Loading...
HomeMy WebLinkAboutTRUSS PAPPERWORK�4,F,'LORID�1 GrORPORATIC}N, 4451 ST. LUCIE BLVD FORT PIERCE, FL 34946 PH: 772-409-1010 FX: 772-409-1015 SCANNED www.AlTruss.com CLC- "9-2 BY o a st. Lucie County 9 Wi J TRUSS. ENGINEERING BUILDER: PROJECT: E COUNTY: v J 6 J :a T/BLK/MODEL; JOB#: MASTER#: OPTIONS: RENAR MORNINGSIDE ST LUCIE LOT.44 / MODEL:SEAMIST 2215 / ELEV.B1/ GAR R 78363 WRMSSMB1 L ."mm �_ A-1 RUUF TRUSSES AFLORIDACORPORATION RE: Job WRMSSMB1L Lumber design values are in accordance with ANSI/iPI 1-2014 section 6.3 These truss designs rely on lumber values established by others. Site Information: Customer Info: RENAR DEVELOPMENT CO. Project Name: MORNINGSIDE Lot/Block: Model: SEAMIST 2215 Address: Subdivision: City: County: St Lucie A-1 Roof Trusses 4451 St Lucie Blvd Fort Pierce, FL 34946 State: FL Name Address and License # of Structural Engineer of Record, If there is one, for the building. Name: License #: Address: City: General Truss Engineering Criteria Design Loads (Individual Truss Design Drawings Show Special Loading Conditions): Design Code: FBC2017/TP12014 Design Program: MiTek 20/20 8.2 Wind Code: ASCE 7-10 Wind Speed: 160 Roof Load: 40.0 psf Floor Load: 55.0 psf This package includes 32 individual, dated Truss Design Drawings and 16 Additional Drawings. With my seal affixed to this sheet, I hereby certify that I am the Truss Design Engineer and this index sheet conforms to 61G15-31.003,section 5 of the Florida Board of Professional Engineers Rules. No. Seal # Truss Name Date No. Seal # Truss Name Date No. Seal # Truss Name Date 1 A0295890 A01AGE 10/18/19 13 A0295902 CJ5 10/18/19 25 A0295914 FL07GE 10/18/19 2 A0295891 A01GE 10/18/19 14 A0295903 CJ5A 10/18/19 26 A0295915 FL08 10/18/19 3 A0295892 A02 10118/19 15 A0295904 D01 10118/19 27 A0295916 HJ7 10/18/19 4 A0295893 B01 10118/19 16 A0295905 D02GE 10/18/19 28 A0295917 J7 10/18/19 5 A0295894 B02GE 10/18/19 17 A0295906 FG01 10/18/19 29 A0295918 L01 10/18/19 6 A0295895 C01G 10/18/19 18 A0295907 FL02GE 10/18/19 30 A0295919 L02 10/18/19 7 A0295896 CO2 10/18/19 19 A0295908 FL03GE 10/18/19 31 A0295920 VO4 10I18h9 8 A0295897 CO3 10/18/19 20 A0295909 FL04 10/18/19 32 A0295921 V08 10/18/19 9 A0295898 C04G 10/18119 21 A0295910 FL05 10/18/19 33 STDL01 STD. DETAIL 10/18/19 10 A0295899 C05 10/18/19 22 A0295911 FL05A 10/18/19 34 STDL02 STD. DETAIL 10/18/19 11 A0295900 CA 10/18119 23 A0295912 FL05B 10/18/19 35 STDL03 STD. DETAIL 10/18/19 12 A0295901 CJ3 124 IA0295913 I FL06G 136 1 STDL04 I STD. DETAIL 10/18/19 I nesuss cmmng(s) remrencea rave ueen prepared byMlTek musines, Inc. under my direct supervision based on the parameters provided byA-1 Roof Trusses, Ltd. Truss Design Engineer's Name: Manuel Martinez My license renewal date for the state of Florida is February 28,2021. NOTE: The seal on these drawings indicate acceptance of pmfessionalengineedng nsponsibil'M1y solelyforthetruss components shown. The suitabii tyand use of components foranyparticularbuilding'sthensponslbsityofthe budding designer, perANSIMPI-1 Sec.2 The Truss Design Dmwing(s)(TDD]s]) referenced have been prepared based on the construction documents (also refened to attires as 'structure! Engineering Dow rientsl provided bythe Building Designermdle Ling the nature and characterofthewodr. . The design critedathemin have been transfened to Manuel Martinez PEby [Al Roof Trusses orspecific location]. These TDDs (also referred to attires as'Stmctural Delegated' Engineering Documents') arespeciatystructural componentdesigns and may be part ofthe projects deferred orphased submittals. As aTmss Desia-'n Eigtnwo4 Speciaty Engineelj, the seal here and on theTDDreoreeents an airroYarias of omfesslonal enalnearino responsbililyforthe design of the sing) Truss depicted o6 the TDD'orilA The Building Designeris mponsble forand shall coordinate and review thbTDOs for cempatrbifnywth thecwriten engtpoenngreWae' rim PleasemvwaadTDDsanda0relatednotes. �� Page 1 of 2 �t C. OXa6173oT- ;! Manuel Digitallyrsignedby , Manuel Martinez r "y rfk�8ti@-.2019.10.22 Marti 4'00' *q' v j zs`. crar ar ManuelMadinez,P.E 4620 ParkVew Dc St Cloud, FL 34T71 '464A-1 ROOF MTRUSSES AFLORIDAOORPORATION RE: Job WRMSSMB1L No. Seal # Truss Name Date 37 STDL05 STD. DETAIL 10/18/19 38 STDL06 STD. DETAIL 10/18/19 39 STDL07 STD. DETAIL 10/18/19 40 STDL08 STD. DETAIL 10/18119 41 STDL09 STD. DETAIL 10/18119 42 STDL10 STD. DETAIL 10/18/19 43 STDL11 STD. DETAIL 10118/19 44 STDL12 STD. DETAIL 10/18/19 45 STDL13 STD. DETAIL 10/18/19 46 STDL14 STD. DETAIL 10/18/19 47 STDL15 STD. DETAIL 10/18/19 48 1 STDL16 I STD. DETAIL 10/18/19 Lumber design values are in accordance with ANSI(TPI 1-2014 section 6.3 F These truss designs rely on lumber values established by others. Page 2 of 2 Job Truss Truss Type oty Ply WRMSSMB1 L A01AGE Common Supported Gable 1 1 A0295890 LJobeference (optional)_ A-1 wooT I russeS, tort Pierce, FL 34a , designLaltruss.com Run: 88.210 s 1 May 18 2018 Print 8.210 s May 18 2018 MiTek Industries, Inc. Fri Oct 18 15:29:54 2019 Page 1 ID:hYCoaQEtYhBIvUGjnCGo4hzcczg-EsMJBi6ddGl ogJDd?Novi2n_?LtOU9rT1_k3msyS95B -1-0-0, 10-M 1 21-8-6 , 44 = 3x4 = 22 21 20 1918 17 16 15 14 13 3x4 C 3x4 = 21-8-6 LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/dell L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.17 Vert(L-) -0.00 1 n/r 90 MT20 244/190 ' TCDL 10.0 Lumber DOL 1.25 BC 0.06 Vert(CT) -0.00 1 n/r 80 + BCLL 0.0 Rep Stress Incr YES WB 0.06 Horz(CT) 0.00 12 We n/a BCDL 10.0 Code FBC2017ITP12014 Matrix-S Wind(LL) 0.00 1 n/r 120 Weight: 108 lb FT =. 10% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 OTHERS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc puriins. BOTCHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. AN bearings 21-7-14. (Ib) - Max Horz 2=101(LC 12) Max Uplift All uplift 100 lb or less at joint(s) 2, 18, 20, 21, 22, 16, 15,.14. 13 Max Grav All reactions 250 lb or less at joint(s) 12, 2, 17, 18, 20, 21, 22, 16, 15, 14. 13 FORCES. (lb) Max. Comp./Max. Ten. -AII forces 250 (Ib) or less except whenshown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf; h=25ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI?PI 1. 4) All plates are 1.5x4 MT20 unless otherwise indicated. 5) Gable studs spaced at 2-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) `This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 18, 20, 21, 22, 16, 15, 14, 13. 9) Non Standard bearing condition. Review required. LOAD CASE(S) Standard Qiaan4wgN/,nv�2�•Prf P0.'YTR'SBES (511Ri).GEfiES0.1EiU6vGU@9(fl(WS W6TDK-0.rSD1'ES]PCgIUglEtXYE'T fan. S'vP,Gcfgn pvsWm W �WW mbmpa Trm Durn BanM {:Vi4�MM BA>t$�+9bex.Ysis®Wwl>bnw Wbaa chMesieKOa, EbiDD CR(0.'Tnw.�:ImWain nha]buvJbAi➢DPbrY6 NeTrvn DOS F+S�bq (u. E.aW ER�u}.R�tlmM'TDDnTm+a6+an c4's,w.d8spebvYndwgrm,s;nrw�lS,/NBy G9ndv.vesry4T�uOYxW TDDaryunMTWt.TN Jeaq,� yrtma btcp ". tuL]"dyW w6MTrvnfnw'/BvhlmT-MmryniFy4M Vnm. Ys(M.nl encvivC WmY BJF:]D>ryra atl'amN.tlWn0.L WISG. 4aibLLLyvdssbtPN,lla 9Cmtl UEniDD bHw WESTrw.-n5W¢96owgnF.tlnp.Yr4lalm iPtitf�RmaNYMmY YMDa3Tih+9n.aMCa6cb NmOa6mn RNWM.Rv9a�WP^>6errGC�@,an6<nnpwv3 Web pimMm(BSOI Y'+-'� MMNv'EfiAa�,JmmnSbAnrt 6+se+� nrya^NrtSm✓9 G4atR/n Gr.-^m.6i+mc4YENm+nud Trm M�sAcc+-cuJ.nu'wnvrs'b'+e0b1'mtrs2tl 9nM'�,naAW4aVe'+n4MM.TItl N�RI`+4^f'aNDTl�6v6f'V D`WeoTrm BY�n^`£+P�MMd-`ivG lJ evYYMbmb�na46,eGbTPtt.C�MO4M6P.iRttlivan�Rmr%,ptrn AOticMatx ibm+Y f>Tbmf.]mlOpxl Ba a+NwSmOcm�d 1 Truss Truss Type Oty Pty FJob MSSMB1L::: A01GE GABLE 1 1 Y0295891 Job Reference o tional A-1 Roof Trusses, Fort Pierce, FL 34946, desil.com Run: 88.210 s 1 Mav 18 2018.Print: 8.210 s Mav 18 2018.Mi7ek Industries. Inc. Fri Oct 1815:29:56 2019 6.00 12 3x4 = 2x4 11 1112 13 14T3 15 16 17 10 3x4 i 9 S 9 0 1 ] e x6 6'I 6 5 S6 `3Fa � � � 3 3q. 26 x6-: z6 7x6� :5 m 6 QT2„r L� 61 3x4 iTtj ,im 0 43 41 39 36 34 31 29 27 25 22 19 78 qg d5 44 7x6 37 3x4= 3x4= 4x4 = 25-3-6 25-3-6 Plate Offsets (X Y)— 112:0-2-00-2-81 116:0-2-12 0-1-81 120:0-0-11 0-1-121 121:0-1-14 0-0-01 [23:0-1-14 0-0-0]; r46:0-0-0 0-0-111 LOADING(psf), SPACING- 2-0-0 CSI. DEFL. in (loc) I/de8 L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.45 Vert(L-) -0.00 1 n/r 90 MT20 2441190 TCDL 10.0 Lumber DOL 1.25 BC 0.24 Vert(CT) -0.01 1 n/r 80 BCLL 0.0 ' Rep Stress Incr NO WB 0.15 Hoa(CT) -0.00 45 n1a We BCDL 10.0 Code FBC2017ITP12014 Matrix-S Wind(L-) 0.00 1 n/r 120 Weight: 242 lb FT = 10% LUMBER: TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 *Except' F13,F10,F11,F12:2x4 SP No.2 OTHERS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc pudins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing, Except: 10-0-0 oc bracing: 22-25,19-22,18-19. 7-6-0 oc bracing: 4546 WEBS 1 Row at ril 17-18, 19-20 JOINTS 1 Brace at Jt(s): 42, 40, 38, 35, 33, 32, 28, 26, 24, 23 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. All bearings 25-3-6. (lb) - Max Hom 46= 343(LC 12) Max Uplift_ All uplift 100 lb or less atjoint(s) 46, 18, 41, 39, 36, 34, 31, 27, 25, 22, 19 except 45=-288(LC 12), 43=-103(LC 12) Max Gmv All reactions 250 Ib or less at joint(s) 45, 18, 43, 41, 39, 36, 34, 31, 29,-27, 25, 22,19 except 46=332(LC 12) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. TOP CHORD 9-1 0=1 07/288, 10-11=-1331363, 11 -1 2=-1 271341, 12-13=-1231358, 13-14=-1211357, 14-1 5=-1 191354, 15-16=-119/354 BOT CHORD 45-46=-564/224, 44-45=-393/145, BOT CHORD 45-46=564/224, 44-45=-393/145, 42-44=442/171, 40:42=-0061149, 38-00=-406/149, 35-38=-398/143, 33-35= 393/140, 32-33=-387/136, 30-32=385/134, 28-30=-385/134, 26-28=-383/132, 24-26=-383/131, 23-24=-377/127, 21-23=-338/97, 20-21=382/129, 16-20=328/100 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf; h=25ft; Cat. It; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Extern zone; cantilever left and right exposed; end vertical left exposed;C-C for members and forces 8 MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designedfor wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) All plates are 1.5x4 MT20 unless otherwise indicated. 6) Gable requires continuous bottom chord bearing. 7) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 8) Gable studs spaced at 2-0-0 oc. 9) This truss has been designed for 10.0 pat bottom chord live load nonconcurmnt with any other live loads. 10) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 11) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 46, 18, 41, 39, 36, 34, 31, 27, 25, 22,19 except Qt=lb) 45=288, 43=103. LOAD CASE(S) Standard aoe yro,.w.a.•a+@w: musse6e��*+R.�za?Emecswa cuuvT x+s arerarR cev*Fmxnicm.ew�sxrrw...v«ry�-+srx.nateT VG »akm.a eu. T.w Gye G..ne n@or�z.. rSAG#6gnenisM1,eu.eNnhNew. wlen cGrnae TiMm MT'JD.pd(hwv uwkrpmef NiMuslMwiOD bsi6! Gin Enp'enev@R.. fiiN�Y ERA^ 3. m.rMma+viLOx�nesertsm e[aSeka cfMAmfau'mN �9��N^emM<O2N6Mtlee4^Nmti' s+Um:Aac'e3q+RTCOa�:twmiP4t.TSCeA���°w��6NS^i�@�n.@��eNum IXYvaimvb�I�Y®As'Yaf4w Ow�v, W O.misw9u�ulgvdwTe B'r1Sq G+W.htbsvaile2RMGGY».RG.bot6uNe.9 m'a MIiN.TN VMw.'IXMTODaMwM1 W wdlnTrvaa.6lvlmplsffi@.MmJ..m@a3Ym mdtm%NYt.MnyenLBb alnbuM.SGSTmm3CMMv.m.NnMmn4aTP6m0MP02�eaaCB�bPis,aSe&Jeu6�?^,r�bm!¢.Mml6Wp+�bMT4YwC53G.asn4mM WP^�a'9WCm. ih1CN.vaTsmgnv@i.GimO e:.me.r.,n.G.�,�...se.mwr�rv�+«n.+r,.ew..a.wa.wr...m.�®s�.ah.e..s.x.p..f �n,:,.,6'wha�n:.' Te. evbwiEa+.n:nmm:a•.waG+.�..n T.m ew.E•w..�m..r6�dm'n �Y. Nmo»vz T2uCi,'Iflt.CgyeSM@SLi6h.I RueJTmaa�Ravf:tbaMAnGe.nreµh Im4naiY.DWCN&WIMwRmpm.m, <1 PaN}Mzp. Job Truss Truss Type Qty Ply WRMS3MBIL A02 ROOF SPECIAL 11 1 AO295892 Job Reference (optional) A-1 Root I russes, Fort Pierce, FL 34946, des1gn@a1tnlss.ccm 5x6 G 1 17 3x6 = Run: 88.210 s 1 May 18 2018 Print: 8.210 s May 18 2018 MiTek Industries, Inc. Fri 6.00 12 5x6 = 1.5x4 II 7 8 3x8 i 1.5x4 T w1Q 44 i 6 6 8 3 5 3x6 T 3x4 i 5 a 13 12 3 4 5x8= 3x4= 14 15 414 a 3x6 4.54 2 6 1 4x4 \\ - 3x6 = Y Dead Load Defl. =114 In 8-2-1 17-1-71 2- -6 25�5-2 31-0-2 3710.1437-71-6 8-2-1 8-11-16 8-7-11 -72 5-11-0 6E-72 Plate Offsets (X Y)- I2:0-3-0 0-1-121 t13:0-5-4 0-3-01 LOADING(psf) SPACING- 2-M 'CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.89 Vert(LL) 0.20 14-16 >999 360 MT20 244/190 TCDL 10.0 Lumber DOL 1.25 BC 0.88 Vert(CT) -0.37 14-16 >818 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.97 Horz(CT) 0.05 13 n/a We BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Weight: 200lb FT = 10% LUMBER - TOP CHORD 2x4 SP No.2'Except' T1: 2x4 SP M 30 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3'ExcepP W4,W6,W2: 2x4 SP No.2 BRACING- TOPCHORD Structural wood sheathing directly applied or 2-2-0 oc puriins, except end verticals. BOTCHORD Rigid ceiling directly applied or 4-5-8 oc bracing. WEBS 1 Row at midpt 3-14, 5-13, 2-16 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (Ib/size) 13 = 225510-3-8 (min. 0-2-11) 10 = 9610-3-8 (min. 0-1-8) 17 = 853/0-7-6 (min. 0-1-8) Max Hom 17 = 423(LC 12) Max Uplift 13 = -672(LC 12) 10 = -194(LC 23) 17 = -110(LC 12) Max Gmv 13 = 2255(LC 1) 10 = 324(LC 24) 17 = 860(LC 23) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOPCHORD 2-3=-2175/1342, 3-4=771/365, 4-5=-655/401, 5-6=-107711505, 6-7=-1057/1706, 7-8=804N 549, 8-9=-297/764, 9-1O=346/733, 2-17=-878/737 BOT CHORD 16-17=-7831509,15-16=-1646/1977, 14-15=-1617/2011, 13-14=-478/664, BOT CHORD 16-17=-783/509, 15-16=-164611977, 14-15=1617/2011, 13-14=-478/664, 12-13=-868/805,10-12=-625/459 WEBS 3-14=-1288/1124, 5-14=-171/589, 5-1 3=-1 99211572, 7-13=-046/493, 8-13=15741897, 8-12=-365/570, 9-12=-335/373, 2-16=-850/1641 NOTES- 1) Unbalanced roof live loads have been considered for this design.. