flashing metal, valley metal, etc.)
5.6.4 Wind Resistance for Underlavment Systems in Foam -On Tile Applications:
FRSA/TRI April 2012 (04-12) does not address wind uplift resistance of all underlayment systems beneath foam -
on or mortar -set tile systems, where the underlayment forms part of the load -path. The following wind uplift
limitations apply to underlayment systems that are not addressed in FRSA/TRI April 2012 (04-12) and are used in
foam -on or mortar -set tile applications. Maximum Design Pressure is the result of testing for wind load
resistance based on allowable wind loads and reflects the ultimate passing pressure divided by 2 (the 2 to 1
margin of safety per FBC 1504.9 has already been applied). Refer to FRSA/TRI April 2012 (04-22), Appendix A,
Table 1A or FBC 1609 for determination of design wind loads.
#1 Maximum Design Pressure =-45 psf.
Deck: Min. 19/32-inch plywood to meet project requirements to satisfaction of Authority Having
Jurisdiction.
Base Layer: GAFGLAS® #80 Ultima'" Base Sheet or Ruberoid® 20 Smooth mechanically attached with 12 ga., min.
1.25-inch long ring shank nails through 32 ga., 1-5/8-inch diameter tin caps spaced 9-inch o.c. at the
4-inch wide side laps and 9-inch o.c. at two (2), equally spaced, staggered center in the field of the
sheet.
Top Layer: Ruberoid® Mop Granule or Ruberoid® Mop Granule FR applied in full mopping of ASTM D312, Type
IV hot asphalt at 20 to 25 Ibs/square.
#2 Maximum Design Pressure=-75 psf.
Deck: Min. 19/32-inch plywood to meet project requirements to satisfaction of Authority Having
Jurisdiction.
Base Layer: GAFGLAS® #80 Ultima" Base Sheet or Ruberoid® 20 Smooth mechanically attached with 12 ga., min.
1.25-inch long ring shank nails through 32 ga., 1-5/8-inch diameter tin caps spaced 8-inch o.c. at the
4-inch wide side laps and 8-inch o.c. at three (3), equally spaced, staggered center in the field of the
sheet.
Top Layer: Ruberoid® Mop Granule or Ruberoid® Mop Granule FR applied in full mopping of ASTM D312, Type
IV hot asphalt at 20 to 25 Ibs/square.
#3 Maximum Design Pressure = -442.5 psf.
Deck: Min. 2,500 psi structural concrete to meet project requirements to satisfaction of Authority Having
Jurisdiction
Base Layer: GAFGLAS #75 Base Sheet, Tri-Ply #75 Base Sheet, GAFGLAS #80 Ultima Base Sheet, GAFGLAS Ply 4,
Tri-Ply Ply 4 or GAFGLAS Flex Ply 6 applied in full mopping of ASTM D312, Type IV hot asphalt at 20
to 25 Ibs/square.
Top Layer: Ruberoid® Mop Granule or Ruberoid® Mop Granule FR applied in full mopping of ASTM D312, Type
IV hot asphalt at 20 to 25 Ibs/square.
NEMO ETC, LLC Evaluation Report 01506.04.08-1114
Certifmte of Authorization#32455 6T"EDITION (2017)FBC NON-HVHZ EVALUATION F110626-1114
GAF Roof Underlayments; (800) 766-3411 Revision 14:06/CS/2018
Page 5 of 11
5.6.4.1
ONEMOletc.
For mechanically attached Base Sheet, the maximum design pressure for the selected assembly shall meet or
exceed that required under FRSA/TRI April 2012 (04-12), Appendix A, Table 1A.
Alternatively, the maximum design pressure-forthe-selectedassembtyshall meet or exceed the Zone 1 design
pressure determined in accordance with FBC 1609. In this case, Zones 2 and 3 shall employ an attachment
density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used
methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29 and Roofing Application Standard RAS 117..
Assemblies marked with an asterisk' carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention
Data Sheet 1-29 (January 2016) for Zone 2/3 enhancements.
5.7 Exposure Limitations:
5.7.1 Deck -Armor'"" Premium Breathable Roof Deck Protection; RoofPro" SBS-Modified All -Purpose Underlayment;
Shingle -Mate® Roof Deck Protection; Storm Safe'" Anchor Sheet and Tiger Paw'" Roof Deck Protection shall not
be left exposed for longer than 30-days after installation.
5.7.2 VersaShield® Fire -Resistant Roof Deck Protection, Ruberoid® Mop Granule and Ruberoid® Mop Granule FIR shall
not be left exposed for longer than 180-days after installation.
