2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
SCANNED
BY
St. Lucie County
Project Name: FRADE RESIDENCE Builder Name:
Street: Permit Office: ST LUCIE COUNTY
City, State, Zip: FORT PIERCE, FL, Permit Number:
v
Owner. Jurisdiction: ST LUCIE COUNTY
=
Design Location: FL, Fort Pierce
O
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable Insulation shall
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
requirements
Breaks or joints in the air barrier shall be sealed.
Ceilinglattic
The air barrier in any dropped ceiling/soffit shall be aligned with the
The insulation in any dropped ceilinglsofft
Insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces stall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within comers and headers of frame walls
The junction of the top plate and the top of exterior walls shall be sealed.
shall be insulated by completely filling the cavity with a
Knee walls shall be sealed.
material having a thermal resistance of R-3 per inch
minimum.
Exterior thermal envelope insulation for framed walls
shall be installed in substantial contact and continuous
alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of insulation.
Floor framing cavity insulation shall be installed to
(including
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity Insulation shall
and cantilevered floors)
be permitted to be in contact with the top side of
sheathing, or continuous Insulation installed on the
underside of floor framing and exdends from the bottorr
to the top of all perimeter floor framing members.
Crawl space walls
Exposed earth in unvenled crawl spaces shall be covered with a
Where provided instead of floor insulation, insulation
Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the orawlspace walls.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to exterior
or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on installation
readily conforms to the available cavity spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spaces.
Recessed lighting
Recessed light futures installed in the building thermal envelope shall
Recessed light fixtures installed in the building
be sealed to the drywall.
thermal envelope shall be air fight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring a
plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind pining and wiring.
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall be
on exterior wall
tubs shall separate them from the showers and tubs.
insulated.
Electrical/phone box on
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall be
sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be sealed
sprinklers
In a manner that is recommended by the manufacturer. Caulking or other
adhesive sealants shall not be used to fill voids between fire sprinkler
cover plates and walls or ceilings.
a. In addition, inspection of log walls shall be in accordance with the provisions of IC(: 400.
11/18/2019 12:05 PM EnergyGauge@ USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
Client Upstate Builders Date. W2 Zui9
SOLIOSTART4Pre1ect Designer. Claudia Martin
Page of
orstcx socrwM Address: Port St. Lucie Job Name: Fmde Residence
Pto)ectM J37714
LVL1 LP-LVL 290OFb-2.OE 1.750" X 11.875" 3-Ply - PASSED
Laval
z
4 44
I 2 Hanger (HHUS5S0/10)
lL 223 '�
�451/4'
23
Member Information
Reactions PATTERNED lb (Uplift)
Type: Girder Application: Roof
Brg Live Dead Snow Wind
Const
Plies: 3 Slope: 0/12
1 1807 1714 0 0
0
Moisture Condition: Dry Design Method: ASD
2
Deflection LL• 480 Building Code: IBCBRC 2015
1570 1512 0 0
0
Deflection TL- 240 Load Sharing: Yes
Importance: Normal Dedc Not Checked
Temperature: Temp c 100-F
General Load
Bearings
Floor Live: 30 PSF
Bearing Length Cap. React D/Llb Total Ld. Case
Ld. Comb.
Dead: 25 PSF
1 - 6.000' 26% 1714 / 1807 3621 L
2- 3.000' 26% 151211570 3083 L
D+L
D+L
Analysis Results
Hanger
Analysis Actual Location Allowed Capacity Comb. Case
...
Moment 16847 Rob 11-8318- 31D48ft4b 0.543 (54%) D+L L
Shear 2775lb 1's 118- 11845 lb 0.234 (23%) D+L L
LL Defl Inch 0.642 (L/495) 117 314' 0.559 (U480) 0.970 (97%) L L
TL Dell Inch 1.065 (L252) 117 3W 1.119 (L240) 0.95D (95%) D+L L
Design Notes
1 Provide restraint at supports to ensure lateral stability.
2 Dead Load Deflection: Instant= 0.523. Long Term = 0.784-
3 Fasten all plies using 2 rows of 10d Bom MRS 02848) at 12- o.a Madmum and distance not
to exceed 6'.
4 Refer to last page of calculations for fasteners required for Specified loads.
ry FlII all hangar nailing holes.
6 Girders are designed to be supported an the bottom edge only.
7 Top loads must be supported equally by all piles.
8 Top must be laterally braced at a madmum of T41W o.c.
Q Bottom braced at bearings.