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=S.Opsf; h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and GO ExLenon(2) zone; cantilever left and right exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has. been designed for a 10.0 pat bottom chord live load nonconcurrent with any other live loads. 4) . This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Bearing at joint(s) 17 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except Qt=1b) 13=672, 10=194, 17=110. LOAD CASE(S) Standard haselomgM/rrvwN•A-I ROC:TWa'fiE6 r6EllEFT. GEXERN.iEFM3atl WlNIMNfi CJ6TWER(9N'ERJACY_NPImn Ye{3Y bqn pen'nelenatl rtmn6amAm Tunpeap,pa'uh,p R�VI.wM 1 $e.-a%Er�p�m,Mrm0Nol 6tlm,o.Vntw eawr.Ys¢N mMTD0. myApi+mob+o�mauMmvem m,9a Too iwaDtIDpn Fmdvmemp paby vvry EnjnmJ,Maetlme,pTW,c}mrem Gev.OV MNee suOvmJe�nImM6NYy �,•gym%bP�Uae9^dM¢n3YT,ua4ptlNmMToo )'.wM..lC1A.lIV MS+�®nH�.�9cmS .v.YM<f aYwdNUTrvabM'ouBIWVMnsRm.ID'1%dM gm,nMm�mlpM6tC, 6e I66,km�Rvtiry aMmITRITM eppaJdMTW bO,a NMT�m,6v8bq MSy.eby,�u,ei.5m mtlbm.pe,W bma,.XsnDYy bfe&,&Monbwstl Wne'cb.Aru,efxloCnMTODWMp.tl�,m66keXotlM ouW,i�^��6v1e,Y6rtaneM, R660Coms6�%F1mb 5FCAm Me�erce6M Wmb9�. TP,hM,en,eWa>rtOu aW CN'm.Nv. Trvas oe�.ev.wa sy,..,.er„=.awm..r.wm..w,,.rmm.a6T.c=wa.v,.w,�,,.,..n,.v era>.m...owtTr.6v.�YE�rtlnroT e.e�v ��m.'a T..,:, 6r+�*�v:�m.hwas„v. cn aapRal'¢W bnmwwtleba�m Tf4f.Gpr{J,IOZX60.1 PxlTrvsa._R,p�,.,p,,,d Pn Jmmxl'n vTlmA ipMbbJwTeAYm"Am {pmrt oat A, Xm(T,uues Job Truss Truss Type Oty Ply 0295893 WRMSSMBIL B01 Monopitch 8 1 ! Job Reference (optional) A-1 Roof Trusses, Fort Pierce, FL 34946, design@aitruss.com Run: 88.210 s 1 Mav 182018 Print: 8.210 s May 18 2018 MiTek Industries, Inc. Fn Oct 3x4 i 6.00 12 4x6 6 6 4x4 Sx6 i 7 8 2 3x4 4.54 12 1 4x4 934 = Dead Load Defl. =118 in LOADING (pst) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.86 Vert(LL) -0.14 6-8 >999 360 MT20 244/190 TCDL 10.0 Lumber DOL 1.25 BC 0.79 Vert(CT) -0.31 6-8 >658 240 BCLL 0.0 Rep Stress Incr YES WB 0.76 Horz(CT) -0.04 11 n/a n/a BCDL 10.0 Code FBC2017/rP12014 Matrix -MS - Weight: 94 lb FT = 10% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 `Except` W2,W4: 2x4 SP No.2 BRACING- TOPCHORD Structural wood sheathing directly applied or 35-10 oc puriins, except end verticals. BOTCHORD Rigid ceiling directly applied or 4-8-11 oc bracing. WEBS 1 Row at midpt 3-6 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (fib/size) 9 = 771/0-7-6 (min. 0-1-8) 11 = 64010-1-8 (min. 0-1-8) Max Horz 9 = 348(LC 12) Max Uplift 9 = -106(LC 12) 11 = -268(LC 12) Max Gmv 9 = 771(LC 1) 11 = 640(LC 1) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (to) or less except when shown. TOPCHORD 2-3=-1815/1056, 3-4=278/0, 6-10=283/438, 5-10=317/481, 2-9=-784/666 BOTCHORD 8-9=-848/487,7-8=1444/1613, 6-7=-1440/1667 WEBS 2-8=-611/1329, 3-6=-1404/1228, 5-11=-653/540 moll iZ-E 1) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=S.Opsf;.BCDL=5.OpsF h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Bearing at joint(s) 9, 11 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate at joint(s)11. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except Qt=1b) 9=106, 11=268. LOAD CASE(S) Standard Job Truss Truss Type Oty Ply WRMSSMBIL B02GE Monopitch Supported Gable 1 1 A0295894 Job Reference (optional) A-1 HOOT I ruses, Fort Pierce, FL 34946, design@attruss.com Run: 88.210 s 1 May 18 2018 Print: 8210 s May 182018 MiTek Industries, Inc. Fri Oct 18 15:30:00 2019 Pagel y ID:hYCoaQEtYhBIvUGjnCG04h¢ g-3?6nSmBOC6olYEhnLevJxg1 pkmgmugpLPwBO_WyS955 1� -4-10 16-11-6 L4-10 16-11-6 —T 5x11 30 29 2'F?6 25 23 21 19 17 15 14 Us = 7x6 � 7x6 i 7x6 i 7x6= 5x6= LOADING(psf) SPACING- 2-0-0 Cal. DEFL. in (loc) I/dell L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC .0.93 Vert(LL) 0.00 1 n/r 120 MT20 244/190 TCDL 10.0 Lumber DOL 1.25 BC 0.42 Vert(CT) -0.00 2 n/r 80 MT20HS 187/143 BCLL 0.0 Rep Stress Incr YES WB 0.15 Horz(CT) -0.00 29 n/a We BCDL 10.0 Code FBC2017fFP12014 Matrix-R Weight: 149 Ib FT = 10% - LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 OTHERS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOTCHORD Rigid ceiling directly applied or 6-0-0 oc bracing, Except: 10-0-0.oc bracing: 2930. JOINTS 1 Brace at Jt(s): 12, 22, 26, 20, 18, 16, 13 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. All bearings 16-11-6. (lb) -.Max Horz 30= 353(LC 12) Max Uplift All uplift 100 Ib or less at joint(s) 30, 14, 25, 23, 21, 19. 17, 15, 28 except 29=-542(LC 12) Max Grav All reactions 250 lb or less at joint(s) 14, 26,23, 21, 19, 17, 15, 28, 29 except 30=584(LC 12) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOPCHORD 2-30=-534/170, 2-3=-685/224, 3-4=-474/164, 4-5=-417/145, 5-6=-347/122, 6-7=-279/100 WEBS 3-29=192/520 NOTES- 1) Wind: ASCE 7-10; Vult=160mph (37second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=S.Opsf; h=25ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/rPI 1. 3) All plates are MT20 plates unless otherwise indicated. 4) All plates are 1.5x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcument with any other live loads. 9) `This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 30, 14, 25, 23, 21, 19, 17, 15, 28 except Qt=lb) 29=542. LOAD CASE(S) Standard QPawmm^qf#nvwM•M0.p¢iAll66E61'6'u=A%.GEf�liY fEll'ewYCrRiORGXS d61W.L ('6{%YF=l.'L9HIXtECtCiP, bm.VM'mPo^Go��'+v W,aatrvAsm Mv4m=M+�9(7<xhetlM 4�4r/iee�aNmuaM l+k�w. WEacTe�eC6Nm6a itm.,✓h a'im _ctxbeMae eM1SR4ufel R+rMTJO brik..0.i.Tmakay�SM>•^"G (ae. Spec SEN�O. P.eWmM':i-0reT�fn .c[HRs.m@MpukdeW e.'wrnG•.'�T�M'Oehs EeeknNPeeaLkT.va4DCLLf anero TLDd.Y.wleTiN.hmlmPmm'+LS>Mba9^iA.Ca:YNN6m inm Hs,rScld,gge�,p}cn,SFay@N 0.,m. W O.ns'e.ufwimO+p/twly 6w`]4,Gd*Vf .e.9atvnE.tldMRG4YBL.bat lv. ➢vd �GTpFf.tla4Aeali,MTCOMmIhNmeNMTw.Mica9Md*4.64rva.sJe3a6n �� �'Yu11�Mr.4*ubUf n.w.@e..T7,.ue'.;�.6c.®erErv+^.�.an,mu..naa..,. w.®w.�mm.ah.cwaxwRe<w�b .aeHaw+:ee:r�,:e.Ti:.spy+:�c:...awme..e=+tivo.:amsT�ss6emme=o�w..ry a+'� w cA:W Kmn.+voac6aNn TRf ltigTryNobYl4 F.i PnYinn...-RmWum,CPu 6imnceb Mfem.tCVSVWMIwN. aev2n Wt'm.m' daf Y:mlSema. Job Truss Truss Type Qty Ply A0295 895 WRMSSMBIL CO1G Hip Girder 1 1 Job Reference (optional) - A-1 Roof Trusses, Fort Pierce, FL 34946, design@attruss.com Run: 88.210 s 1 Mav 18 2018 Print: 8110 s Mav 18 2018 MTek Industries, Inc. Fri Oct 18 15:30:01 2019 Dead Load Deb. = 31161n l3i IN 9 19 8 20 7 3x6 11 5x6 WB= 6x6 = M= 3x6 = 0-(,1-8 7-0-0 14-0-1 20-11-8 21r0-0 6-11-8 7-0-1 I 6-11-7 0 8 Plate Offsets (X Y)— 13:(1-1-12,0-3-81 f4:0-3-0 0-2-7f LOADING(psf) SPACING- 2-M CSI. DEFL. in (loc) Vdefi Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.55 Vert(LL) -0A2 7-9 >999 360 MT20 244/190 TCDL 10.0 Lumber DOL 1.25 BC 0.74 Vert(CT) -0.30 7-9 >830 240 BCLL 0.0 Rep Stress Incr NO WB 0.31 Horz(CT) 0.08 5 n/a n/a BCDL 10.0 Code FBC2017iTP12014 Matrix -MS Weight: 97 lb FT = 10 LUMBER - TOP CHORD 2x4 SP M 30 `Except' T2: 2x6 SP 2400F 2.0E BOT CHORD 2x4 SP M 30 WEBS 2x4 SP No.3 OTHERS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 3-6-1 oc pudins. BOT CHORD Rigid ceiling directly applied or 8-4-5 oc bracing. MTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation uide. REACTIONS. (lb/size) 2 = 1794/0,3-8 (min. 0-2-2) 5 = 17941O-0-8 (min. 0-2-2) Max Hom 2 = 68(LC 7) Max Uplift 2 = -489(LC 8) 5 = -489(LC 9) Max Grav 2 = 1794(LC 1) 5 = 1794(LC 1) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-3335/882, 3-16=2938/840, 16-17=2938/840, 17-18=2938/840, 4-18=-2938/840, 4-5=3336/882 BOT CHORD 2-9=-741/2908, 9-19=739/2936, 8-19=-739/2936, 8-20=-739/2936, 7-20=-739/2936, 5-7=695/2909 WEBS 3-9=0/817,4-7=0/818 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=S.Opsf; BCDL=5.Opsf, h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope); cantilever left and right exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcument with any other live loads. 5) ` This truss has been designed for a live load of 20.Opsfon the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members: 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding. 100 lb uplift at joint(s) except at --lb) 2=489, 5-089. 7) Hanger(s) or other connection device(s).shall be provided sufficient to support concentrated load(s) 222 lb down and 239lb up at 7-0-0,125 lb down and 126 lb up at 9-0-12, 125 lb down and 126 lb up at 10-5-12 , and 125 lb down and 126 lb up at 11-11-5, and 222 lb down and 239 lb up at 14-0-1 on top chord, and 400 lb down and 58 lb up at 7-M, 90 lb down at 9-0-12, 90 lb down at 10-5-12, and 90 lb down at 11-11-5,.and 400 lb down and.58 lb up at 13-11-5 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25 , Plate Increase=1.25 Uniform Loads (plo Vert: 1-3=60, 3-4=-60, 4-6=-60, 10-13=20 Concentrated Loads (lb) Vert: 3=-175(B) 4=-175(B) 8=73(13) 9=-400(B) 7=-400(B) 16=125(B)17=-125(B) 18=125(B) 19=73(13) 20=-73(B) Qapa9t wo-ws�N�e.I.N•0.1 aoa rwrM l's'�+EeS,cwuau 16W6NCIXi�,iNMscJ61O1IER t�m+'emacuwwtEo6l-HrAm*�n; taw w..�.uz N,m .sa a,mnm M+m uwaat�m.aa�. Si�maMENl�,dumuaF®10@n,¢e MMffifW[n qs TOO.rvNMm+wn,sb, d:v�W9�.mEbaeTW a ,�g'qn EnN^A^^B4c SyavMEnpMvl. PeeW an vpTW mHveb en .v�T+�NWAme+m^+��9�++�^9mwuLJhly 9a Gugn6tlnv9YT,wbP.MmIM1mOmY.wMTN-1.tIwC �mmF<v�v.Atli�mW'#ma.z�nzNEDupwtlNUTw b+XErmNc4bvGm✓b0%dBn o..a,s<w.r..�e��.amsa�+.a wa��sp �m m.m.,.ama.we.o-.isc.m�weaq tea. ewm�s.Tx+�r.amnu.mo a r,w,:wo-a sm�rv. mw.�Nusm.,ee.�rvwesa..,=,w��r a"N"re.ae.i �;. �nrem=,w�er,i:a.wff`ww°�"x�.r. w`"`mew ewe,em«.��.,,;r+.vi,Rscnwm�eyrnwsacn.. m.,.m m.sma+a•r.�. rx+arw�ue,e.+w®su�.w oaaaemmw...oas�.an.w, cwrM�eaisni aom T„m.._v.c�=m.mmwai,,..�"i,., ��i�.,,uw�+�TM�*. �•a c.�w.a�.�mTx.s�.3go✓E T �.xo*c. ammrm e®v.•o.T..w sr%�*Em:wm.n sWiaan.�u Job Truss Truss Type Oty Ply WRMSSMBIL CO2 Hip 1 1 A0295896 Job Reference (optional) A-1 Roof Trusses, Fort Pierce, FL 34946, design@altmss.com Run: 88.210 s 1 May 18 2018 Prim: 8.210 s Mav 18 2018 Mil 3*4 = 1.5x4 11 3x4 = Fn Oct 18 15:30:02 2019 4x4 = 5x8 = 4x4 = Dead Load Defl. = 114 h LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (too) Wall Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.78 Vart (LL) -0.19 10-13 >999 360 MT20 2441190 TCDL 10.0 Lumber DOL 1.25 BC. 0.59 Verl(CT) -0.42 10-13 >597 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.23 Horz(CT) 0.03 8 n/a n/a BCDL 10.0 Code FEC2017ITP12014 Matrix -MS Weight: 92 lb FT = 10% LUMBER - TOP CHORD 2x4 SP No.2 SOT CHORD 2x4 SP M 30 WEBS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or4-M oc pudihs. BOT CHORD Rigid ceiling directly applied or 9-10-10 oc bracing. 'MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 2 = 924/0-3-8 (min. 0-1-8) 8 = 92410-3-8 (min. 0-1-8) Max Hoe 2 = 85(LC 11) Max Uplift 2 = -191(LC 12) 8 = -191(LC 13) Max Grav 2 = 924(LC 1) 8 = 924(LC 1) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOPCHORD 2-3=-1341/765, 3-4=-1073/632, 4-5=-922/593, 5-6=922/593, 6-7=-1073/632, 7-8=-1341l165 BOTCHORD 2-10=516/1155, 8-10=-523/1154 WEBS 3-10=-309/327, 5-10=-302/608, 7-10=-309/327 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf; h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Extedor(2) zone; cantilever left and right exposed; end vertical left ezposed;C-C for members and forces 8 MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-M wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except Qt=lb) 2=191, 8=191. LOAD CASE(S) Standard QPeva RwM1M"*vwN-i1 FOOFTW38E6l�l, GE1ERPt iFF6 atl CFYIDT]Nfi CJ6lONER �9VVE670.61(NOINEDGYffiEMl-� V� �pn Vmercbn*N wa]MEim Be T„¢s DerP m>0.GRDDIWM r �Eegtli�Ma.enu YVlCb*m.Vnb d,v+lxe¢'Safm NTDD. u+Y F+M [anw.bpbawY Wvevlb•IV TCUb ei Dc9n Gg0.ernG M1*-S{vay Erpc®). Se Woe x^YiOD,amram C�.W0.Mam,TxMpe0.mna M^��^imp6MiT f�3Gcajng0.J96 T.ei M1F �mMTDDoN. wEV TN-LiM �mnV� 6MirgwNJay.v^bt%ugmdlM1eTw fi. M'B'^n^V YBu�w+e3�N'tlOn Subti9On9m WCaY�i.vm.N�mv�a�oND�9m. wroDmuef Ytl �n�0.1BC.WbAN9WmOTPL1.M .p.+m„dNWiDD v�GWMe^T'�9. Y^W.ve4bhsmtlb^z,DNNb6n,v+Lm+�Y pXIJv¢atl Pe&JMi CemNene6YM'TMn6en l��%OODeaMdhTPI ed69(J.ea Men .aG bGm�tl9�ct. 1PFf ONwge2Vme�m'+� W My H on Trvo 0.agree. 6Ta6y cpvmr stl Tvw Mew(vlw. uMaa eiFanm 6Me] fy * CUMd 9AM uY.n m wIInp Ly aE pvf ae inwXN. iFa 6{ef+Ny Enynxr a I.LT Pv Bv. eAEa'¢�1Gww®66nJnliLl.Cmrgi0A16hIPafTr,¢ae-R*pWw.Eonggp Aoma;v, n9�nbpoFYibLMArvINmDm p.muslm WFl T.v.ITrvmi Vvq DulmemTrv»6y4n EepbwIXvpbNSry. F➢ Job Truss Truss Type Qty Ply WRMSSMBIL CO3 Common �p 1 �A0295897 Job Reference o tional A-1 Roof Trusses, Fort Pierce, FL 34946, design@aibuss.com Run: 88.210 s 1 May 18 2018 Print: 8.210 s May 18 2018 MITek Industries, Inc. Fri Oct 1815:30:03 2019 Page 1 I D:hYCoaQEtYhBIvUGjnCGo4hzcczg-Uanv4nDGV1 AKPhPMOmTOZSfQpzor59on5tQ2a)yS952 -14-0 64-11 10-6-0 147$ 20-71$ 64-11 1 55 41-5 64-2 ' 44 = 04 = Sxe = 3x4 = LOADING(pst) SPACING- 2-M CSI. DEFL. in (loc) I/deft L/d TCLL 20.0 Plate Grip DOL 1.25 TC 0.55 Vert(LL) -0.17 7-13 >999 360 TCDL 10.0 Lumber DOL 1.25 BC 0.66 Vert(CT) -0.38 7-13 >661 240 BCLL 0.0 Rep Stress Incr NO WB 0.27 Horz(CT) 0.03 6 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP M 30 WEBS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 4-34 oc purins. BOTCHORD Rigid ceiling directly applied or 9-2-1 oc bracing. MITek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 6 = 836/0-3-8 (min. 0-1-8) 2 = 925/0-3-8 (min.0-1-8) Max Hom 2 = 102(LC 12) Max Uplift 6 = -167(LC 13) 2 = -201(LC 12) Max Grav 6 = 836(LC 1) 2 = 925(LC 1) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1361/805, 34=1054/647, 4-5=-1055/648, 5$=1363/809 BOTCHORD 2-7=-603/1177, 6-7=608/1180 WEBS 4-7=-393!