HomeMy WebLinkAboutOLIVER REVISION467 Swan Ave • Hohenwald, TN 38462 • (800) 284-7437 o www.olivertechnologie5.com • Fax (931) 796-8811
OLIVER TECHNOLOGIES, INC.
INSTALLATION INSTRUCTIONS FOR FLORIDA
MODEL 1101 "Y" SERIES ALL STEEL FOUNDATION SYSTEM PAN & CONCRETE (revision 5/18)
PATENT# 6634150 & OTHER PATENT PENDING
OCT 10 IjI9
ST. Lucie County,
REVISED
By SEAMSWONGER at 6:77 am, N V1S
E
EWEDER at 6.33 am, 831M6
,,
x
,t
5;.
SCANNED
BY
St. Lucie County
•°, (9911 L•9ftf
0..10242
STATE OF
k, o
tf0`'rnn99°j° .
Aug 24, 2018
FILE -COPY
Nov 0 5 7019
467 Swan Ave • Hohenwald. TN 38462 • (800) 284-7437
www.olivertechnoiogies.com • rax tY>i) IV,...
OLIVER TECHNOLOGIES, INC.
FLORIDA INSTALLATION INSTRUCTIONS FOR THE
MODEL 1101-"V" SERIES ALL STEEL FOUNDATION SYSTEM
MODEL 1101"V" (Steps 1-14)
LONGITUDINAL ONLY: Follow Steps 1-9
LATERAL ONLY: Follow Steps 1-3 and Steps 10-14
-ENGINEERS-STAMP FOR CONCRETE APPLICATIONS: Follow Steps 1 S-18 ENGINEERS STAMP
1. SPECIAL CIRCUMSTANCES: if the following conditions occur -STOP! Contact Oliver Technologies at 7-800-284-7437:
a) Pier height exceeds 48" c) Roof eaves exceed 16" e) Location is within 1500 feet of coast
b) length of home exceeds 76' d) Sidewall height exceed 96'
INSTALLATION OF GROUND PAN
2. Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan (C) .
3. Place ground pan (C) directly below chassis I-beam. Press or drive pan firmly into soil until flush or belowsoi),then install pier per
manufacturers instructions or per Florida Regs.
SPECIAL NOTE: The longitudinal "V" brace system may also serve as a pier under the home and 'Should be loaded as any other pier.
It is recommended that after leveling piers, and one-third inch (1/31 before home is lowered completely on to piers, complete
steps 4 through 9 below then remove jacks. �" ^ A'
._.-_... ...... .. u�,e, wr nun DDnrCCVCTLAA (MndeV 101-L"V")
NOTE WHEN INSTALLINGTHE LONGITUDINAL SYSTEM ONLY, A MINIMUM OF SYSTEMS
USED TO DETERMINE CORRECTTYPE OF ANCHOR PER SOIL CLASSIFICATION. IF PROBETI
BE USED. IF PROBETEST READINGS ARE BETWEEN 276 &350 A FOOT ANCHOR MAY
STABILIZERPLATES EVERY 5'4" . VERTICALTIES ARE ALSO REQUIRED -ON HOMES SUPPLIE
4. Choose one of the approved longitudinal tube installations; either Diagram A
diagram for appropriate pier height at support location or cut and drill 1Tsq
PIER HEIGHT 1.251,
(40' Min. - 45" Max.) Tube Length Tube Length . ; r a/t6'iNa ise
7 3/4" to 25"
22"
24 314" to 321 /4"
32"
33" to 41.
44"
Via-
40"to48"
54"
18°
)N IS REQUIRED. SOILTEST PROBE SHOULD BE
BETWEEN 175 & 275 A FOOT ANCHOR MUST
)UND ANCHORS WITHDIAGONALTIES AND
TIE CONNECTION POINTS (PER FLORIDA REGJ)
or$. Then select the correct square tube (E) length from the
care tube to achieve appropriate length,
PIER HEIGHT 1.50"
(400 Min. - 60" Max.) Tube Length
■.
n
""`
Diagram A o.7s
9 �
Diagram B
5. Install (2) of the 1.50" square tubes (E) into the 4' bracket (J), insert carriage bolt and leave nutloose for final adjustment.
