DESCRIPTION OF JOB:
BOAT UFT
WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR:
A. BOAT LIFT
1. FURNISH AND INSTALL 1 PC 9,000 LB. CAPACITY GEAR DRIVE MODEL BOAT LIFT BY HI TIDE
2. UP TO 4 PCS OF 10" X UP TO 25' TtMBER SUPPORT PILING INCLUDED
3. INCLUDED OPTIONS: REMOTE CONTROL, LIMIT SWITCH, ALUMINUM BUNKS AND PILE WRAP
4. ALL PILINGS TO BE FINAL HAMMER DRIVEN TO PROPER CAPACITIES
• IF LONGER PILES ARE NEEDED
COST: $10,700.00
'PRICE DOES NOT INCLUDED ELECTRICAL SUPPLY TO LIFT (MUST BE COMPLETE BY A LICENSED ELECTRICAL CONTRACTOR PER CODE)
A SUB FORSUCH CAN BE PROVIDED 'LIGHTS WILL BE INSTALLED WITH ELECTRICIAN -T.B.D.
FURNISH AND INSTALL 4' X 1T FINGER PIER TO MATCH EXISTING DOCK WITH 2 PCS. ROPE WITH CLIPS FOR BOAT ENTRY
( PILES LEFT MUCH HIGHER ABOVE DECK FOR ROOF SUPPORT IN FUTURE)
COST: $4,200.00
C.uFURNISH AND INSTALL 1 PC. SPINNER LIFT ON EXISTING PILE
l.d COST: $5,750.00
NOTES:
1. WILCO CONSTRUCTION CARRIES U.S.L & H WORKERS COMPENSATION INSURANCEAS PER FEDERAL REGULATIONS FOR
MARINE CONSTRUCTION
2. ACCESS FOR EQUIPMENT, MATERIALS, AND CREW REQUIRED
3. PERMITS, PLANS, ENGINEERING AND ALL ASSOCIATED COSTS APPLIED OR OBTAINED BY WILCO CONSTRUCTION INC. WILL BE
PAID BY THE CUSTOMER AS AN EXTRA COST , ) OWNER TO GET HOA APPROVAL PRIOR TO PERMITTING
4. EXCLUDED (UNLESS SPECIFIED ABOVE): ELECTRIC, PLUMBING, ROCK AND/OR HARD SUBSTRATE CUTTING, TRENCHING OR
PUNCHING COSTS (IF REQUIRED), ADDITIONAL DOCK WORK/REPAIRS, DREDGING, AND/OR ANY WORK BEYOND BOAT
LIFT INSTALLATION AND OR ANY ADDITIONAL WORK BEYOND STATED ABOVE
5. PRICES BASED ON EQUIPMENT IN THE AREA AND LIFT INSTALLED WITH DOCK EXT.
6. STANDARD BUNKS AND GUIDE POLES INCLUDED ( SPECIALIZED OR ADDITIONAL IF REQUIRED TO BE EXTRA)
7. PRICE BASED ON EQUIPMENT WITHIN THE IMMEDIATE AREA ( BARGE WORKING WITHIN THE COMMUNITY OR "PASSING BY')
PAYMdTS AS FOLLOWS: 5% OF CONTRACT UPON SIGNING, 30% OF CONTRACT WKS.+/-PRIOR TO INSTALLATION (LIFT ORDERED),
30% 09 ONTRACT UPON PILINGS IN PLACE, 30% OF CONTRACT UPON LIFT IN PLACE AND BALANCE UPON ISSUANCE OF KEYS/CONTROLS
DATE: AUI Kw
8/9/2019 V
iIS PR OSALICONTRACTAND UNDERSTAND ITS TERMS AND CONDITIONS;
OF THI ORM. WILCO IS AUTHORIZED TO DO THE WORK SPECIFIED IN THE
ABOVE. ALL INVOICES ARE PART OF THIS PROPOS
DATE; SIGNATUR
SIGNATURE
RON EVERLY