Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BUILDING PERMIT CHECKLIST
BOARD OF PLANNING & DEVELOPMENT COUNTY COUNTY SERVICES DEPARTMENT COMMISSIONERS F L • R I. A Building & Code Regulation CHECKLIST FOR RESIDENTIAL/COMMERCIAL BUILDING PERMIT Proiect Location: I;y�`I'5© W1 L1I o.n r- 4 Date: Permit Number: Technician: Required Documents: SCANNED BY St. Lucie County Application completely filled out with Notarized Signatures ............................ Yes\ No — N/A -Sub Agreements with Notarized Signatures (prior to issuance) ........................... YesN No _ N/A Owner / Builder Affidavit (signed in office) ................................................. Yes_. No_ N/A\4 Filled Land Affidavit (prior to issuance) ................................................... Yes \`No _ N/A_ Recorded Warranty Deed, if applicable......................................................Yes_No N/AN Recorded Notice of Commencement (prior to issuance or inspection) ................. Yes_No",► N/A Utility Agreement or Payment Receipt (prior to issuance) ................................. Yes _No V N/A Vegetation Removal Application with copy of survey ..................................... Yes_ No _ N/A_ Plans. Calculations &_Attachments (3 copies commercial, 2 copies residential) - No -N/A Complete set of plans with Engineer / Architect Raised S61........................... Yes — No -N/A -Truss Plans reviewed and approved by Engineer / Architect ............................ Yes — No -N/A -Landscaping and Parking plan (under 6,000 sgft)......................................... Yes —No — N/A Approved Site Plans........................................................................... Yes — No -N/A -Sealed Survey with Dimensions, Finished floor ........................................... Yes — Elevations and Setbacks.............................................................. Yes No N/A Plot plan with Setbacks............................................................... Yes —No — N/A Health Department approval stamped on survey and floor plan ........................ Yes_No_N/A_ Health Department Food Establishment Permit stamped on floor plan ................ Yes — No -N/A -Manual "J" or Manual "N" Calculations.................................................... Yes _ N/A_ —No Signed Energy Calculations (1 set original signatures & signed in 2 spots) ........... .Yes_No_N/A_ Sealed Wind Load Compliance Certification ............................................... Yes_No_N/A_ Product Review Affidavit..................................................................... Yes — No -N/A - Excavating a pond for fill: Site plan showing 25-foot(minimum) set back from all property boundaries, size, Yes_ No_ N/A_ shape, location and quantities of proposed excavation and fill areas Side slopes not to exceed 4 to 1 to a minimum of 3 feet below water level......... Yes_ No_ N/A. Depth of excavation does not exceed 12 feet in depth .................................... Yes_ No_ N/A_ If Hauling fill off site (excess of 100 cubic yards) you must have a mining permit Yes_ No_ N/A_ Other: Health Department Permit Paperwork....................................................... Yes_No_N/A_ CD for Fire Department if commercial or multi -family ................................... Yes_No_N/A_ DEP, SFWMD or Army Corp of Engineers (dock, seawall, SF on beach)............ Yes — No -N/A -Pool Barrier Affidavit.......................................................................... Yes_No_N/A_ Ground Sign Landscape Affidavit (signs) ................................................... Yes —No _ N/A_ Burn Rate for Sign Cabinets.................................................................. Yes_No_N/A_