5.7.3 Liberty" SBS Self -Adhering Base/Ply Sheet; StormGuard8 Film Surfaced Leak Barrier and WeatherWatch" Mineral
Surfaced Leak Barrier shall not be left exposed for longer than 30-days after installation.
5.8 Tile Slippage Limitations (TAS 103 per FRSA/TRI April 2012 (04-12)):
When loading roof tiles on the underlayment in direct -deck tile assemblies, the maximum roof slope shall be as
follows. These slope limitations can only be exceeded by using battens during loading of the roof tiles.
6.1
6.2
6.3
6.4
6.5
6.5.1
TABLE 2:
Underlayment
TILE SLIPPAGE LIMITATIONS FOR DIRECT -DECK
Tile Profile
Staging Method
Maximum
Slope
Ruberoid® Mop Granule
Flat
Max. 10-tile stack
4:12
Flat
Max. 6-tile stack (4 over 2)
5:12
Lugged
Max. 10-tile stack
5:12
Ruberoid® Mop Granule FR
Flat or Lugged
Max. 6-tile stack (4 over 2)
5:12
Lugged
Max. 10-tile stack
4:12
GAF Roof Underlayments shall be installed in accordance with GAF published installation instructions subject to
the Limitations set forth in Section 5 herein and the specifics noted below.
Re -fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to
remove any dust and debris prior to application and prime the substrate (if applicable).
Install self -adhering underlayments when ambient temperatures are minimum 457 and rising.
All metal surfaces shall be primed with MatrixTM 307 Premium Asphalt Primer or alternate GAF accepted ASTM
D41 primer prior to application of self -adhering membranes.
Deck -Armor^' Premium Breathable Roof Deck Protection:
Shall be installed in compliance with the requirements for ASTM D226, Type I or II underlayment in FBC Table
1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed, considering the wider sheet -width for
double -layer applications.
6.5.2 Minimum fasteners shall be 1-inch diameter plastic -capped corrosion resistant nails or 1-inch diameter plastic -
capped, corrosion resistant staples.
Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 requires use of metal cap nails
where the ultimate design wind speed, Vwr, equals or exceeds 150 mph.
NEMO ETC, LLC Evaluation Report 01506.04.08-R14
certificate of Authorrsotion#32455 6m EDITION (2017) FBC NON-HVHZ EVALUATION F1.30626-1134
GAF Roof Underlayments; (800) 766-3411 Revision 14:06/05/2018
Page 6 of 11
I�
ONEMOjetc.
6.5.3 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty" SBS Self -Adhering
Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier; UnderRoof" 2 Polyester -Surfaced Leak Barrier or
v WeatherWatch® Mineral Surfaced Leak Barrier at vulnerable leak areas, including but not limited to eaves,
valleys, rakes, skylights and dormers. At eaves and valleys, install the leak barrier prior to installation of the
underlayment. Along the rake, install the underlayment, leaving 6 to 8-inch of the deck exposed, and then install
the leak barrier over the underlayment and exposed decking. At other areas, install the leak barrier over the
underlayment.
- 6.5.4 Non -Tile Roof Installations:
Single Laver: Roof Slope > 4:12:
Starting at the eave, fasten the eave edge and 6-inch wide end -laps 6-inch o.c. Fasten in the field of the roll 12-
inch o.c. in two, equally spaced, staggered center rows.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Fasten 6-inch o.c. in the laps and 12-inch o.c. in two, equally spaced, staggered center rows in the field. Ensure
all end laps are staggered at least 3-feet apart.
Double Laver; 2:12 < Roof Slope <4:12:
If leak barrier (6.3.3) is not used, install a half -width sheet at the eave prior to subsequent courses. Starting at
the eave, fasten the eave edge and 6-inch wide end -laps 6-inch o.c. Fasten in the field of the roll 12-inch o.c. in
two, equally spaced, staggered center rows.
Continue upslope in a similar manner, with minimum 25.5-inch side -laps for 48-inch wide rolls (resulting in
maximum 22.5-inch exposure) or minimum 28.5-inch side -laps for 54-inch wide rolls (resulting in maximum 25.5-
inch exposure) and minimum 6-inch end -laps. Fasten 6-inch o.c. along the low edge and end laps and 12-inch o.c.
in two, equally spaced, staggered center rows in the field. Ensure all end laps are staggered at least 3-feet apart.