/02, 5-7=387/400, 3-7=-383/393 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf; h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed; end verticel left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load noncencument with any other live loads. 4) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 Ib uplift at joint(s) except at --lb) 6=167, 2=201. LOAD CASE(S) Standard Dead Load Dell. = 3116 in PLATES GRIP MT20 2441190 Weight: 911b FT=10% QA... ��N�.va,e a�RWFTtIIt6£E6 r6E+uaT evu6ruE TE1A14MCIXIDIfmN6CJ610YFA reu•'En wmow�o6Newre�,.v.,+r=wn��m..x..a,m..=, e.mm�.+ama.�t �wm. r EpN�yEgbv Msm tl,ol Mma ua Ux.am.�.e.wmo„wAO.piI0.P�m:,vN Ns W9Muaf bVs lW bG W! 4alw Oa'4^6µsP]M1a-6PCmh EnpYsf.0. WmvTliID rapawbn uyW efO�P���iaYmT+w+9 ^>PY"d'b0.Mi�ndOnu,iV Taw Wt�m W IOO v,Y.�nOUTH.,. M 4Yi^d^Pay.bYw3 eo,�s. WbV1mCu�J W TrvebvYP�W s W rm^�CtiIdM w o.w..m��m.wumm.^"moe+e^d.ba.mumaa.ru.wifie.�mma�w �m..,em.,.Ts weq++mwmo.,ewae,sann,m.-.wmw e.mx.�.e+:.w.se...eneawee. v....w+�+�*++r am+ee+""OT�.u'u.6�"•"�'."paremu.,a..eam.oa..°�oe,...�e.e��"a ca: ie,w..e�n�nu„m,t6scewN.r+ahm.wserr..a..r.,.,m n.w.�m em.... ,arwxrem�w...w tl �e4,pe,tlpmelnMwllM6.w>aty Erp®aNOi M6uVry 0.Yyn,vTrvw 6y,lenEryMn NetINSYq. G➢ a WJislbrmeno0.lnNeilKl. Gpm9YCID160.1 Ps1 T,uyn-n�Vvaapm W Lb=av�eJ.nvy (wm a pc1,6MMMPea�Nm Pmvnnal>I pttlTai� Job Truss Truss Type pry Ply WRMSSMBIL C04G Common Girder 1 1 A0295898 Job Reference o gonal v.-i Fowl irussus, run Pierce, rc 34946, cesign@alvuss.com 1 i Hun: 85.210 s 1 May 18 2018 Print: 8.210 s May 18 2018 MiTek Industries, Inc. Fd Oct 18 15:30:04 2019 Page 1 I D:hYCoaQEIYhBIvUGjnCGo4hzcozg-ynLIH7EuGK[B1 r_YaU_F6gBalN6HgamxKX967HyS951 44 = R Dead Load Did. =1/16 in 5-5-8 5-5-8 10-11-0 5-5-8 4x4= LOADING (psf) SPACING- 2-M CSI. DEFL. in (loc) I/deft Ud PLATES GRIP ' TCLL 20.0 Plate Gdp DOL 1.25 TC 0.63 Vert(LL) -0.08 4-10 >999 360 MT20 244/190 TCDL 10.0 Lumber DOL 1.25 BC 0.77 Vert(CT) -0.16 4-10 >836 240 BCLL 0.0 Rep Stress Incr NO WB 0.41 HO2(CT) 0.02 3 n/a n/a BCDL 10.0 Code FBC2017, TPI2014 Matrix -MS Weight: 38 lb FT = 10% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP M 30 WEBS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 3-8-2 oc purlins. BOTCHORD Rigid ceiling direc0y applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 1 = 108010-3-8 (min. 0-1-8) 3 = 1081/0-3-8 (min. 0-1-8) Max Horz 1 = -44(LC 4) Max Uplift 1 =-202(LC 8) 3 =-202(LC 9) Max Grav 1 = 1080(LC 1) 3 = 1081(LC 1) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOPCHORD 1-2=-1671/314,2-3=1671/314 BOTCHORD 1-11=-235/1464,11-12=-235/1464, 4-12=-235/1464,4-13=-235/1464, 13-14=235/1464, 3-14=-235/1464 WEBS 2-4=-140/1085 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=S.Opsf; BCDL=5.Opsf; h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope); cantilever left and right exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-M wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (t-lb) 1=202, 3=202. 6) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 258 lb down and 56 lb up at 2-0-4, 258 lb down and 56 lb up at 4-0-4, 258 lb down and 56 lb up at 5-5-4, and 258 lb down and 56 to up at 6-10-13, and 258 lb down and 56 lb up at 8-10-13 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 7) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25 , Plate Increase=1.25 Uniform loads (plf) Vert: 1-2=-60, 2-3=-60, 5-8=20 Concentrated Loads (Ib) Vert: 4=-258(F) 11=258(F) 12=-258(F) 13=258(F) 14=258(F) Job Truss Truss Type Qty ply WRMSSMBIL C05 Common Supported Gable 1 1 A 0295899 Job Reference (optional) A-1 Roof Trusses, Fort Pierce, FL 34946, design@attmss.com Run: 88.210 s 1 May 18 2018 Print 8.210 s May 18 2018 MiTek Industries, Inc. Fri Oct 1815:36:05 2019 Page 1 ID:hYCoaQEtYhBIvUGjnCGo4hzcczg-Q vgVrEX1eQ2e77J88VUetksOndGZ6J4ZBv9fIfyS950 -1d-0 5-5-8 10-11-0 12-3-0 I 1-0-0 5-5-8 i 5-5-8 14-0 4x4 = I 3x4= '- - - 3x4= 1.5x4 11 1.5x4 11 1.5x4 11 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) Well Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.17 Vert(LL) -0.00 7 nlr 90 MT20 244/190 TCDL 10.0 Lumber DOL 1.25 BC 0.08 Vert(CT) -0.00 7 n/r 80 BCLL 0.0 Rep Stress Incr YES WB 0.07 Horz(CT) 0.00 6 n/a We BCDL 10.0 Code FBC2017/TP12014 MatrixS Wind(LL) 0.01 7 n/r- 120 Weight: 47 lb FT= 10% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 OTHERS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc puriins. BOT CHORD Rfgid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. All bearings 10-11-0. (lb) - Max Horz 2= 56(LC 1'I) Max Uplift All uplift 100 It, or less at joint(s) 2, 6, 10, 8 Max Grav All reactions 2501b or less at joint(s) 2, 6, 9 except 10=256(LC 23), 8=256(LC 24) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf; h=25ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left exposed; porch left exposed;C-C for members and forces 8 MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANS11TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 2-M oc. 6) This truss has been designed for a 10.0 lost bottom chord live load nonconcurrent with any other live loads. 7) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-M wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 6, 10, 8. LOAD CASE(S) Standard Job Truss Truss Type pry Ply WRMSSMBiL CJ1 Comer Jack 4 1 A0295900 Job Reference (optional) w-1 MOOT i msses, ron tierce, ru :waab, aesign(o-alvuss.com Run: 88.210 s 1 May 182018 Print 8.210 s May 182018 MiTek Industries, Inc. Fri Oct 18 15:30:06 2019 Pagel > ID:hYCoaQEtYhBIvUG)nCGo4hzcczg-u9T2lpF9oyYvG98xiu0)B5H1uAzGlalEom!BAyS95? -1-4-0 0-11-11 1-4-0 0-11-11 2 f I LOADING(psf) SPACING- 2-0-0 CSL DEFL. in (loc) Well L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.18 Vert(LL) 0.00 7 >999 360 MT20 244/190 TCDL 10.0 Lumber DOL 1.25 BC 0.03 Vert(CT) 0.00 7 >999 240 BCLL 0.0 Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 4 n/a We BCDL 10.0 Code FBC201.7/rP12014 Matrix -MP Weight: 6 lb FT = 10% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 BRACING - TOP CHORD Structural wood sheathing directly applied or 0-11-11 oc pudins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordancewithStabilizer Installa8on uide. REACTIONS. (lb/size) 3 = -4/Mechanical 2 = 18310-3-8 (min. 0-1-8) 4 = -la/Mechanical Max Hom 2 = 42(LC 12) Max Uplift 3 = -4(LC 1) 2 = -66(LC 12) 4 = -18(LC 1) Max Grav 3 = 12(LC 8) 2 = 183(LC 1) 4 = 20(LC 8) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf; h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Extedor(2) zone; cantilever left and right exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-M wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100lb uplift at joint(s) 3, 2, 4. LOAD CASE(S) Standard Peav PmuC W me�N'0.f RWF iRV68E6 C6rLIRi'1.4EHEPK 1EPF4utl CGl0.'MXSG6TOYEP ITiYTFA1P6KNMILFLGYENI'Gn, V.,tY R.W^ pveaeMM etl nMan On Trm 6.YP��^6 (f➢Y) vW M I N++N E�a�nY,aiw elw, Oelm.,a.MYo,YaW Mtlm MR10.aM��W vmanv 04en Yn0 Y,uv]bMlrO LJ.lYeiaamsh^69��^Y O...6i�.%ENO. YYUYm MR1D ram.^®m •�edm.wd..bd.�vA.wc�warlsa.a.nrdm...aYT.,. aa.+ea.u.T®mr.,.w Txf. m. �.�.�.+M'a+.nd'.,sa,rm...aaay.a,>ae..n�,e f.er a,�e+n.e.,�r�mYrde. o...a,o.w,s..ms,..a.��>a.au.aY.+'v��nw�,.adu.uc.o.,ec. meeaac�f..amFf.rw. we�aawToo o-aarxea.rm,.i.+e.�fi.�v.•bo-. w.m.b,.am.ay.eue.a.,ew�E+r J!Y@iNINY�9^aaG fm4m Nraea n lODwtl OS a.Ya.atl futletisadEY BaVMCo-nin�bd<hMMKK`n1�PWEYr1MTR�b S�I.w,afnwNbMb� 1R1 CefwPe¢W^.��+�M a,r.ae.TN..6.+s«.w.mnr Erv=®.er„�u..n�nw.w..ee..�.a.aAaer.a�x.�.a»a w�n.,m,vN.oc.�u..a..e.n.6e.m�r E,��exoT n.6wsro b.ov.oT,.,e crd..bc�mar o-.�v. iv few..e Ym... oaaYa.TM.r.cm„ nne�6wf RMrnpa._v�,w.m,dr.. m..n«aria,. ram mauwaa.�emo..�eMo.�+o,m..f nwr.,,m Job Truss Truss Type Oty Ply WRMSSMBIL CJ3 Corner Jack 4 1 A 0295901 Job Reference (optional) A-1 Roof Trusses, Fort Pieroe, FL 34946, design@albuss.com Run: 88.210 s 1 May 182018 Print: 8.210 s May 182018 MTek Industries, Inc. Fri Oct 18 15:36:072019 Page 1 ID:hYCoaOEtYhBIvUG)nCGo4hzcczg-MMI Ow9Gn2FgmuJj7FcXyjlpCealnl IyNOVOFIWS95_ -1-4-0 2-11-11 1-0-0 I 2-11-11 6.00 12 rim LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.18 Vert(l) 4-7 >999 360 MT20 2441190 TCDL 10.0 Lumber DOL 1.25 BC 0.08 Vert(CT) -0.01 4-7 >999 240 BCLL 0.0 Rep Stress Incr YES WB 0.00 Horz(CT) -0.00 3 n/a We BCDL 10.0 Code FBC2017ITP12014 Matrix -MP Weight: 12 lb FT = 10% . LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 BRACING - TOP CHORD Structural wood sheathing directly applied or 2-11-11 oc pudins. BOTCHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. fib/size) 3 = 66/Mechanicel 2 = 221/0-3-8 (min. 0-1-8) 4 = 31Mtechanical Max Horz 2 = 82(LC 12) Max Uplift 3 = -41(LC 12) 2 = -56(LC 12) Max Grav 3 = 66(LC 1) 2 = 221(LC 1) 4 = 50(LC 3) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vul1=160mph (3-second gust) Vasd=124mph; TCDL=S.Opsf; BCDL=5.Opsf; h=25ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 par bottom chord live load nonconcument with any other live loads. 3)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2. LOAD CASE(S) Standard Qpease NeuSM'ml,.[u'41 ACOF rP1156E6 r6ELLE0.'1. GENEIYJ.lFT016aM WNMIC06G1610YE0.r6VYERIICRAntF➢GlfcNi-bv, V.In/� V✓a^.�wvtl wOnPvaPn T,w M„P Or�K+6Oml W N 4 .=NE.y��,ee�,o.r..�exm.�.uaw mew.eu.o•,n. mo. e,+r �.>,,:,.mapr wve.,manv. mo mxa.r�w.o�,E,.�mv o...6w,+r E,,:.,®y e..d e„o.rrw rea�.n.. .Rw�=.ay.w�,.'w.g....namwm6+Mba•.ea.m.e m.w�r,,,nai�w. a.rmm+r.,.,e.mt rn. e.�6..mw+a..bma..,.am...w»^b.,a,..awr,,..�+ry 6+amaawnw�a•Nae.. 0.,�.6.. w..r,...u�.a.rw o, e.. RA6n6 o.+v"m. • a gem m w mc, m. mc, ar wm.awe,..e Tnr. TN mwwm a 6. mo..a.•r aa„�.ear,.m,:mm.n m,aw..a.c.:,=�.'o..w o-.m.�6 con a w.e�mr CNVa �'W6a�Tw�¢6�n0�.bWUTY e9��i mAu�aO�n.�uNno]nu 4 w] mMBUMMCmm+w^r6NbTMmaMn(6YT/WmIYb trIiR M68cl.¢e Mn,cMb Na��LW_m-a_ TPLf,�+lmrM ugvelktteeW vmldy0ynawe6lmEglR,. CM�109)184r PmI Tr,�,-RryrcbeM,tlgoppg,yy. y, �y'�'•' RtlniNp � c„Nr.1M 6p[ulb E,ge�siM1OTN BW1Fp fM4�aTrvo 6y,lm EyYw Mep NW]eq. iL cop bm Y ptl,hlM i8va ba afa pn®,hn d MI gwfT�S Job Truss Truss Type Qty Ply WRMSSMB1L CJ5 Comer Jack 2 1 A0295902 Job Reference (optional) I AID:hYCoaQEtYhBIvUGInCGo4hzcczg-aYl inc. rn va in may.uo maa 4-11-3 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) Vdefl Lld PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.36 Vert(LL) 0.04 4-7 >999 360 MT20 244/190 TCDL 10.0 Lumber DOL 1.25 BC 0.29 Vert(CT) -0.06 4-7 >999 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.00 Horz(CT) -0.00 3 n/a n/a BCDL 10.0 Code FBC2017rrPI2014 Matrix -MP Weight: 18 lb FT = 10% LUMBER - TOP CHORD 2x4 SP No.2 BOA CHORD 2x4 SP No.2 5) Provide mechanical connection b others of truss others) BRACING- to bearing plate capable of withstanding 100 uplift at P 9 P TOP CHORD joint(s) 3, 2. Structural wood sheathing directly applied or4-11-11 oc purfiT C BO ROT CHORD LOAD CASES. ( ) Rigid ceiling directly applied or 10-0-0 oc bracing. Standard MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 3 = 124/Mechanical 2 = 29210-3-8 (min. 0-1-8) 4 = 61/Mechanical Max Horz 2 = 123(LC 12) Max Uplift 3 = -77(LC 12) 2 = -62(LC 12) Max Grav 3 = 124(LC 1) 2 = 292(LC 1) 4 = 89(LC 3) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf; h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and CC Exterior(2) zone; cantilever left and right exposed; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcument with any other live loads. 3)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. Qwm. eww6rF..�.n.•a� aoo6 Tws6Es rsEucan, 4FNEfUt TEAM6 MIXNSIIVJIsc�sTweEa �eurercr xmow���mmmm vaWaa� om.•W..ma..awa.acn r.m o.,o.u..a6 cram maw mwmE.a�amr�.a�.�mmceWwm.a„mWti.u..mmmwroo. mN.m6. m�.=m cow w66..memwroo vmm wsmm6 B.o.6rWary e.ve�..Awwo,mrroo rer++.�e.� Osw Omwlr WmiNw Vim®�mJ mB�mb�9n+pv^+L1�Nbwa^9^p[� WYTrvmbPwamtln100 r^N.waeeiW6.1MaWCnmwWum.4+HMm�04w.vi�lahLD maum�Ylb Tw.b .>miaweaae o..g�... cow Wtl W w we, w me, �eaaw..e..em-r.Tn. m„6aa..6+w �mwrarmw Wwaa.c omanewcsnw.. n.,,ymwmnv:.Too..ew�.m>..�e6wm,oew aam: m.,�mm,^°"'�mwroomemruamawnm.:.�.syn.m�y, w.a.,bmm,we,.®ymue.w�moemaar w:. Wwr�m.o.,bm,. armory sy:®..an,m umW.x.,..l... m.e e.u.an.eo.mmv �wm„6eM11v xir.m„(e66n wmmm MTn.w Eec.w An2m.a wom.meea.�a.. rn,nr..aw re�.wma. � matl'a•1Ymm rnmbhW nTGN.Cg6nylOX,\641q 1Trm_.-gmrefizp,pp. L'nnyYm�upMSpamwN�r��'6p[vTygat10Tw0ulNq AgmraTrve6yJ.niEryNw Worry WiGp. , Job Truss - Qfy Ply WRMSSMBIL �Truss`rylpe CJSA Comer Jack 2 1 A0295903 Joh Reference o tional A-t KooT l russes, Fon tierce, FL M4 b, desgn(maltruss.com Run: 88.210 s 1 May 182018 Print: 8.210 s May 182018 MiTek Industries, Inc. I'd Oct 1815:30:09 2019 Page 1 I0_hYCoaQEtYhBlvUGjnCG04hzcczg-lk9BLril5twU7ctWNIZQpjvUrOw VxSgUptMnyyS94y 6.00 12 2x4 LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Lid TCLL 20.0 Plate Grip DOL 1.25 TC 0.39 Vert(L-) 0.06 3-6 >999 360 TCDL 10.0 Lumber DOL 1.25 BC 0.37 Vert(CT) -0.06 3-6 >920 240 BCLL 0.0 Rep Stress Incr YES WB 0.00 Horz(CT) -0.00 2 n/a n/a BCDL 10.0 Code FBC2017/rP12014 Matrix -MP LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4SPN0.2i BRACING- TOPCHORD Structural wood sheathing directly applied or4-11-11 oc pudins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 1 = 196/0-3-8 (min. 0-1-8) 2 = 130/Mechanicel 3 = 67/Mechanical Max Horz 1 = 100(LC 12) Max Uplift 1 = -25(LC 12) 2 = -80(LC 12) Max Grav 1 = 196(LC 1) 2 = 130(LC 1) 3 = 92(LC 3) FORCES. (Ib) Max. Comp./Max. Ten. -All forces 250 (Ib) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=S.Opsf; BCDL=5.Opsf; h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed; end vertical left exposed;C-C for members and forces 8 MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chard live load nonconcurrent with any other live loads. 3) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 Ib uplift at joint(s)1, 2. LOAD CASE(S) Standard PLATES GRIP MT20 244/190 Weight: 16 lb FT=10% rrm..mmsmr..+e.M ar s�TwsaEs rseimn canrwa rues mecoxort,oxswsromEn Ri+r'en..cmrnneu,Kxr�n vmy emc e..m.r.+..a �ermmM r„d o.�Dr.+Ue Roor.aM f An[Wry ErglsnM1,mm.Msl W4.u. Unb eMrtmsbMm MRID.m%PPri^an,maW&u WYLeuvIWMTW bpuW NnTr•4D.%'��E^ir�TY N. �'.-Y Erge,vlMarmaq TDO n.ro.Ym .mpYUNMprbrWstl mpwrign.pmDld/WMemgndMvgb T.mbpcYemMTODmy.ubrrlVN.lMenlynow..1'mc�b� pm,tlmm.cSyvYr m,tl,MMYn Trvu faoryBwbagi Yu n.msr3lrymM Om�,MOm.M1.uPmme mp.ImM 6Abi Dny�,n0.mmilm MPiO,pn ®C,�pgC.ymCemgrR.l.lNq wmNMlW me 0.Trm.id6,prwWnq,tlwyaimN'Ials Wbv�p WYb MrvpaaLiry mMm,�o..o.m.acmrm.u,mMa<w.e..roomeM>.m....,a�.um,vaMa,w,�.�mmnw.pme..��mm�esar one eym.a�ri..r.er.mew��my,.a.... TeF, «rwea. r.�o,.wa:>, me aw.wMn,,.. D..yrm. sp.mq Fiy,rNTn� 4mNmMr.+am. mw. ae.eq. Dmm.n q�®f rpm a.rc:q errn..w unW1lYa Sytlevy E.pr.w®rfOrM euuy o.am.rmTne a mmarnero...eamw.Tan.ca„ouo�sar Dmr n,®.-n.w�.mrmemmn.,,mu.nmro,,,remmme.enrrMmw,wrM.a„aa�aaatr,� Nan E=eM.wm�re�+5ra. �.a Job Truss Type pty ply 7D��07 WRMS5MBILA0295904__._ _._,_ _ -. Job Reference (optional) t-i nw, ruses, ran neme, ru 34946, oesign@a1truss.com Hun: 88.210 s 1 May 182018 Print 8.210 s May 18 2018 MiTek Industries, Inc. Fri Oct 18 15:30:10 2019 Page 1 ID:hYCoaQEtYhBIvUGjnCGo4hzcczg.nxjZYBIfsA2LlmSixk5gLxRgeoGSEM?pjTc JxyS94x -1-4-0 4-0-2 7-10-8 1-4-0 4-4-2 8-6-6 I 4x4 = 3x4 = Io Dead Load Defl. =1116 in LOADING(psf) SPACING- 2-" CSI. DEFL. in (loc) Well L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.32 Vert(LL) 0.24 6-9 >391 360 MT20 2441190 TCDL 10.0 Lumber DOL 1.25 BC 0.34 Vert(CT) 0.20 6-9 >476 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.17 Horz(CT) -0.00 6 n/a n/a BCDL 10.0 Code FBC2017frP12014 Matrix -MP Weight: 33 lb FT = 10% LUMBER - TOP CHORD 2x4 SP M 30 BOT CHORD 2x4 SP 240OF 2.OE WEBS 2x4 SP No.3 BRACING - TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc pudins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and require tl cross bracing be installed during truss erection, in accordance with Stabilizer Installa0on uide. REACTIONS. (lb/size) 4 = 76/Mechanical 2 = 402/0-M (min. 0-1-8) 6 = 232/Mechanicel Max Horz 2 = 182(LC 12) Max Uplift 4 = -61(LC 12) 2 = -132(LC 9) 6 = -142(LC 9) Max Grav 4 = 76(LC 1) 2 = 402(LC 1) 6 = 232(LC 1) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. TOPCHORD 2-3=-324/253 BOT CHORD 2-6=-499/276 WEBS 3-6=-322/582 NOTES- 1) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf, h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed; end verfical left exposed; porch left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss is not designed to support a ceiling and is not intended for use where aesthetics are a consideration. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6), Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joints) 4 except at --lb) 2=132, 6=142. LOAD CASE(S) Standard rwm. emm,6nrm.b.n. •4t aaw Tm,ssEfi r6Eiusn eEv=e., iEw cmemwmxsasrouEn reurenaca,amtncumme.,�. vmMm� owmw. me w mmmi em rmm rw.Po..aa tiov) wu. t 4wLMEigtry refmnv Ysl bb�m Ynlm dtiMne,pEm0y 1p0.vy Ppire w�eaWrytlu NibuatlbATppb[y VY6. Nairva Dssyn Fry6m�Yp Q.e.6{aaify Enpliw),MUYmeq TOD g2mnb ee ®Y WMPY��,bnYmP�m�^9���K?mT�YbACmIB^JWalb TrvrbC�mYe TOO wY.wYrTN.L 1M �m�miCYov.bN@m�ay.c�taWyaMw JOO Tmm IwmY6�AWYWm�m'NytlYe O�v.pu0.mtTbuap¢atlgmlmlrt&dbp 6Spm.nMmietldOy WC. Pp IgC. Mtlpiig:aYatliP4l.TMmyrwd JtlmlOO Y6eeummfa Trm.T�6^96mbig Jpy.LaWe6y. mtlp,agepYbeu,npaaHGT d Cw B,MgG+9mwICmLec6v iemmaMmdnMTOOWNp�[Yms�tl Gbm�>PztDYC^]�^^Wbm6Y�V bbm6tn R6LOPMnbf MlpmC58GarorY�,mMbianM Pmmv. TRI Cefwa W.eNa�eltteW EUW�d MT,w (islym.6,ymlry E,q'vwrmtlirm Ymalxlq,. mom ommmm 66n6q• Cmpvfmmf,pm i, �9 pTY pmOeT Mtlm]. Tlv 6{maTy E,gNasaNOTM B 1Lp p,gmrmim 6Yebm En�mmry O�Yq. FY a�Y'¢tl LLw �nm6Yi,1WLCeyy�OZ164t PVOTn®-11�pnW[b,pMmpnri Fmpbmupgi3EYdv�Ipm�YpnpmmYsm olMl poi Tams Job Truss Truss Type Oty Ply WRMSSMBiL D02GE Monopitch Supported Gable 1 1 A029590-9 Jab Reference o tional A-1 Root Trusses, Fort Pierce, FL 34946, design@altruss.com Run: 88.210 s i May 18 2018 Print 8.210 s May 18 2018 MITek Industries, Inc. Fri Oct 18 LOADING(psf) SPACING- 2-U CSI. DEFL. in (loc) I/deft Ud TCLL 20.0 Plate Grip DOL 1.25 TC 0.20 Vert(LL) 0.00 1 n/r 120 TCDL 10.0 Lumber DOL 1.25 BC 0.04 Vert(CT) -0.00 1 n/r 80 BCLL 0.0 Rep Stress Ina NO WB 0.06 Horz(CT) 0.00 n/a n/a BCDL 10.0 Code FBC2017frP12014 Matrix-P LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 OTHERS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc pudins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-M oc bracing. MITek recommends that Stabilizers and required cross bracing beinstalledduring truss erection, in accordance with Stabilizer Installation guide. REACTIONS. Al bearings 8-0-0. (lb) - Max Horz 2=183(LC 12) Max Uplift All uplift 1001b or less at joint(s) 7, 2, 8, 9, 10 Max Grav All reactions 250 lb or less at joint(s) 7, 2, 8, 9, 10 FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-303/128 NOTES- 1) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=S.Opsf; BCDL=5.Opsf; h=25ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI?PI 1. 3) All plates are 1.5x4 MT20 unless otherwise indicated. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 2-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 2, 8, 9, 10. LOAD CASE(S) Standard PLATES GRIP MT20 2441190 Weight: 41 lb FT=10% QPYsma6M'n+wfv'M 0.CGi TNR6E6C6E11ER}. GENERLL TEAA6MCVlW1,ONSCt,GiOYf(i r6WfPJ XM Imn.\'�E/�9^6e^�YnWwC muam PeTobap Ary91iO01�ab 6�TE,5nvreY,ae�awl biaww WYn �o.�w.aM.embiCC.aryq�xniw,:lmp@f aw9b,m5frs.�itID bv4'/u�iMlOvgn Emry�,YgN.6,v. ty E,gnwl. 4Y n9mfgl[tl npauYsm C.vS Yw OnVta�6mvJ pivb �9 M9�.6,wmtm alb Fob 9C.tvIGUYimYwn �a 1PN.TbCpwa W eniODNvnYimNMTrvv.b56^36w��G.a�9.n,uspvsa YaR NYb¢n anW�M ®itlgbW+rNGnesb./diW�MaLnvw TOCawam�Capw4WeIXb Mbp Ca�M1avil6aMy ea¢nmoi (69bI we0MW 1w YW,wM.uol bpw�Ngalw.. iA, .t4+eamsnC,nWRmwm JGaotb Tw f�,4 .6i®fIE^j^�wdiwYMm�.u.4v rA,�e bS.wlta�Cdbat w�ntl 4-minim,iA4tlM+�YM.�1.i�E�'TfN�+'aIRrtM BWfN bW�virvv6M�^frJ6�pM�-` V. 30 ®GAsf,mmv CYat<obaLniPFt CWymq Ca>16MI Pat Tnws-tLpWic.IW,tlquyxvmtFuphm.bpa6WMv.YwlbuiC�, ,dFipMlrvm®. Job Truss Truss Type Otty Ply WRMSISMBIL FG01 FLOOR 2 A0295906 2 Job Reference (optional) A-1 KeeT I ruses, Von Marco, rL :w b, ceslgnganruss.com Run: 85.210 s 1 May 18 2018 Print: 8.210 s May 18 2018 MiTek Industries, Inc. Fri Oct 18 15:30:11 2019 Pagel c ID:hYCoaQEtYhBIvUGjnCGo4hzcczg-F7GxNJJHdUBBMwivUScvuey3BVjziPzx7MTSNyS94w &5-2 6-1-9 &11-15 13-3-6 16-&8 3-5-2 33-6 3—M 3-3-6 3-5-2 416 = 15x6 = 4x6 = 44x6 = 6x8 = 64x6 = Dead Load Defl. = 1/81n 5x6 = 2x4'11 5x6 = 5x10 MT20H5= 1.5x4 11 1.5x4 II 44 = 3x10 = 2x4 II LOADING(psf) SPACING- 2-M CSI. DEFL. in (loc) Well Ud PLATES GRIP TCLL 40.0 Plate Grip DOL - 1.00 TC 0.47 Vert(LL) -0.30 11-12 >655 360 MT20 2441190 TCDL 10.0 Lumber DOL 1.00 BC '0.78 Vert(CT) -0.4111-12 >476 240 MT20HS 1871143 BCLL 0.0 Rep Stress Incr NO WB 0.61 Horz(CT) 0.08 8 n/a We BCDL 5.0 Code FBC2017rrPI2014 Matrix -MS Weight: 197Ib FT = 10% LUMBER - TOP CHORD 2x8 SP 240OF 1.8E BOT CHORD 2x4 SP M 30 `Except' 82: 2x4 SP 240OF 2.0E WEBS 2x4 SP No.3 `Except- W2: 2x4 SP No-2 BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc pudins, except end verticals. BOTCHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS. (Ib/size) 15 = 2799/0-4-0 (min.0-1-10) 8 = 279910-3-8 (min. 0-1-8) Max Grav 15 = 2799(LC 1) 8 = 2799(LC 1) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. TOP CHORD 1-15=2696/0, 1-2=4067/0, 2-3=-8085/0, 34=-10660/0, 4-5=-8109/0, 5-6=-8109/0, 6-7=-4110/0, 7-8=-2689/0 BOT CHORD 14-15=0/288, 13-14=0/8007, 12-13=0/10660, 11-12=0/10660, 10-11=0/10660, 9-10=0/8109, 8-9=0/295 WEBS 2-13=0/847, 6-10=0/820,1-14=0/4293, 2-14=-0476/0, 7-9=0/4335, 6-9=-4643/0, 3-13=2851/0,4-10=-2829/0 NOTES- 1) 2-ply truss to be connected together with 10d (0.131'xX) nails as follows: Top chords connected as follows: 2x4 -1 row at 0-9-0 oc , 2x8 - 2 rows staggered at 0-9-0 oc. Bottom chords connected as follows: 2x4 -1 row at 0-9-0oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced floor live loads have been considered for this design. 4) All plates are MT20 plates unless otherwise indicated. 5) The Fabrication Tolerance at joint 5 = 10% 6) Required 2x6 strongbacks, on edge, spaced at 10-0.0 oc and fastened to each truss with 3-10d (0.131' X 3") nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. LOAD CASE(S) Standard 1) Dead + Floor Live (balanced): Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 1-7=331(F=231), 8-15=-10 {Yv vaw"M'mYenN -M RNF 1RI188E6 rEelc+Tn OEXERPL lEAM6mM W,S,IIONSCJSIOYE0.l73VYER'1 ALIMOWtEYGY£NI-Gm Vn�:/M.aOn Gmmnls� M nM nWsan Pe Trm OexP@emG ROO)eMM I 4+b,ry ErylM1a, Nmvrt m�wmon�n.w�,.emn.e�n.0 rnOq T00. mNI.Pu m'+nn>i�eYW Yarvel bEn iLONpceM Pao Trm Oeapn GgMUMp Pa 6pn�YEnpF,mI.M VYmmry TOO ,e�rmf®Ym mNa�+dMmtlu�bf myw'agnepvAiYybNlmgn JYnwpbTrvn A�vYfm WlW mk..MulR-LiM4 �wvM'M Fa69mNi4ms,mubLYlmCu�Ylb TrvnbM'O.i4VYWIMaIDY/N0. Oms.W0.n✓c aGW^6mMe�^wWpe+O^m.b,OnwalYWI0.C.0. i6C.IW 4a`6BmAam 1T1.T4 ytwYplNlr,O W,m�MMnm.iW'+gNmR.4wW.4v,dc5maYprmgv�tlbOnnap.�iYl Wlm6tigFDOn9mNCm.Cuer.FY,m�mY enNMTOOWMp.mYuemCOmId�YW Bu^ini�WmITWYY�nbrtJm l66W yN'N�]gTHM66LPw.4anatlb,ryimY WUE+. THt bfisa PertfNm4me u0 dMEN6v Trvs0.ys.6po'6y vgnm Trvm Yvwb[Mv.uN,u oPwmc 6L�NgELwtln't¢aJ ipmnvin601tlrYY4rvdW.l,n 6PvMErpvbYOT Os 6uMsq D�tiymrmTrvn 6lflw EnpNwro,vryNVL4q. R0 cCY+@�OYevwodHwJnTR-1 WnylOA1641P. Tnm.,_p,p�mq,ppsy�,m,�,tia%I.mInpMDSU MOYpnepu.pm�n mctAlrbclTmm Jab Truss Truss Type Oty Ply WRMSSMBIL FL02GE GABLE 2 1 A0296907 a. Job Reference (optional) A-1 Roof Trusses, Fort Pierce, FL 34946, design@altruss.cem 'Run: 88.210 s 1 May 18 2018 Pdnt: 8.210 s May 18 2018 MiTek Industries, Inc. Fri Oct 18 15:30:13 2019 Page 1 ID:hYC QEtYhBIvUGjnCGo4hzcczg-BWOhACLY85RvcEAHc NzZ9FS7MEMxGPRmwGyS94u LOADING(psf) SPACING- 2-0-0 CSI. TCLL 40.0 Plate Grip DOL 1.00, TC 0.09 TCDL 10.0 Lumber DOL 1.00 BC 0.01 BCLL 0.0 Rep Stress Incr NO WB 0.03 BCDL 5.0 Code FBC2017/TPI2014 Matrix-S LUMBER - TOP CHORD 2x4 SP N0.2(flat) BOT CHORD 2x4 SP No.2(flat) WEBS . 2x4 SP No.3(flat) OTHERS 2x4 SP No.3(flat) BRACING. TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc puriins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS. All bearings 18-3-8. (lb) - Max Grav Al reactions 250 lb or less at joint(s) 17, 31, 30, 29, 28, 27, 26, 25, 24, 23, 22, 21, 20, 19. 18 FORCES. (Ib) Max. Comp./Max. Ten. - Al forces 250 (lb) or less except when shown. NOTES- 1) All plates are 1.5x3 MT20 unless otherwise indicated. 2) Gable requires continuous bottom chord bearing. 3) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 4) Gable studs spaced at 1-4-0 oc. 5) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-10d (0.131 ° X 3') nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. LOAD CASE(S) Standard r :?::�>;:�::iea`"u��:�;ys�::T:$<: DEFL. in (too) Weft L/d Vert(LL) n/a - We 999 Vert(CT) n/a - me 999 Hoa(CT) 0.00 17 n/a nla PLATES GRIP MT20 2441190 Weight: 87 lb FT = 10%F, 10%E QFYm�aejnlr,.„..b'0.�ROfYT0.�RSE6r61lERn, GEHpFAt TEf3g et b6l.`M,9.SA5iWEPl�a9lL0MNt£WYFHI-bm. Y.�%N A��']MrrtMm hUm 4+M �.�Gn�aMh ST.atl1YEgNrrmM1mo W[144.m.lAYs.a6.nm sYMm MTCp.gtlr/,tyy.y+mabyl6m Ja9b,mlMOw INObNA N.TxaafYY6+E�G✓..Aq PY[�yFrysaal. P. YJm YM1 iOO YYI 0.u.LL aMertNM tde.,LntlwymnN `�+m+OYM1 In WC.a4 MAsu4Y TrvwdMNanMTODm9/.,n9wiR1.iM0.epm.w{yn>bbMmrf.M1vn. wisYltYwtua WOn Tuo YxMf�u�6YM mCm>.L%%dOn d 4a Buel+q CetP✓/uvC ro. N.vx�K tOUatl rtiwa3wW I�.beY WaznOmYWTA..T4muNdMT^a MMblfm✓MTrvn.iJW.96Y tiN..bN..YpCahmpt L�*9Mbewm0.n'-W WW6..gvYL 6<wgcne^.6YW mbnn6n ReD1 WY"b NR"M:GCP e.,eYmxMW WYYY4Y"•- iVL,CWw.OeitR'm.Ym+M mY.as.T,,,..u.tic+.3.x.YVFM�..�T..mu�.bm.v,,..�.em.vu susah.cWc�.m.�a�w.,4vbaw�..anmM.9.6w.'�vEWw�: Y�raY 6aNy G+vwnTrvs6NaeN-+NMY+sv- u •vptYixYYmv¢�mPo4W w1Pl, W'7mg.lODI6IVIRa9Tmw-Rec.v�.CTvMyw4hx.1�T0.YM=fYM.IDxW M.WnP^YsadN (iMimma. Job Truss Truss Type Qty Ply WRMS6MBIL FL03GE Floor Supported Gable 1 1 A0295908 Job Reference o bonal v.-i poor i msses, con rierce, rL ,wnno, oe119nLmaltruss.com Run: 65.210 s 1 May 18 2018 Pn t:8.210 s May 18 2018 MITek Industries, Inc. Fri Oct 18 15:30:14 2019 Page 1 r ID; In1 E14n4krFMR5vCX81m4z20vo-8y4OYLAvPZmEOITAa9cVncQCPiRABBPd5a7SiyS94t Otm 3x3 II 3x3 = 3r3 11 y�I 1 2 3 4 5 6 7 a3x3= 9 10 11 vi 4, ST TI sit SP;I BL I 22 21 2D 19 18 17 16 15 14 13 12 34 11 3x3 = 3x3 - 313 = LOADING(psf) SPACING- 24)-0 TCLL 40.0 Plate Grip DOL 1.00 TCDL 10.0 Lumber DOL 1.00 BCLL 0.0 Rep Stress Incr NO BCDL 5.0 Code FBC2017/TPI2014 LUMBER. TOP CHORD 2x4 SP No.2(flat) BOT CHORD 2x4 SP No.2(flat) WEBS 2x4 SP No.3(flat) OTHERS 2x4 SP No.3(flat) BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc puriins, except end verticals. BOTCHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS. All bearings 12-7-8. (Ib) - Max Grav All reactions 250 lb or less at joint(s) 22. 12, 21, 20. 