ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 98
The lower the Energy
Performance Index, the more efficient the home.
1. New home or, addition
1. New (From Plans)
12. Ducts, location & insulation level
R
6.0
a) Supply ducts
27Single=family or multiple -family
2. Single-family
b) Return ducts R
6.0
Attic
c) AHU location
3. No. of units (if multiple -family)
3. 1
4. Number of bedrooms
4. 0
13. Cooling system: Capacity
SEER
46.5
16.0
a) Split system
5. Is this a worst case? (yes/no)
5. No
b) Single package SEER
c) Groundiwater source SEER/COP
6. Conditioned floor area (sq. ft.)
6. 2122
d) Room unit/PTAC EER
e) Other
7. Windows, type and area
a) U-factor:(weighted average) 7a. 0.774
b) Solar Heat Gain Coefficient (SHGC) 7b. 0.472
c) Area 7c. 135.0
8. Skylights
a) U-factor:(weighted average) 8a. NA
b) Solar Heat Gain Coefficient (SHGC) 8b. NA
9. Floor type, insulation level:
a) Slab -on -grade (R-value)
b) Wood, raised (R-value)
c) Concrete, raised (R-value)
10. Wall type and insulation:
A. Exterior:
1. Wood frame (Insulation R-value)
2. Masonry (Insulation R-value)
B. Adjacent:
1. Wood frame (Insulation R-value)
2. Masonry (Insulation R-value)
11. Ceiling type and insulation level
a) Under attic
b) Single assembly
c) Knee walls/skylight walls
d) Radiant barrier installed
ga. 0.0
9b.
9c.
10A1. 13.0
10A2. 4.1
10B1.
1062.
11a. 30.0
11b.
11 c.
11d. No
14. Heating system: Capacity 34.0
a) Split system heat pump HSPF
b) Single package heat pump HSPF
c) Electric resistance COP 1.0
d) Gas furnace, natural gas AFUE
e) Gas furnace, LPG AFUE
f) Other
15. Water heating system
a) Electric resistance EF 0.95
b) Gas fired, natural gas EF
c) Gas fired, LPG EF
d) Solar system with tank EF
e) Dedicated heat pump with tank EF_
f) Heat recovery unit HeatRec%
g) Other
16. HVAC credits claimed (Performance Method)
a) Ceiling fans Yes
b) Cross ventilation No
c) Whole house fan No
d) Multizone cooling credit
e) Multizone heating credit
f) Programmable thermostat Yes
'Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy
saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL
display card will be completed based on installed code compliant features.
Builder
Date:Sal I COPY
Address of New Home: 10750 HFEIL RD. City/FL Zip: FT. PIERCE FL
2/2012020 12:08:34 PM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: LUSTER GUEST HOUSE Builder Name:
Street: 10750 HFEIL RD. Permit Office: ST. LUCIE COUNTY
City, State, Zip: FT. PIERCE, FL, Permit Number:
Y
w=
Owner. JOHNNIE & KATHERINE LUSTER Jurisdiction: ST. LUCIE COUNTY
Design Location: FL, Fart Pierce
O
-COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
requirements
Breaks or joints in the air barrier shall be sealed.
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
Ceiling/attic
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
The junction of the foundation and sill plate shall be sealed.
Cavities within comers and headers of frame walls
Walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
cavities shall be filled by insulation that on
Narrow cavities
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spa
s.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in extedorwalls, or insulation that on
installation readily conforms to available space shall
extend behind n'nina and Aring
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exteriorwalls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire sprinkler cover plates and wails or ceflinos.
I
a. In addition, inspection of log walls shall be in accordance win the provisions or rua.-ruu.
2/20/2020 12:08 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1