6.6 I Tiger PawTM Roof Deck Protection:
6.6.1 Shall be installed in compliance with the requirements for ASTM D226, Type I or II underlayment in FBC Table
1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed, considering the wider sheet -width for
double -layer applications.
6.6.2 Minimum fasteners shall be 1-inch diameter plastic -capped corrosion resistant nails or 1-inch diameter plastic -
capped, corrosion resistant staples.
Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 requires use of metal cap nails
where the ultimate design wind speed, Veit, equals or exceeds 150 mph.
6.6.3 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty'" SBS Self -Adhering
Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier; UnderRoof" 2 Polyester -Surfaced Leak Barrier or
WeatherWatch® Mineral Surfaced Leak Barrier at vulnerable leak areas, including but not limited to eaves,
valleys, rakes, skylights and dormers. At eaves and valleys, install the leak barrier prior to installation of the
underlayment. Along the rake, install the underlayment, leaving 6 to 8-inch of the deck exposed, and then install
the leak barrier over the underlayment and exposed decking. At other areas, install the leak barrier over the
underlayment.
6.6.4 Non -Tile Roof Installations:
Single Laver: Roof Slope > 4:12:
Starting at the eave, fasten the eave edge and 6-inch wide end -laps 6-inch o.c. Fasten in the field of the roll 12-
inch o.c. in two, equally spaced, staggered center rows.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Fasten 6-inch o.c. in the laps and 12-inch o.c. in two, equally spaced, staggered center rows in the field. Ensure
all end laps are staggered at least 3-feet apart.
NEMO ETC, LLC Evaluation Report 01506.04.08-1134
Certificate ofAuthod:adon N32455 6r"EDITION (2017)FBC NON-HVHZ EVALUATION FL30626-R74
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/Z018
Page 7 of 11
ONEMOjetc.
Double Laver; 2:12 < Roof Slope <4:12:
If leak -barrier (6.4.3) is not used, install a half -width sheet at the eave prior to subsequent courses. Starting at
the eave, fasten the eave�edge an 6=lnch—wide-end-laps-6-inch-o.c..Fasten in the field of the roll 12-inch o.c. in
two, equally spaced, staggered center rows. --
Continue upslope in a similar manner, with minimum 25.5-inch side -laps (resulting in maximum 22.5-inch a
exposure) and minimum 6-inch end -laps. Fasten 6-inch o.c. along the low edge and end laps and 12-inch o.c. in
two, equally spaced, staggered center rows in the field. Ensure all end laps are staggered at least 3-feet apart.
6.7 I StormSafe' Anchor Sheet:
6.7.1 StormSafe'" Anchor Sheet is limited to use as a mechanically attached base layer in 2-ply underlayment systems.
6.7.2 Minimum fasteners shall be 1-inch diameter plastic- or steel -capped corrosion resistant nails; corrosion -resistant
nails & 1-5/8-inch tin -caps; or Drill-Tec screws and plates.
Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 requires use of metal cap nails
where the ultimate design wind speed, Vnn, equals or exceeds 150 mph.
6.7.3 Non -Tile Roof Installations:
Starting at the eave, fasten the eave edge and 6-inch wide end -laps 6-inch o.c. Fasten in the field of the roll 12-
inch o.c. in two, equally spaced, staggered center rows.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Fasten 6-inch o.c. in the laps and 12-inch o.c. in two, equally spaced, staggered center rows in the field. Ensure
all end laps are staggered at least 3-feet apart.
One the same day, install Liberty'"" SBS Self -Adhering Base/Ply; StormGuard® Film Surfaced Leak Barrier or
WeatherWatch® Mineral Surfaced Leak Barrier over the StormSafeTM Anchor Sheet.
6.8 I RoofPrW" SBS-Modified All -Purpose Underlayment and Shingle -Mate® Roof Deck Protection:
6.8.1 Shall be installed in compliance with the requirements for ASTM D226, Type I or II underlayment in FBC Table
1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed. No hammer tacks or staples are
permitted.
Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 requires use of metal cap nails
where the ultimate design wind speed, V n, equals or exceeds 150 mph.
6.8.2 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty'" SBS Self -Adhering
Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier or WeatherWatch® Mineral Surfaced Leak Barrier at
vulnerable leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and
valleys, install the leak barrier prior to installation of the underlayment. Along the rake, install the underlayment,
leaving 6 to 8-inch of the deck exposed, and then install the leak barrier over the underlayment and exposed
decking. At other areas, install the leak barrier over the underlayment.