19, 18, 17, 16, 15, 14, 13 FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. NOTES. 1)All plates are 1.5x3 MT20 unless otherwise indicated. 2) Gable requires continuous bottom chord bearing. 3) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 4) Gable studs spaced at 1-4-0 oc. 5) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-10d (0.131" X 3") nails. Srongbacks to be attached to walls at their outer ends or restrained by other means. 6) CAUTION, Do not erect truss backwards. LOAD CASE(S) Standard CSI. TC 0.09 BC 0.01 WB 0.03 Matrix-S DEFL. in (loc) Well L/d Vert(L-) n/a - n/a 999 Vert(CT) We - n/a 999 Hom(CT) 0.00 12 n/a n1a PLATES GRIP MT20 244/190 Weight: 63 lb FT= 10%F, 10%E Job Truss Truss Type Qty Ply WRMSSMBIL FL04 Floor 2 1 v0295909 Job Reference' o Uonal N-i mom iw5ses, ron riema, r, araao, cesign�aa iwss.cam 0." H 1 2-6-9 3x6 = 2 Run: 88.210 s 1 May 18 2018 Print: 8.210 s May 18 2018 MiTek Industries, Inc. Fri Oct 1815:30:15 2019 Page 1 ID:hYCoaQEtYhBIvUGInCGo4hzcczg-7u WSbuMogjhdrXKgjHg2_9T6pu RvZMYslKg?WS94s 3 4 3x6 = 5 6 1ZL V V b0 L 9 8 3.4 = cA 3x4 = 3x4 = 12-7-8 Plate Offsets (X Y)-- 18:0-1-8 Edgel 19:0-1-8 Edge] LOADING (Pat) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plate Grip DOL 1.00 TC 0.53 Vert(LL) -0.16 9-10 >940 360 MT20 2441190 TCDL 10.0 Lumber DOL 1.00 BC 0.67 Vert(CT) -0.23 9-10 >638 240 BCLL 0.0 Rep Stress Incr YES WB 0.36 Horz(CT) 0.03 7 n/a n/a BCDL 5.0 Code FBC2017/TPI2014 Matdx-S Weight: 62 lb FT =10%F, 10%E LUMBER - TOP CHORD 2x4 SP No.2(flat) BOT CHORD 2x4 SP No.2(flat) WEBS 2x4 SP No.3(flat) BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc pudins, except end verticals. BOTCHORD Rigid ceiling directly applied or 10-M oc bracing. REACTIONS. (lb/size) 7 = 674/0-6-14 (min. 0-1-8) 10 = 674/0-6-14 (min. 0-1-8) Max Grav 7 = 674(LC 1) 10 = 674(LC'1) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1704/0, 3-4=-1704/0, 4-5=-1704/0 BOTCHORD 9-10=011166, 8-9=0/1704, 7-8=0/1166 WEBS 5-7=-1289/0, 2-10=-1289/0, 5-8=0/680, 2-9=0/680 NOTES- 1) Unbalanced floor live loads have been considered for this design. 2) All plates are 1.5x3 MT20 unless otherwise indicated. 3) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-10d (0.131 ° X 3") nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. LOAD CASE(S) Standard Job Truss Truss Type Qry Ply WRMSSMBIL FL05 Floor 10 1 A0295910 Job Reter rice (opfo all r- i rxoor i ruses, ron r.erce, , ease,, aesignLaiuuss.com 0-1-8 H 1 2-6-0 4x10 = 3x6 FP= Kun: umziu s i May in zuiu Print: u.ziu s May in zui6 MITek Industries, Inc. Fri Oct 18 15:30:16 2019 Page 1 ID:hYCoaOEtYhBlvUGJnCG04hzcczg-b44gpENOROpUThv H?B4bChcFCBlevhi5P3EXbyS94r 1.3-0 2-5-0 i 1-3-0 4x4 = 4x4 = 4x10= 0A1-8 Dead Laad Defl. = 1/8 In 3.6 = 3x12 = 3x4 = 3x4 = 3.12 MT20HS FP-- Us = 3xi2 = LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (too) I/deft Ud PLATES GRIP TCLL 40.0 Plate Gdp DOL 1.00 TC 0.70 Vert(LL) -0.40 16-17 >623 360 MT20 2441190 TCDL 10.0 Lumber DOL 1.00 BC 0.86 Vert(CT) -0.5415-16 >453 240 MT20HS 1871143 BCLL 0.0 Rep Stress Incr YES WB 0.80 Horz(CT) 0.09 12 n/a n/a BCDL 5.0 Code FBC2017frP12014 Matrix-S Weight: 103lb FT= 10%F, 10%E LUMBER - TOP CHORD 2x4 SP M 30(flat) 'Except' Tt: 2x4 SP No.2(flat) BOT CHORD 2x4 SP M 30(flat) LOAD CASE(S) WEBS 2x4 SP No.3(flat) Standard BRACING - TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc pudins, except end verticals. BOTCHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS. (lb/size) 12 = 113010-6-14 (min. 0-1-8) 18 = 1130IM-14 (min. 0-1-8) Max Gmv 12 = 1130(LC 1) 18 = 1130(LC 1) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOPCHORD 2-3=-3647/0, 3-4=-3647/0, 4-5=-3647/0, 5-6=-4748/0, 6-7=-4748/0, 7-8=-4748/0, 8-9=-3647/0, 9-10=-3647/0 BOTCHORD 17-18=0/2128, 16-17=0/4505, 15-16=014748, 14-15=014506, 13-14=014506, 12-13=012127 WEBS 10-12=2352/0, 2-18=2353/0, 10-13=011680. 2-17=0/1679, 9-13=-259/0, 4-17=258/0, 8-13=949/0, 5-17=-949/0, 8-15=-109f729, 5-16=108f729, 6-16=391/25, 7-15=-392/25 NOTES- 1) Unbalanced floor live loads have been considered for this design. 2) All plates are MT20 plates unless otherwise indicated. 3) All plates are 1.5x3 MT20 unless otherwise indicated. 4) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-10d (0.131 ° X 3') nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. Job Truss Truss Type Oty ply A0295911 WRMSSMBIL FL05A Floor 3 1 Job Reference(opriona0 A-1 Roof Trusses, Fort Pierce, FL 34946, design@aItruss.com Run: 88.210 s 1 May IS 2016 Print: 8.210 s May 18 2018 MTek Industries, Inc. Fri Oct 18 15:30:16 2019 Page 1 ID:hYCeaOEtYhBIvUG1nCGo4hzcczg-b44gpENOROpUThv H?64bChZGCA2evu151 3EXby394r 0-" H 2�{'- F 1-M 2-5-0 1.Sx3 11 1.5x3= — - 1.Sz3= �zt0= i:5x'iZI-3i4""I:Sx371— t:5Kt1�3a 1 2 3 4 5 6 7 1.5x3 II R a 10 Dead Lead Dell. =1181n 11 3x8= We= 314= 3x4= 318= 3.8= 3x12 MT20HS FP= 9-3-0 10-e-0 11'-0 20-7-8 43-0 1s-n �1-n-n R-11-R Plate Offsets (X,Y)— 113:0-2-0,Edge1. 114:0-1-8,Edee1, 115:0-1-8,Edge1, 116:0-0$.Edael LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plate Grip DOL 1.00 TC 0.89 Vert(LL) -0.39 15-16 >629 360 MT20 244/190 TCOL 10.0 Lumber DOL 1.00 BC 0.93 Vert(CT) .0.53 14-15 >460 240 MT20HS 187/143 BCLL 0.0 Rep Stress Incr NO WB 0.79 Horz(CT) 0.09 12 We n/a BCDL 5.0 Code FBC2017ITP12014 Matrix-S Weight: 102lb FT=10%F, 10%E LUMBER - TOP CHORD 2x4 SP No.2(flat) *Except* T1: 2x4 SP M 30(flat) BOT CHORD 2x4 SP No.2(flat) *Except* B2: 2x4 SP M 30(flat) WEBS 2x4 SP No.3(flat) BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc pudins, except and verticals. BOT CHORD Rigid ceiling directly applied or 1G-M oc bracing. REACTIONS. (lb/size) 17 = 1117/0-6-14 (min. 0-1-8) 12 = 1117/Mechanical Max Grav 17 = 1117(LC 1) 12 = 1117(LC 1) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOPCHORD 2-3=-3596/0, 3-4=-3596/0, 4-5=464110, 5-6=-4641/0, 6-7=4641/0, 7-8=-3621/0, 8-9=3621/0, 9-10=-3621/0 BOTCHORD 16-17=0/2101, 15-16=0/4424, 14-15=0/4641, 13-14=0/4442, 12-13=012145 WEBS 5-15=375/34, 6-14=-046/56, 2-17=-2322/0, 2-16=0/1653, 3-16=-259/0, 4-16=916/0, 4-15=-1221694, 10-12=2362/0, 10-13=011631, 8-13=258/0, 7-13=908/0, 7-14=-1347718 NOTES- 1) Unbalanced floor live loads have been considered for this design. 2) All plates are MT20 plates unless otherwise indicated. 3) Refer to girder(s) for truss to truss connections. 4) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-10d (0.131a X 3") nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 5) CAUTION, Do not erect Imes backwards. LOAD CASE(S) Standard Job Truss Truss Type Qry Ply WRMSxSMB1L FLOSB Floor 1 1 A0295912 Job Reference (optional) • 0-1-8 H 21 6-0� 1-10 -1 1.5x3 II 1.5x3 = 1.5x3 = 3x6 = 1.5x3 II 1 2 3 c 618 R1] Bi o •x 15 3x4 = 3.4 = 34 FP= nun: 00, m 5 1 May 10 4U 10 YOm: O.ZIU 5 May 10 ZU16 M11 eK InOUSMe5, Inc. Fn Oct 18 15:30:11 ZU19 Page 1 I D:hYCoaQEtYhBIvUGjnCGo4hzcczg-3HeC0aO2CKxL5rU2ri)J7PEn Fc7xNRWrK3pn31 yS94q 2-7-8 Dead Load Deft.=11161n 1.5x3 11 1.5x3 II 3x6 = 3.6 = 3x6 FP= 3x4 = 3x3 11 4 _. 5 6 7 8 8 10 14 3x4 = 9 12 3x6= 3.8= LOADING(psf) SPACING- 2-D-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plate Grip DOL 1.00 TC 0.68 Vert(L-) -0.15 15-16 >999 360 MT20 244/190 TCDL 10.0 Lumber DOL 1.00 BC 0.73 Vert(CT) -0.24 15-16 >621 240 BCLL 0.0 Rep Stress Incr NO WB 0.51 Horz(CT) 0.02 11 n/a n/a BCDL 5.0 Code FB02017frPI2014 Matrix-S Weight: 103lb FT = 10%F, 10%E LUMBER - TOP CHORD 2x4 SP No.2(flat) BOT CHORD 2x4 SP No.2(flat) WEBS 2x4 SP No.3(flat) LOAD CASE(S) BRACING- Standard TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc pudins, except end verticals. BOTCHORD Rigid ceiling direcfly applied or 6-0-0 oc bracing. REACTIONS. (lb/size) 13 = 1289/0-3-8 (min. 0-1-8) 16 = 60910-6-14 (min., 0-1-8) 11 = 336/1viechanicel Max Grav 13 = 1289(LC 1) 16 = 620(LC 3) 11 = 422(LC 7) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOPCHORD 2-3=-1433/0, 3-4=-1433/0,4-5=-1433/0, 5-6=0/876, 6-7=-6521174, 7-8=-652/174, 8-9=-652/174 BOTCHORD 15-16=011053, 14-15=0/1433, 13-14=0l734, 12-13=-876/0, 11-12=-21/640 WEBS 4-14=288/0, 6-13=-708/0, 2-16=-1164/0, 2-15=01420, 5-13=1395/0, 5-14=0/816, 9-11=-704/23, 9-12=290/14, 7-12=270/0, 6-12=0/1066 NOTES. 1) Unbalanced floor live loads have been considered for this design. 2) Refer to girder(s) for truss to truss connections. 3) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-10d (0.131" X 3") nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 4) CAUTION, Do not erect truss backwards. Job Truss Truss Type Qty Ply WRMSSMBIL FL06G Floor Girder 1 1 »0295913 re Job Refence o clonal A-1 Root Trusses, Fort Pierce, FL 34946, design@aibuss.com 0-1-8 H r 2-M 8.210 s May 182018 MiTek Industries, Inc. Tue Oct 22 10:25:21 2019 Pagel ID:hYCoaQEtYhBIvUGjnCGo4hzcczg-jBddyAQMfUoj4S9GiOmJYCArrY7eFIx8m6GGt;yQvAl i-3-0� 11�2-0-� 0-1A ilg aK r-11 - 3.6 = 3x8 = 3.8 MT20HS FP= 15 14 3X3 = 314 = 13 3.8 = LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) Well Ud TCLL 40.0 Plate Grip DOL 1.00 TC 0.75 Vert(LL) -0.66 13-14 >373 360 TCDL 10.0 Lumber DOL 1.00 BC 0.49 Vert(CT) -0.43 13-14 >568 240 BCLL 0.0 Rep Stress Ina NO WS 0.64 Hoiz(CT) 0.10 12 rda n/a BCDL 5.0 Code FBC2017/TP12014 Matrix-S LUMBER - TOP CHORD 2x4 SP M 30(flat) BOT CHORD 2x4 SP 240OF 2.OE(flat) WEBS 2x4 SP No.3(flat) BRACING - TOP CHORD Structural wood sheathing directly applied or 6-0-0 cc pudins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 cc bracing. REACTIONS. (lb/size) 12 = 1195/0-6-14 (min.0-1-8) 18 = 119610-6-14 (min. 0-1-8) Max Uplift 12 =-243(LC 13) 18 =-241(LC 13) Max Grav 12 = 1195(LC 1) 18 = 1196(LC 1) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOPCHORD 2-3=-3116/1497, 3-23=-311611497, 4-23=3116/1497,4-5=-3679/2394, 5-6=-3679/2394, 6-24=-3679/2394, 7-24=-3679/2394, 7-25=3116/1500, 8-25=3116/1500, 8-9=-3116/1500, 9-10=3116/1500 BOTCHORD 17-18=644/2089, 16-17=-2173/3587, 15-16=2173/3587, 14-15=-2394/3679, 13-14=2199/3573, 12-13=-651/2091 WEBS 10-12=-2312/720, 2-18=-2310f712, 10-13=938/1133, 2-17=-944/1135, 7-13=506l774, 4-17=-5211746, 7-14=334/494, 4-15=338/434 NOTES- 1) Unbalanced floor live loads have been considered for this design. 2) All plates are MT20 plates unless otherwise indicated. 3) All plates am 1.5x3 MT20 unless otherwise indicated. Continued on page 2 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 243 lb uplift at joint 12 and 241 Ill uplift at joint 1It. 5) Load case(s) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 has/have been modified. Building designer must review loads to verify that they are correct for the intended use of this truss. 6) Recommend 2x6 strongbacks, on edge, spaced at 10-" cc and fastened to each truss with 3-10d (0.131' X 3") nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 7) Hanger(s) or other connection devices) shall be provided sufficient to support concentrated load(s) 209 lb up at 5-1-12, 209 lb up at 7-1-12, 209 lb up at 9-1-12, 209 Ib up at 10-5-8, 209 Ill up at 11-9.4, and 209 lb up at 13-9-4, and 209 lb up at 15-9-4 on lop chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) 1) Dead + Floor Live (balanced): Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 12-18=-18, 1-11=-170 Concentrated Loads (lb) Vert: 9=209(B) 3=209(B) 5=209(B) 6=209(B) 23=209(B) 24=209(B) 25=209(B) 2) Dead: Lumber Increase=1.00, Plate Inaease=1.00 Uniform Loads (plf) Vert: 12-18=-18, 1-11=170 Concentmted Loads (lb) Vert 9=209(B) 3=209(B) 5=209(B) 6=209(B) 23=209(B) 24=209(B) 25=209(B) 3)1sl chase Dead +Floor Live (unbalanced): Lumber Inaease=1.00, Plate Increase=1.00 Unifoml Loads (plf) Vert: UA8=18, 1-6=-170, 6-11=-90 Concentrated Loads (lb) Vert: 9=209(B) 3=209(B) 5=209(B) 6=209(B) 23=209(B)24=209(B)25=209(B) 4) 2nd chase Dead + Floor Live (unbalanced): Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) 22:5 4 26. PLATES GRIP MT20 244/190 MT20HS 1871143 Weight: 1041b FT = 10%F, 10%E Vert: 12-18=18, 1-5=90, 5-11=170 Concentrated Loads (Ib) Vert* 9=209(B)3=209(B)5=209(B)6=209(B) 23=209(B)24=209(13)25=209(B) 5) 3rd chase Dead: Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 12-18=-18, 1-6=170, 6-11=-90 Concentrated Loads (lb) Vert: 9=209(B) 3=209(B) 5=209(B) 6=209(B) 23=209(B) 24=209(B) 25=209(B) 6) 4th chase Dead: Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 12-18=18, 1-5=90, 5-11=170 Concentrated Loads (lb) Vert:9=209(B)3=209(B)5=209(B)6=209(B) 23=209(B)24=209(B)25=209(B) 7) Reversal: Dead + Floor Live (balanced): Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 12-18=18, 1-11=170 Concentrated Loads (lb) Vert 9=209(B) 3=209(B) 5=209(B) 6=209(B) 23=209(B) 24=209(B) 25=209(B) 8) Reversal: Dead: Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (pit) Vert: 12-18=-18, 1-11=170 Concentrated Loads (lb) Vert: 9=209(B) 3=209(B) 5=209(B) 6=209(B) 23=209(B) 24=209(B) 25=209(B) 9) Reversal: 1st chase Dead + Floor Live (unbalanced): Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 12-18=-18, 1-6=170, 6-11=-90 Concentrated Loads (lb) Vert: 9=209(B) 3=209(B) 5=209(B) 6=209(B) 23=209(B) 24=209(B) 25=209(B) 10) Reversal: 2nd chase Dead + Floor Live (unbalanced): Lumber Increase=1.00, Plate Increase=1.00 Uniforn Loads (plf) Vert: 12-18=-18, 1-5=-90, 5-11=l70 Qxw..wy,ry,..ne.w •e-1 amE mu66E6 r6E�-ITT e.Ea,6xx TEmas.ewxomwswsTou6a r6uTEm wmuow�oc�Yrm�,,. v.,ue e.�, p..,,.w..,a tie,oae„ fimr� o.� 60..:�o t�6m.^eu. Retl^MEylmvrNremxYmlleb�w�. VnYaeTer�be ve.N on Ey ryO.vryq�,v avn,e[,m ptlu tl,EEb,mNb9aTW bb.%1. Paoirvm Rev, Em�Inwbp P�.6pcvey Enp4ivA OsuYm Ml6D,^�vvbm (Mv,WO�N.