10 Lateral slenderness ratio based on single ply width.
ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const 1.25 Comments
1 Point 0-1-12 Top 327 to 393 to 0 to 0lb 0 to ZHJ7
Bearing Length 03-0
2 Point 1-8-9 Top 1771b 2131b 0lb 0Ib 0Ib ZCJ3
Bearing Length G3-0
3 Point 3-8-9 Top 189 lb 226 lb 0Ili 0Ib 0lb ZCJ5
Continued on page 2...
Notes
Manufacturermfo
Fit Coast Try
T � u b -- m. n
gmnoey bra orm mama m amee h
Dm
USA
lt.
Louisiana-Pacific Corpp
®a bm1 b be 2cot na Lisa b nbpoebb b
414 Union Street, Suite 2000
Nashvae. TN 37219
M4W24a0
meD�atbmF tlm. ntif+uycYbwBaurYlor Ns
(81111)a2a03i5
Pm lrbse
~pmrp.carl
cm nyaafsnn �m nY.ree q rabmu remo
APA: PR4280, ICCES: ESR-2403,
o 414u s,sum�mo.acn a-,rnmfe
Trio design Isys8d inn;
LADBS RR-25783. Florida F7.15'12B
terllrffia
UP Sorid-q d Desion Veedon 31.a1 maild 1a1111Q a.. ---a �...:o.. ,.n
Client Upstate Builders Date: 91%2019 Page 20f3
SOLIDSTART"P1Ofet Designer. Claudia Martin
BFSlsxsoFrwAgE Address: Port St. LUC)e Job Name: Frade Residence
Project#: J37714
LVL1 LP-LVL 290OFb-2.OE 1.750" X 11.875" 3-Ply - PASSED Level: Level
I. 1 2 3
a 11 7!6'
2Hanger(HHUS5S0110) JIc_J'.
ill I "IS 114"
1 23'
..Continued from page 1
ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Conat 125 Comments
Bearing Length 030
4 Part Uniform 4-8 4 to 2340 Top 116 PLF 139 PLF 0 PLF 0 PLF 0 PLF ZEJ7
Self Weight 18 PLF
Natue
Manufacturer Info
East Coast7luse
M beax
Loubb PatlflG
SM SL Lude BIW, FL
em bbe b ed1 n:wL lro um b ��vmtb b
414 Ualm Sheet Suite 20M
M
w'�reae fa
Nashvine. TN 3721g
7]2.4a0.24ea
o..F�uobo�mLlw m.ywb.mt e+f v4n
(M) e20-0325
wel�bt•4
v ..Ipcorp mm
C'" 416N npw msarss bM taadme PaIDP
APA: PR-1.280. ICGES: ESR4403,
lv p • r. awn W 6Lb al. NaMuY 1N m16
1nb1=0 bveW loW
lAD&S: RR-25783, Fladtla: FL15228
tNJtlA20
UP SclidStart Dedon Version 3.1D rBuild 18111151 Pma ro....a
Client Upstate Builders Date: 92=019 Page 3 of 3
SOLIDSTART&Pmj"t Designer. Claudia Martin
osstce mctvaas Address: Port St Lucie Job Name: Frede Residence
Project#. J37714
LVL1 LP-LVL 290OFb-2.OE 1.750" X 11.875" 3-Ply - PASSED U et Level
no
N_
2 Hanger (HHUS5.50110) A
227 I �51l4'
Ply Analysis
all plies using 2 rows of 10d Box nails (.1280") at 12" o.c- Nail from both sides. Maximum end distance not to exceed
oad 0.0 PLF
Yield Unlit per Foot 181.1 PLF
Yield Limit per Fastener 90.5 fib.
Yield Mode N
Edge Distance 1 12'
Min. End Distance 3'
oad Combination
umlion Factor 1.00
Notes
6lanufaelurerinfo
East COastTucs
lM5 mryns[ ereyeS tl heal m Om
m" �o
St. Ludo Blvd. FL
LouiemnaPe�e COT
dement cm n-mm.O h e.
e4 ¢.ev n mb Rpvt 11e m b m
414 Ur Wn Street, Suite 29e0
USA
34e46
e®eaeamvmymme swdma me ewrmpSiYm
ere ema mwume m ne csumve ra mmi sio
Nasbvffl%TN37219
]72 Ztad
mnpmad6 wewemm�miehabb.sa mra.w
(89a)pwrp-o
wommmm4
r
w'pata �swemm
ARA:P 4280.I
tmm9e e�
1hL^ desyn 6vaGd um0
L S& M83 Florida: Fl.15229
10131lNM
Wsslidstart D.znn Vernon 1104 MAd 1a1111Ct