6.9 VersaShieldO Fire -Resistant Roof Deck Protection:
6.9.1 Shall be installed in compliance with the codified requirements for ASTM D6757 underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to be installed. No hammer tacks or staples are permitted.
6.9.2 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty"' SBS Self -Adhering
Base/Ply Sheet; StoriTGuard® Film Surfaced Leak Barrier or WeatherWatch® Mineral Surfaced at vulnerable
leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and valleys, install
the leak barrier prior to installation of the underlayment. Along the rake, install the underlayment, leaving 6 to
8-inch of the deck exposed, and then install the leak barrier over the underlayment and exposed decking. At
other areas, install the leak barrier over the underlayment.
�t
NEMO ETC, LLC Evaluation Report 01506.04.08-1114
certificate ofAutharisadon 43245S 0EDITION (2017)FeC NON-HVHZ EVALUATION FL30626-R34
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/2018
Page 8 of 11
ONEMOjetc.
6.10 Liberty'" SIBS Self -Adhering Base/Ply Sheet:
6.10.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to be installed.
6.10.2 The minimum and maximum roof slopes are %:12 and 6:12, respectively. Back -nailing is required when slope is
1:12 or greater. Back -nailing shall consist of minimum 1-inch square or round cap nails spaced 18" D.C. within 3-
inch side laps.
6.10.3 Non -Tile Applications:
Shall be fully self -adhered to the substrates noted in Section 5.6. For direct -bond to deck applications plywood
shall be primed with MatrixTM' 307 Premium Asphalt Primer or alternate GAF accepted ASTM D41 primer at Y. to
Y..gallon per square.
Prior to removal of release film, align sheets properly starting at the low -point of the roof leave) with the selvage
edge upslope and for minimum 2-inch overhang at eaves and rakes. Roll out sheet and allow to 'relax' for min. 30
minutes. Remove the lower piece of release film and bond to substrate and fold the overhanging 2-inch over the
eave and nail into place 12" D.C. Remove the top piece of release film and bond to substrate. Install primed drip
edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8-inch troweling of MatrixTM 201
Premium SIBS Flashing Cement over drip edge.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Ensure all end laps are staggered at least 18-inch apart.
Use a weighted lawn or linoleum roller to ensure complete adhesion to the substrate. Use a hand roller to firmly
bond side and end laps.
6.11 StormGuard® Film Surfaced Leak Barrier:
6.11.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table
2507.1.1 for the type of prepared roof covering to be installed.
6.11.2 Back -nailing is required. Back -nailing shall consist of minimum 1-inch square or round cap nails spaced 18" D.C.
within 3-inch side laps.
6.11.3 Non -Tile Applications:
Shall be fully self -adhered to the substrates noted in Section 5.6. Prior to removal of release film, align sheets
properly starting at the low -point of the roof leave) with the selvage edge upslope and for minimum 2-inch
overhang at eaves and rakes. Remove the lower piece of release film and bond to substrate and fold the
overhanging 2-inch over the eave and nail into place 12" D.C. Remove the top piece of release film and bond to
substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8-inch
troweling of MatrixTM' 201 Premium SBS Flashing Cement over drip edge.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Ensure all end laps are staggered at least 18-inch apart.
Use a hand roller to firmly bond side and end laps.
NEMO ETC, LLC Evaluation Report 01506.04.08-R34
Certificate clAuthodwrion#32455 6'"EDITION (2017)FBC NON-HVH2 EVALUATION FL10626-R14
GAF Roof Underlayments; (8001766-3411 Revision 14: 06/05/2018
Page 9 of 11
ONEMO I etc. "
6.12 I WeatherWatch® Mineral Surfaced Leak Barrier:
6-123—Shall-be-installed-incompliance with the codified requirements for ASTM D1970 underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to a Installed. -
6.12.2 WeatherWatch® Mineral Surfaced Leak Barrier may be installed as a secondary water barrier using minimum 4-
inch wide rolls to seal plywood deckjoints prior to installation of the primary underlayment system.
6.12.3 Back -nailing is required. Back -nailing shall consist of minimum 1-inch square or round cap nails spaced 18" o.c.
within 4-inch side laps. -
6.12.4 Non -Tile Applications:
Shall be fully self -adhered to the substrates noted in Section 5.6. Prior to removal of release film, align sheets
properly starting at the low -point of the roof leave) with the selvage edge upslope and for minimum 2-inch
overhang at eaves and rakes. Remove the lower piece of release film and bond to substrate and fold the
overhanging 2-inch over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to
substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8-inch
troweling of Matrixm 201 Premium SBS Flashing Cement over drip edge.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Ensure all end laps are staggered at least 18-feet apart.