�wvcatl�Nv,a na B.aivi Vv9�. bt6+bt6+mNtl A�RC.M1 L�Fala�em MlWmN.uMrlN.L1M0 �®✓,Nmub �p�w�CA've^�9^^+G^G^b+T.-rivYlaM1nb m�ifbv9YaEYM,�eM�YY mveemwo•ov�o.ncon.o,.. ri�o,..moenn.Toowe. o.nn.one.6�=..dna6���6+�me,mm,�t�%Srn wxu4ewm.ws�.s.,n.,.wab,w.�+o�+�'.Y.. T», a+wmx+e�x.+..a dNe�NOV Tun 0.egrw.6q[My Erp6,v,vnTnm Ywlidnr. mY.. eNaw C,Wwty � CmOW N�,� m vEsq 6E�6pvvsbNM.Tha 6ptiNy ErgevsxOTM OGLp Duywvirvv fiysMn Ee,To NvrytuNvy. AE �yNb�,4m\NPMeaGaiiKl, hgyry410A16AI Rvo,T,csE�PxpW,apq,xgympp,y,y,neMb,n Y pdu}b1�iAwitln niMp,n#xundF, pMT,van. Job Truss Truss Type Qty Ply WRMS.SMBIL FL07GE GABLE 2 A0295914 1 re Job Refence lartirnall A-i Kom i cusses, roa rierce, r� aasao, uesign�waiuuss.mm 7 2 Run: 88.210 s 1 May 18 2018 Print 8.210 s May 18 2018 MTek Industries, Inc. Fri Oct 1815:30:19 2019 Page i ID:hYCoaQEtYhB1vUG)nCGo4hzcczg-MRFPJkxB3K9eRy7inCgJGzQPerSR8nN IuewyS94o 9-1-18 3 4 5 0 1 12 14 T 3T I T 13 0 t Id aIs 10 9 8 7 6 LOADING(psf) SPACING- 2-M CSI. DEFL. in (too) I/deft L/d TCLL 40.0 Plate Grip DOL 1.00 TC 0.09 Vart(LL) n/a - me 999 TCDL 10.0 Lumber DOL 1.00 BC 0.01 Vert(CT) n/a - n/a 999 BCLL 0.0 Rep Stress Incr NO WB 0.03 Horz(CT) 0.00 6 n/a n/a BCDL 5.0 Code FBC2017/TPI2014 Matrix-R LUMBER - TOP CHORD 2x4 SP No.2(flat) BOT CHORD 2x4 SP No.2(flat) WEBS 2x4.SP No.3(flat) OTHERS 2x4 SP No.3(flat) BRACING- TOPCHORD Structural wood sheathing directly applied or 5-0-0 oc pudins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-M oc bracing. REACTIONS. Al bearings 5-0-0. (Ib) - Max Grant All reactions 250 lb or less at joint(s) 10, 6, 9, 8, 7 FORCES. (Ib) Max. Comp./Max. Ten. - Al forces 250 (Ib) or less except when shown. NOTES- 1) All plates are 1.5x3 MT20 unless otherwise indicated. 2) Gable requires continuous bottom chord bearing. 3) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 4) Gable studs spaced at 1-4-0 oc. 5) Recommend 2x6 stmngbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-10d (0.131" X 3") nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. LOAD CASE(S) Standard PLATES GRIP MT20 2441190 Weight: 24 lb FT = 10%F, 10%E Job Truss Truss Type Oly, PIy A0295915 WRMSSMBIL FLOE ROOF TRUSS 7 1 9; Job Reference (optional) A-1 Roof Trusses, Fort Pierce, FL 34946, design@altruss.com Run: 88.210 a 1 May 18 2018 Print 8.210 s May 18 2018 Mffek Industries, Inc. FriOct 18 15:36:20 2019 Pagel ID:hYCoaOEtYhBIvUGInCGo4hzcczg-UsJLebOxVFJwyJDd WrGO12sRrglFatW1011 RgMyS94n 0-1-8 uo - a11a 0-7-e as.o sae 0-7-e LOADING(psf) SPACING- 2-M CSI. " L. in (loc) I/defi L/d TCLL 40.0 Plate Grip DOL 1.00 TC 0.08 VeL) -0.0 rt(L0 5 >999 360 TCDL 10.0 Lumber DOL 1.00 BC 0.05 Vert(CT) 0.00 5 >999 240 BCLL 0.0 Rep Stress Incr NO WB 0.17 Horz(CT) -0.00 4 n/a We BCDL 10.0 Code FBC2017/iP12014 Matrix-P LUMBER - TOP CHORD 2x4 SP No.2(flat) BOT CHORD 2x4 SP No.2(flat) WEBS 2x4 SP No.3(flat) BRACING. TOP CHORD Structural wood sheathing directly applied or 2-M oc puriins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. REACTIONS. (fie/size) 4 = -209/Mechanical 5 = 701/0-8-0 (min. 0-1-8) Max Hom 5 = -42(LC 10) Max Uplift 4 = -209(LC 1) Max Gram 5 = 701(LC 1) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. TOP CHORD 6-7=-305/0, 7-8=-305/0, 1-8=305/0 WEBS 2-6=0/358, 2-4=0/309, 2-5=-66510 NOTES- 1) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=S.Opsf; BCDL=5.0psh h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcument with any other live loads. 4) • This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-M wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 209 lb uplift at joint 4. 7) CAUTION, Do not erect truss backwards. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.00 , Plate Increase=1.00 Uniform Loads (pit) Vert: 4-6=-20, 1-3=-100 Concentrated Loads (Ib) Vert 1=285 PLATES GRIP MT20 2441190 Weight: 19 Ile FT = 10%F, 10%E Job Truss Truss Type OtY ply WRMS6MB1 L HJ7 Diagonal Hip Girder 2 1 A0295916 Job Reference o tional ^-i Roca iFusses, Fort Fierce, rL,xa % oesigniaanruss.com 3 Run: un.ziu s 1 May 16 2e1a Fruit: 8.210 s May 18 2018 MTek Industries. Inc. Fri Oct 18 15:30:22 2019 LOADING(psf) SPACING- 2-M CSI. DEFL in (too) I/deb L/d TCLL 20.0 Plate Grip DOL 1.25 TC 0.46 Vert(LL) -0.23 6-9 >512 360 TCDL 10.0 Lumber DOL 1.25 BC 0.55 Vert(CT) -0.45 6-9 >258 240 BCLL 0.0 ' Rep Stress [nor NO WE 0.34 Horz(CT) 0.01 6 n/a n/a BCDL 10.0 Code FBC2017/ 1312014 Matrix -MS LUMBER - TOP CHORD 2x4 SP M 30 BOT CHORD 2x4 SP 2400F 2.0E WEBS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc purins. BOTCHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be Installed during truss erection, in accordance with Stabilizer Installation uide. REACTIONS. (lb/size) 4 = 135/1VIechanical 2 = 514/0=1-9 (min. 0-1-8) 6 = 355/1VIechanical Max Hom 2 = 182(LC 22) Max Uplift 4 = -104(LC 4) 2 = -136(LC 4) 6 = -45(LC 8) Max Grav 4 = 135(LC 1) 2 = 514(LC 1) 6 = 355(LC 1) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOPCHORD 2-10=663/176, 10-11=-658/193, 3-11=-595/194 BOTCHORD 2-13=-264/620, 13-14=264/620, 14-15=264/620, 6-15=-264/620 WEBS 3-6=-662/282 NOTES- 1) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=S.Opsf; BCDL=5.Opsf, h=25ft; Cat. II; Exp B; Encl., GCpi=0.16; MWFRS (envelope); cantilever left and right exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss is not designed to support a ceiling and is not intended for use where aesthetics are a consideration. 3) This truss has been designed for a 10.0 psf bottom chard live load nonconcurrent with any other live loads. 4) Y This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-M wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 104 lb uplift at joint 4, 136 lb uplift at joint 2 and 45 lb uplift at joint 6. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load (a) 77 Ito down and 61 lb up at 1-4-9, 77 lb down and 61 lb up at 1-4-9, 36 lb down and 41 lb up at 4-2-8, 36 lb down and 41 lb up at 4-2-8, and 68 lb down and 91 Ib up at 7-0-7, and 66 lb down and 88 lb up at 7-0-7 on top chord, and 9 lb down and 46 lb up at 1-4-9, 9 lb down and 46lb up at 1-4-9, 21 lb down at 4-2-8, 21 lb down at 4-2-8, and 39 lb down at 7-0-7, and 40 lb down at 7-0-7 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25 , Plate Increase=1.25 Uniform Loads (plf) Vert: 1-4=-60, 5-7=-20 Concentrated Loads (lb) Vert: 12=-84(F=39, B=-45) 13=59(F=30, B=30) 14=-%F=4, B=4)15=-71(F=-32, B=39) Dead Load Deft. =1141n PLATES GRIP MT20 2441190 Weight: 41 lb FT=10% QPbb nYw06Y�+"tiM1-FI PCGi TPV66E6('6ELLFn'/, fiENERAL IEidl6WC6VO,IIOX6CJsiO,AEa(Blryf,rll.6NHpWtEp6VEp6-bm vtirtT Eeepn pvmvbn 6M,W Mesm em Trvv p,pi4YUYp(rW)mOP.e 6 [pY,gE,pY.,s,pYnn®Wwl eYw�m. MYvtllu+b6Y6TOmbl[IO.wd/Ppie we,vfwgCU NYbwOlm pb lGpYM�aIY. evgn ErgwvYp fi.a6�Inry E,gMv). gsuYm�gTW ,epmmum tWogMr+almJor9a�%nrn9��Me�hbNla9^JNw}b Tvm Gh�Y�mIM1eTMwH. wY, iPN.Tn Jri�mwwR�.YrvBMmdOm. v.LE]q W un J,b Txo W erl Patl]NUYs�Na��Y✓ee Ane.0.M,',Mv¢Ngm,wM1B�ifiry �L�.Yv�m.Yl>1F6 WG.0.Rfi.kolYM"R wa e^e TR-I.Tlrvppv++,JWRIG YYYumJM1Tm.vYdp N�fmpM^'^KYobAaM. rvYtrmn9eMb0.,v,snAN/ JM1BY,Cn0�9�m�+]Cmwam.Nmba&p6wMiW WNprv9m�mtl Y�Y^mtl6z 6uiinea^NY�Y6teb Wam6tnl�OWmMef MTR mL68UortM1rtneEbObYrtlW TP6, 4rweMe,e,pas44fuvW GUIY, N M1 Trvn peYpa. 6rya6y Eigvse, eq Tem YMiCmr. w.Y„e6srem 64M h � Cn"RI �T^b ,Sm n YgAi M Y P W � htlM TN BGMeA Env Y NOT Pw B uplYv116nva�abh.MmTR,.CmYr�CA160.1 ax,Tmn�q,µa]¢Ynd6oEvnN.umgbn,Ypp64�C�ipnppe �,'[,m Pwnm FIPwrTwa¢v �'6 �4mwirvw 8ytlen E�qw>vryddSrp.M Job Truss Truss Type WRMSSMBIL J7 �0295917 RQtyPly ee Jb A-1 Roof Trusses, FortPierce, FL 34946, design@altruss.cam Run: 88.210 s 1 May 182018 Pdnt: 8.210 s May 18 2018 MITek Industries, Inc. Fri Oct 18 15:30:23 2019 Page 1 ID:hYCoaQEtYhBIvUGjnCGo4hzcczguR7THdSpoAhVpmxCBzpjNgUmjl cbnGwki?G6HhyS94k I 3x4 = 6.00 F12 LOADING(ps9 SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d TCLL 20.0 Plate Grip DOL 1.25 TC 0.88 Vert(LL) 0.20 3-6 >422 360 TCDL 10.0 Lumber DOL 1.25 BC 0.71 Vert(CT) -0.25 3-0 >333 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.00 Hom(CT) -0.01 2 We n/a BCDL 10.0 Code FBC2017frPI2014 Matrix -MP LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 BRACING- TOPCHORD Structural wood sheathing directly applied or 2-2-0 oc pudins. BOTCHORD Rigid ceiling directly applied or 10-M oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 1 = 278/Mechanical 2 = 185/Mechanical 3 = 93/Mechanical Max Horz 1 = 141(LC 12) Max Uplift 1 = -36(LC 12) 2 = -115(LC 12) Max Grav 1 = 278(LC 1) 2 = 185(LC 1) 3 = 130(LC 3) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=S.Opsf; BCDL=5.Opsf; h=25ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-CExterior(2) zone; cantilever left and right exposed; end vertical left exposed;C-C for members and forces 8 MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 36 Ib uplift at joint 1 and 115 lb uplift at joint 2. LOAD CASE(S) Standard Dead Load Deb. =1/a in PLATES GRIP MT20 244/190 Weight: 22111 FT=10% AmegN/mYwN •/-1 RO]FT{pI6FF6 r6E11FP} GEVJW TFPNSuy CONpiiPJ.16 W 6TO,dFA (9WEPIACMWMFLGNETn•fnm VM/ bgn pseralm sM iu1 ne,um Cm Trvv Mvpi 6nNnp (fOQY vMOw Q $+'-+h Enplmv Mm,mtl®IMae w.V�6,mm�re4e¢1etlmWlOR, mfYgl�.e mnM.vtlm tl,m N,etl bMTW bb M1. 46T miJl�mvru.6rcMry EnylwJ.6�eW to mriOUrepwnen q�muaYMPdwJmtlnV^^e•^d��4e^U�Yb0.'w®^Jbc•9�T+wb1+>bmIM1s1C�W/.uNUTG41.1M deY^�Nm.EWR aNum NPe Tnmtre�I fi+M+V L[V ,nW^��dY✓8w pes,N 0.mtarvNmJapm.ImlM 6vlbq 6e+gm.lntlsmvmlJNIRC. Pa �6C.4N WJry:WeaV TP4.TIs..pmtld0.iW mJmY6��d6+Tw.imLM1y1, �n6tlmM.0.M4iT, s+lbunY W�YbYn.epe4Vy a.u.. M�6mpT �. �m'1T T+qb nn�ixm urM e�.unba�ol�ep Eb�,si�M�EaM�vl �i uCaF Wha'Iimm�aM�.I�M SNPrMYe^P�R✓�'OTM6mibf90.�uPar6�xm Trm sl'/��MEE^Yti�NW� � uMtl�ut b,.a wmb4u0rTtt1.6MrGu0A16F6 Pm1TmwE-Rem=+m�JA66gmw.t haMMTu PdW41 NVCLmaiMM��GN0.1 MCITrvmc Job Truss Truss Type - qry ply WRMSSMBIL L01 Common Supported Gable 1 1 A0295918 Job Reference o tional n-i Roos i msses, ran nerve, rr..weao, aesi9n�aalwss.com Run: tlb.zlu s 1 May 16 201a Ynnt: 821n s May 182018 Mil 4x4 = 21 20 19 18 17 16 15 14 13 12 3x4 = Inc. Fri Oct 1815:30:24 2019 6-6-8 LOADING(psf) SPACING- 2-" CSI. DEFL, in (loc) Udefl L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TO 0.25 Vert(L-) -0.01 11 n/r 90 MT20 2441190 TCDL 10.0 Lumber DOL 1.25 BC 0.04 Vert(CT) -0.02 11 n/r 80 BCLL 0.0 ' Rep Stress Incr YES WB 0.07 Horz(CT) 0.00 12 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matdx-R Wind(L-) 0.01 11 n/r 120 Weight: 91 lb FT = 10% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 OTHERS 2x4 SP No.3 BRACING- TOPCHORD Structural wood sheathing directly applied or 10-0-0 oc puriins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. MITek recommends that Stabilizers and required cross bracing be Installed during truss erection, in accordance with Stabilizer Installation quide. REACTIONS. All bearings 16-6-8. (lb) - Max Harz 21=-113(LC 10) Max Uplift All uplift 100 lb or less at joint(s) 21, 12, 18, 19, 20, 15, 14, 13 Max Grav All reactions 250 lb or less at joint(s) 21, 12, 17, 18, 19, 20, 15, 14, 13 FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. TOP CHORD 2-21=-175/254, 5-6=-104/273, 6-7=-104/273, 10-12=175265 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf; h=25ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left exposed; porch left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 1.5x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcument with any other live loads. 9)' This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100lb uplift at joint(s) 21, 12, 18, 19, 20, 15, 14. 13. LOAD CASE(S) Standard R,sl Obpgl.Y,.ra�0.•Yf FHC TAlI58E8rS1tER}OENfF.LL 1FlU18 NLIX.9rtbiS fl�BIGPEPf9u1'E,rIPfMNM£OGl4M1-Gn.\'eRI�APf+�++.W Mm4m MTrm D�.S R++NRB%MYn f 6YLb eq^e..M1,aoniwl b,mw. WYa cM.lefY,MmMTDD.uhA'i0.ucv,COG:itm 4i buiM4M1T11D bMO.. /u. irts 4v4E�mq F..BT %F1gWQ.MwYtn.MiDDml�e.^Sm aaaClro NBwpt(aevnNwg6mYp.mbmOlu/bW GY6ndM,ag4Troa bpNia,MTDDpq.u�ylgl.l4pgssumWm, Wygwutimq-rvbllry�tlmppa Tnwbwr/@ubfp Yde,ovnaOiydM Mb,B�On�I�m.6,e4a9�1wM8✓\+'9Duq�.:0..ma.Ytl4Y RG On @C. bifv64^YmSwtl RN.TI�,m. vrtltlMTW M'4tlm WMT,w.:WS+q pamF..bR.F�YLeo�W>a•:tlWbM,ayv�y '. a0. FWW0.,4u,rwq Ca4Cv.MmuMa6nFiW NMOTnr �tlpu6W�tl0. Glsq Cm�p�sg6tlNy 9iYmDn®801 We^�hlR�b 53GAwwlwMlbP^etlT^`>b. 1R16M.Ca+wm,Neu�,f ' an:.as.m..o..�.6�ur e.�.....6T...u.wm..w.,.mw..�a,e.veh.ma.6.P..ego.:+av6rac.rs�+maTn.4+=+rEra.�•: rrore.s.un D.,w>r.,m6w+rm�.�a,nu.axau ' vLLLYlmmf e.®a<b.CFTR1 GquJlC'IDI60.1 Rvi Trv,a-Ww6u[9atlTSOmguquglwv�SpMypC�p,nCp�wpnCamym. !-f A`W iasia ' Job Truss Truss Type Oty Ply A0295919 WRMSSMBIL L02 Common 4 1 Job Reference (optional) A-1 Roof Trusses, Fort Pierce, FL 34946, design@albuss.mrn Run: 88.210 s 1 May 18 2018 Print 8.210 s May 18 2018 MTek Industries, Inc. Fri Oct 18 15:30:25 2019 4x6 = Dead Load Defl. =11161n 4x6 11 5x8 = 4x6 II 8-3-0 16-6-8 F% 1 8-34 Plate Offsets (X,Y)— f2:0-2-12,0-1-81,I4:0-2-12,0-1-81,16:Edoe,0-3-81.