6. Placed -beam connector (F) loosely, on thepottom flange of the I-beam.
7. (For Diagram A installation) Slide the selected 1.25" tube (E) into a 1.50" tube (E) and attach to I-beam connectors-{F) and fasten Loosely
with bolt and nut. (For Diagram B installation) Attach the selected 1.5" tubes (E) to the I-beam connectors (F) and fasten loosely with bolts
and nuts.
B. Repeat steps 6 through 7 to create the "V",pattern of the square tubes loosely in place.
9. Using standard hand tools tighten all nuts and bolts. (For Diagram A installation only, secure 1.25" and 1 .50° tubes using
four(4)1 /4"-14 x 314" self -tapping screws in pre -drilled holes.)
INSTALLATION OF LATERALTELESCOPINGTRANSVERSE ARM SYSTEM_(Model 1101 T"V")
THE MODEL 1101 -V" (LONGITUDINAL & LATERAL PROTECTION) ELIMINATESTHE NEED FOR STABILIZER PLATES & FRAMETIES.
NOTE:THE USE OFTHIS.SYSTEM REQUIRES VERTICALTIES SPACED AT 5'4",
FOUR FOOT (N) GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT.
10. Install remaining vertical tie -.down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerline anchors
to be sized according to soil torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of 4,000 lbs.
require a 5' anchor per Florida Code.
11. Select the correct square tube brace (H) length For set-up lateral transverse at support location. The lengths come in either 60" or
72" lengths. (With the 1.50" tube as the bottom tube, and the 1.25" tube as the inserted tube.)
12. Install the 1.50 transverse brace (H) to the ground pan connector (D) with bolt and nut.
13. Slide 1.25" transverse brace into the 1.50" brace and attach to adjacent I-beam connector (1) with bolt and nut.
14. Secure 1.50" transverse arm to 1.25" transverse arm using four (4)1 /4" -14 x 3/4'" self -tapping screws in pre -drilled holes. Page
DATFNTk 6Fiid1 Sri R (1THFR PATENT PFNf)INf;
Revision 08123tl E
467 Swan Ave a Hohenwald, TN 39462
(900)284-7437
www.ohvertechnologies.corn o Fax t931) 190-sat 1
INSTALLATION USING CONCRETE RUNNERI FOOTER
IS. A concrete runner, footer or slab may be used in place of the steel ground pan.
a) The concrete shall be minimum 2500 psi mix
b) A concrete runner may be either longitudinal or transverse; and must be a minimum of 8" deep with a minimum width of 16 inches
longitudinally or 18 inches transverse to allow proper distance between the concrete bolt and the edge of the concrete (see below).
c) Footers must have minimum surface area of 441 sq. in. (i.e. 21" square), and must be a minimum of 8" deep.
d) If a full s4ab is used, the depth must be a 4" minimum . Special inspection of the system bracket installation is not required. Footers
must -allow for-at4east-4" ffom the�ancreteboluo-the edge_of-the-concrete,
NOTE: The bottom of all footings, pads, stabs and runners must be per local jurisdiction.
LONG BLDINAL: Model 1101 LC "V")
16. When using Part# 1101-W-CPCA (wetset) simply install the bracket in runner/footer OR When installing in cured concrete use Part#
101-D-CPCA (dryset). The 1101 (dryset) CA bracket is attached to the concrete using (2) 518"x3" concrete wedge bolts (Simpson part #
S162300H 5/8" X 3" or Powers equivalent). Place the CA bracket in desired location. Mark bolt holelocations, then using a 5/8" diameter
masonry bit, drill a hole to a minimum depth of 3". Make sure all dust and concrete is blown out of thiholes. Place wedge bolts into drille
holes, then place 1101 (dry set) CA bracket onto wedge bolts and start wedge bolt nuts.Take:.a hammer and lightly drive the wedge bolts
down by hitting the nut (making sure not to hit the top of threads on bolt) .The sleeve of concrete wedae bolt needs to he at or below tht
too of concrete Complete by tightening nuts.