Use a hand roller to firmly bond side and end laps.
6.13 I Ruberoid® Mop Granule; Ruberoid® Mop Granule FR:
6.13.1 Ruberoid® Mop Granule or Ruberoid® Mop Granule FR shall be installed in compliance with current GAF
published installation requirements.
6.13.2 For use in tile applications, Ruberoid® Mop Granule or Ruberoid® Mop Granule FR are for use as an alternate to
"Mineral Surface Roll Roofing" (ASTM D6380, Class M) in the "Single Ply System' from FRSA/TRI April 2012 (04-
12) beneath mechanically fastened tile roof systems or the Hot Asphalt applied "Cap Sheet' in the 'Two Ply
System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered tile roof systems.
6.13.3 Fully adhere in ASTM D312, Type IV hot -asphalt to the substrates noted in Section 5.6. Side laps shall be
minimum 4-inch and end -laps minimum 6-inch wide, and offset end -laps minimum 3-feet from course to course.
Side and end -laps shall be fully adhered in a complete mopping of hot asphalt with asphalt extending
approximately 3/8-inch beyond the lap edge.
6.13.4 Consult GAF instructions regarding back -nailing requirements.
6.14 Tile Staging (Ruberoid® Mop Granule; Ruberoid® Mop Granule FBI:
6.14.1 Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment.
Refer to Table 2 herein, and GAF published requirements for tile staging.
6.14.2 Battens and/or Counter -battens, as required by the tile manufacturer and FRSA/TRI April 2022 (04-12) must be
used on all roof slopes greater than 7:12. Precautions should be taken as needed, such as the use of battens or
nail -boards, to prevent tile sliding and/or damage to the underlayment during the loading process.
NENIO ETC, LLC Evaluation Report 01506.04.08-R74
Certifimte ofAuthorimtion N32455 6'"EDITION 12017)FBC NON-HVHZ EVALUATION FL10626-1134
GAF Roof Underlayments; (800) 766-3421 Revision 14; 06/05/2018
Page 10 of 11
j
ONEMOjetc.
As required by the Building Official or Authority Having Jurisdiction to properly evaluate the installation
product.
Contact the noted QA agency for information on product locations covered for F.A.C. 61G20-3 QA requirements.
The following plants have qualified products under their respective physical properties specifications.
Plant
Specification
Product Us
Charleston, SC
FBC 1507.1.1 (Exception)
Tiger PawTM Roof Deck Protection
Conover, NC
ASTM D6757
VersaShield- Fire -Resistant Roof Deck Protection
Dadra, India
FBC 1507.1.1 (Exception)
Tiger Paw'" Roof Deck Protection
Fontana, CA
AC165
RoofPrOTM SBS-Modified All -Purpose Underlayment
Homer, LA
FBC 1507.1.1 (Exception)
Tiger Paw'" Roof Deck Protection (WIP)
McGregor, TX
FBC 1507.1.1 (Exception)
Shingle -Mate® Roof Deck Protection
Mission, BC
FBC 1507.1.1 (Exception)
Tiger Paw'" Roof Deck Protection
Mt. Vernon, IN
ASTM D1970
Liberty'" SBS Self -Adhering Base/Ply Sheet; StormGuard- Film Surfaced
Leak Barrier; WeatherWatch- Mineral Surfaced Leak Barrier
North Bay, Ontario
FBC 1507.1.1 (Exception)
Deck -Armor'" Premium Breathable Roof Deck Protection, StormSafe—
Anchor Sheet, Tiger Paw" Roof Deck Protection (conversion)
Pryor, OK
FBC 1507.1.1 (Exception)
Shingle -Mate- Roof Deck Protection
Savannah, GA
ASTM D1970
StormGuard- Film Surfaced Leak Barrier; WeatherWatch- Mineral
Surfaced Leak Barrier
ASTM D6164
Ruberoid- Mop Granule; Ruberoid- Mop Granule FR
9. QUALITY ASSURANCE ENTITY:
UL,LLC.— QUA9625; (847) 664-3281
- END OF EVALUATION REPORT -
NEMO ETC, LLC
Certificate ofAuthodtation 432455 6-EDITION(2017)FBC NON-HVH2 EVALUATION
GAF Roof Underlayments; (800) 766-3411
Evaluation Report 01506.04.08-R34
FL10626-R34
Revision 14: 06/05/2018
Page 11 of 11