(7:0-",0-3-01 LOADING(psf) SPACING- 2-M CSI. DEFL in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.86 Vert(L-) 0.23 7-8 >830 360 MT20 244/190 TCDL 10.0 Lumber DOL 1.25 BC 0.70 Vert(CT) 0.19 7-8 >999 240 BCLL 0.0 Rep Stress Incr YES WB 0.35 Hom(CT) -0.01 6 n/a We BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Weight: 90 lb FT =10% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 *Except* Wl: 2x4 SP No.2 BRACING- TOPCHORD Structural wood sheathing directly applied or 4-11-11 oc purlins, except end verticals. BOTCHORD Rigid ceiling directly applied or 6-10-14 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (Ib/size) 8 = 746/0-7-4 (min. 0-1-8) 6 = 746/0-7-4 (min. 0-1-8) Max Horz 8 = -113(LC 10) Max Uplift 8 = -253(LC 8) 6 = -274(LC 8) Max Grav 8 = 746(LC 1) 6 = 746(LC 1) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-756/1079, 3-4=-756/1080, 2-8=-674/903,4-6=-674/904 BOT CHORD 7-8=-513/363, 6-7=524/363 WEBS 3-7=-541/308, 2-7=275/306, 4-7=-264/306 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=5.Opsf; h=25ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Extedor(2) zone;.can8lever left and right exposed ; end vertical left exposed; porch left exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonooncument with any other live loads. 4) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100lb uplift at joint(s) except Ct--lb) 6=253, 6=274. LOAD CASE(S) Standard Qpea TcaiM'mM N'M1I RWGTRI6BEE CSE46[? GEnFRFLTFAY6etl WfMiRWS W610YER R6rFn'J RfixNMNlvm YMYtr T Ge�u�eYn W wtl MssmAe:,m D,.T OnMY{m�) W N ��q��Mmm Yal bhm m.11nM eAiwYW mNmO. wfTgptN pnvYupl4n M.O4uM IONTW 4m6 NeTvn Dupe EnpuuMp Q...6pWryF ymv). PeWmmrmOm�9m� 0.e®.N0.esM1 Wlrmu gNmNSVU*V �Tm�a�mME,�dYV WC.0�1�eG, WICu1PoV evle NlW Wl.uNr R41.Tn CaS�mM4�.NT^]amSPee.vuTAlflerlwd WTw fam�I9+L°VSM M%JN I. T4.p.erl a u. mo.,e..4n,s a N r,,,r,:wmg 6>�✓�v..�.ce..=m.m..,e o-®.e »w b�°`a.,.+v�r aN amno».ew.wcae.w. ra mn.nmm NTwwN1..�..amae.i...aNe„w�cen��.v6e.Ir Maw.ne.tauawnm.aerlp..a6�,..,w.,.bel..6..wno,ae.�. Tci-I e.x�..N re.aim�e aW.tlCmirvn Mtlpv. �Tm uwA+mne.wY.. ciao. trmwb.6ohvaw^ol�m batlp Ei apvfobeNr.iT46{cIc!a'Enp6esNOT A.OUYbq OeegwmTrvp SYelm LVm Mvry OuYSp. w pyYu�l4nromn4lvwENTW1. GgnyNOAt60.1 e1 W Trim.-FWrcbvYnpp66amp.1, nmr dnA upglieCKwlYv vEtm Amt,MgAI pm/Trvuu Job ms 7mu Truss Type pry Ply WRM5SMBIL Valley 1 A0295920 Job Reference (optional) n-1 xooi i russes, Tort Tierce, rL J9 b, cesigntmaltruss.com Run: 66.2113 s 1 May 182018 Print 8.210 s May 18 2018 MiTek Industries, Inc. Fri Oct 18 15:30:26 2019 Pagel 3- ID:hYCoaQEtYhBlvUGjnCGo4hzcczg-JOgcvtVi4543gEgnt5NQ9J6UnEn2_dfAOyUmt0yS94h 2-0-0 4-0-0 2-0-0 2-M Y 00 2x4 G 6.00 12 2 3x4 = 2x4 1 LOADING(psf) SPACING- 2-M CSI. DEFL. in (loc) I/deg Ud TCLL 20.0 Plate Grip DOL 1.25 TC 0.06 Vert(LL) We - n/a 999 TCDL 10.0 Lumber DOL 1.25 BC 0.09 Vert(CT) We - We 999 BCLL 0.0 ' Rep Stress [nor YES WB 0.00 Horz(CT) 0.00 3 We We BCDL 10.0 Code FBC2017/TP12014 Matrix-P LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 BRACING- TOPCHORD Structural wood sheathing directly applied or 4-0-0 oc purlins. BOTCHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be Installed during truss erection, in accordance with Stabilizer Installation quide. REACTIONS. (lb/size) 1 = 11013-11-0 (min. 0-1-8) 3 = 110/3-11-0 (min. 0-1-8) Max Horz 1 = 11(LC 11) Max Uplift 1 = -22(LC 12) 3 = -22(LC 13) Max Grav 1 = 110(LC 1) 3 = 110(LC 1) FORCES. (Ib) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=S.Opsf, h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Exterior(2) zone; cantilever left and right exposed; end vertical left exposed;C-C for members and forces 8 MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 pat bottom chord live load nonconcument with any other live loads. 5)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-M wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 Ib uplift at joint(s) 1, 3. LOAD CASE(S) Standard PLATES GRIP MT20 2441190 Weight: 10 lb FT=10% Qw..wwv v».�..v.•cl noaanwssas REuEx4 c.Eeeuv,E��u.aca+wmis maroe�u ro�+��xn�av�Ex.x*mam.v...•+r�r+��...u,w w.. e, e..Tp.amo'.�anoorwm. I, ! 4��iYEMnwrt4�wo Nxlbla�w VntrnaMMf�RtlMm MI -.A. Y<'Xvu-neoviMla eN9 b,nMMMiW bbeYt. NeTrvss�Fage�Fi 4a.ETa+b ENFv4.M Wm WltYl m,>eanMn m4'rodW1�FF�>nm'e+0^+w+V'wvw�FllvOa YMTWM�+4b Than@PcbfmMRW N:w1rTR1.1M>W^Nv^R�.FF�M�v«''Fv.F�tY m1uNMMivUly�^rdIN^OYFv�mP^'At-JMT Aiv,MMti�oNOXaN Mav0a9'+1' VV�P�.Fha6Ydla GSMNl.bmibil4Y miWRH.lb�.v��v4wlODeq M4pus NRa Trvss.veLrtwll+alnY.WM.Yuuyana4✓si9�W bvw.�yu+NC/ �. Oa@Ab9O�b�v¢tl CeMCv.Nov�aFW nP�TVDay0.ROHN wbiN�0.+vOw 9u>A Vv�wa�l[+4V e�bnMv, lB6dI Wv�N�]T'lFYN6Y.Fo�rt,wM10rP^va PYa�t. TK1 trav�TmwYu[MM ' JI'a�dA tan OF9�.4'�aYE^GvvalTwn Yvr/v9rv.v.La oaA N�OC/�Gv.449�Yv�Far=MllgVa�Yw6.a1.TN6W'+43 �`+9N'u NOib I [%!a6-M,mm�wumYifFIPN.[N NO3M6.T.I FaJiv�u-fLeMUOw �IIn MwMFVOI'mr.Y ..1L+b1aINMSarN�Tvum�pN(tmli�e� �Va9�viw tl+�^E^P�KM'v�9 N i, Job Truss Truss Type Oty Ply WRMSSMBIL V08 Valley 1 s0295921 1 re Job Refence o tional A-1 Roof Trusses, Fort Pierce, FL 34946, design@altmss.com Run: 88.210 s 1 May 182018 Print 8.210 s May 18 2018 Milrek Industries, Inc. Fri Oct 1815:30:27 2019 Page 1 ID:hYCoaOEtYhBIvUGjnCGo4hzcczg-nCE_6?VKrPCwHNFzOpurAW eb9e?Bj4vJdcEJOSe94g 6.00 r 12 2x4 3.4 = 2 2x4 1 LOADING(psf) SPACING- 2-0-0 Cat. DEFL. in (Too) Well Ltd TCLL 20.0 Plate Grip DOL 1.25 TC 0.27 Vert(LL) n/a - n/a 999 TCDL 10.0 Lumber DOL 1.25 BC 0.61 Vert(CT) n/a - rue 999 BCLL 0.0 Rep Stress Incr YES WE 0.00 Horz(CT) 0.00 3 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix-P LUMBER - TOP CHORD 2x4 SIP No.2 BOT CHORD 2x4 SP No.2 BRACING- TOPCHORD Structural wood sheathing directly applied or 6-0-0 oc pudins. BOTCHORD Rigid ceiling directly, applied or 104)-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 1 = 270f7-11-0 (min. 0-1-8) 3 = 27017-11-0 (min. 0-1-8) Max Horz 1 = 28(LC 9) Max Uplift 1 = -54(LC 12) 3 = -54(LC 13) Max Gmv 1 = 270(LC 1) 3 = 270(LC 1) FORCES. (lb) Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. TOPCHORD 1-2=-2621271, 2-3=-262/271 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=5.Opsf; BCDL=S.Opsf; h=25ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (envelope) and C-C Extedor(2) zone; cantilever left and right exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) `This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-" wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 It, uplift at joint(s)1, 3. .LOAD CASE(S) Standard 3 PLATES GRIP MT20 244/190 Weight: 231b FT=10% QV OwaOv/nrw On-PA(iGCFTW$fiE8{9ELLER�.6EII1:S/C TFFYB vtl CQ:pl/J26A15fCYCM ITV✓r�iiLglry.52EIXAhlli-Sm.YM'm9�0�v�WMnoMmCn Trm hfg OnnN(�6�leNM 6T+%b£egma�M�iwo eMtlRla�w YJevaCn,vpY.NCmMIW.�M'Mvv�*'mc#rLmm WlbutltrOn iMbbNl. Y�iwn OrnF rnFv�^i4�. 6ia4rnPA�l.MwtlmM'TOOvi+m'�n C+G's¢nbYi�PWv4w>�Gn+�M1bOn G�i^MM VG4T�mbPblonlwTW u�M. v.YRF1.TMMW4�e.ru%^9 ' eu' IEYelmgfw ivnN�^i9'yni4fv,vym�'utJ�9v Onv.4n0.�Ntmsv+iM4maa0.&at: Dsa'Pn.FWm64ciM RGW R4lVtv6.4^YeW�a,ITW,.TIv4Pw+�NXn TMYmdimYy6tlwJOnTw.h1.�64 Nb6nY.MVV.ivW�n WtM9�MYM1Psnamablb dM Bd1NOmVue Rd Gn�uc,v.R/RSM OA.nev AOv9Mpa9aaampuSlNmyryGUA4+d�%onm.¢M Web m¢nuPm.(65GpmCNHCyiA WSX'Aw2MVMbW'^�ti0umno- TR, bR�niwnwa'+�"m�nb OM�MN2rvxa O+STn.EPaiiVE^V�mSi,m Y�JWv,m4v M�a biny Ll�GmtrN R��Vm a,�r2^YhtlVMb2nCMi1�6V�iE^J^v'iNW>fv6,iM'9 r�9�eivy 6l+m^T^P+�tiv,I�N DY [miYalln'imanm<otra1ATPL1.4OI�'N6AI6 A..I WCITmwv-R®faCnndMOm+nnthMMRumMt nPM]nsuS+,imrmmolFlRMie,®a. ,DUNE 20, 2019 TYPICAL HIP / KING JACK CONNECTION I STDTL01 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34W 772-409-1010 CORNERSET GENERAL SPECIFICATIONS MAX LOAD: 55 psf Roof Load, 175 mph, ASCE 7-10, Exp. B, C up to 60' Mean Roof Height and Exposure D up to 30' Mean Roof Height. Attach End Jack's w/ (4) 16d Toe Nails @ TC & (3) 1.6d Toe Nails @ BC Attach King Jack w/ (3) 16d Toe ,Nails @ TC & BC 0 ttach Corner Jack's 4 (2) 16d Toe Nails @ TC & BC (Typ) Attach Corner Jack's w/ (2) 16d Toe Nails @.TC & BC (Typ) FEBRUARY 17, 2017 1 ALTERNATE GABLE END BRACING DETAIL 1 STDTL03 A-/ ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34W 772>09-1070 ALTERNATE DIAGONAL BRACING TO THE BOTTOM CHORD 1' - 3' MAX. DIAL. BRACE AT 1/3 POINTS IF NEEDED IT IS THE RESPONSIBILITY OF THE BLOG. DESIGNER OR THE PROJECT ENGINEER/ARCHITECT TO DESIGN THE CEILING DIAPHRAGM AND ITS ATTACHMENT TO THE TRUSSES TO RESIST ALL OUT OF PLANE LOADS THAT MAY RESULT FROM THE BRACING OF THE GABLE ENDS. HORIZONTAL BRACE (SEE SECTION A -A) TRUSSSES @ ENO WALL 2X6 1 D.C. A (4) - NAIL DIAGONAL BRACE TO PURLIN WITH TWO l6d NAILS. 2X4 PURLIN FASTENED TO FOUR TRUSSES WITH (2) - 16d NAILS EACH. FASTEN PURLIN TO BLOCKING V/ (2) - 16d NAILS (MIN.). PROVIDE 2X4 BLOCKING BETWEEN THE TRUSSES SUPPORTING THE BRACE AND THE TWO TRUSSES ON EITHER SIDE AS NOTED. TOENAIL BLOCKING TO TRUSSES WITH (2) - 10d NAILS AT EACH ENO. ATTACH DIAGONAL BRACE TO BLOCKING WITH (5) - 10d COMMON WIRE NAILS. CEILING SHEATHING BRACING REQUIREMENTS FOR STRUCTURAL GABLE TRUSSES STRUCTURAL GABLE TRUSSES MAY BE BRACED AS NOTED: METHOD 1: ATTACH A MATCHING GABLE TRUSS TO THE INSIDE FACE OF THE STRUCTURAL GABLE AND FASTEN PER THE FOLLOWING NAIL SCHEDULE. METHOD 2: ATTACH 2X_ SCABS TO THE FACE OF EACH VERTICAL MEMBER ON THE STRUCTURAL GABLE PER THE FOLLOWING NAILING SCHEDULE. SCABS ARE TO BE OF THE SAME SCAB ALONG SIZE, GRADE, AND SPECIES AS THE TRUSS VERTICALS. VERTICAL NAILING SCHEDULE: - FOR VINO SPEEDS 120 MPH (ASCE 7-98, 02, 05), 150 MPH (ASCE 7-10) OR LESS, NAIL ALL MEMBERS WITH ONE ROW OF 10d (131' X 3') NAILS SPACED S' O.C. - FOR WIND SPEEDS GREATER 120 MPH (ASCE 7-9B, 02, 05), 150 MPH (ASCE 7-10) NAIL ALL MEMBERS WITH TWO ROWS OF IOd (131'X3') NAILS SPACED S' D.C. (2X4 STUDS MINIMUM). STRUCTURAL GABLE TRUS! MAXIMUM STUD LENGTHS ARE LISTED ON PAGE 1. ALI BRACING METHODS SHOWN ON PAGE'1 ARE VALID AND ARE TO BE FASTENED TO THE SCABS OR VERTICAL STUDS OF THE STANDARD GABLE TRUSS ON THE INTERIOR SIDE OF THE STRUCTURE. NOTE: THIS DETAIL IS TO BE USED ONLY FOR/ STRUCTURAL GABLES WITH INLAYED STUDS. TRUSSES WITHOUT INLAYED STUDS ARE NOT ADDRESSED HERE. STANDARD GABLE I TRUSS UKAL TRUSS ;TI In AN AOEOUATE DIAPHRAGM OR OTHER METHOD OF BRACING MUST BE PRESENT TO PROVIDE FULL LATERAL SUPPORT OF THE BOTTOM CHORD TO RESIST ALL OUT OF PLANE LOADS. THE BRACING SHOWN IN THIS DETAIL IS FOR VERTICAL/STUDS ONLY. 1ULY 17, 2017 STANDARD PIGGYBACK TRUSS /mil KIKII ^P I/ Kl MST.,, 1 STDTL04 THIS DETAIL IS APPLICABLE FOR THE FOLLOWING WIND CONDITIONS: ASCE 7-98, ASCE 7-02, ASCE 7-05, ASCE 7-10 WIND STANDARDS UNDER ALL ENCLOSURE AND EXPOSURE CONDITIONS AS LONG AS NO UPLIFT EXCEEDS 377 LBS. REFER TO ACTUAL PIGGYBACK TRUSS DESIGN DRAWING FOR UPLIFTS. NOTE: THIS DETAIL IS VALID FOR ONE PLY TRUSSES SPACED 24' O.C. OR LESS.. A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 PIGGYBACK TRUSS REFER TO ACTUAL TRUSS DESIGN DRAWING FOR ADDITIONAL PIGGYBACK TRUSS INFORMATION. SPACE PURLINS ACCORDING TO THE MAXIMUM SPACING ON THE TOP CHORD OF THE BASE TRUSS (SPACING NOT TO EXCEED 24' D.C.) A PURLIN TO BE LOCATED AT EACH BASE TRUSS JOINT. ATTACH PIGGYBACK TRUSS TO THE BASE TRUSS WITH 2' X 8' TEE -LOCK MULTI -USE CONNECTION PLATES SPACED 48' O.C. PLATES SHALL BE PRESSED INTO THE PIGGYBACK TRUSS AT 48' O.C. STAGGERED FROM EACH FACE AND NAILED TO THE BASE TRUSS WITH FOUR (4) 6d (1.5' X 0.099') NAILS IN EACH PLATE TO ACHIEVE A MAXIMUM UPLIFT CAPACITY OF 377 LBS. AT EACH 2' X W TEE -LOCK MULTI -USE CONNECTION PLATE. (MINIMUM OF 2 PLATES) ATTACH EACH PURLIN TO THE TOP CHORD OF THE BASE TRUSS. (PURLINS AND CONNECTION BY OTHERS) BASE TRUSS REFER TO ACTUAL TRUSS DESIGN DRAWING FOR ADDITIONAL BASE TRUSS INFORMATION. JULY 17, 2017 1 TRUSSED VALLEY SET DETAIL - SHEATHED 1 STDTL05 - A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34M 772<09-1010 VALLEYTRUSS (TYPICAL) SECURE VALLEY TRUSS W/ ONE ROW OF 10d NAILS 6" O.C. GABLE END, COMMON TRUSS, OR GIRDER TRUSS P 12 SEE DETAIL'A' BELOW (TYP.) GENERAL SPECIFICATIONS: 1. NAIL SIZE=3'X0.131'=10d 2 WOOD SCREW = 4.5' WS45 USP OR EQUIVALENT. 3. INSTALL SHEATHING TO TOP CHORD OF BASE TRUSSES. 4. INSTALL VALLEY TRUSSES (24- O.C. MAXIMUM) AND SECURE TO BASE TRUSSES AS PER DETAIL'A". 5. BRACE VALLEY WEBS IN ACCORDANCE WITH THE 6. NAILING DONE PER NDS-01. 7. VALLEY STUD SPACING NOT TO EXCEED 48'O.C. BASETRUSSES VALLEY TRUSS (TYPICAL) ATTACH 2X4 CONTINUOUS #2 SYP TO THE ROOF W/ TWO USP WS45 (1/4' X4.5') WOOD SCREWS INTO EACH BASE TRUSS. TRUSS CRITERIA: GABLE END, COMMON TRUSS, OR GIRDER TRUSS WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH WIND DESIGN PER ASCE 7-10: 170 MPH MAX MEAN ROOF HEIGHT = 30 FEET ROOF PITCH = MINIMUM 3112 MAXIMUM 6112 CATERGORY II BUILDING EXPOSURE WIND DURATION OF LOAD INCREASE: 1.60 MAX TOP CHORD TOTAL LOAD = 50 PSF MAX SPACING = 24' O.C. (BASE AND VALLEY) MINIMUM REDUCED DEAD LOAD OF 6 PSF ON THE TRUSSES. FEBIRUARY 5, 2018 I TRUSSED VALLEY SET DETAIL I STDTL06 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 VALLEY TRUSS (TYPICAL) SECURE VALLEY TRUSS W/ ONE ROW OF 10d NAILS 6' O.C. GABLE END, COMMON TRUSS, OR GIRDER TRUSS DETAIL A (NO SHEATHING) N.T.S. GENERAL SPECIFICATIONS: 1. NAIL SIZE =3'X 0.131'=10d 2. WOOD SCREW = 3' WS3 USP OR EQUIVALENT. 3. INSTALL VALLEY TRUSSES (24- O.C. MAXIMUM) AND SECURE PER DETAIL 'A' 4. BRACE VALLEY WEBS IN ACCORDANCE WITH THE INDIVIUAL DESIGN DRAWINGS. S. BASE TRUSS SHALL BE DESIGNED WITH A PURLIN SPACING EQUIVALENT TO THE RAKE DIMENSION OF THE VALLEY TRUSS SPACING. 6. NAILING DONE PER NOS -01. 7. VALLEY STUD SPACING NOT TO EXCEED 48' O.C. P 12 SEE DETAIL'A' BELOW (TYP.) BASETRUSSES GABLE END, COMMON TRUSS, OR GIRDER VALLEY TRUSS TRUSS (TYPICAL) - WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH WIND DESIGN PER ASCE 7-10: 170 MPH MAX MEAN ROOF HEIGHT = 30 FEET ROOF PITCH = MINIMUM 3/12 MAXIMUM 6112 CATERGORY II BUILDING EXPOSURE WIND DURATION OF LOAD INCREASE: 1.60 ATTACH 2X4 CONTINUOUS #2 MAX TOP CHORD TOTAL LOAD = 50 PSF SYP TO THE ROOF W/TWO USP MAX SPACING= 24' O.C.