17. For wet set (part # 1101-W TACA) installation simply install the anchor bolt intofunn
mark bolt hole locations, then using a 518" diam. masonry bit. drill a hole to a minim
blown out of the hole. Place wedge bolts (Simpson part #S162300H 5/8" X 3' or POvt
connector and into drilled hole. If needed; take a hammer and lightly,dfivg the wed!
hit the top of threads on bolt), then remove the nut. The sleeve of concrete wedge t
18. When using part# 1101 CVW (wetset) or 1101, CVD (dryset), install perstep5-17 & 18.
Notes:
1. LENGTH OF HOUSE IS
2.i -=LOCATION OFTI
3 7: =LOCATION OF LI
4. ti g=• = TRANSVERSE Al
NNG ONLY
LOCATIONS
AND LENGTHS UP TO 52'
;n : For dry set installation (part # 1101-D TACA
th of 3". Make sure all dust and concrete is
ivalent) into IN concrete dry transverse
down by hitting the nut (making sure not to
`I
i
i,
ALL WIDTHS AND LENGTHS OVER 52' TO 8W
HOMES WITH 5/12 ROOF PITCH REQUIRE. PER FLORIDA REGULATIONS
6 systems for home lengths up to 52' and 8 systems for homes over 52' and up 80.
Page ?
Revision o812311 E
PATENTN 6634150 & OTHER PATENT PENDING
1-Transverse Arm. I -Beam Connector
H-Transverse Am
/ Top(1.25')
Bottom (I S-)
C - Ground Pan
I
I -Transverse Arm. I -Beam Connector
HH-/ Part. F101-O-tACA
-Transverse Arm PanY1101-W-TACAn.1,h.
Top 11.251
Bottom 0.51
I J
I Cement Block 1 /? ICMU -Pier
Omitted I� Omitted I
Lfor Clarity D- Concrete Transverse LFof Canty I
y Connector
C- Concrete 51ab1 t2'� -
> t8-Max.
Foote?
Botts
Model # 1101 T "V" Model # 1101 TC W"
1
Florida approved 4' ground anchors may be used in all locations except where home manufacturers specifications for sidewall
straps are in excess of 4,000 lbs. These locations require a S' anchor. Per Florida code.
C = GROUND PAN / CONCRETE FOOTER OR RUNNER
D = GROUND PAN / CONCRETE U BRACKETS TRANSVERSE CONNECTOR (connects with grade-5— 1/try,x 2" 1/2"carriage bolt and nut)
E =TELESCOPING V BRACETUBE ASSEMBLY (1.5" TUBE BOTTOM AND 1.25" TUBE INSERT)OR 1:5_," TUBE
F = "V" BRACE I -BEAM CONNECTOR ASSEMBLY
H = TELESCOPING TRANSVERSE ARM ASSEMBLY r}
I =TRANSVERSE ARM I -BEAM CONNECTOR (connects with grade 5 -1/2",x2"e1 /2" carriage bolt and nut)
J = V PAN BRACKET (connects with grade 5 -1/2" x 2" 1/2" carriage bolt and nut)
L_7r
I -Transverse Arm, I -Beam C�onne
D - Pan Transverse Connector
/ Concrete Transverse Bracket
i,
S,
-1r
o
F- "V"Brace I -Beam
H-Transverse Arm Connectors
/ Top (1.25*1
Bottom (1.5') J
C - Ground Pan —
Concrete Footer
E
0
- Pan V Bracket /
Concrete V Bracket
1
t
Model # 1101 "V"
Patti 1101 O-CPCA 8
Part a 1101 W-CPCA n"tshown
PATENT# 6634150 & OTHER PATENT PENDING
Model # 1101 G r'V,r
Page3
Revision 08/2311 E