Loading...
HomeMy WebLinkAboutMISC LETTERSPLANNING AND DEVELOPMENT SERVICES DEPARTMENT Building & Code ST. LUCIE COUNTY November 19, 2019 BOARD OF COUNTY COMIv=ONERS Caleb Holden AnnaMarie Hayes SC UNDA BARTZ 201 Rosewood Dr. By tlJ By CHAIR Ft. Pierce, FL 34947 St• " DISTRICT 3 CnI^' RE: Parcel ID.: 1418-214-0015-000-1 CATHY TOWNSEND Dear Mr. Holden: VICE CHAIR DISTRICT 5 The above referenced parcel has a zoning designation of AR-1 (Agriculture- Residential -1 du/ac) and a future Land Use Classification of RU (Residential- Urban, 5 du /ac). CHRIS DZADOVSKY DISTRICT 1 The above parcel is nonconforming because it does not meet the required road frontage of 30 feet. Frontage is defined in the St. Lucie County Land development Code (LDC) as "the length of a lot that fronts on a public street or that fronts on a private street having been SEAN MITCHELL constructed in conformance with the St. Lucie County Standard Specifications for Public DISTRICT 2 Works Construction." In order for a parcel to be considered a nonconforming lot of record and thereby qualify for a waiver of these requirements, it must exist in separate ownership FRANNIE and not be contiguous to other lots in the same ownership prior to July 1, 1984 pursuant to HUTCHINSON Section 10.00.04, Land Development Code (LDC). DISTRICT 4 Pursuant to the research of county records, it has been determined that the property was not contiguous to other lots in the same ownership prior to July 1, 1984. Accordingly, this parcel HOWARD TIPTON is considered a non -conforming lot of record. As a result the road frontage requirements is COUNTY ADMINISTRATOR hereby waived. A single family home may be constructed upon this property subject to meeting all applicable local, state and federal codes. The AR-1 setbacks are as follows: 50 foot front, 20 foot sides and a 30 foot rear, with a maximum lot coverage of 20%. DAN MUNTYR6 COUNTY ATTORNEY A recorded easement providing access to your property from the closest public road will be required at the time of submission of your building permit application. MAILING ADDRESS 2300 VIRGINIA AVENUE Please contact the health department regarding well and/or septic at (772) 873-4903 to ensure FORT PIERCE, FL 34982 that their requirements can be satisfied prior to applying for a building permit for the subject PHONE property. In addition, you will need to contact the Environment Resources Division at (772) (772) 462-1553 462-2526 prior to any removal of vegetation. TDD If you have any questions regarding the above determination, please don't hesitate to contact (772) 462-1428 the undersigned. FAX Respectfully, ,J (772) 462-1578 )AbC.. I/( —tiL I NJ W"- " Melissa Brubaker E-MAIL Zoning & Permitting Supervisor PERMITS@STLUCIECO.ORG Building and Code Regulation (772)462-1558 WEBSITE Brubakerm@stlucieco.org W W W.STLUCIECO.GOV Dave Golden Homes, Inca SCANNED SY License No. CBC1253198 .St. Lucie Countv 4900 Indrio Road Ft. Pierce, FL 34951 Office (772) 466-0829 THIS AGREEMENT made the 271h day of August, 2019 by and between Dave Golden Homes, Inc., hereinafter called the Contractor, and Anna Hayes and Caleb Holden, 201 Rosewood Drive, Fort Pierce, FL. 34947 hereinafter called the Owner. Witnesseth, that the Contractor and the Owner for the considerations named agree as follows: Article 1. Scope of the Work The Contractor shall furnish all of the materials and perform all of the work shown on the Drawings and/or described in the Specifications entitled Exhibit A, as annexed hereto as it pertains to work to be performed on property at: Legal Description: Tax ID—141821400150001 - Tree Top Trail, Fort Pierce, FL 34951 Article 2. Time of Completion The work to be performed under this Contract shall be commenced after bank closing and permits received and shall be completed on or before six months from date of receiving permit. The following constitutes substantial commencement of work pursuant to this proposal and contract: Engineering / Permitting / Plans Article 3. The Contract Price The Owner shall pay the Contractor for the material and labor to be performed under the Contract the sum of Two Hundred Eighty Five Thousand Dollars ($285,000.00), subject to additions and deductions pursuant to authorized change orders. Article 4. Progress Payments Payments of the Contract Price shall be paid in the manner following: 10% Down at bank closing; Balance per bank scheduled draws. Article 5. General Provisions Any alteration or deviation from the above specifications, including but not limited to any such alteration or deviation involving additional material and/or labor costs, will be executed only upon a written order for same, signed by Owner and Contractor, and if there is any charge for such alteration or deviation, the additional charge will be added to the contract price of this contract. W// Page 2 If payment is not made when due, Contractor may suspend work on the job until such time as all payments due have been made. A failure to make payment for a period in excess of 7 days from the due date of the payment shall be deemed a material breach of this contract. In addition, the following general provisions apply: 1. All work shall be completed in a workman -like manner and in compliance with all building codes and other applicable laws. 2. To the extent required by law all work shall be performed by individuals duly licensed and authorized by law to perform said work. 3. Contractor may at its discretion engage subcontractors to perform work hereunder, provided Contractor shall fully pay said subcontractor and in all instances remain responsible for the proper completion of this Contract. 4. Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due. 5. All change orders shall be in writing and signed both by Owner and Contractor, and shall be incorporated in, and become a part of the contract. 6. Contractor warrants it is adequately insured for injury to its employees and other incurring loss or injury as a result of the acts of Contractor or its employees or subcontractors. 7. Contractor shall, at his own expense, obtain all permits necessary for the work to be performed. 8. Contractor agrees to remove all debris and leave the premises in broom clean condition. 9. In the event Owner shall fail to pay any periodic or installment payment due hereunder, Contractor may cease work without breach pending payment or resolution of any dispute. 10. All disputes hereunder shall be resolved by binding arbitration in accordance with rules of the American Arbitration Association. 11. Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty or general unavailability of materials. 12. Contractor warrants all work for a period of 12 months following completion. Article 6. Additional Terms See Spec Sheet Attached Signed this ��_ day of !/ v "�• By: Anna Hayes By: Caleb Holden 4900 Indrio Road Ft. Pierce, FL 34951 (772) 466-0829 License No. CBC1253198