(BASE AND VALLEY) WS3 (1/4' X 3-) WOOD SCREWS MINIMUM REDUCED DEAD LOAD OF 6 PSF ON THE TRUSSES. INTO EACH BASE TRUSS. JULY 17, 2017 I (HIGH WIND VELOCITY) I STDTL07 - A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE. FL 34946 772409-1010 ATTACH VALLEY TRUSSES TO LOWER TRUSSES WITH USP RT7 OR EQUIVALENT. WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH WIND DESIGN. PER ASCE 7-10: 170 MPH MAX MEAN ROOF HEIGHT 30 FEET CATERGORY II BUILDING EXPOSURE B OR C WIND DURATION OF LOAD INCREASE: 1.60 MAX TOP CHORD TOTAL LOAD = 50 PSF MAX SPACING = 24' O.C. (BASE AND VALLEY) SUPPORTING TRUSSES DIRECTLY UNDER VALLEY TRUSSES MUST BE DESIGNED WITH A MAXIMUM UNBRACED LENGTH OF 2'- 10' ON AFFECTED TOP CHORDS. NOTES: 1. SHEATHING APPLIED AFTER INSTALLATION OF VALLEY TRUSSES. 2. THIS DETAIL IS NOT APPLICABLE FOR SPF-S SPECIES LUMBER. NON -BEVELED BOTTOM CHORD FOR BEVELED BOTTOM CHORD, CLIP MAY BE APPLIED TO EITHER FACE. NOTE: VALLEY STUD SPACING NOT TO y �' EXCEED 48' O.C. SPACING. CLIP MAY BE APPLIED TO THIS FACE UP TO A MAXIMUM 6112 PITCH NON -BEVELED BOTTOM CHORD CLIP MUST BE APPLIED TO THIS FACE WHEN PITCH EXCEEDS 6112 (MAXIMUM 12/12 PITCH) FEBRUARY 17, 2017 1 STANDARD GABLE END DETAIL I STDTL08 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 TYPICAL 2X4 L-BRACE NAILED TO 2X4 VERTICALS W/10d NAILS, 6' O.C. VERI STUD SECTION B-B TRUSS GEOMETRY AND CONDITIONS SHOWN ARE FOR ILLUSTRATION ONLY. VERTICAL 2X6 SP OR SPF STUDVBRACE 02 DIAGONAL BRACE (4) - 16d NAILS16d NAILS SPACED 6' O.C. (2) IOd NAILS INTO 2X62X6 SP OR SPF #2 2X4 SP OR SPF #2L HORIZONTAL NAILED TO RTICALS SECTION A -A W/(4) - Uld NAILS DIAGONAL BRACE 4' - 0' D.C. MAX. SEE INDIVIDUAL ENGINEERING DRAWINGS FOR TRUSSDESIGN CRITERIA. 12 PROVIDE 2X4 BLOCKING BETWEEN Q VARIES TO COMMON TRUSS THE FIRST TWO TRUSSES AS NOTED. TOENAIL BLOCKING TO TRUSSES * WITH (2) - 10d NAILS AT EACH ENO. ATTACH DIAGONAL BRACE TO BLOCKING WITH (5) - 10d NAILS (4) Bd NAILS MINIMUM, B 3X4= PLYWOOD SHEATHING TO 2X4 STO SPF BLOCK v * DIAGONAL BRACING ** L - BRACING REFER REFER TO SECTION A -A TO SECTION B-B 24' MAX. / 1DT.MINIMUM GRADE OF #2 MATERIAL IN THE TOP AND BOTTOM CHORDS. 2. CONNECTION BETWEEN BOTTOM CHORD OF GABLE ENO TRUSS AND WALL TO 12' MAX. BE PROVIDED BY PROJECT ENGINEER OR ARCHITECT. 3. BRACING SHOWN IS FOR INDIVIDUAL TRUSS ONLY. CONSULT BLDG. -- ARCHITECT OR ENGINEER FOR TEMPORARY AND PERMANENT BRACING OF ROOF - SYSTEM. 4. 'L' BRACES SPECIFIED ARE TO BE FULL LENGTH, SPF OR SP #3 OR BETTER WITH ONE ROW OF 10d NAILS SPACED 6' O.C. 5. DIAGONAL BRACE TO BE APPROXIMATELY 45 DEGREES TO ROOF DIAPHRAGM / AT 4'-0' O.C. 6. CONSTRUCT HORIZONTAL BRACE CONNECTING A 2X6 AND A 2X4 AS SHOWN WITH 16d NAILS SPACED G' D.C. HORIZONTAL BRACE TO BE LOCATED AT THE MIDEPAN OF THE LONGEST GABLE STUD. ATTACH TO VERTICAL GABLE STUDS WITH (3) IOd NAILS THROUGH 2X4 (REFER TO SECTION A -A) - 7. GABLE STUD DEFLECTION MEETS OR EXCEEEDS L/240. - DIAG. BRACE B. THIS DETAIL ODES NOT APPLY TO STRUCTURAL GABLES. AT 1/3 POINTS S. DO NOT USE FLAT BOTTOM CHORD GABLES NEXT TO SCISSOR TYPE IF NEEDED TRUSSES. 10. 10d AND 16d NAILS ARE 0131'X3A' AND 0131'X3.5' COMMON WIRE NAILS RESPECTIVELY. 11. SOUTHERN PINE LUMBER DESIGN VALUES ARE THOSE EFFECTIVE 06-01-12 BY SPIB/ALSC. MINIMUM STUD SIZE SPECIES AND GRADE STUD SPACING WITHOUT BRACE 2X4 L - BRACE DIAGONAL BRACE (2) DIAGONAL BRACES AT 1/3 POINTS MAXIMUM STUD LENGTH 2x48P#VSTUD 12'0.C. 3-8-10 5&11 6-6-11 11-1-13 2x4SP#31STUD 16'0.C. 3-3-10 4-9-12 6-6-11 9-10-15 2x4SP43ISTUD 24'O.C. 2-8-6 3-11-3 54-12 8-1-2 2X4SP*2 12'0.C. 3-10-15 5-6-11 6Fr11 11-8-14 2x4 SP42 16'0.C. 3-G11 4-9.12 6-6mll 10-8-0 2X4 SPE 24'O.C. 3.1-4 3-11-3 6.2-9 9-3-13 DIAGONAL BRACES OVER 6' - 3' REQUIRE A 2X4 T-BRACE ATTACHED TO ONE EDGE. DIAGONAL BRACES OVER 12' - 6' REQUIRE 2X4 I -BRACES ATTACHED TO BOTH EDGES. FASTEN T AND I BRACES TO NARROW EDGE OF DIAGONAL BRACE WITH 10d NAILS 6' O.C., WITH 3' MINIMUM END DISTANCE. BRACE MUST COVER 90% OF DIAGONAL LENGTH. T OR I BRACES MUST BE 2X4 SPF #2 OR SP #2. ROOF SHEATHING (2) - 10d NAILS TRUSSES @ 24' O.C. 2X6 DIAGONAL BRACE SPACED 48' D.C. ATTACHED TO VERTICAL WITH C4) - 16d NAILS, AND ATTACHED TO BLOCKING WITH (5) - 10d NAILS. HORIZONTAL BRACE (SEE SECTION A -A) END WALL IS BASED ON COMPONENTS AND CLADDING. OF BRACING IS BASED ON MWFRS. FEBRUARY 17, 2017 LATERAL BRACING RECOMMENDATIONS I STDTLIO A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34M 772-0D94010 TO MINIMIZE VIBRATION COMMON TO ALL SHALLOW FRAMINGSYSTEMS, 2X6 'STRONGBACK' IS RECOMMENDED, LOCATED EVERY 8 TO 10 FEET ALONG A FLOOR TRUSS. NOTE 1: 2X6 STRONGBACK ORIENTED VERTICALLY MAY BE POSITIONED DIRECTLY UNDER THE TOP CHORD OR DIRECTLY ABOVE THE BOTTOM CHORD, SECURELY FASTENED TO THE TRUSS USING ANY OF THE METHODS ILLUSTRATED BELOW. NOTE 2: STRONGBACK BRACING ALSO SATISFIES THE LATERAL BRACING REQUIREMENTS FOR THE BOTTOM CHORD OF THE TRUSS WHEN IT IS PLACED ON TOP OF THE BOTTOM CHORD, IS CONTINUOUS FROM ENO TO END, CONNECTED WITH A METHOD OTHER THAN METAL FRAMING ANCHOR, AND PROPERLY CONNECTED, BY OTHERS, AT THE ENDS. USE METAL FRAMING ANCHOR TO ATTACH TO TOP CHORD INSERT WOOD SCREW THROUGH OUTSIDE FACE OF CHORD INTO EDGE OF STRONGBACK (DO NOT ATTACH TO -VERTICAL CC ATTACH TO VERTICAL USE DRYWALL TYPE SCREWS) Ell WITH \ NAILS (013131d X 3')\ NAILS SCAB tITH 3d 0.131'X 3')�ATTACH TO VERTICAL WEB WITH C3) - 10d NAILS (0131' X 3') P65is •• 1 1 h .•II �1* m BLOCKING BEHIND THE VERTICAL WEB IS RECOMMENDED WHILE NAILING THE STRONGBACK USE METAL FRAMING ATTACH TO VERTICAL ANCHOR TO ATTACH WEB WITH (3) - 10d TO BOTTOM CHORD NAILS (0131' X 7) ATTACH 2X4 VERTICAL TO FACE OF TRUSS. FASTEN TO TOP AND BOTTOM CHORD WITH (2) - 10d NAILS (0131' X 3') IN EACH CHORD , ATTACH TO CHORD WITH (2) #12 X 3' WOOD SCREWS (0.216' DIAJ ATTACH TO VERTICAL )-INSERT SCREW THROUGH. SCAB WITH (3) - IDd OUTSIDE FACE OF 'CHORD INTO NAILS (0131' X 39 EDGE OF STRONGBACK (00 NOT USE DRYWALL TYPE SCREWS) TRUSS 2X6 4' - O' WALL STRONGBACK r (TYPICAL SPLICE) � (BY OTHERS) THE STRONGBACKS SHALL BE SECURED AT THEIR ENDS TO AN ADEQUATE SUPPORT, DESIGNED BY OTHERS. IF SPLICING IS NECESSARY, USE A 4' - 0' LONG SCAB CENTERED ON THE SPLICE AND JOINED WITH (12) - 10d NAILS (0131' X 3') EQUALLY SPACED. ALTERNATE METHOD OF SPLICING: OVERLAP STRONGBACK MEMBERS A MINIMUM OF 4' - 0' AND FASTEN WITH (12) - 10d NAILS C0131' X 7) STAGGERED AND EQUALLY SPACED (TO BE USED ONLY WHEN STRONGBACK IS NOT ALIGNED WITH A VERTICAL). BLOCKING (BY OTHERS) FEBRUARY17,2017 LATERAL TOE -NAIL DETAIL STDTL11 e. u A-1 ROOF TRUSSES 4461 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772409-1010 NOTES: 1. TOE -NAILS SHALL BE DRIVEN AT AN ANGLE OF 45• WITH THE MEMBER AND MUST HAVE FULL WOOD SUPPORT (NAIL MUST BE DRIVEN -THROUGH-AND-EXIT AT -THE -BACK -CORNER -OF THE -MEMBER -ENO -AS SHOWN). 2. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 3. ALLOWABLE VALUE SHALL BE THE LESSER VALUE OF THE TWO SPECIES FOR MEMBERS OF DIFFERENT SPECIES. TOE -NAIL SINGLE SHEAR VALUES PER NOS 2001 (LB/NAIL) DIA SP OF HF SPF SPF-S .131 88.0 80.6 69.9 68.4 59.7 o .135 93.5 85.6 74.2 72.6 63.4 J in .162 108.8 99.6 86.4 84.5 73.8 ri .128 74.2 67.9 58.9 57.6 50.3 co g .131 75.9 69.5 60.3 59.0 51.1 r .148 81.4 74.5 64.6 63.2 52.5 ri VALUES SHOWN ARE CAPACITY PER TOE -NAIL. APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED. EXAMPLE: (3) - 16d NAILS (0162' OIA. X 35') WITH SPF SPECIES BOTTOM CHORD FOR LOAD DURATION INCREASE OF 115: 3 (NAILS) X B45 (LB/NAIL) X 1.15 (OOL) = 2915 LB MAXIMUM CAPACITY ANGLE MAY VARY FROM 30' TO 60' 45.00' ANGLE MAY VARY FROM 30' TO 60' THIS DETAIL IS ONLY APPLICABLE TO THE THREE END DETAILS SHOWN BELOW. VIEWS SHOWN ARE FOR ILLUSTRATION PURPOSES ONLY. SIDE VIEW (20) 2 NAILS NEAR SIDE FVT- NEAR SIDE SIDE VIEW (2X4) 3 NAILS FVFNEAR SIDE NEAR SIDE NEAR SIDE 45.00° SIDE VIEW (2X3) 2 NAILS NEAR SIDE NEAR SIDE NEAR SIDE NEAR SIDE ANGLE MAY VARY FROM 30' TO GO' 45.000 FEBRUARY17,2017 I UPLIFT TOE -NAIL DETAIL I STDTL12 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 THIS DETAIL SHALL BE USED FOR A CONNECTION RESISITING UPLIFT FORCES ONLY. BUILDING DESIGNER IS RESPONSIBLE FOR LOADS IN OTHER DIRECTIONS. TOE -NAIL WITHDRAWAL VALUES PER NOS 2005 (LB/NAIL) DIA. SP OF HF SPF SPF-S L7 .131 59 46 32 30 20 O J .135 60 48 33 30 20 U7 (T7 .162 72 58 39 37 25 J 2' 0 .128 54 42 28 27 19 Z Z .131 55 43 29 28 19 LU .148 62 48 34 31 21 J J N Q M Z .120 51 39 27 26 17 CD Z .1211 49 38 26 25 17 O .131 51 39 27 26 17 .148 57 44 31 28 20 M NUTES: 1. TOE -NAILS SHALL BE DRIVEN AT AN ANGLE OF 30° WITH THE MEMBER AND STARTED 1/3 THE LENGTH OF THE NAIL FROM THE MEMBER ENO AS SHOWN. 2. THE ENO DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 3. ALLOWABLE VALUE SHALL BE BASED ON THE SPECIE WITH LOWER NAIL CAPACITY BETWEEN THE TWO MEMBERS IN THE CONNECTION. VALUES SHOWN ARE CAPACITY PER TOE -NAIL. APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED. , EXAMPLE: (3) - 16d NAILS (0162' DIA. X. 3.5') WITH SPF SPECIES TOP PLATE FOR WINO OOL OF 133: 3 (NAILS) X 37 (LB/NAIL) X 133 COOL FOR WINO) = 148 LB MAXIMUM ALLOWABLE UPLIFT REACTION DUE TO WINO FOR WINO DOL OF 1.60: 3 (NAILS) X 37 (LB/NAIL) X 1.60 (OOL FOR WINO) = 177 LB MAXIMUM ALLOWABLE UPLIFT REACTION DUE TO WINO IF THE UPLIFT REACTION SPECIFIED ON THE TRUSS DESIGN DRAWING EXCEEDS 147 LBS (177 LBS) BUILDING DESIGNER IS RESPONSIBLE TO SPECIFY A DIFFERENT CONNECTION. *a* USE (3) TOE -NAILS ON 2X4 BEARING WALL *to USE (4) TOE -NAILS ON 2X6 BEARING WALL NEAR SIDE FAR Si IE TOP PLATE OF WALL VIEWS SHOWN ARE FOR ILLUSTRATION PURPOSES ONLY L NAIL NAIL SIDE VIEW END VIEW FEBRUARY 5, 2016 TYP 2x2 NAILER ATTACHMENT STDTLI3 R 2x2 NAILER ATTACHMENT - GENERAL SPECIFICATIONS A-1 ROOF TRUSSES FORT PIERCE,IFL 34946 MAX LOAD: 55 psf Roof Load, 170 mph, ASCE n2.409-1010 7-10, 291-0" Mean Height, Exp. B, C or D. 1.0X4 April 11, 2016 TYPICAL ALTERNATE BRACING DETAIL STDTL14 FO EXTERIOR FLAT GIRDER TRUSS A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 (4) 12d TRUSS 2411 O.C. UPLIFT CONNECTION (SEE ROOF TRUSS) EXTERIOR FLAT GIRDER 12 VARIES (4) 12d MAX 3011(21-611) 2x6 #2 SP (Both Faces) 2411 O.C. . SIMPSON H5 FEBRUARY 17, 2017 STANDARD REPAIR DETAIL FOR BROKEN CHORDS, WEBS, AND STDTL15 DAMAGED OR MISSING CHORD SPLICE PLATES ! A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409A010 TOTAL NUMBER OF NAILS EACH SIDE OF BREAK * X (INCHES) MAXIMUM FORCE (LBS) 15% LOAD DURATION SP OF SPF HF ----2X4— 20 -- 2X6 30 —2X4— 1706 —2X6— 2559 --1X4— 1561 —2X6- - -2X4— —2X6— —2X4— —2X6 24' 2342 1320 1980 1352 2028 26 39 30' 2194 3291 20D7 3011 1697 2546 1738 2608 32 48 36' 2681 4022 2454 3681 2074 3111 2125 3187 38 57 42' 3169 4754 2900 4350 2451 3677 2511 3767 44 66 48' 3657 5485 330 5019 2829 4243 2898 4347 • DIVIDE EQUALLY FRONT ANO BACK ATTACH 2X_ SCAB OF THE SAME SIZE AND GRADE AS THE BROKEN MEMBER TO EACH FACE OF THE TRUSS ( CENTER ON BREAK OR SPLICE) WITH 10d NAILS (TWO ROWS FOR 2X4, THREE ROWS FOR 2X6) SPACED 4' O.C. AS SHOWN (131' DIA. X 3'). STAGGER NAIL SPACING FROM FRONT FACE AND BACK FACE FOR A NET 2' O.C. SPACING IN THE MAIN MEMBER. USE A MIN. 3' MEMBER ENO DISTANCE. THE LENGTH OF THE BREAK (C) SHALL NOT EXCEED 12'. (C=PLATE LENGTH FOR SPLICE REPAIRS) THE MINIMUM OVERALL SCAB LENGTH REQUIRED (L) IS CALCULATED AS FOLLOWS: L = (2) X + C X BREAK 110jd�NAILS NEAR SIDE 104 +10d NAILS FAR SIDE X' MIN 6' MIN TRUSS CONFIGURATION AND BREAK LOCATIONS FOR ILLUSTRATIONS ONLY THE LOCATION OF THE BREAK MUST BE GREATER THAN OR EQUAL TO THE REQUIRED X DIMENSION FROM ANY PERIMETER BREAK OR HEEL JOINT AND A MINIMUM OF 6' FROM ANY INTERIOR JOINT (SEE SKETCH ABOVE). DO NOT USE REPAIR FOR JOINT SPLICES NOTES: 1. THIS REPAIR DETAIL IS TO BE USED ONLY FOR THE APPLICATION SHOWN. THIS REPAIR DOES NOT IMPLY THAT THE REMAINING PORTION OF THE TRUSS IS UNDAMAGED. THE ENTIRE TRUSS SHALL BE INSPECTED TO VERIFY THAT NO FURTHER REPAIRS ARE REQUIRED. WHEN THE REQUIRED REPAIRS ARE PROPERLY APPLIED, THE TRUSS WILL BE CAPABLE OF SUPPORTING THE LOADS INOICATED. 2. ALL MEMBERS MUST BE RETURNED TO THEIR ORIGINAL POSITIONS BEFORE APPLYING REPAIR AND HELD IN PLACE DURING APPLICATION OF REPAIR. 3. THE ENO DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 4. WHEN NAILING THE SCABS, THE USE OF A BACKUP WEIGHT IS RECOMMENDED TO AVOID LOOSENING OF THE CONNECTOR PLATES AT THE JOINTS OR SPLICES. S. THIS REPAIR IS TO BE USED FOR SINGLE PLY TRUSSES IN THE 2X_ ORIENTATION ONLY. E. THIS REPAIR 15 LIMITED TO TRUSSES WITH NO MORE THAN THREE BROKEN MEMBERS. FEBRUARY17,2017 1 SCAB APPLIED OVERHANGS I STDTL16 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34945 772-409-1010 TRUSS CRITERIA: LOADING: 40-I0-0-10 DURATION FACTOR: 115 SPACING: 24' O.C. TOP CHORD: 2X4 OR 2X5 PITCH: 4/12 - 12/12 HEEL HEIGHT: STANDARD HEEL UP TO 12' ENERGY HEEL END BEARING CONDITION NOTES: 1. ATTACH 2X--SCAB (MINIMUM N2 GRADE SPF, HF, SP, OF) TO ONE FACE OF TRUSS WITH TWO ROWS OF IOd COMMON WIRE NAILS (148' DIA. X 3') SPACED 6' D.C. 2. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 3. WHEN NAILING THE SCABS, THE USE OF A BACKUP WEIGHT IS RECOMMENDED TO AVOID LOOSENING OF THE CONNECTOR PLATES AT THE JOINTS OR SPLICES. 2X SC NOTE: TRUSS BUILT WITHOUT AN OVERHANG. THIS DETAIL IS NOT TO BE USED WHEN OVERHANG HAS BEEN BROKEN OFF. Ifila i4lum THIS DETAIL TO BE USED ONLY WITH TRUSSES (SPANS LESS THAN 400 SPACED 24' Or. MAXIMUM AND HAVING PITCHES BETWEEN 4/12 AND 12/12 AND TOTAL TOP CHORD LOADS NOT EXCEEDING 50 PSF. TRUSSES NOT FITTING THESE CRITERIA SHOULD BE EXAMINED INDIVIDUALLY.