Loading...
HomeMy WebLinkAboutROOF PLANSas s4-08-00 y� Trim OH's as needed for covered porch �t Cl C1 co GOW •cf M r- N M LO ID too O C3 Q Q ¢ ¢ ¢ C3 ¢ ¢ �Q ¢ o a < ¢ Q C3 C5 C5 1.0 W7-0D a0T a-oD- 7-00-00 Ceili e Dl o-v Oro .e O W W O llnYe " UU W mm 9l0 .e n 1lnYA2 0 9' ceiling bearin CS dr F01 C3 g 12'-0" LG o O ci�= �E 02 s'-o^ LG D01B 0 osed o wi i �1 U U U D01 B C1C M M D01 w w w � y D01 KNEEwALL D01 All bearing walls at 8' aff, entry raised to 12' aff. m D03 0 0 D04 C5=== C5 C3 E 5) C3 C1 27r — I 1 11 111 U C1 y� U - L) U 26-00-00 8-00-01 20-D8-0O 54-08-00 SCANNED BY St- Lucie County !.J REVISE AND RESUBMIT ?i_T.J, ivK's .1-1 '(SEE REVIEWED Correcttons or comments made on equipment wbmdtals or shop drawings during this review do not relieve con- tractor from compliance with requirements of the draw - rags and specifications. This check Is only for review of general conformance with the design concept of the project and general compliance with the Information given In the contract documents. The contractor 1s responsible for confirming and correlating all quantities and dimen- sions; selecting fabrication processes and tectxtiques of construction; coordinating his work with that of all other trades and performing Ns work in a safe and satisfeCtory manner FLORIDA DESIGN SOLUTIONS, INC- Date- ey Submittal No. Project No. ftild E4 Project Name' cm.¢ muw rauiw �aamD 1..... axrowrmrvu Iues oxaFcaasrimmoauma.xmxnem ..a IMPORTANT cc.,, c..c i a This Dewing Must Be Approved And ...'se. nranox L.w Returned Butom Fa1inina on Will on ..1i&wisasaxaxmE.F..1saF1 oucrmr 1Ac.m Begin. For Your PmtecBon Check All xoxcoxcuwcmwm�axrenaalss conoi Dimensions And Conditions Prior To ApBELO Of Plan. SIGNATURE BELOW INDICATES ALL ROOF LOADING FLOOR LOADING NOTES AND DIMENSIONS HAVE TCLL 20 PSF TOLL: 40 PSF BEEN ACCEPTED. TCDL 07 PSF TCDL: 10 PSF By Date_ BCUL: 10 PSF BCDL: 5 PSF TOTAL: 37 PSF TOTAL: SS PSF DURATION: 1.25 DURATION: 1.00 CAUTION!!! DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND BSCIa1 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING TRUSSES. (ie. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES AND NAILING SCHEDULE 2) BEARING BLOCK REQUIREMENTS 3)SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS WARNING Backcharges Will Not Be Accepted Regardless of Fault Without Prior NoBBcation By Customer Within 48 Hours And mveatigaeon By Builders First Source. NO EXECPTIONS. The General Contractor is Responsible For All Connections Other Than Truss to Tress, Gable Shear Wall, And Connections. Temporary and Permanent Bracing, And Ceiling And Reef Diaphragm Connections. ROOF PITCH: W12 CEILING PITCH: 3112 TOP CHORD SME: 2 X 4 BOTTOM CHORD SQE: 2 X 4 OVERHANG LENGTH: 16" END CUT: Plumb CANTILEVER - TRUSS SPACING: 24" BUILDING CODE: FBC2011 BEARING HEIGHT SCHEDULE Hatch Legend ®12'-00" KNEE WALL �W-DO" BRG WALL BUILDER: Adams Homes Single Family755B 10X20 LANAI: $609 BIRCH DRCK: JSingle: 40ION: ESTATESIFORTFORT PY: KTEUBER2046340/1612019 SCALE: NIS PLAN DATE:T 2019 REVISIONS: 1. 2. 3. 4. �, �a� . FrstSource audit Airport Read Plant City, FL 33663 Ph.(913)305-130D Fax (813) 305-1301